HomeMy WebLinkAboutTown of Sunset Beach (2)CERTIFICATION OF EXEMPTION
FROM REQUIRING A CAMA PERMIT
as authorized by the State of North Carolina,
Department of Environmental Quality and the Coastal Resources Commission in an area of
environmental concern pursuant to 15 NCAC Subchapter 7K Q r NCGS 113A-103 (5) (b) (5)
Applicant Name 7V) KJIIS-L, K� frh Phone Number 10 �ti3 1Iy'1
Address
City SJJI� P��- '13e t� _ --State N C_ Zip
P L 0d t
c rotet ocat_t (County, State Road, Water
q-c
d.
y, e c. )�l�l
tis4� UG. a.o
Type and Dimensions of Project ' `'"' 0—
Cr.,` A,,,n.e- ko QCSC 0. 6CAC'L' QCCLaSwa-�, -
The proposed project to be located and constructed as
described above is hereby certified as exempt from the
CAMA permit requirements. This exemption to CAMA
permit requirements does not alleviate the necessity of
your obtaining any other State, Federal, or Local
authorization.
This certification of exemption from requiring a CAMA permit
is valid for 120 days from the date of issuance. Following
expiration, a re-examination of the project and project site may
be necessary to continue this certification.
AEC(S): n(= A SCALE: jJ-rS
.__'7-7- T__T__T -_; __i __i __i __ i
I I 1 1 I I 1 I 1 I I 1 i I 1 1 I I I i 1 I I I I I I 1 I
rj%--t hl�t-=t`_4- —f--t_ .t _+`
1 1 1 I 1 I I I i I I I I i 1 I I I I i 1 I I 1 I 1 `lJ I I
i I I 1 I I I I I 1 I I I 1 I 1 I I I 1 1 I I I 1 1 I 1 I
r--r--r--r--t--r--r--r��--11r--t--r--t--T--r11�---r--r--t--CC11Dr--r--t--((r--t--T--r--t--r--r--r--y
r--r--r--r--rt=LTr�� �t \ J H7T�_r---r'--r --1
Q jjj ��Jr - - r.qq,.�� t `i-
r--t•--f T- l--r--7 �T_�]��/C-G_ _Q7 WT _J �--r--1
I I 1 I I 1 I I I (J 1 1 1 1 I I I I "Ir 1 I ���TTTI ___ I I 1 I 1 I I
i I 1 1 I I I I I i i I I i I 1 I I i 1 7 1 I i 1 I I I I
I I
QE �.S s'il
r--r--r--r ---r--r--r--r--r--rt--r- -r--r�-'t-�-- ,--r--r- r--r--r--r----r_-r--�
Jj-L�1 I 1}_ ✓ Il �t I I 1 I 1 1 1 1 I I 1
�Y
r--r--r--j---r--�-- �'-r--{--�''`r--T--�-�---1--r-- - -,-- r--r--{--+--,---}--}---,---r--;
I 1 1 1 I I I I I I 1 I 1 I I I I I 1 I I I I I I 1 I I I
t--L--�--L--1--�--L--L--L--1--L--1--�--L--1--L--1--L-�-t--1--1--�y,, 1L 'L--1- t---L--�--1
3 _L__J
L--L --L--�----�v��G7/L-Wi�•L,i_`'�-'�71--�--''O..�J--}�G...__Y`_�xi`='�'1�T�_�S_IY_I__�L�-*.L__
I I i I I I I 77Y I 1 1 1 1 I I I i tl, I I 1 I I I\J I I 1 I 1 I
I I I 1 I I 1 I I
I 1 I 1 I I
r`_1�L
I I 1 I I I 1 I I I I
1 1 I 1
at--'L__'tZ=-_LS�L _J
l�l-I�I��I 1 1
I I I 1 I 1LJrriJ -{�' I{,�IJ - I `I ►1�1`�"I i `�I'} J4�`J�. I ,jl I ,JAL I i
+-_I-� 'J_-- +-- +--+--L---F- a
Any person who proceeds with a development without the con-
sent of a CAMA official under mistaken assumption that the APRLLQ�. sign e
development is exempted, will be in violation of the CAMA if there
Is a subsequent determination that a permit was required for the ^ `�
development. CAM ificialis signature
The applicant certifies by signing this exemption that the 2 'Z
applicant will abide by the conditions of this exemption. issuing hate Expirlition Date
CERTIFICATION OF EXEMPTION
FROM REQUIRING A CAMA PERMIT
as authorized by the State of North Carolina,
Department of Environmental Quality and the Coastal Resources Commission in an area of
environmental concern pursuant to 15 NCAC Subchapter 7K.2y�or NCGS 113A-103 (5) (b) (5)
Applicant Name
Address
q W A\- N .
