Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
66299D - Ludlum
/v JCAMA / ❑ DREDGE & FILL q GENERAL PERMIT Previous permit # flew ❑Modification ❑Complete Reissue ❑Partial Reissue Date previous permit issued >rized by the State of North Carolina, Department of Environment and Natural Resources Coastal Resources Commission in an area of environmental concern pursuant to 15A NCAC ! 9 Rules attached. nt Name i '�`1 Project Location: County > �O V t/✓ K.G.- Street Address/ State Road/ Lot #(s) f State NC ZIP 'v Gtr'Lt'` 0 (2 5� Sj �J ` 49`7E-Mail - _ Subdivision zed Agent /� �� City ✓ `t%' r ZIP_y ❑ CW V EW $PTA )MS ElPTS ElOEA �❑ HHF ❑ IH ❑ UBA ❑ N/A ❑ PWS: yes t-fir PNA -(�—Yes / no A Project/ Activity ock) length 'latform(s)` g Platform(s) ength umber , ad/ RlPrap length vg distance offshore , iax distance offshore .6nnel ubic rds imp wse/ Boatlik, Bulldozing ine Length —11� not sure yes;-- t_� I rium: n/a yes yes Attached: yes no ing permit may be required by: Local Planning jurisdiction) Phone # ( — River Basin AA Adj. Wtr. Body t/C�� ✓rl�� c(fiat Closest Maj. Wtr. Body SO1-1 lx'le k1k1a, (Scale: ❑ See note on back regarding River Basin NC Division of Coastal Mgt, Habitat impact Computer Sheet Applicant: Date: V Describe below the HABITAT disturbances for the application. All values should match the name, and units of measurement found in your Habitat code sheet. TOTAL Sq. Ft. FINAL Sq. Ft. TOTAL Feet FI (Applied for. (Anticipated final (Applied for. (Ai DISTURB TYPE Disturbance total disturbance. Disturbance di: Habitat Name Choose One includes any Excludes any total includes Ex anticipated restoration any anticipated re: restoration or and/ortemp restoration or ter ternimpacts) impact amount) ternim acts arr G i Dredge ❑ Fi Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ ' Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other 171 3/182016 3rz12016 John & Mary Richardson 3/182016 1 3/212016 Peter Mueller 3/18/2016 3/21/2016 Brenty & Sherrie Turner 3/18/2016 3/21/2016 JRW/RDW Inc _ __ __ 3/21/2016 3/242016 Charles Waiters, Jr. 3/21 /2016 3/24/2016. F & S Marine Contractors Inc _ 3/21/2016 3/24/2016 :F & S Marine Contractors Inc _ 3/21/2016 3/24/2016 F & S Marine Contractors Inc _ 3/22201613/24/2016 Town of Carolina Beach 31232016� 3/24/2016 Mike Gallant/ANA Builders Inc 3/23/2016 3/24/2016 Richard or Erica Penny 3/23/201613/24/2016 Antinori Construction Inc 3/24/2016 3/29/2016 Proper Building Group Inc _ 3/24/2016 3/29/2016Bradford Stevens _ 3/24/2016 3/29/2016 Rhonda Wootenlrown of Holden Beach _ 3/25/2016 3/29/2016 Mike Conard/Coastal Marine Construction Inc 3/25/2016 3/29/2016 Chris Conaway/Conaway Marine Construction 3/282016 3/29/2016 Rods Solid Construction 3282016 3/292016 Adam Knierim/Mardedt LLC 328/2016'3/292016 Adam Knierim/Maritech LLC 3282016 3/292016,Brandon Grimes/money order 3/2820163/292016 Jerry Ennett/Antinon Construction Inc same Edward Hathaway same Louise Mengel same Richard & Laura Fisher _ Dennis Farrell Dennis Farrell same _ _ Mo Afify _ same Ed Ball _ _ Ed Hill 4741 5025 $200.00 $200.00 GP 66367D Sf GP 66346D _ JC B of A B of A Wells Fargo 6740403431 $100.00 minor fee. Lot 4 Chestnut St. Ext NTB Ons _ JC First Bank 1026 $400.00 GP 66365D __ Sf 8125 _ $250.00 major fee, 9197 Schuyler Drive, Calabash BrCo Sf 5239 $200.00 GP 66372D _ RI 5194 _ $450.00 GP_ 66.371 D @$600 - . _ _ _ _ _ RI 51198, $150.00 RI 66194 $100.00 minor fee, CB 16-03 RI 7823' $100.00 minro fee, 9 Hunter Heath NTB Ons _JC 782 $200.00TGP 66370D - - JC 0 4163 $200.00'.GP 66307D JC 1829 $100.00 minor fee, Lot 4 Majestic Oaks, Hampstead PN JC 1037 $200.00 GP 64727D SI 28499 $400.00 GP 66360D SI 10169' $200.00'GP66380D _ JC _ BB &T PNC Bank PNC Bank PNC Bank BB &T TD Bank USAA Federal Savings Bank B of A First Citizens Bank _ NC SECU Isame BB &T I Michael McDaniel First Bank Georgia Rasmussen B of A 1223 $200.00 GP 66381 D HI Linda Piccirillo I CresCom Bank 15271 _ 8200.00 GP 66383D SI Steven