Loading...
HomeMy WebLinkAbout01527D - BaldCERTIFICATE OF EXEMPTION FROM REQUIRING A LAMA PERMIT '� 01.5 as authorized by the State of North Carolina, Department of Environment and Natural Resources and the Coastal Resources Commission in an area of environmental concern pursuant to 15 NCAC Subchapter 7K , ( , �, . C %b CSNC t icant Name ��1� Inca (1 LS���Y1c1 L�m,1-C ,LL( Mfc K Phone Number I� 0) 'ess c L5 c\ , l S \ al yA Q. - - ;ct Location (County, State Road, Water Body, etc.) t�,N rSvv and Dimensions of Project I to roposed project to be located and constructed as described is hereby certified as exempt from the CAMA permit ementpursuantto 15 NCAC 7K -!('' . This exemption MA permit requirements does not alleviate the necessity of )btaining other State, Federal or Local authorization. _ State Zip P pL L, Mk - A, UIA t-o Prl w VV This certification of exemption from requiring a CAMA pe valid for 90 days from the date of issuance. Following exph a re-examination of the project and project site may be nec to continue this certification. -TCH (SCALE: 0 Z tS ; ('7 r\(( tti--FV1� 6 M -s S ,r r. �-�i�1iYA v� (� C I� q►1hf 1 �r t' NCrT -C <k3�4, rl(t� C V, vVN bt COX, 4, �b ram % I" (e 0)—e n7� a V�-h 0 (Z �. y) , Ison, Debra 1m: Bruce Marek <marekyd@ec.rr.com> it: Wednesday, January 20, 2016 10:59 AM Wilson, Debra; MacPherson, Tara marekyd@ec.rr.com; 'Ben Traynham'; 'Jim Henry' )ject: Bald Head Island Limited, LLC Marina Repairs ichments: BHIMarina.pdf; DeepPoint Marina.pdf; Indigo Marina.pdf; CAMA 41-45 Indigo Marina At S Al-A2.JPG; CAMA 41-85 Along Backside of D-Dock Bulkhead.JPG; CAMA 41-85 Indigo Marina Near Slip D1.JPG )ebbie, our phone conversation yesterday, here is the information on the marina piling repairs that Bald Head Island ited, LLC needs to do. The attached color pdf's with slip numbering is probably better descriptive than I could do crate cad drawings. As they are all piles that have been permitted previously, we would like repair exemption(s) feel that they are needed. The Pile Driver has an available time slot, and would like to start by the end of the wE ether permitting. If we need repair exemption(s), I am available to come by to sign the yellow sheets. If you can rove this by e-mail, or by e-mail until Tara returns from annual leave, that would suffice us also. 1A 91-96 Deep Point Marina: Insert 1 single missing pile between F-18/F-19 1A 41-85 Indigo Marina: • Replace Broken piling on waterway side of the B-T head • Replace Broken Pile at B-3/13-5 • Replace two missing outer entrance Channel Piles 1A 172-87 Bald Head Island Marina: Remove tilted piling at B-04/13-06, remove broken stub, and replace piling Repair dolphin cluster broken bolt at Ferry Terminal edition, I have included three pictures of typical bulkhead backfill needed at Indigo Marina. Nothing very drastic, ething we need to address soon so that we can get grass/vegetation growing this spring. It is intermittent aroun narina, with dips apparently occurring at tiebacks. The estimate to fill all of the depressions/fair it into the )unding area is 100 yds of sand/soil. As a repair exemption, does the Indigo Marina Drawing and the photos givE igh info or will that need a more formal drawing? ably at Bald Head Island on Thursday, but am around today if you need me to stop in. I could also put off my Ba e trip off until Friday, if you have exemptions for me tomorrow. > have the Barge Landing repair exemption drawings for both Deep Point and the Island that I am still working or ve have a little more time on those to coincide with a weekend shutdown in February and March for maintenam I:P, I Ro Vl ^tif�Pl 1A('1111H 1l O PLANTATION & M RINA 0 RESERVE A SLIP, C ,ILL 910-269-2380 01-I SE.ViIl'CHv I.10.