HomeMy WebLinkAbout66208D - KellyCAMA / ❑ DREDGE & FILL AV ' `' A B
iENERAL PERMIT Previous permit#
New ❑Modification ❑Complete Reissue El Partial Reissue Date previous permit issued
zed by the State of North Carolina, Department of Environment and Natural Resources
oastal Resources Commission in an area of environmental concern pursuant to 15A NCAC Rujes attached.
Name
i �„ Project Location: County �J nS ! G h1
� i
p f g2 j 7 Street Address/ State Road/ Lot #(s)
C (- State t C. ZIP L K���� �y
2�y'� `f-Mail Subdivision
ed Agent I `— C) t ? (AAC'% `(/l Cif, <:__>V. • - ��( C 1 ZIP
Basin
❑ CW )Q EW i MA El ES ❑ PTS
ElOEA /`❑ HHF !❑ IH ❑ UBA ❑ N/A
❑ PWS:
yes no PNA yes •r_� 1
44
f Project/ Activity 1M t o E., r°�
Phone #
Adj. Wtr. Body llt OA ! + na r
Closest Maj. Wtr. Body � '� Avila
ck) length
atform(s)
Platform(s)
)ier(s) _..
i
"h I
id/ I$prap length_
,g distance offshore_
ax dish offshore
:hannel
ibic
imp
'use/ Boatlift
ine Length
not sure yes
xium: n/a yes no
s: yes no
r Attached: yes no ,
(Scale: I"
ding permit may be required by: `7 I �� y "5 ❑ See note on back regarding River Basin
P f ocal Planning lurisdiction)
1/1b/Zo16
1/15/2016
1/19/Zt116
1/19/2016
Clements manne L onstrucuon me
Backwaer Marine Construction Inc
vvunam nuams
Irene Hoffman
rnaa vmca�w a.,a��o
BB &T
2231
.r+...• --
$200.00
•+
GP 66265D
1/15/2016
1/19/2016
Allied Marine Contractors LLC
Russel and Cynthia Davis
B of A
8092
$200.00
GP 64728D
1/20/2016
1/21/2016
Kathi and Steven Todd
same
Wells Fargo
6917
$400.00
major fee, 421 6th Stre,
1/20/2016
1 /20/2016
1/20/2016
1/21/2016
1/21/2016
1/22/2016
1/21/2016 Southern Coast marketing LLC
1/21/2016 Armand and Phyllis Daniel
1/21/2016 Pippin Marine Construction LLC
1/21/2016 Land Management Group Inc
1/22/2016 F and S Marine Contractors Inc
Surf City Crab, INC
Coming Federal Credit Union
1046
$100.00
mod fee, MP 108-14
Ben Barker (Holmes, Sherrill, Miller, Griffin)
TD Bank _
5341
$100.00
renewal fee, MP 10-03
David and Suzanne Price
Wells Fargo
3634
$200.00
GP 66266D
Steve Malone
First Bank
46275
$100.00
mod fee, MP 37-07
RobertGibbons
PNC Bank
5117
$100.00
renewal fee, MP 7-09
1/22/2016 MONTCO
Charles Tilson
Woodforest National Bank
2117
$400.00
GP 66251D
1/22/2016
1/22/2016
1/22/2016
1/25/2016
1/25/2016
1/22/2016 JRW/RDW Inc
1/22/2018 IF and S Marine Contractors Inc
1/27/2016 Maritech LLC
1/27/2016 Atlantic Coast Industrial, LLC
1/27/2016 Aqua North Carolina Inc
Ron Sinclair
First Bank
1140
$200.00
GP 66250D
Joel Killion
PNC Bank
5118
$250.00
major fee, 250
_
Maritech, LLC
B of A
2136
$400.00
GP 66252D
same
BB &T
7568
$200.00
GP 66278D
same
BB &T
1882
$400.00
GP 66279D
1/25/2016
1/27/2016
FStephen and Rebecca Crager
same
First Citizens Bank
5038
$200.00
GP 66276D
1/27/2016
1/27/2016
John and Jane] Brogan
same
BB &T
1054
$200.00
GP 66204D
1/27/2016
1/27/2016
1/27/2016
1/27/2016
W.J. and Carolyn Knowles (via Pat Antinori)
same
Southem Bank
Coming Federal Credit Union.
B of A _
First Citizens Bank
6554
1248
5729
4005
2181
$400.00
GP 66203D
1/27/2016
Logan Marine LLC
Crockers Landing Association Inc.
