HomeMy WebLinkAbout74082_Thomas L Edwards_20191024 VOCAMA/ ❑DREDGE & FILL - D (01+ 41 No. 74082 A g C D
GENERAL PERMIT Previous permit# ,., /A
>Z New ❑Modification ❑Complete Reissue ❑Partial Reissue Date previous permit issued „i /A-
j As authorized by the State of North Carolina,Department of Environmental Quality O �� �J
and the Coastal Resources Commission in an area of environmental concern pursuant to I 5A NCAC
Jr]Rules attached.
Applicant Name 1 'o.'- 5 L• E i✓'4'z r9 j Project Location: County ; 1i I.y Z o za'r .1'-o .
Address .f_( '(, 01-c'' 1,-2ooi.t 12c, . Street Address/State Road/Lot#(s)
City k...i 7 ,� . K
-r z>,. State i' ZIP 2 5 v 'i-- j / --�o 5,r/0 - i-za- 72 cl ,
Phone# (.. ) ) "= '/3(r,l E-Mail Subdivision ,,,L/._i, 62. +-=a
Authorized Agent J✓ i.- City ,z-I c-i A ZIP 1 _2 /,-) (0
Affected ❑CW ❑EW (PTA El ES )'PTS Phone# ( ) River Basing- nn•k r(.•,) '.
❑OEA ❑HHF ❑IH ❑UBA ❑N/A �j
AEC(s): Adj.Wtr. Body 27i n��^^ e_=k 6). C("at7,'man /unkn)
❑ PWS:
Closest Maj.Wtr. Body /,^ f=-'c--. A-''_,=/L•
ORW: yes /,h) PNA yes / n,
Type of Project/Activity r _ •
(Scale:/ - )
Pier(dock)length f
Fixed Platform(s) I
Floating Platform(s) -- --1 1Jrr�AM Ltd' "1
Finger pier(s) ` I I
Groin length { 1 I 1
I I
number !. i ;
Bulkhead/-Riprap length /, 'D
I
avg distance offshore 0I
max distance offshore 'J ' 1
Basin,channel " G r A LI 2 I 7 'I T.1
I
cubic yards "' . P/ �.
Boat ramp I , i r-,sriAN-{c. -- fto
Boathouse/Boatlift
;..., o al' 1 4.�_
�`•
Beach Bulldozing I r-x t;-!--/Other ! �' pf I _�.4
�
Shoreline Length — 'S/ /)(70 r -r�- / Je
SAV: not sure yes no -1:2_ _..- o�AaE fA j 1�_ �2 clP—
1
Moratorium: n/a yes o `�CVIu1-Q/hr711 I I^/,_wv/.'-)1 , PA-JP i
Photos: yes Cfio — I d 4%9....4 fr 72, G/
Waiver Attached: yes no I ,q O .1-0la 5 c I /
[.) Z.l4-
A building permit may be required by: �r-/1« -Dil'r erO. . See note on back regarding River Basin rules.
I (Note Local Planning Jurisdiction)
Notes/Special Conditions - A,..J-r/---1 /--4.ISM z.,— _J t`-' •
V) 12) c k›-i is, Lf- 4-1,., _..-6,,,,_ i
Agent or Applicant Printed Name PermitOfffcer's Printed Name
Signature **Please read compliance statement on back of permit** ''Signture
Application Fee(s) Check# Issuing Date Expiration Date
ROY COOPER
t- Governor
?,a
MICHAEL S. REGAN
Secretary
Coastat Management BRAXTON DAVIS
ENVIRONMENTAL QUALITY Director
BUFFER AUTHORIZATION CERTIFICATE FOR SHORELINE STABILIZATION
A riparian buffer authorization is required for shoreline stabilization activities within the Neuse and Tar-Pamlico River
basins per Division of Water Resources(DWR) regulations 15A NCAC 02B.0233 and 0259. The Division of Coastal
Management(DCM)through a Memorandum of Understanding with the Division of Water Resources(DWR) has
reviewed your project proposal and has determined that the project as proposed complies with the aforementioned
regulations.
Those activities covered by your Coastal Area Management Act(CAMA) permit have received Buffer Authorization
provided the project is constructed in a manner that continues to meet all of the conditions listed below. Failure to
comply with this Buffer Authorization may subject the property owner and the party(contractor) performing the
construction and/or land clearing to a civil penalty by DWR of up to$25,000 per day per violation.
i. Impacts: Impacts to woody vegetation from clearing and filling in Zone 1(begins at the most landward of either
normal water line (NWL) or normal high water line(NHWL)and extends 30 feet landward)shall be minimized to
what must be impacted for the sound installation of the shoreline stabilization project. Unnecessary clearing and
filling in the buffer is a violation of the riparian buffer rules.
2. Clearing& Grading:Clearing and grading of Zone 2 (begins at the landward edge of Zone 1 and extends 20 feet
landward) is allowed provided that it is re-vegetated immediately and Zone 1 is not compromised,which includes
maintaining diffused (non-channelized) flow of storm water runoff through the buffer.
3. Construction Corridors: Construction corridors are allowed for shoreline stabilization projects, but they must be
satisfactorily restored as described in condition 5 below,
4. Potential Overwash: For vertical shoreline stabilization projects (bulkheads)only;sites where wave overwash is
expected to be severe,the first ten (10)feet landward (unless specifically authorized otherwise by DCM)from the
structure may be maintained as a stable lawn in order to provide for structural stability.
s. Temporary Stabilization: Immediately post-construction, bare soils must be stabilized as quickly as possible by
providing a temporary ground cover. Newly seeded areas should be protected with mulch and/or erosion matting.