Phone Number-1
City : , . ; l z c H State N Zip
Project Location (County, State Road, Water Body, etc.)
Type and Dimensions of Project .1. ` 't {" ' f `` , '`- �' e " `r ` —
The proposed project to be located and constructed as
described above is hereby certified as exempt from the
CAMA permit requirements. This exemption to CAMA
permit requirements does not alleviate the necessity of
your obtaining any other State, Federal, or Local
authorization.
This certification of exemption from requiring a CAMA permit
is valid for 120 days from the date of issuance. Following
expiration, a re-examination of the project and project site may
be necessary to continue this certification.
AEC(S): :{ l SCALE: T I
I I I I I I 1 I I I I 1 I I I I I I I I I I I I I I I I I
I I I 1 1 1 1 I I I I t 1 I I I I I I 1 I I 1 I I 1 I I 1
r--F--F--t--t- t--t--t--1---t- i--F--t--t--t--F-1---t--t--t--t F--t--f--r--r--i
I I 1 I I 1 1� ti •,,,�1 A .�..,I')�r.JZ,Q"-- I` \ -- q^ G1 t 1
r--r--r--r--t--r--t--t--r----r--t(--t--r--t--r--t--r-1---t--t--t--t--r--t--r-- --r--i
I 1 1 I I I 1 I I I I I 1 1 I I I I I I I 1 I 1 I I I I I
r--r--r--r--t--r--r--t--r--t----t--t--r--Y--r--t--r-�---t-- t--7��--��r--t--r--r--r--y
I 1 1 1 "'
1 1 I I �� I I I F 4.,,1 'N •-1�WF i ICY Li�. �f•• � 1 � � I `OFF _ 711
-r--r--r--T--r'-r--r--r- �r--r--r----r--1--r--T--r-1---r--r--T--T--r--r-
r--r- --r--�
I 1 I I I 1 I I 1 I I I I
1 I I I I 1 1 I I 1 I 1 1 I I I I 1 I I I 1 I I I I I I I
r--r--r--r--r--r--r--r--r--T--r--T--�-- T--r- T--r- r--r--T--T--r--r--r--r--r--i
�l
t� ; s''r1 1 "
n1 I I I
I�rrvv �I` t 1 i Mtn I 1 r f 1 1 r 1 1 1
r--r--r--rr--r--r--r--r--r--r--T--n--r�-T-ter-------r--r--T--T--r--r- Q)--r--r--i
I I I 1 I �
1 r--r--r--f--j--r--r--r--,T-- T--�--r--T--r--T--r-�---r--�---r--�--r--�--r--�--r--�
I 1 1 I I I I 1 1 I I 1 I I I 1 1 I I I I I I I I 1 1 1 I
t--L--L--L--1--�--L--1--L--1--L--1--1--L--1--�--1--�--t---1--1- 1--1--L--1 L--�--�--�
I 11-- I I I I
<�..,,� ,,I � !' L � J ' - N_U . _ - L � _ 1 _ _ L� � � _ L _ _ J
t----L--�- -- _ L__-L 1--L-- {--L -1----
I I I I I 1
-'It I ItU�/le �1 1
L__L_-�
r.. I I I I I I
I I I I 1 I I I I I I 1 I I 1 I 1 I I 1 I I I I I I I I I
V-I CK
�� r' I,_ tt_` ,•1_i�l.J0.Yr J�I.-rr i( i�..^�1--L �-='--L--L•--L--�
r l,�li
I 1 I ( 1% 1 I 1 1 `t�I 1 1 t 1 i t 1 1 1( t 1 1
i1'.'14' tV,
------F--+--}-+--}----+----+-- --�- ►----+--E--�-- }- +--+--+ --+---�--a
1�1r'-y
1 I I I I i1 �1 c•YI `1' U;1 � 1CI W\ �1I.f� A I T h,
��
Any person who proceeds with a development without the con-
sent of a CAMA official under mistaken assumption that the
development is exempted, will be in violation of the CAMA if there
is'a subsequent determination that a permit was required for the
development.
