Loading...
HomeMy WebLinkAbout67102D - MerrillJCAMA / ,❑ DREDGE & FILL LV O J�/l � �.' ' Il A B 3ENERAL .PERMIT Previous permit # .lNew ❑Modificatibn ❑Complete Reissue El Partial Reissue Date previous permit issued sized by the State of North Carolina, Department of Environment and Natural Resources Zoastal Resources Commission in an area of environmental concern pursuant to 15A NCAC ❑Rules attached. it Name �),C� /�' -; (I C�6 3�r� C Project Location: County�.) Clrr`,., _ Fi,l :LS(4V J State ;JC ZIP 10�_ t (51u) i 2 E-Mail Eed Agent Cj�1 IA�Cr� ❑ CW (EW PTA VES ❑ PTS ❑ OEA ❑ HHF ❑ IH ❑ UBA ❑ H/A ❑ PINS: i1 �— )ck) length latform(s) _ Platform(s) =ngth % ember id/ Riprap length L66 ,g distance offshore ax distance offshore J_ :hannel ibic yards mp use/ Boatlift 3ulldozing Z a ne Length t U(x) not sure 4yesnomum: n/a Attached: Street Address/ State Road/ Lot #(s) Subdivision AJ Jn City ,_m_ ZIP ' Phone # ( ) River Basin Lo Adj. Wtr. Body Fri )'sue C , in%-4(at\/ Closest Maj. Wtr. Body (Scale: 1 ling permit may be required by: 1 ` p �o �C (ANC. c� ❑ See note on back regarding River Basin Local Planning jurisdiction) AGENT AUTHORIZATION FOR CAMA PERMIT APPLICATION Name of Property Owner Requesting Permit: dAe� Mailing Address: 0 xfo' - o? d 9��' a 7a4,i Phone Number: 'CFO - `; 34 - -7p(f Email Address: certify that I have authorized��--�, Agent / Contractor to act on my behalf, for the purpose of applying for and obtaining all CAMA permits necessary for the following proposed development: �,� C"J at my property located at in RWAO %/t.4 Xounty. I furthermore certify that I am authorized to grant, and do in fact grant permission to Division of Coastal Management staff, the Local Permit Officer and their agents to enter on the aforementioned lands in connection with evaluating information related to this permit application. Property Owner Information: "4z Signature Print or Type Name Title CERTIFIED MAIL • RETURN RECEIPT REQUESTED DIVISION OF COASTAL MANAGEMENT ADJACENT RIPARIAN PROPERTY OWNER NOTIFICATION/WAIVER FORM Name of Property Owner: Address of Property: .fo? —2 1.,vz ,Z;w Agent's Name #: Agent's phone #: �i.6,c (Lot or Street #, Street or Road, City & County) Mailing Address: I hereby certify that I own property adjacent to the above referenced property. The individual applying for this permit has described to me as shown on the attached drawing the development they are proposing. A description or drawing. with dimensions must be provided with this letter. J I have no objections to this proposal. I have objections to this proposal. If you have objections to what is being proposed, you must notify the Division of Coastal Management (DCM) in writing within 10 days of receipt of this notice. Correspondence should be mailed to 127 Cardinal Drive Ext., Wilmington, NC, 28405-3845. DCM representatives can also be contacted at (910) 796-7215, No response is considered the same as no objection if you have been notified by Certified Mai! WAIVER SECTION I understand that a pier, dock, mooring pilings, breakwater, boathouse, lift, or groin must be set back a minimum distance of 15' from my area of riparian access unless waived by me. (If you wish to waive the setback, you must initial the appropriate blank below.) . I do wish to waive the 15' setback requirement. I do not wish to waive the 15' setback requirement. (Property Owner Information) Signature Print or Type Name 6c,;r Mailing Address (Adjacent Property Owner Information) Signature Print or Type Name / 1 % Mailing Address ADJACENT RIPARIAN PROPERTY OWNER STATEMENT I hereby certify that I own property adjacent to s property located at 7 (Name of Property Owner) on,�jis C'jr�s�,C (Address, Lot, Block, Road, etc.) in x,tr I, {V•C• (Waterbody) (City/Town an r County) The applicant has described to me, as shown below, the development proposed at the above loca I have no objection to this proposal. I have objections to this proposal. DESCRIPTION AND/OR DRAWING OF PROPOSED DEVELOPMENT (Individual proposing development must fill in description below or attach a site drawing WAIVER SECTION i understand that a pier, dock, mooring pilings, breakwater, boathouse, lift, or groin must be set bac minimum distance of 15' from my area of riparian access unless waived by me. (If you wish to ws the setback, you must initial the appropriate blank below.) I do wish to waive the 15' setback requirement. I