HomeMy WebLinkAboutJoynerCERTIFICATION OF EXEMPTION
FROM REQUIRING A CAMA PERMIT
as authorized by the State of North Carolina,
Department of Environment, Health, and Natural Resources and the Coastal Resources Commission
y in an area of environmental concern pursuant to 15 NCAC Subchapter 7K .0203. , /
0licant Name , O l l U V1 11 /v � I (04.101- •l Phone Number 1 C. '7 7Vi4
Dress
tate ,� Zip �
)ject Location (County, State Road, Water Body, etc.) A-1
r t Nt% l i i 7J A CT Ili t? (- ,71r7%4.
)e and Dimensions of Project
proposed project to be located and constructed as described
)ve is hereby certified as exempt from the CAMA permit re-
'ement pursuant to 15 NCAC 7K .0203. This exemption to
MA permit requirements does not alleviate the necessity of
r obtaining any other State, Federal, or Local authorization.
This certification of exemption from requiring a CAMA pi
valid for 90 days from the date of issuance. Following exp
a re-examination of the project and project site may be nec
to continue this certification.
(ETCH (SCALE:
AWij, AA Od (f] (at--h OKS 14-4At Ji ►"�> t) (o -
E ,
i
.ars, Courtney
n: Deborah Conard < portcityexecutive@charter. net>
t: Tuesday, June 13, 2017 3:50 PM
Spears, Courtney
carolinamarineconstruction@charter.net
ject: Joyner Marina
ichments: GoogleEarth_Image.jpg
d afternoon Courtney, Attached is the drawing for our site visit at
ier Marina to look at the storm damage. We are proposing to remove the existing ramp and 5'x16' cantilevered
it is attached to. A new band board and associated decking will be replaced at the ramps attachment point to
are a secure fit. A new 4'x35' aluminum ADA ramp will be installed. The existing ramp is currently resting on for
Jeck and held on with straps to allow for temporary access of staff. It was ripped off during the storm. Please le
N if you need anything else. I apologize for bombarding you with all of this information today..it is the 1st office
had in almost a month. I do appreciate your help.
iks again , Mike.