Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Town of Atlantic Beach (2)
AFE / JREDGE &FILL N75798 jNo.A B C D RAL PERMIT Previous permit# WModification []Complete Reissue El Partial Reissue Date previpus permit issued As authorized by the State of North Carolina, Department of Environmental Quality i and the Coastal Resources Commission in an el of environmental concern purs nt to 15A NCAC % s ❑R les attached. f, Applicant Name t1, Project Location: County Address l ',' 'mil ! % r _ Streetv4ddressl State Road/ Lot #(s) , City r i i 11j-1 t .• ,'J.( . a , ,.� _ , -c �,f , ( Phone Mail Subdivision `t: F Author Authorized Ag, { \, f I r Y�_r Cityn_ -ZIP ❑CW 19EW Affected El ❑PTS Phone # (_) tr River Basin i '`! ❑OEA ❑HHF IH ❑LIBA El N/A Adj. Wtr. Body. (, S.-, Junkt AEC(s): _f an ORW: yes / no PNA yes / no Closest Maj. Wtr. Body Type of Project/ Activity �) (Scale /) Pier Fixe Floa Fing Groi Bulk Basil Boat Boat Beac Othr Shor SAV: Mor, Phot Waiv ■■ ■M■j■■■■■■■■■■■■■■■�■ ■■■■■ ■■mo■■■■M■ E■■:EM EEEEmm`= :EEE El OEEEEEEEEE"�EE ■■■■■■■■■■■■■E■■■OIL■■■■■■ MEMO ■■■■■EEE■■■ ■E■■■■■N■■■■lME■■■:MERE ■■■■■F■E■M■M■■■ ■■„G ■■■■EEEIN EEEpE■■■■■E ■ ■■n WINNER ■ lmmomilmoolmilima M■■■®■llly■■N14EU • A u■ ■■■ ■E . /. ►A �//II.■■■ ■■■��■■■ ■■■■� rJ i■■►v�■■■■■MEMO■ . iE■EEEEEEEE oommoomm E■■ r: 0EEEEE�MMEi ro■■'" ramp ■■w■3Ir■■MoRwail■ MEN ■■■�M■■'M■■■■\®M■■■■■EM■E ■ ■■■ErEEEHEE EE ■■Mi■■■■■ louse/ Boadift ■■■►>t ■�'�■M■■■■■EEG ■I I ■�'■■■■M -E.go■M_.■.■ . E0E1%'..:aE E■E E.�;�.■►-��m•■■■■■E ME 0 P Bulldozing ■EN\\■■■G/M■■■E■■■■ML■IIIIIINLT.IT.I ■■■■■■■■■ r ■.jM....■....■■■■■■■■�■■■■■Mr:57..■■■■■■■■E ■Stlf�l■■�.■■E■■■■■■■■■■E ■■■■ ■FI■II■■■OEM■■■■ ■■■■■ ■■■ ■E■■■■■■■ ■■E■■ �ww■ I*�17■■■ ■■■■■E OEM E■■■■■■■■■■E■O■E■EIYI A � ME■■M ellne Length ■■■E■■■■■■OEEE■■■■■■ ■■o■1�liMIW�!■I■■■■■■■ M re not su o \lEN■E■■■E■■NEEEo0EE�EEEEEOEEEEEENEEEE yes EEEEE::E::EEEEEEnSONN EE:E:EEE A building permit may be required by: ( Note Local Planning jurisdiction) Notes/ Special Conditions , Agent or Applicant Printed Naame Slgnawre"` Please read compliance statementon back of permit ❑See note on Permit Officer's Printed Name / Signature Application Pee(s) Check# Issuing Date back regarding, River Basin rule96 i, Expiration Date W_?,-AMA q(PREE)GE & FILL A B eC D GENERAL PERMIT Previouspermit# '©New ElModification OComplete Reissue ElPartial Reissue Date previous permit issued As authorized by the State of North Carolina, Department of Environmental Quality and the Coastal Resources Commission in an area of environmental concern pursuant to 15A NCAC EJ Rules attached[ - Applicant Name Project Location: County Address Street Address/State Road/ Lot #(s) (;Ity---- — State— ZIP_ Phone # )—E-Mail Authorized Agent OCw DEW D PTA E3 ES El PTS Affected 0 OEA OHHF OIH OUBA ON/A AEC(s): El Pws: Dill yes / To I PNA yes :no' Type of Project/ Activity Pier (dock) length Fixed Platform(s) Floating Platform(s) Finger pler(s)— Groin length number Bulkhead/ Riprap length avg distance offshore max distance offshore Basin, channel cubic yards- / lel Boat ramp Boathouse/ Boatlift — Beach Bulldozing.. Other Shoreline Length SAV. notsure yes no (Scale: — t U 71 71i _j -T— I— A L I t Syr F t —3— _J t 4 L M.natc,rl.nn: n/a yes no Photos: yes -T Waiver Attached: yes 0 E. 7 El See note on back regarding River Basin rules. A building permit may be required by: (Note Local Planning jurisdiction) Notes/ Special Conditions REeEIV Signature Please read compliance statement on back of permit Application Fee(s) Check# OCT 10 2019 PermitOfficer's Printed Pjan,. i. DCM-MHD CITY Signature Issuing Date Expiration bate Water Resources Development Grant Program Shallow Draft Navigation Channel Dredging Application FY 2018 - 2019 North Carolina Department of Environmental Quality >:oun� cnao,_,N Division of Water Resources fmironmrrtrai Qunflry Contact Coley Cordeiro at coley.Cordeiro@ncdenr.gov or (919) 707-9013 3. Project Description - Provide a short summary of the project The Town of Atlantic Beach annually completes dredging of channels to ensure safe travel of commercial and recreational boaters to, from, and around Atlantic Beach, as well as use of the channels for access by first responders. 