The applicant certifies by signing this exemption that the
applicant will abide by the conditions of this exemption.
J>gr"
Ap si nature--
CAMA fficia's signature
Issuing 'date
2{" 1 ?- d 2-C3
:ion Date
a
AGENT AUTHORIZATION FOR CAMA PERMIT APPLICATION
Name of Property Owner Requesting Permit: n D7' fvn S,Gf /.3F�
Mailing Address: 7G 0 Sin S-e- >- ac a- c-,i
!� C'As..ef Q�-GX All .7-S-Y65-
Phone Number: e!!o - 5-? 5 - G Zt `7
Email Address:
I certify that I have authorized Z_- 'C,'4g " ,
Agent ! Contractor
to act on my behalf, for the purpose of applying for and obtaining all CAMA permits
necessary for the following proposed development: -7'o� Ae-e c4.n Ira, rS G
C CLW'NW y
at my property located at 3 S 5 4OV ecw�
in County.
l furthermore certify that l am authorized to grant, and do in fact grant permission to
Division of Coastal Management staff, the Local Permit Officer and their agents to enter
on the aforementioned lands in connection with evaluating information related to this
permit application.
Property Owner Information:
Signature
III M .t'tAZ�0
Print or Type N me
-t-o Vr✓ 4Oi'+1 41r'f-1121{-1&-e -
Title
Date
This certification is valid through
IL
p-
VICINrrY MAP
LwTDR LBE iaDt ba \ Z
W CBIEi >. P.1Cr b
SURVEpY POVIDED BY: wowa • A®¢� aj \� \ O
E�mWE.rR0T N86 AewrN¢Pc O� �Li �5 � \ �y \ '.• • PpJ
P�CeBIu�Bv-tea DY y \R \ PS
P \ \ 7
llEE _ \ IEpN E%ISTND IEACR �J:
TII�UYOUi LS ROL SUITABLE WRISE w� \\ \ 1 �YIIILKWIY
AN OFFIOML PROPERtt SURVEY OR FOR
REOJRDI�TAJN PIIfbOSEs \ \ \\ sd \ \
\ \ \ \ sB \ \ er
Q.
�a \
BED MEVtMNBVMYAT o°o \ .. W o�
ll0.4TND IBIW POINTIN ai
<< ��yy7 m
\\ \ \ LOCI1TIOnV, FlETf. O \\ REMOVE APPR MAO to O �
TNGWwL� V
\ \-SKWHYIwDREBOLD
9�/ m ABOVE DUKE TOMATCR ExISTINO T
\ baE \ \ \ .-POWTOFMWLKWAY i
$
\\ \\ \\ ENO OF EA TnO BEACR ®' \ sTNR PER s,TE p
VIAL
ftSQ 41-N ACCESS Y Cdd110i15. BEE DETAlS W U
— ,t mERs LL I^�
\ \ \ WALKWAY sEE-CEss ® ± \ sLONGLANDING rQL.i 0.
\ \ tOE Cf DIME FlA3(iED STAMs PER sITE /LUUj
/�
BY CINM 18291,a \ Lr11ptT10Ns.R5EE
DETAILS V/ �Q! O �F..
1 \ ALLOWABLE BWLD LINE, B O \ \ ZmZ V!
\ BEYOND TDE OF OUnE / \ \ J� r U J \ \ W aa
\ \ 1 0 \\ \\ LL 90 W
\ \ \ \ \ Fw
\ \ run Ho«vwm \
rATcn urtF \ \
B«EET
p >e� ST-1
LL—
BOLE: 1' • 30
NOTCH POST FOR END JOIST
4XA HANDRAIL MST, BOLT TO
6X6 THROUGH END JOIST
WITH (21V BOLTS
M MST, TYP
(2)Y' THROUGH BOLTS
2X12DRDPPED
GIRDER TYP
2)GI0JOISTS 9 I4.1' O.0
VA DECK BOARDS
1 qTE ALL BOLTS B
F0.3TENER9 TO BE HOT
DIPPED GALVN)IZED. ALL
LUMBER TO BE R.T. SYR a
WALKWAY PLAN
SCALE:
3 - TYPICAL STAIR
m
1 - SECTION
TUTS
M FLAT
VA RAIL
2X2 HANDRAIL
2X2 PCKEn
M RAIL
ME DECK BOARDS
AAA HANDRAIL POST,
BOLT TO BXB THROUGH
END JOIST MTN (2)V
MOLTS
(2)1(' THROUGH MOLTS
U12 DROPPED GIRDER, TYP
BAB MST. TYP
SHEET
S-
NO.