$200.00
$600.00
$400.00
$400.00
GP 66280D
1/27/2016
Lighthouse Marine Construction Inc
Gordon Maxwell
GP 66205D
1/29/2016
1/29/2016
Clements Marine Construction Inc
Rosario Cappello
GP 66277D
1/29/2016
1/29/2016
Backwater Marine Construction Inc
Jim and Nancy Yeager
BB &T
GP 66270D
1/29/2016
1/29/2016
Richardson Construction
Afton "Butch" Sheffield
BB &T
6250
$800.00
GP 66268D @$200
Tom Earnhardt
GP 66267D @$600
1/29/2016
2/2/2016
1/29/2016
2/4/2016
Milligans Docks & Bulkheads/Joseph & Lara Milligan
Charles Riggs & Assoc
TI Coastal Services, Inc.
Mike Conard/Coastal Marine Construction Inc
Peter Mueller/Larry Naylor Farms Inc.
Daniel Shirley/Overbeck Marine Construction Inc
Paula Wise
NewBridge Bank
6255
$260.00
GP 66269D
Jerrold Schuett
First Citizens Bank
14394
$100.00
minor fee, 502 S. Shop
2/4/2016
2/4/2016
Chris Gibson for Ted Kaniuka
Coming Federal Credit Union
739
$400.00
GP 66285D
2/5/2016
Bryan Batten
First Bank
10083
$600.00
GP 66288D
2l5/2016
Larry Naylor
Southern Bank
2454
$600.00
GP 66118D
2/5/2016
Joe Green
SunTrust
4571
$250.00
major fee, 401 N. Lumi
2/5/2016
BOKF Money Order/Robbie Morgan
Emily Kelly
BOKF, NA
R206357391141
$200.00
GP 66208D
NC Division of Coastal Mgt. Habitat Impact Computer Sheet
Applicant:
Date: I �'
Describe below fhe HABITAT disturbances for the application.
All values should match the name, and units of measurement found in your Habitat code sheet.
TOTAL Sq. Ft.
FINAL Sq. Ft.
TOTAL Feet
F
(Applied for.
(Anticipated final
(Applied for.
(A
DISTURB TYPE
Disturbance total
disturbance.
Disturbance
di
Habitat Name
Choose One
includes any
Excludes any
total includes
E:
anticipated
restoration
any anticipated
re
restoration or
and/or temp
restoration or
to
ternimpacts)
impact amount
temp impacts)
r
Dredge ❑ Fill ❑ Both ❑ Other
f*i
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
AGENT AUTHORIZATION FOR CAMA PERMIT APPLICATION
Name of Property Owner Applying for Permit: E M l I y
Mailing address: 1040 st S t re -e t-
I V ► i-q , N G 2
Phone Number: °r I -'Z52 - 3G'212.
I certify that I have authorized
Agent / Contracto
to act on my behalf, for the purpose of applying and obtaining all CAMA permits
necessary for the proposed development of
at my property located at 10�4 5 �Sfirec+ , surd\ C►
in QV)SkoW County.
This certification is valid through
Date
(Property Owner Information)
tighi3iture
P nt or Type Name 11
Title
ADJACENT RIPARIAN PROPERTY OWNER STATEMENT
hereby certify that I own property adjacent to Elm I t— Ke` I S
c (N me of rope Owner)
property located at �d "1� `���e�
(Address, Lot, Block, Road, etc.)
on in s r C� �-v 0yq L0 N.C.
(Waterbody) (City/To n and/or County)
The applicant has described to me, as shown below, the development proposed at the above
location.
'—K I have no objection to this proposal.
I have objections to this proposal.
DESCRIPTION AND/OR DRAWING OF PROPOSED DEVELOPMENT
(Individual proposing development must fill in description below or attach a site drawing)
WAIVER SECTION
I understand that a pier, dock, mooring pilings, boat ramp, breakwater, boathouse, lift, or groi
must be set back a minimum distance of 15' from my area of riparian access unless waived b
me. (If you wish to waive the setback, you must initial the appropriate blank below.)
I do wish to waive the 15' setback requirement.
I do not wish to waive the 15' setback requirement.
(Property Owner Information) (A . ent Property Owner Information)
Si atu • � t nat�u-`e*
Print nr Tuna 1VAmP.
