Loading...
HomeMy WebLinkAboutJoynerCERTIFICATION OF EXEMPTION FROM REQUIRING A CAMA PERMIT as authorized by the State of North Carolina, Department of Environment, Health, and Natural Resources and the Coastal Resources Commission y in an area of environmental concern pursuant to 15 NCAC Subchapter 7K .0203. , / 0licant Name , O l l U V1 11 /v � I (04.101- •l Phone Number 1 C. '7 7Vi4 Dress tate ,� Zip � )ject Location (County, State Road, Water Body, etc.) A-1 r t Nt% l i i 7J A CT Ili t? (- ,71r7%4. )e and Dimensions of Project proposed project to be located and constructed as described )ve is hereby certified as exempt from the CAMA permit re- 'ement pursuant to 15 NCAC 7K .0203. This exemption to MA permit requirements does not alleviate the necessity of r obtaining any other State, Federal, or Local authorization. This certification of exemption from requiring a CAMA pi valid for 90 days from the date of issuance. Following exp a re-examination of the project and project site may be nec to continue this certification. (ETCH (SCALE: AWij, AA Od (f] (at--h OKS 14-4At Ji ►"�> t) (o - E , i .ars, Courtney n: Deborah Conard < portcityexecutive@charter. net> t: Tuesday, June 13, 2017 3:50 PM Spears, Courtney carolinamarineconstruction@charter.net ject: Joyner Marina ichments: GoogleEarth_Image.jpg d afternoon Courtney, Attached is the drawing for our site visit at ier Marina to look at the storm damage. We are proposing to remove the existing ramp and 5'x16' cantilevered it is attached to. A new band board and associated decking will be replaced at the ramps attachment point to are a secure fit. A new 4'x35' aluminum ADA ramp will be installed. The existing ramp is currently resting on for Jeck and held on with straps to allow for temporary access of staff. It was ripped off during the storm. Please le N if you need anything else. I apologize for bombarding you with all of this information today..it is the 1st office had in almost a month. I do appreciate your help. iks again , Mike. 1% JN