Matthews 6 of A 2142 $250.00 major fee, 223 Florida Ave, CB NHCo @$400 RI Steven Matthews B of A 2143 $150.00 major fee, 223 Flodda Ave, CB NHCo @$400 RI Eric Cassidy IWells Fargo 17-335655485 $200. DOI GP 66391D JC 3292016 Jimmy North/Coastal Marine Piers Bulkheads LLC Gene Hodges Sterling Kenan Wells Fargo 3292016 _ Mark Clements/Clemenls Marine Construction Channel Walk & Shore Line HOA First Citizens Bank 3/30/2016 Nicholas Nixon III same - , Donnie Reid/Reid & Cook Builders LLC_ John & Jan Best - _ _ Jerry Ennett/Antinod Construction Inc_ _ Will Russell - Chris Gibson/TI Coastal Services Mallard Bay HOA Jerome & Joy Kay Timothy D. Cates Erick Olsen/Olsen Associates, Inc Village of BHI, Inc. _ Apnl and D. Page Wilson same _ _ _ S OuaintanceCarolina Bluewaler Construction Boyd & Becky Gasque Mike Conard/Coastal Manna Construction Inc James Thompson - Greg Holden/Holden Docks & Bulkheads Mark Hurley Mark Clements/Clements Marine Construction I Channel Walk & Shore Line HOA Catherine & Michael Barone _ same Stephen Conway/Southeastern Coastal _Const._Cc David & Patricia Johnson Mark Coley/Carolina Decocrete LLC Mark Coley David Purser/LPM Revenue Share LLC Rick and Kelly Earnhardt BB &T B of A _ B of A- Coming Federal Credit Union Branch Banking and Trust Wells Fargo iBank of -Oak Ridge BB &T First Bank CresCom Bank First Citizens Bank USAA Federal Savings Bank First Federal BB &T BB &T 3/30/2016 3/302016 3/302016 _3/302016 3/312018 3/312016 3/31/2016 3/31/2016 3/312016 4/120116 4112016 4"12 4/42016 4/4120161 Wiliam and Paula Wnght/Weston Lyall Jeff Holt _ Wellman's Construction Inc. Jeff Williamson Oyster Harbour Homeowner's Association, Inc. same Carolina Lifts Inc. via Lane Helms Ron Austin & Robert Canna Glenn & Nancy Evans Maritime Coastal Construction LLC Kenneth Lovett Simon List/SITECH Consulting PC Simon List Carolina Bluewater Construction Inc. Gordon Nash James Bonner/Bonner Law Firm same_____ Rick Bumgardner/AC&PMI _ Ron Cottle Easley Construction Michael Griffin William Hudson same Gran Ludlam/Sea View Fishino Pier LLC same of Bank 4165 $200.00 �GP 66297D JC 20793 $400.00 GP 66393D @$200 RI _ _ _ _ GP 66392D @$200 _ 4061 $250.00 major fee, 199 Driftwood Court, WB NHCo RI 4462 $400.00 major fee, 115 & 125 Hollis Lane, Wilm NHCo RI 1628 $100.00'minorfee, 409 S. Anderson Blvd_._, TB PN J[ 4164 $200.00GP66298D 755 _J[ $400.00 GP 66395D 5219 $200.00 GP 66396D _ - _ _J[ J[ 2218 _ _ $400.00 major fee, Row Boat Row, BHI BrCo HI 3207 ----__ VOW00 GP 66382D SI 9458 $200.00 GP 66387D SI 30047406 $200.00 GP 66512D RI 2521 $400.00 GP 66390D SI 4_068 $150.00 major fee, 199 Driftwood Court, WB NHCo@$400 RI - 4093 $200.00 GP 66397D J1 9819 $200.00 GP 66513D RI 1977 $200.00'GP66MD RI 1391 $200.00 GP 65116D H 1467 $100.00 minor fee, 9113 Ninth St. SurfCity Ons J[ 13820 $100.00 minor fee, end of 8th Ave., NTB Ons J[ 5399, $100.00 renewal fee, MP 50-09 Sl 19091 $100.00:minor fee, 108 Scotch Bonnet Circle NTB 9459 $200.00 GP 66384D Bank 1 2775 $200.00 I transfer and renewal fee, MP 38-08 PIN Marine Federal Credit Union GP 66515D CERTIFIED MAIL — RETURN RECEIPT REQUESTED DIVISION OF COASTAL MANAGEMENT ADJACENT RIPARIAN PROPERTY OWNER STATEMENT I hereby certify that I own property adjacent to 6 j . - J uA `t j m (Na e of Property Owner) property located at G2136t� t L a t ) (Lot, Block, Road, etc.) on C 1 ('gam << ,in N, (Waterbody) (Town and/or County) Applicant's phone #: & 5 a --5 5 - 0-7 3 Mailing Address: 1f) S LP c'&- L 9 R He/She has described to me as shown below the development he/she is proposing at th t location, and I have no objections to the ^� --------------------------------- Postal DESCRIPT] CERTIFIED MAILP Domestic Mail Only ,OPMENT: (Individual propos � ch a site drawing) Ln IP U S co x p Certified Mail Fee $3.45 .D $ A FAra Services & Fees (check box; add tee aS appro hate) y7py � ❑ Ratum Receipt (p» $ � C3 ❑ Retum Receipt (electroelectmnic) $ IIU.UUHere rk Postma t] ❑ Certified Mail