HomeMy WebLinkAboutSunset Lakes HOA C/O Kyle Canadyvl�/I". �
CERTIFICATE OF EXEMPTION
FROM REQUIRING A CAMA PERMIT 'NV OU27 b
as authorized by the State of North Carolina,
:� ( ;
Department of Environment and Natural Resources and the Coastal Resources Commission
in an area of environmental concern pursuant to 15 NCAC Subchapter 7K o 10 .
Applicant Name _
Address
City
Project Location
The proposed project to be located and constructed as described This certification of exemption from requiring a CAMA permit is
above is hereby certified as exempt from the CAMA permit valid for 90 days from the date of issuance. Following expiration,
requirement pursuant to 15 NCAC 7K This exemption a re-examination of the project and project site may be necessary
to CAMA permit requirements does not alleviate the necessity of to continue this certification.
your obtaining other State, Federal or Local authorization.
I SKETCH (SCALE: )
CO
Any person who proceeds with a development without the con-
sent of a CAMA official under the mistaken assumption that the
development is exempted, will be in violation of the CAMA if there
is a subsequent determination that a permit was required for the
development.
The applicant certifies by signing this exemption that (1) the ap-
plicant has read and will abide by the conditions of this exemp-
tion, and (2) a written statement has been obtained from adjacent
landowners certifying that they have no objections to the
proposed work.
Applicant's signature
p 6v LAT- A
CAMA Official's signature
6 / f,2 La 1
Issuing date
J / a "Z _/z o l�
Expiration date
Attachment: 15 North Carolina Administrative Code 7K
CERTIFICATE OF EXEMPTION
FROM REQUIRING A CAMA PERMIT N° 01027 D
as authorized by the State of North Carolina,
Department of Environment and Natural Resources and the Coastal Resources Commission
In an area of environmental concern pursuant to 15 NCAC Subchapter 7K b D ,
Phone Number Iite s 55-tI152.
The proposed project to be located and constructed as described This certification of exemption from requiring a CAMA permit is
above Is hereby certified as exempt from the CAMA permit valid for 90 days from the date of Issuance. Following explradon,
requirement pursuant to 15 NCAC 7K , b 103. This exemption a re-examination of the project and project site may be necessary
to CAMA permit requirements does not alleviate the necessity of to continue this certification.
your obtaining other State, Federal or Local authorization.
I SKETCH (SCALE: N/A- )
t
w o,nc 011/s� be JbV'e. 0,106 ai&il LAA9"-
I/
APt AA-7, MV6
k
k
k
Any person who proceeds with a development without the con-
sent of a CAMA official under the mistaken assumption that the
development Is exempted, will be in violation of the CAMA if there
is a subsequent determination that a permit was required for the
development,
The applicant certifies by signing this exemption that (1) the ap-
plicant has read and will abide by the conditions of this exemp-
tion, and (2) a written statement has been obtained from adjacent
landowners certifying that they have no objections to the
proposed work.
W t= awe L(
bZ / 62 Z-o l�
Issuing dale
6 5 / q -7-- &o (71
Expiratiofi date
Attachment: 15 North Carolina Administrative Code 71K
re�
C'-4i'c4t
�.y
a,fom C- Rp
1vFC)
JGT'N, NC
1 2011
Farrell, Sean C
From: Kyle Canady <kylemcanady@gmail.com>
Sent: Thursday, January 26, 2017 2:18 PM
To: Farrell, Sean C
Cc: Happy Days; David Loy; Jennifer Steinke
Subject: Fwd: Drawing of repair
Follow Up Flag: Follow up
Flag Status: Flagged
Sean,
Thank you for coming to our site today and bringing Chad and Liz. Please see the attached drawing from our
contractor. If you could issue us a maintenance and repair exemption permit quickly that would be great. Once
the lake level has been brought down to an acceptable level we'd like to start repairs and having a permit in
hand will speed the process.
Do you know where and how we could find documentation of what level the lake was originally set at? We
were thinking a permit would have been issued way back to create the levee and that the lake level would have
been part of that permit/process. Right now we don't have a clue where to start looking.
Thanks again,
Sent from my iPhone, thank you,
-Kyle Canady
Begin forwarded message:
From: kyle canady <kmcwithbcwha@yahoo.com>
Date: January 26, 2017 at 2:07:12 PM EST
To: Kyle Canady <ky1emcanady(a gMail.com>
Subject: Drawing of repair