REVISION
TOWN OF SUNSET BEACH
39TH STREET BEACH ACCESS
SUNSET BEACH, NORTH CAROLINA
WALKWAY PLAN & DETAILS
b FLAT
S RAIL
BLOCKS. VON
:NTER
2 HANDRAIL
2 MKETS
A RAJL
A DECK
A HANDRAIL POST.
XT TO BAB THROUGH
ID J 5T VMTH (2)%'
XTS
%'THROUGH BOLTS
12 DROPPED GIRDER. TYP
B A -SPACE IF BOTTOM OF
[DER HEIGHT EXCEEDS S'-0-
OVEGRADE,USE%'BOLTS
S MST. IF
DRAWING DATA
DATE: 2119120
SCALE: AS NOTED
DRAWN BY: ARM
DESIGNED BY: ARM
CHECKED BY: RPA
PLOT SCALE: WA
CAD FILE NO: ST-1
ZAS FIAT
ZXS RAIL
MP KETS
2A8 RAIL
ZAS DECK BOARDS
AX< HANDRAIL POST,
BOLT TO ME THROUGH
END JOIST WITH (2)%'
BOLTS
(2)%' THROUGH BOLTS
2X12 DROPPED GIRDER, TYP
BAB POST. IF
2 - ELEVATION
NTB
GENERAL STRUCTURAL NOTES
1. NO OTHER PARTY AAY REVISE ALTER OR DELETE ANY STRW TUFAL ASPECTS OF
THESE GONSTRUCTN)N DOCUMENTS WITHOUT WRITTEN PERMISSION OF SUMMIT DESIGN
GROUP, INC FROM HERE FORWARD REFERRED TO AS SUMMIT DESIGN.
2TR CONACTOR SHALL VERIFY ALL DINS MENSIO.
& SUMMT DESIGN WILL NOT BE HELD RESMNSBLE FOR THE CONTRACTORS FAILURE
TO CONPoRM M THE CONTRACT DOCUMENTS, SHOULD ANY NOKCW MRMRTES
OCCUR
A. THE CONTRACTOR SHALL PROVIDE ALL REWIRED TEMPORARY BRACING DURING
CONSTRUCTON TO STABILIZE THE STRUCTURE.
S. THESE DRAWINGS ARE TO BE COORDINATED WITH THE ARCHITECTURAL. MECHANICAL.
PLUMBING, ELECTRK:AL. AND CIVIL DRAWINGS. THIS COORDINATION 0 HOT THE
RESPONSIBILITY OF SUMMIT DESIGN. SHOULD ANY DISCREPANCIES BECOME APPARENT
THE CONTRACTOR SHALL NOTIFY SUMMIT DESIGN BEFORE ANY CONSTRUCTION BEGINS.
S. THE CONTRACTOR SHALL VERIFY ALL ASSUMED HELD CONDITIONS FOR ACCURACY
AND REPORT ANY DISCREPANCIES TO SUMMIT DESIGN BEFORE CONSTRUCTION BEGINS.
T. CONSTRUCTION SHALL CONFORM TO THE CURRENT EDITION OF THE NORTH
CAROIINA BUILDING CODE AND ANY LOCAL ORDINANCES.
B. CONCRETE $HALL HAVE NORMAL WEIGHT AGGREGATE AND A MINIMUM COMPRESSIVE
STRENGTH (I'c) AT 28 DAYS OF 3(00 PSI.
V. ALL REINFORCING STEEL SHALL M GRADE M BARB CIXIF NG M MS A815 AND
HAVE A MINIMUM COVER OFT.
10. MAP REINFORCING STEEL AS REWIRED A MINIMUM OF AO BAR DIAMETERS MR
TENSION OR COMPRESSION UNLESS NOTED OTHERWISE. SPLICES IN MASONRY SMALL
BE A MINIMUM OF Q BAR DIAMETERS.