Restricted Delivery $ ❑ Adult Signature Required $ El Adult Signature Restricted Delivery $ OR o Postage $0.93 03/09/2OI6 Is Total Postage and Fees C3 $4.38 a If you have objections to what i r within 10 days of receipt of this DCM representatives can also I (Pr erty Owner Information) CJ Signature Gye 7 Print or Ty e Name t(31 G-DL)-4k1> -16LaK"c Mailing Addre.qc lagement (DCM) in Yi ive Ext. Wilmington, ton I you ave been nott teby Certified Mail (Riparian Property Owner Information Sib ature �6C4,- 14 Ph2kecL Print or Type Name 9 t 70 5-,15 -fie, LA-iJ ADJACENT RIPARIAN PROPERTY OWNER STATEMENT I hereby certify that I own property adjacent to G&E(q L -,JA (y vy is (Nam4 of Property Owner) property located at f `b Gtrt�R iE. l.#t t,-)C (Lot, Block, Road, etc.) in O0 S.i0 LJ , N.C. (Waterbody) (Town and/or County) Applicant's phone #:9-159--6 e`i ` -0733 Mailing Address: l`©� u '`b L'A�"� He has described to me, as shown below, the development he is proposing at that location, and, I have no objections to his proposal. ----------------- DESCRIPTI n m - o , (Ta a U v m H c��c�mNTm ��� am IT m 0 OWm Ohio ov BCD �(DhII C-�O f2- Dt 0 N Ord+ -I. OO�tp� NFCo.. fl, t0 N 1] --- C2 3 r+ O CD -- CD Cb 3 �- i to CD— r ao 4 — (D Cb � C01j r-� CD -it O 0 \ N n u N � N �i O fA J n O W O u CO $I A Co Co .i CO 01 W (Information for Property Owner Applying for Permit) O 7 OV CD 0 CD 1.� _D 0 r+ -G CD r+ , ID N w K o v 0) C! _ -nZ Co OOl MD C) W CD ( r W (A C" -n NOCD;EM �! , 0) 0 x Cn 0) -) M Ln O IV r+ < 00Z,33 `O C7� O CD 0�1 O ----------------- UENT: (Riparian Property Owner Information) r-- Mailing Address Signature 1 140 CC7 p c y DIRECTIONS FOR OBTAINING A CAMA GENERAL PERMIT for a BULKHEAD To obtain authorization to construct a bulkhead, you must submit the following items to your CAMA Permit Officer: Signatures of no objection to the bulkhead, from all adjacent riparian property owners. rAy, Fill out the attached forms, complete with drawing of the proposed bulkhead, and have your neighbors sign and date in the appropriate place. If hand delivering, use the form attached labeled "Hand Deliver" QF If your neighbor will not sign the form, or lives out of town, you may send the, CERTIFIED MAIL/RETURN RECEIPT form, and 10 days after the date of receipt (which is listed on the green cards returned to you by the Post Office) the permit can be issued, even if no response has been received. 2. You must also include a drawing of the proposed bulkhead, which includes the following information: 00 Qgrl Your name and project address w ®' Names of adjacent property owners el N Width of property and name of the waterbody, and the approximate location of the proposed structure, noting that the exact location will be staked by a representative from the Division of Coastal Management. C�V- Any marsh grass border along the shoreline. Once you have this information you should contact your CAMA permit Officer and arrange an appointment to meet you on the property and evaluate the request. When you receive your permit, take it to your building inspector to obtain a building permit. This authorization is only valid for 120 days, contact your CAMA Permit Officer if for some reason you cannot complete the construction within this time period. The CAMA Permit Officer will inspect the completed bulkhead to assure compliance with the submitted drawing and all conditions of the permit. SECTION .1100 - GENERAL PERMIT FOR CONSTRUCTION OF BULKHEADS kNrD RIPRAP REVETMENTS FOR SHORELINE PROTECTION IN ESTUARINE AND PUBLIC TRUST WATERS AND OCEAN HAZARD AREAS 15A NCAC 07H .1101 PURPOSE A permit under this Section shall allow the construction of bulkheads and riprap revetments for shoreline protection in the public'trust waters and estuarine waters AECs according to authority provided in Subchapter 07J .1100 and according to the Rules in this Section. This permit shall not apply to shoreline protection along the oceanfront or to waters and shorelines adjacent to the Ocean Hazard AEC with the exception of those shorelines that feature characteristics of the Estuarine Shoreline AEC. Such features include the presence of wetland vegetation, lower wave energy and lower erosion rates than the adjoining Ocean Erodible Area. History Note: Authority G.S. I MA-107(a); 113A-107(b); 113A-113(b); 113A-118.1; 113A-124; Eff. March 1, 1984; AmendedEff. July 1, 2009; April 1, 2003. 