do not wish to waive the 15' setback requirement. (Property Owner Infonnation) (Adjacent Property Owner Information) � 1 c_ Signature Signature ` 1��� Sf e '< ✓, Pint or Ty e Name Print or T pe Name o , ,� /=T�f mil„ c h dn� Mallon dr/,frenn w SECTION .1700 - GENERAL PERMIT FOR EMERGENCY WORK REQUIRING A CAMA AND/OR A DREDGE AND FILL PERMIT 154 NCAC 07H .1701 PURPOSE This permit allows work necessary to protect property and/or prevent further damage to property caused by a sudden or unexpected natural event or structural failure which imminently endangers life or structure. For the purposes of this general permit, major storms such as hurricanes, northeasters or southwesters may be considered a sudden unexpected natural event although such storms may be predicted and publicized in advance. History Mote: Authority G.S. 113-229(cl); 113A-107(a),(b); 113.4-113(b); 113.4-118.1: Eff. November 1, 1985. 15A NCAC 07H .1702 APPROVAL PROCEDURES (a) Any person wishing to undertake development in an area of environmental concern necessary to protect life or endangered structures will notify the Division of Coastal Management or Local Permit Office (LPO) when a possible emergency situation exists. (b) The applicant may qualify for approval of work described in this permit after an onsite inspection by the LPO or Division of Coastal Management Field Consultant and upon his findings that the proposed emergency work requires a CAMA and/or Dredge and Fill permit. The LPO shall issue the permit if the required emergency measures constitute minor development. (c) Once the LPO or Consultant determines that the applicant's proposed project may qualify for an emergency permit, he shall consult with the applicant and assist him in preparing an application. The applicant shall include a sketch showing existing conditions and the proposed work. (d) The applicant for an emergency permit must take all reasonable steps to notify adjacent riparian landowners of the application, and prior to receiving a permit will certify by signing the permit the following: (1) that a copy of the application and sketch has been served on all adjacent riparian landowners, or if service of a copy was not feasible, that the applicant has explained the project to all adjacent riparian landowners; (2) that the applicant has explained to all adjacent riparian landowners that they have a right to oppose the issuance of a permit by filing objections with the local CAMA permit officer or with the Secretary of the Department of Environment, Health, and Natural Resources; (3) that, as to adjacent riparian landowners not contacted, the applicant has made a reasonable attempt to contact them and furnish them with the required information. (e) All work authorized by this general permit will cease after thirty days from the date of issuance. History Note: Authority G.S. 113-229(cl); 113A-107(a),(b); 113.4-113(b); 113A-118.1; Eff. November 1, 1985; Amended Eff. May 1, 1990. 15A NCAC 07H .1703 PERMIT FEE The agency shall not charge a fee for permitting work necessary to respond to emergency situations except in the rase when a temporary erosion control structure is used. In those cases, the applicant shall pay a permit fee of four hundred dollars ($400.00) by check or money order made payable to the Department. History Note: Authority,- G.S. 113-229(cl); 113A-107(a), (b); 113A-113(b); 113A-118.1; 113A-119; Eff`. November 1, 1985; Amended Eff' September 1, 2006; August 1, 2002; March 1, 1991; October 1, 199. 15A NCAC 07H .1704 GENERAL CONDITIONS (a) Work nermitted by means of an emergency general permit shall be subject to the following limitations: to five years if they are protecting a bridge or a road. The property owner shall be responsible for removal of the temporary structure within 30 days of the end of the allowable time period. (7) Temporary sandbag erosion control structures may remain in place for up to eight years from the date of approval if they are located in a community that is actively pursuing a beach nourishment project, or if they are located in an Inlet Hazard Area adjacent to an inlet for which a community is actively pursuing an inlet relocation or stabilization project in accordance -with G.S. 113A-115.1 For purposes of this Rule, a community is considered to be actively pursuing a beach nourishment, inlet relocation or stabilization project if it has: (A) an active CAMA