Loading...
HomeMy WebLinkAbout66527D - Enoch7CAMA / ❑ DREDGE & FILL 3-PENERAL PERMIT [ Previous permit # A B 2New ❑Modification ❑Complete Reissue El Partial Reissue Date previous permit issued prized by the State of North Carolina, Department of Environment and Natural Resources Eoastal Resources Commission in an area of environmental concern pursuant to I SA NCAC1 r r IF;?RUles attached. it Name 10lnvt pool F.11 p<.� Project Location: Count�k, -L% Street Address/ State Road/'Lot #(s) State )% ZIPQrl�li //..E-Mail 1D4A.4l?N"OWli� Subdivision G :ed Agent %�� nf' Celt., � City C/lii/fi`/ ! j!�Pll�� ZIP 213 9 ❑ CW ✓a EW .RW fA ❑ ES ❑ PTS Phone # ( ) W 1 fir River Basin ❑ OEA ❑ HHF ❑ IH ❑ URA ❑ N/A Z1 S ❑ PWS: yes /� PNA yes f Project/ Activity ick) length 1k la�s) l X Platforms) �ngth amber �d/ Riprap length_ g distance offshore ax distance offshore hannel bic yards_ np ise/ Boatlift Adj. Wtr. Body H �'/�.� nat Closest Maj. Wtr. Bodo /4- . ■■■■■■E■iiliiiiliislii�iii (Scale: / 1� M ❑ See note on back regarding River Basin r KC Division of Coastal. Mgt. Habitat Im pact Calr>t;tputer Sheet Applicant: \ -PUvU, Permit #, Date: Describe below the HABITAT disturbances for the application. All values should match the name, and units of measurement found in your Habitat code sheet Habitat Name DISTURB TYPE Choose One TOTAL Sq. Ft. (Applied. for. Disturbance total includes any anticipated restoration or temp impacts) I FINAL Sq. Ft. (Anticipated final disturbance. Excludes any restoration and/or temp . impact amount) TOTAL Feet . FINAL Feet (Applied for.. (Anticipated final Disturbance disturbance. total includes Excludes any any anticipated restoration and/o restoration or temp impact temp irnpacts) amount) Dredge ❑ Fill ❑ Both ❑ Other Dredge ❑ Fill ❑ Both ❑ Other Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both [l Other ❑ Dredge ❑ Fill ❑ Both ❑ Other Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge [( Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑: Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ . Dredge.❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ 4 airs, Robb L m: carolinamarineconstruction <carolinamarineconstruction@charter.net> t: Thursday, June 09, 2016 11:05 AM Mairs, Robb L eject: Enoch pier A morning again Robb, just noticed that I had a 16x20 drawn,labeled and calculated on the drawing but have written 16 x16 ebo... which is incorrect. It should be 16x20 as calculated and drawn. Call me if you have any questions d anything else. Thanks Mike firom my U.S. Cellular Smartphone iirs, Robb L m: carolinamarineconstruction <carolinamarineconstruction@charter.net> it: Thursday, June 09, 2016 9:14 AM Mairs, Robb L eject: Fwd: Re: Enoch project [ from my U.S. Cellular, Smartphone ---- Original message-------- m: Susan Collins <shctennis2003 @yahoo. com> :e: 6/2/16 9:32 PM (GMT-05:00) Michael Conard <carolinamarineconstruction@charter.net> )ject: Re: Enoch project ;hael, have reviewed the revised plans and have no objections to this June 1 revision. san and Bob Collins Wednesday, June 1, 2016 9:01 PM, Michael Conard <carolinamarineconstruction@charter.net> wrote: od Evening Bobby & Susan, ached is the revised drawing for the Enoch pier. As you can see the dock was relocated to thl it so there will be no encroachment on either riparian quarters. Please let me know if you hav i objections to this proposed drawing. inks, ;e firs, Robb L m: carolinamarineconstruction <carolinamarineconstruction@charter.net> it: Thursday, June 09, 2016 9:14 AM Mairs, Robb L >ject: Fwd: Re: Enoch drawing t from my U.S. Cellular® Smartphone ---- Original message-------- m: "N. J. Dalton" <daltonnj@gmail.com> te: 6/2/16 10:24 AM (GMT-05:00) Mike Conard <carolinamarineconstruction@charter.net> )ject: Re: Enoch drawing Mike, t the drawing and since the new structure will not be any closer to me than before, I have no objections. ce we have swimmers in the area, did not want any boats entering on the north side, and that shouldn't 1 blem with the ramp on the end of the pier. l have one question which doesn't affect my approval - just curious. With the floating dock on the end,1 1 ramp access it, especially at low tide? Could be pretty steep. wever, again, with the new drawing showing the set backs not being encroached upon, we have no ections. ill sign the form you sent me and scan it back to you at some point today when I get a chance. Inks. Jean it from J. Dalton >od Evening Jean, tached is the revised drawing for the Enoch pier. As you can see the dock was relocated to the front so airs, Robb L m: carolinamarineconstruction <carolinamarineconstruction@charter.net> t: Monday, June 13, 2016 11:20 AM Mairs, Robb L jest: Fwd: Permits from my U.S. Cellularx Smartphone ---- Original message-------- m: Pam & John <YQ00@aol.com> e: 6/13/16 10:58 AM (GMT-05:00) carolinamarineconstruction <carolinamarineconstruction@charter.net> >ject: Permits ce Conard (Carolina Marine Construction) has our permission to obtain Cama and building permits for dence at 610 Waynick Blvd, Wrightsville Beach, N.C.. cerely, n and John Enoch it from my iPhone jl� ), 01 �Qi ��2 A r t-