This ground cover is a temporary measure used to address erosion until site restoration can be accomplished.
6. Site Restoration:At minimum, pre-project site conditions must be re-established.A site that was wooded prior to
this shoreline stabilization project must be restored with woody vegetation at a stem density of 260 stems per acre.
Non wooded sites may be re-vegetated with woody vegetation. Restoration must be completed by the first
subsequent planting season (November 1 through March 30) after completion of the bulkhead.
• Pre-project site conditions:/✓/4,,�JT,4 /e 7 L41...)
7. Project Drawing:The drawing on the CAMA General Permit is considered the project drawing of your property
indicating the location of the shoreline stabilization structure and any associated clearing, grading,and construction
corridors.This drawing will be used to aid in compliance and monitoring efforts.
By your signature below you agree to be held responsible for meeting all of the above listed conditions and verify that all
infor ation s complete and accurate.
CP Ivy.
Agent App}ifan rented Name Permit Of r Sig ture
2¢- �� � 2°" 7
A Applican Signature Issue Date E`
CAMA GENERAL PERMIT#: . 741''°f'25
State of North Carolina I Environmental Qualtty I Coastal Management
Washington Office 1943 Washington Square Mall Washington.NC 27889 1252-946-6481
Wilmington Office 1127 Cardinal Drive Ext.Wilmington,NC 28405-3845 1910-796-7215
Morehead City Office 1400 Commerce Avenue Morehead City,NC 28557 1252-808-2808
From:Thomas L. Edwards
Sent:Wednesday, October 23, 2019 10:23 AM
To: poledriver2@hotmail.com
Subject: Sea Wall Approval -
Attached is an approval letter from Nutrien.
With it you are further authorized to secure permits for both making storm damage pier repairs and
seawall.
Please let me know if anything is further needed.
Thanks for your help!
Tommy Edwards
From: John Prescott [mailto:John.Prescott@nutrien.com]
Sent: Wednesday, October 23, 2019 9:02 AM
To: Thomas L. Edwards
Subject: RE: [EXT] Sea Wall Approval Request -
See attached.
John
John B. Prescott
Land Supervisor
P.O. Box 425
Aurora,North Carolina
T: (252)322-5121
C: 1.252)402-7155
www.nutrien.com
•
� ut r�en
From:Thomas L. Edwards<tedwards@suddenlink.net>
Sent:Tuesday, October 22, 2019 11:31 AM
To:John Prescott<John.Prescott a@nutrien.com>
Subject: [EXT] Sea Wall Approval Request-
Importance: High
Thomas 1. Edwards
2466 Old Poole Rd.
Kinston, NC 28504
Mr. John Prescott
Land Manager
Nutrien Phosphate Aurora
24960 N. Carolina Highway 33
Aurora, North Carolina 27806
Subject: Sea Wall
Mr. Prescott,
We would like to install a 100 ft. (+or—25 ft. as needed to finish) seawall in front of our river
house located at 1780 Bonnerton Road on Durham Creek. The wall would be centered on the
house, extending a little on each side of the house.
Other than Edwards Property Group, LLC, Nutrien Phosphate is the closest adjacent land owner.
In order to obtain a permit for the installation, Nutrien Phosphate's approval is required.
Please indicate the willingness to grant or withhold approval by singing below. If you choose to
withhold approval, leave the signature blank; however and in either case, please return this
letter.
Thanks very much for your special attention and consideration!
Best,
Tommy Edwards
John Prescott
Nutrien Phosphate Aurora
NC Division of Coastal Mgt. Habitat Impact Computer Sheet
Applicant:- i0A-rAS L. �1�G✓.`��✓�
Date: 2 y- dGT 2oi f
General Permit#: ..� 4,1--49ee
Describe below the HABITAT disturbances for the application. All values should match he name,and units of measurement
found in your Habitat code sheet.
TOTAL Sq. Ft. FINAL Sq. Ft. ! TOTAL Feet FINAL Feet
(Applied for. (Anticipatedfinal (Applied for. (Anticipated final
DISTURB TYPE Disturbance total disturbance. Disturbance disturbance.
Habitat Name Choose One ncludes any Excludes anv total includes Excludes any
anticipated restoraticn any anticipated restoration and/or
restoration or and/or tem p restoration or temp impact
temp impacts) impact am Clint) temp impacts) amount)
15, ,e.fr€ Dredge❑ Fill❑ Both ❑ Other trj p O . j )oo t- •
414,4
G?R-0 I,/47 Dredge❑ Fill❑ Both ❑ Other ❑ (, 6 pe, /,6,00 rt
/3 o ria..--1 Dredge❑ Fill❑ Both ❑ Other, g-2.9 �- ce)
Dredge❑ Fill❑ Both ❑ Other ❑
• Dredge❑ Fill❑ Both ❑ Other ❑
Dredge❑ Fill❑ Both ❑ Other ❑
Dredge❑ Fill❑ Both ❑ Other ❑
Dredge❑ Fill❑ Both ❑ Other ❑
Dredge❑ Fill❑ Both ❑ Other ❑
Dredge❑ Fill❑ Both ❑ Other ❑
i I
Dredge❑ Fill❑ Both ❑ Other ❑
Dredge❑ Fill❑ Both ❑ Other ❑
Dredge❑ Fill❑ Both ❑ Other ❑
j I
Dredge❑ Fill❑ Both ❑ Other ❑