permit, where necessary, approving such project; or (B) been identified by a U.S. Army Corps of Engineers' Beach Nourishment Reconnaissance Study, General Reevaluation Report, Coastal Storm Damage Reduction Study, or an ongoing feasibility study by the U.S. Army Corps of Engineers and a commitment of local or federal money, when necessary; or (C) received a favorable economic evaluation report on a federal project; or (D) is in the planning stages of a project designed by the U.S. Army Corps of Engineers or persons meeting applicable State occupational licensing requirements and initiated by a local government or community with a commitment of local or state funds to construct the project and the identification of the financial resources or funding bases necessary to fund the beach nourishment, inlet relocation or stabilization project. If beach nourishment, inlet relocation or stabilization is rejected by the sponsoring agency or community, or ceases to be actively planned for a section of shoreline, the time extension is void for that section of beach or community and existing sandbags are subject to all applicable time limits set forth in Subparagraph (6) of this Paragraph. (8) Once the temporary erosion control structure is determined by the Division of Coastal Management to be unnecessary due to relocation or removal of the threatened structure, a storm protection project constructed by the U.S. Army Corps of Engineers, a large scale beach nourishment project, an inlet relocation or stabilization project, it shall be removed by the permittee within 30 days of official notification by the Division of Coastal Management regardless of the time limit placed on the temporary erosion control structure. (9) Removal of temporary erosion control structures is not required if they are covered by dunes with stable and natural vegetation. (10) The property owner shall be responsible for the removal of remnants of all portions of any damaged temporary erosion control structure. (11) Sandbags used to construct temporary erosion control structures shall be tan in color and 3 to 5 feet wide and 7 to 15 feet long when measured flat. Base width of the structure shall not exceed 20 feet, and the height shall not exceed 6 feet. (12) Soldier pilings and other types of devices to anchor sandbags shall not be allowed. (13) Excavation below mean high water in the Ocean Hazard AEC may be allowed to obtain material to fill sandbags used for emergency protection. (14) An imminently threatened structure may be protected only once regardless of ownership, unless the threatened structure is located in a community that is actively pursuing a beach nourishment -project, or in an Inlet Hazard Area and in a community that is actively pursuing an inlet relocation or stabilization project in accordance with Subparagraph (7). Existing temporary erosion control structures may be eligible for an additional eight year permit extension provided that the structure being protected is still imminently threatened, the temporary erosion control structure is in compliance with requirements of this Subparagraph and the community in which it is located is actively pursuing a beach nourishment, an inlet relocation or stabilization project in accordance with Subparagraph (7) of this Paragraph. In the case of a building, a temporary erosion control structure may be extended, or new segments constructed, if additional areas of the building become imminently threatened. Where temporary structures are installed or extended incrementally, the time period for removal under Subparagraph (6) or (7) shall begin at the time the initial erosion control structure is installed. For the purpose of this Rule: (A) a building and septic system shall be considered as separate structures. (B) a road or highway shall be allowed to be incrementally protected as sections become ANML- M/CKEY MICKEY TRUCK BODIES INC 777(/�CX BAOVES 1305 Trinity Avenue • P.O. Box 2044 • High Point, NC 27261 Family owned and operated since 1904 H. Dean Sink PRESIDENT & CEO 1-800-334-9061 336-882-6806 336-882-6856 (Ext.3208) (Ext.3208) www.mickeybody.com Email: dsink@mickeybody.com BLUE WATER POINT MARII 57th PI. W. Beach Dr. Oak Island, NC 28465 Capt. Sid Merrill United States Coast Guard License GENERAL MANAGER Marina a Motel • Restaurant Phone: (910) 278-1230 Fax: (910) 278- Cell: (336) 908-3793 smerrillidimickeybody