ADJACENT RIPARIAN PROPERTY OWNER STATEMENT
I hereby certify that I own property adjacent to CvyI `� L . 1<e1 �y is
(Name of Property Owner)
Q St S
property located at �Yee�-
(Address, Lot, Block Road, etc.)
on , in U G•i'14 , 0 - 1 0 W Co. N.C.
(Waterbody) (City/Tow and/or County)
The applicant has described to me, as shown below, the development proposed at the above locatic
1X/— I have no objection to this proposal.
I have objections to this proposal.
DESCRIPTION AND/OR DRAWING OF PROPOSED DEVELOPMENT
(Individual proposing development must fill in description below or attach a site drawing)
WAIVER SECTION
I understand that a pier, dock, mooring pilings, breakwater, boathouse, lift, or groin must be set bac'
minimum distance of 15' from my area of riparian access unless waived by me. (If you wish to wa
the s bac , you must initial the appropriate blank below.)
�I do wish to waive the 15' setback requirement.
I do not wish to waive the 15' setback requirement.
(P ert Owner Information) (Adjacent Property Owner Information)
17
0
Si turk., I� Si ture
_ CAVI&-aVW
Prin(� TOy .. � oriel �1-f�� Prim 0r TTe I N r
AA -;I;-- A.J.J.-. --
:40
a!
dot •�
OZX01
e I i
I
3_4 QL 4q +
m I v
Ct�- 57 fhb
� w
d
Ida
i
In/ dye "134vW � 1b� /
°1/x8
:lam
LlY s
°g o
�o ;4
j� U V
SECTION .1200 — GENERAL PERMIT FOR CONSTRUCTION OF PIERS AND DOCKING FACILITIES: IN
ESTUARINE AND PUBLIC TRUST WATERS AND OCEAN HAZARD AREAS
15A NCAC 07H .1201 PURPOSE
A permit under this Section shall allow the construction of new piers and docking facilities (including pile supported or
floating) in the estuarine and public trust waters AECs and construction of new piers and docks within coastal wetlands
AECs according to the authority provided in Subchapter 07J A 100 and according to the Rules in this Section. This
permit shall not apply to oceanfront shorelines or to waters and shorelines adjacent to the Ocean Hazard AEC with the
exception of those shorelines that feature characteristics of the Estuarine Shoreline AEC. Such features include the
presence of wetland vegetation, lower wave energy, and lower erosion rates than the adjacent Ocean Erodible Area.
History Note: Authority G.S. 113A-107(a); 113A-107(b); 113A-113(b); 113A-118.1; 113A-124;
Eff. March 1, 1984;
Amended Eff. July 1, 2009; April 1, 2003.
15A NCAC 07H .1202 APPROVAL PROCEDURES
(a) An applicant for a General Permit under this Subchapter shall contact the Division of Coastal Management and
request approval for development. The applicant shall provide information on site location, dimensions of the project
area, and his name and address.
(b) The applicant shall provide:
(1) confirmation that a written statement has been obtained signed by the adjacent riparian property
owners indicating that they have no objections to the proposed work; or
(2) confirmation that the adjacent riparian property owners have been notified by certified mail of the
proposed work. The notice shall instruct adjacent property owners to provide any comments on the
proposed development in writing for consideration by permitting officials to the Division of Coastal
Management within 10 days of receipt of the notice, and, indicate that no response will be interpreted
as no objection. DCM staff shall review all comments and determine, based on their relevance to the
potential impacts of the proposed project, if the proposed project can be approved by a General Permit.
If DCM staff finds that the comments are worthy of more in-depth review, DCM shall notify the
applicant that he must submit an application for a major development permit.
(c) No work shall begin until an on -site meeting is held with the applicant and a Division of Coastal Management
representative to review the proposed development. Written authorization to proceed with the proposed development
shall be issued if the Division representative finds that the application meets all the requirements of this Subchapter.
Construction shall be completed within 120 days of the issuance of the general authorization or the authorization shall
expire and it shall be necessary to re-examine the proposed development to determine if the general authorization may be
reissued.
(d) Any modification or addition to the authorized project shall require prior approval from the Division of Coastal
Management.
History Note: Authority G.S. 113A-107(a); 113A-107(b); 113A-113(b); 113A-118.1; 113A-124,
Eff. March 1, 1984;
Amended Eff. October 1, 2007; August 1, 1998; January 1, 1990.
15A NCAC 07H .1203 PERMIT FEE
The applicant shall pay a permit fee of two hundred dollars ($200.00) by check or money order payable to the
Department.