II. STRUCTURAL STEEL SHALL HAVE A MINIMUM YIELD STREW(Fr)OF 38 KSL
1Z SOLD SAWN WOOD FRAMING SHALL CONFORM TO THE SPECIFICATIONS AS LISTED IN
ME NATKNUIL FOREST PRODUCTS AS SOCIATKYI'NATIONAL DESM SPECIFCATK)N FOR
WOOD CONSTRUCTION- (NDS) LATEST EDITION.
13. SOLID SAWN WOOD MEMBERS SHALL BE SPRUCE -PINE -FUR F2 GRADE OR BETTER
UNLESS OTHERWISE NOTED.
M. STRUCTURAL COMPOSITE LUMBER SHALL HAVE THE FOLLOWING MINIMUM DESIGN
STRESSES'.
LW: FD•2800PSI Fv.2B5 PSI Fc.MPSI E•1.0X10^8PSI
PSL Fl .2YW P51 W .250 PSI ft. 750 PSI E • D A 10"S PSI
GLULAM: W .2AW PSI Fv. 21OPSI E • 118X 10"S PSI
15. LUMBER N CONTACT WITH EARTH, CONCRETE. OR MASONRY SHALL BE PRESSURE
TREATED.
16. ALL BEAMS SUPPORTED ON TIMBER FRAMING SHALL HAVE FULL MARNO FOR THE
DESIGN LOADS
WIDTH OF THE BEAM AND BE SUPPORTED BY A MINIMUM OF TWO (2) STUDS. WHERE
BEAMS BEM ONTO A WALL PAMLLEL TO THE 8EAM, THE BEAM SMALL HAVE A MMMM
BEARING LENGTH OF T.
1. BUILDING CODES
17. STUD WALLS SWILLBEM4018' ON CENTER UNLESS NOTED OTHERWISE.
1.1 NORTH CAROLNA BUILDING CODE 2018 EDITION
1& BEAMS CONTAINING MORE TWIN 3 PLIES SHALL SE BOLTED TOD>fTHER WITH (2))V
1,2 MNNUM DESIGN LOADS MR BUILDINGS AND OTHER
THRU BOLTS 0 IF ON CENTER UNLESS OTHERWISE NOTED. MINIMUM EDGE DISTANCE
STRUCTURES, ASCE T.
FDA BOLTS IS 2 )V. TWO (2) BOOTS SHALL BE LOCATED MINIMUM B' FROM EACH END.
2. DESIGN LOADS
ILL ALL PARALLEL NON -LOAD BEARING WALLS SHALL BE SUPPORTED BY A DOUBLE JOIST
LOADING CONDITION DEAD LOAD LIVE LOAD
ROOF IO PSF MMF
UNLESS NOTED OTHERWISE
20. CONTRACTOR TO PROVIDE LOOKOUTS WHEN CEILING JOISTS SPAN PERPENDICULAR
WALK UP ATTIC 10 PSF 30PSF
MRAF TERS.
CEILING 10 PSF M PSF
21. ALL MATERIAL BELOW THE BASE FLOOD ELEVATION SHALL BE PRESSURE TREATED.
FLOOR 10 PSF . PSF
ALL CONSTRCUTON WITHIN A DESIGNATED FLOOD ZONE SHALL BE CONSTRCUTED IN
BALCONY IO PSF MP&F
PLATFORM 10 PSF IM PSF
ACCORDANCE WITH LOCAL FLOOD PREVENTION ORDINANCES B IN ACCORDANCE WITH
THE M18 NC RESIDENTIAL BUILDING CODE,
ULTMATE WIND SPEED 150 MPH
2E. AT A MINIMUM, PROVIDE BLOCKING AT MID SPANS OF ALL FLOOR FRAMING
M. ASSUMED SOIL BEARING CAPACITY 2000 PSF.
ENGINEER
CAp,O�
SUMMIT DESIGN GROUP, INC
TJ SEAL !r
0
STRUCTURAL . CIVIL . MECHANICAL . ELECTRICAL
025485
�tl`
2rz�m 2"
ENCNLLR
PO BOX 995 BLADENBORO, NC 28320
�O
9104363-4580
ARMS
LICENSE C-2565