HomeMy WebLinkAboutPleasure (2)CERTIFICATION OF EXEMPTION
-Y
FROM REQUIRING A CAMA PERMIT
as authorized by the State of North Carolina,
Department of Environment, Health, and Natural Resources and the Coastal Resources Commission
- r lin an area of environmental concern pursuant to 15 NCAC Subchapter 7K .0203.
flicant Name P-I a sal(AM H V� /P r�iry(�j �fiGi 111'�-d Phone Number W 21P r5'
cress '
A State Ave: Zip 9'
ject Locatio (County, State Road, Water Body, etc.) ' 1 2 of r ,,t r Crl UV AKt,
14. P T I A t'al V e f1JAA hl ; 4 bia r,10
and Dimensions of Project
proposed project to be located and constructed as described
ve is hereby certified as exempt from the CAMA permit re-
ement pursuant to 15 NCAC 7K .0203. This exemption to
AA permit requirements does not alleviate the necessity of
obtaining any other State, Federal, or Local authorization.
This certification of exemption from requiring a CAMA pE
valid for 90 days from the date of issuance. Following exp
a re-examination of the project and project site may be nec
to continue this certification.
;ETCH (SCALE:
Settic pqs tf b� 1YGLPu �t tit- Zl s1 iy�S la PO Vel
-5N I �/l a w'd K.
A Si t vt.�5 �' k 44 Cfpt 4-a S 0,11t 'dvt tAoYS
6t ►�1 G l {1 �G�fI y"l s ,Gt G l S l a '� /'-9 tti f l .s e- { (-i GC .
_ a -I
(cant Name
ess ) IT'
and Dimensio
CERTIFICATION OF EXEMPTION
FROM REQUIRING A CAMA PERMIT
as authorized by the State of North Carolina,
Department of Environment, Health, and Natural Resources and the Coastal Re ources Commission
in an area of environmental concern pursuant to 15 NCAC Subchapter 7K .020
11
State Road, Water Body, etc.)
iroposed project to be located and constructed as described
e is hereby certified as exempt from the CAMA permit re-
ment pursuant to 15 NCAC 7K .020'This exemption to
A permit requirements does not alle late the necessity of
obtaining any other State, Federal, or Local authorization.
Phone Number 5
State ,fff- Zip
This certification of exemption from requiring a CAMA per
valid for 90 days from the date of issuance. Following expir
a re-examination of the project and project site may be nece
to continue this certification.
=TCH (SCALE:
$S�'C,ti � r►.s Df b>ti! �G�.eard �,t- 2l �- �� i nS�f lit ��, 22
,eN,i n5u&, NVe- 2OD Tea�Woaj AW l fit- 9,10red
WS-i m p l k Ao f 4-. avt j{ys wik S ,
k Amy W\1 C-A UnS A444SI be am-med 1� ma's D� cc
a4 q1V IqU 7-ti23.