15A NCAC 07H .1102 APPROVAL PROCEDURES (a) An applicant for a General Permit under this Subchapter shall contact the Division of Coastal Management and request approval for development. The applicant shall provide information on site location, dimensions of the project area, and the applicant's name and address. (b) The applicant shall provide: (1) confirmation that a written statement has been obtained signed by the adjacent riparian property owners indicating that they have no objections to the proposed work; or (2) confirmation that the adjacent riparian property owners have been notified by certified mail of the proposed work. The notice shall instruct adjacent property owners to provide written comments on the proposed development to the Division of Coastal Management within 10 days of receipt of the notice, and, indicate that no response shall be interpreted as no objection. The Division of Coastal Management shall review all comments and determine, based on their relevance to the potential impacts of the proposed project, if the proposed project can be approved by a General Permit. If the Division of Coastal Management determines that the project exceeds the guidelines established by the General Permit Process, DCM shall notify the applicant that an application for a major deyelopment permit shall be required. (c) No work shall begin until an on -site meeting is held with the applicant and a Division of Coastal Management representative so that the proposed alignment may be marked. Written authorization to proceed with the proposed development shall be issued if the Division representative finds that the application meets all the requirements of this Subchapter. Construction of the bulkhead or riprap revetment shall be completed within 120 days of the issuance of the general authorization or the authorization shall expire and it shall be necessary to re-examine the alignment to determine if the general authorization may be reissued. History Note: Authority G.S. 113A-107(a); 113A-107(b); 113A-113(b); 113A-118.1; 113A-124; Eff. March 1, 1984; Amended Eff. July 1, 2009, October 1, 2007; September 1, 2006; January 1, 1990; December 1, 1987. (i) No excavation, grading or fill shall be permitted except for that which may be- required for the construction of the bulkhead or riprap revetment. This permit shall not authorize any excavation watervard of the approved alignment. 0) Runoff from construction shall not visibly increase the amount of suspended sediments in adjacent waters. Appropriate sedimentation and erosion control devices, measures or structures shall be implemented to ensure that eroded materials do no enter adjacent wetlands, watercourses and property (e.g. silt fence, diversion swales or berms, sand fence, etc.). (k) If one contiguous acre or more of property is to be excavated or filled, an erosion and sedimentation control plan shall be filed with the Division of Land Resources, Land Quality Section, or appropriate local government having jurisdiction. This plan shall be approved prior to commencing the land -disturbing activity. (1) For the purposes of these Rules, the Atlantic Intracoastal Waterway (AIWW) is considered a natural shoreline. (m) Construction authorized by this general permit shall be limited to a maximum shoreline length of 500 feet. History Note: Authority G.S.113A-107(a); 113A-107(b); 113A-113(b); 113A-118.1; 113A-114; Eff. March 1, 1984;Amended Eff. July 1, 2009; April 1, 2005; December 1, 1991; January 1, 1989; December 1, 1987.