HomeMy WebLinkAboutTown of Carolina Beach C/O Brian StanburgCERTIFICATION OF EXEMPTION
FROM REQUIRING A CAMA PERMIT
as authorized by the State of North Carolina,
Department of Environmental Quality and the Coastal Resources Commission in an area of
environmental concern pursuant to 15 NCAC Subchapter 7KUZ—or NCGS 113A-103 (5) (b) (5)
Applicant Name
Type and Dimensions, of Project
The proposed project to be located and constructed as
described above is hereby certified as exempt from the
CAMA permit requirements. This exemption to CAMA
permit requirements does not alleviate the necessity of
your obtaining any other State, Federal, or Local
authorization.
hone Number � 3 {J _6d ` i
StateZi 25W a
_ P
Thie certification of exemption from requiring a CAMA permit
is valid for 120 days from the date of issuance. Following
expiration, a re-examination of the project and project site may
be necessary to continue this certification.
AEC(S): ( lH SCALE: k (`, 1
I I I 1 I I I I I I I I I I I I 1 I I I I I 1 I I 1 I 1 I
I I I I I I 1 I ----rt11 --- --trfI1 ---I---t+tIIII---I---Crt11I ----'t+fIII �----- fiII ----- tIII ---
r-h-t-t-tAI =pr(
"
I I 1 I 1 I 1 "fir I 1 (I ( _ I
r--r--r--r- r-- - T- YY �`t - - -r-- --r--f---f - -
I I I I I I I I /� I� 1 1 1 I 1 /+ �
F- I 1 1 PW" ],fir 1
r--r--r--r--r--r- r-- r Y` : -- --TAi' -- T--T-- ---T--r--r--r--1
I _ 1i• i i i i __ 1 __i i i
f--r--r--r--T--r-- -r-- --Z--r - r T-r-1---T--T--T T r--T--r--r--r--�
I I I I 1 1 1 I I I 1 I I I 1 1 1 I I I 1 I I I I I I I I
I I 1 I I I I I I I I I I I I I I 1 I I I 1 1 1 I I 1 I 1
r--r--r--r--r--r--r--r--r--r--r--r--�--r--T--r--r--r-�---r--r--r--r--r--r--r--r--r--i
I I I I I I I 1 I 1 I I 1 I I 1 I I I I I I 1 I I I I I 1
1 I I I I I 1 I I I I 1 I 1 I I 1 1 1 I I 1 I I I I 1 I
r--r--r--r--r--r--r----r--r--r--r- - r---r-- ----r--,---r r-----r--r--r--r--r--r--�
c I 1 1 1 1 1 I
-L--J
L__L__L__L__1__L__L__L__ 1 •n� 7„[{j Y[j j� L_
I I I 1 1 1 I I I I I I I I I I I I I I 1 I I I I --I -- I
I I I 1 I I I I I 1 I I I I I 1 I I I I I I 1 I I I I I I
1 I I I I 1 1 I 1 I I I I 1 I t I I I I I I I I I I I I 1
I 1 I I I I I I I 1 I I I 1 I I I I I I I I 1 I I I I I I
1 I I I 1 I I I 1 1 I I I 1 I I I I I I I I I I I I I 1 I
I I I I 1 I I 1 1 1 I I I I 1 I I I 1 1 I I 1 1 I 1 1 I I
L--L'--L--L--1--L--I'--L--L--1--L--1--�--L--1--L--1--L-�---1--'L--1--J'--L--1--L--L--1'--a
I 1 I I I I I I I I 1 t 1 I 1 I I 1 1 I I I 1 I I 1 1 1 I
1 1 I I I I I I I I I 1 I I I 1 I 1 I I I I I I I 1 1 I I
I I I I I I I I I I 1 1 1 I I I I I I 1 I 1 I I I I I I 1
I I I I I 1 1 I I I 1 I I 1 I 1 I I I I 1 I 1 I 1 I I I I
I 1 I I 1 1 I I I 1 I I 1 I I I 1 I I 1 I I 1 I 1 I I 1 1
1 I I 1 I I I I I 1 I I I I I I 1 I I 1 I I I I I I 1 I I
Any person who proceeds with a development without the con-
sent of a CAMA official under mistaken assumption that the
development is exempted, will be in violation of the CAMA if there
is a subsequent determination that a permit was required for the
development.
The applicant certifies by signing this exemption that the
applicant will abide by the conditions of this exemption.
MacPherson, Tara
From:
Brian Stanberry <brian.stanberry@carolinabeach.org>
Sent:
Tuesday, January 7, 2020 4:23 PM
To:
MacPherson, Tara
Cc:
Miles Murphy
Subject:
[External] RE: Surfrider xmas trees
Ta ra,
Happy New Year! Thank you for the feedback. The Surfrider Foundation plans to install the trees, per the provided specs
(15 A NCC 07K .0212), in the area shown below. The target date for the project is January 25th and approximately 80
trees will be installed at that time. They will be focusing on the area between Scotch Bonnet and Oystershell Lane
accesses. Please, let me know if any further information is required for this exemption.
RECEIVED
JAN 0 7 2020
DCM WILMINGTON, NC
igsj
, I
IS�-PH'$T.� c
r
z
z
z
0
7.t