History Note: Authority G.S. 113A-107, 113A-113(b); 113A-118.1; 113A-119; 113-119.1; 113A-124,
Eff. March 1, 1984;
Amended Ef.September 1, 2006; August 1, 2000; March 1, 1991..
15A NCAC 07H .1204 GENERAL CONDITIONS
(a) Piers and docking facilities authorized by the general permit set forth in this Section shall be for the exclusive use of
(p) Piers and docking facilities shall in no case extend more than 1/4 the width of a natural water body, human -made
canal or basin. Measurements to determine widths of the water body, human -made canals, or basins shall be made from
the waterward edge of any coastal wetland vegetation which borders the water body. The 1/4 length limitation shall not
apply when the proposed pier and docking facility is located between longer structures within 200 feet of the applicant's
property. However, the proposed pier and docking facility shall not be longer than the pier head line established by the
adjacent piers and docking facilities nor longer than 1/3 the width of the water body.
(q) Piers and docking facilities shall not interfere with the access to any riparian property, and shall have a minimum
setback of 15 feet between any part of the pier and docking facility and the adjacent property lines extended into the
water at the points that they intersect the shoreline. The minimum setbacks provided in this Paragraph may be waived by
the written agreement of the adjacent riparian owner(s), or when two adjoining riparian owners are co -applicants. Should
the adjacent property be sold before construction of the pier commences, the applicant shall obtain a written agreement
with the new owner waiving the minimum setback and submit it to the Division of Coastal Management prior to
initiating any development of the pier or docking facility. The line of division of areas of riparian access shall be
established by drawing a line along the channel or deep water in front of the property, then drawing a line perpendicular
to the line of the channel so that it intersects with the shore at the point the upland property line meets the water's edge.
Application of this Rule may be aided by reference to the approved diagram in Paragraph (t) of this Rule illustrating the
rule as applied to various shoreline configurations. Copies of the diagram may be obtained from the Division of Coastal
Management website at-http://www.nccoastalmanagement.net. When shoreline configuration is such that a perpendicular
alignment cannot be achieved, the pier or docking facility shall be aligned to meet the intent of this Rule to the maximum
extent practicable.
(r) Piers and docking facilities shall provide docking space for no more than two boats (a boat is defined in 15A_NCAC
07M .0602(a) as a vessel or watercraft of any size or type specifically designed to be self-propelled, whether by engine,
sail, oar, paddle or other means, which is used to travel from place to place by water) except when stored on a platform
that has already been accounted for within the shading impacts condition of this general permit. Boats stored on floating
or fixed platforms shall not count as docking spaces.
(s) Applicants for authorization to construct a pier or docking facility shall provide notice of the permit application to
the owner of any part of a shellfish franchis lease over which the proposed pier or docking facility would extend.
The applicant shall allow the lease holder tl�pportunity to mark a navigation route from the pier to the edge of the
lease.
DIRECTIONS FOR OBTAINING A CAMA GENERAL
PERMIT for a PIER, DOCK, BOATHOUSE/LIFT
To obtain authorization to construct a pier, you must submit the following items to your
CANIA Permit Officer:
1. Signatures of no objection to the pier, from both adjacent riparian property
owners.
cip" Fill out the attached forms, complete with drawing of the proposed
pier, and have your neighbors sign and date in the appropriate place.
If hand -delivering use the form that states such.
cze- If your neighbor will not sign the form, or lives out of town, you may
send the CERTIFIED MAIL /RETURN RECIEPT form, and 10 days
after the date of receipt (which is listed on the green cards returned to
you by the Post Office) the permit can be issued, even if no response
has been received.
r�r If any part of the proposed pier is located within 15 feet of the
Riparian Access Corridor line, the applicable neighbor must check
AND initial the box to waive the 15 feet setback requirement. A
signed form, without this box checked, does not constitute a waiver.
CV, The Riparian Access Corridor is not the extension of property lines
out into the water. It is established by two imaginary lines that extend
at a 90' angle from the channel of the waterbody to the highground
property corners. Your Local Permit Officer can help you in
determining your Riparian Access Corridor. In some cases, a survey
may be required.
2. Drawings of the proposed pier:
Your drawing must include the following information (see attached examples):
Coll Your name and project address
ci�" Names of adjacent property owners
ci�' Width of property and name of the waterbody
CZ11 Dimensions of the proposed structure, including distance to the