4. Project Scope — Brief description of the project scope what is being proposed and justification(why is it beingroposed There are five areas that need to be dredged this year: Royal Channel (296cy), New Causeway Channel (333cy), Anchorage Channel (666cy), and two sections of Causeway Channel (444cy and 296cy). There is likely additional yardage of dredging that will be needed at one or more of the locations, so this project includes a contingency budget for a maximum of 3000cy. This will keep the waterways usable for the boaters and first responders. 5. Existing Conditions - Brief description of existing site conditions and land use within project area Typical seasonal cycles can render these channels difficult to navigate through shoaling, but Hurricane Florence added to this significantly In 2018. The surrounding land is primarily residential, but there are several large marinas and commercial operations that rely on certain water depths to continue functioning. 6. Anticipated Contract Start Date As soon as feasible Anticipated Contract End Date 4 weeks from start date 7a. Project Location: Important to submit as completely as possible, especially the Lat/Long coordinates Project Location Royal Channel County Name Carteret InIeUChannelfWaterbody Name Bogue Sound Latitude-76.7445 Position coordinates of project location Longitude 34.7129 Anticipated Total Dredged Material in Cubic 296cy (approximately 200WOW) Yards 7b. Project Location: Important to submit as completely as possible, especially the Lai/Long coordinates Project Location New Causeway Channel County Name Carteret InletiChanneW✓aterbody Name Bogus Sound Latitude-76.738 Position coordinates of project location Longitude 34.7109 Anticipated Total Dredged Material in Cubic 333cy (approximately 50'x60'x3) Yards RFCEIVED Water Resources Development Grant Program Shallow Draft Navigation Channel Dredging Application FY2018-2019 North Carolina Department of Environmental Quality :otirF, c.a:xo._>w Division of Water Resources SnWronazrtraf ¢out: rr Contact Coley Cordeiro at Coley.cordeiro@ncdenr.gov or (919) 707-9013 7c. Project Location: Important to submit as completely as possible, especially the Lat/Long coordinates Project Location Anchorage Channel County Name Carteret InIeUChannel/Waterbody Name Bogue Sound Latitude-76.729 Position coordinates of project location Longitude 134.702 Anticipated Total Dredged Material in Cubic 666cy (approximately 150k30k47 Yards 7d. Project Location: Important to submit as completely as possible, especially the Lat/Long coordinates Project Location Causeway Channel (at buoy 5A) County Name Carteret InIeUChannel/Waterbody Name Bogus Sound Latitude-76.7326 Position coordinates of project location Longitude 134.7141 Anticipated Total Dredged Material in Cubic 444cy (approximately 150k20k47 Yards 7e. Project Location: Important to submit as completely as possible, especially the Lat/Long coordinates Project Location Causeway Channel (at buoy 7A) County Name Carteret Inlet/Channel/Waterbody Name Bogue Sound Latitude-76.7358 Position coordinates of project location - Longitude 134.711 Anticipated Total Dredged Material in Cubic 296cy (approximately f00k20k47 Yards 7d. Project Location: Important to submit as completely as possible, especially the Lat/Long coordinates Project Location Additional yardage at above project locations (contingency) County Name Carteret Inlet/Channel/Waterbody Name Bogus Sound Latitude Position coordinates of project location Longitude Anticipated Total Dredged Material in Cubic Yards 965cy (total maximum anticipated yardage = 3000cy) 1 Q Ty