Loading...
HomeMy WebLinkAbout01529D - Bald��k oz'�L CERTIFICATE OF EXEMPTION FROM REQUIRING A CAMA PERMIT 0 1 rc, as authorized by the State of North Carolina, Department of Environment and Natural Resources and the Coastal Resources Commission in an area of environmental concern pursuant to 15 NCAC Subchapter 7K j vu icant Name (SA r d I ii c� d SI m roc+ L , Nl -r d , L f C MAY t k Phone Number 'esS �_ v �I '; o L i't< I ek V) J State N L Zip act Location (County, State Road, Water Body, etc.) clr5w (o 0-1 AI h 1-e k d 1Z4,h l A�� ana uimensions of Frolect roposed project to be located and constructed as described is hereby certified as exempt from the CAMA permit ement pursuant to 15 NCAC 7K . This exemption .MA permit requirements does not alleviate the necessity of )btaining other State, Federal or Local authorization. This certification of exemption from requiring a CAMA pe valid for 90 days from the date of issuance. Following expi. a re-examination of the project and project site may be nec to continue this certification. -TCH (SCALE: dam, l � Jc' f 'U Vfw� LArrvv �h Ok nC -c i �'V\ o.,z Ck �r 1 (jt� r e Cf t, l -C 121 i C;r-- son, Debra n: Bruce Marek <marekyd@ec.rr.com> t: Wednesday, January 20, 2016 10:59 AM Wilson, Debra; MacPherson, Tara marekyd@ec.rr.com; 'Ben Traynham'; 'Jim Henry' ject: Bald Head Island Limited, LLC Marina Repairs chments: BHIMarina.pdf; DeepPoint Marina.pdf; Indigo Marina.pdf; CAMA 41-45 Indigo Marina At Al-A2.JPG; CAMA 41-85 Along Backside of D-Dock Bulkhead.JPG; CAMA 41-85 Indigo Marina Near Slip D1.JPG ebbie, )ur phone conversation yesterday, here is the information on the marina piling repairs that Bald Head Island ted, LLC needs to do. The attached color pdf's with slip numbering is probably better descriptive than I could di irate cad drawings. As they are all piles that have been permitted previously, we would like repair exemption(! feel that they are needed. The Pile Driver has an available time slot, and would like to start by the end of the w ther permitting. If we need repair exemption(s), I am available to come by to sign the yellow sheets. If you can ove this by e-mail, or by e-mail until Tara returns from annual leave, that would suffice us also. IA 91-96 Deep Point Marina: Insert 1 single missing pile between F-18/F-19 IA 41-85 Indigo Marina: • Replace Broken piling on waterway side of the B-T head • Replace Broken Pile at B-3/13-5 • Replace two missing outer entrance Channel Piles IA 172-87 Bald Head Island Marina: Remove tilted piling at B-04/13-06, remove broken stub, and replace piling Repair dolphin cluster broken bolt at Ferry Terminal Idition, I have included three pictures of typical bulkhead backfill needed at Indigo Marina. Nothing very drastil 2thing we need to address soon so that we can get grass/vegetation growing this spring. It is intermittent arou narina, with dips apparently occurring at tiebacks. The estimate to fill all of the depressions/fair it into the )unding area is 100 yds of sand/soil. As a repair exemption, does the Indigo Marina Drawing and the photos gig igh info or will that need a more formal drawing? ably at Bald Head Island on Thursday, but am around today if you need me to stop in. I could also put off my B I trip off until Friday, if you have exemptions for me tomorrow. have the Barge Landing repair exemption drawings for both Deep Point and the Island that I am still working c ve have a little more time on those to coincide with a weekend shutdown in February and March for maintenai �Af .4 �_ ., tau• .�a�z lZou � . \ + ED 0. '1.VLi,V.L.L°J`.",s{ i.�. B' DOCK `C DOCK Iniv>aLER BUILDINGD-DOCK BALD HEAD ,. k .... ISLAND MARINA72 . HOME, OF THE BALE? HEAD ISLAND YACHT CLUB 01 T' DOCK Ino'si r A` DOCK 70 54 TE 1Gac > MARSH HARBOUR IN'v -- T'I-ii. !.iGHT1�:a.�4Ps=.RGiri�TlC71 =� -