HomeMy WebLinkAbout74010_Billy Smith_20190727 CAMA/ ❑DREDGE & FILL No. 74010
zl� toyy35 A c
GENERAL PERMIT Previous permit# 4 !Al
New ❑Modification El Complete Reissue El Partial Reissue Date previous permit issued t'a f'Lk_.
As authorized by the State of North Carolina,Department of Environmental Quality
and the Coastal Resources Commission in an area of environmental concern pursuant to I SA NCAC ? •
iiRules attached.
Applicant Name 3r / S h 1, T7/-/. Project Location: County /5t /"T..::»-t I F
Address /6-' c/5, YI4-I b-"�15 73/-'" 0 Street Address/State Road/Lot#(s) O ]� !P 7 j�
City /-✓f� /-1-,-)�� 1� ...1 Stater! ZIP -7
--- '5.,‹ (-1 , /<
f _x T.'S',- ,--t fz • / .- •tom
Phone# (I(.z) <'r -C-`> U7 E-Mail Subdivision
Authorized Agent #- i 10=li City;;,..,A 3 ) 1-7) ZIP 7-- '7' '' 9
❑CW ❑EW IRTPTA ❑ES XPTS Phone# ( 1--- River Basin r .- .I 'n4--/' )
Affected
❑OEA ❑HHF ❑IH ❑UBA ❑N/AAEC(s): Adj.Wtr. Body /2OA-0 G 2 Cz--'7l (na /man /unkn) •
ORW: yes / no PNA yes /nol Closest Maj.Wtr. Body
Type of Project/Activity -? 1Ptz.E` = rc 6, -ui-e,4-t
(Scale: / 3j ! )
Pier(dock)length
Fixed Platform(s) j
Floatin Platforms Lire
g () T lic ca.r-a-) 1
1_ill , ,'
Finger pier(s) , �
Groin length ( j , ��
number I I 9
Bulkhea Riprap length
, r r ■ ' P,.� y
avg distance offshore .2 I III L �� 11, .11ra
max distance offshore '- /, T.1
•
Basin,channel I
cubic yards
I j 1
Boat ramp ! I
Boathouse/Boatlift r2150/«EA-! 14.J )-4-t,
krp
Beach Bulldozing
Other 41Ik_r +-1 . . i
Shoreline Length S �� I i
r
SAV: not sure yes no _ _._ --- i ;.a r —........_ �.
Moratorium: n/a yes y ,� • 1 f���UGtQ
Photos: yes / I I 1 Th ) II .— .
Waiver Attached: yes no I I I
A building permit may be required by: /3c4-..•e-X 1 e` J . . ,See note on back regarding River Basin rules.
(Note Local Planning Jurisdiction)
Notes/Special Conditions ,'r' T" 4-!/-2., --Ili CY -II h'><--e✓ 7$1-D ,1 '6,f 1~-1 '�,4` ?
4-1.47 i!I 4),-4- L_A-a..---1 _
Agent or Applicant Printed Name PermitOfficer's Printed Name
[ 47
t'v � / /..— ,e.o' �'`'. /
Signature / Please read compliance statement on back of permit Signature
Application Fee(s) Check# Issuing Date Expiration Date
. ROY COOPER
G: Governor
MICHAEL S. REGAN
Secretary
Coastal Management BRAXTON DAVIS
ENVIRONMENTAL QUALITY Director
BUFFER AUTHORIZATION CERTIFICATE FOR SHORELINE STABILIZATION
A riparian buffer authorization is required for shoreline stabilization activities within the Neuse and Tar-Pamlico River
basins per Division of Water Resources(DWR) regulations 15A NCAC 02B.0233 and 0259, The Division of Coastal
Management(DCM)through a Memorandum of Understanding with the Division of Water Resources(DWR) has
reviewed your project proposal and has determined that the project as proposed complies with the aforementioned
regulations.
Those activities covered by your Coastal Area Management Act(CAMA) permit have received Buffer Authorization
provided the project is constructed in a manner that continues to meet all of the conditions listed below. Failure to
comply with this Buffer Authorization may subject the property owner and the party(contractor) performing the
construction and/or land clearing to a civil penalty by DWR of up to$25,000 per day per violation.
1. Impacts: Impacts to woody vegetation from clearing and filling in Zone 1(begins at the most landward of either
normal water line (NWL)or normal high water line(NHWL)and extends 30 feet landward)shall be minimized to
what must be impacted for the sound installation of the shoreline stabilization project. Unnecessary clearing and
filling in the buffer is a violation of the riparian buffer rules.
2. Clearing&Grading:Clearing and grading of Zone 2 (begins at the landward edge of Zone 1 and extends 20 feet
landward) is allowed provided that it is re-vegetated immediately and Zone 1 is not compromised,which includes
maintaining diffused (non-channelized) flow of storm water runoff through the buffer.
3. Construction Corridors: Construction corridors are allowed for shoreline stabilization projects, but they must be
satisfactorily restored as described in condition 5 below.
4. Potential Overwash: For vertical shoreline stabilization projects (bulkheads)only;sites where wave overwash is
expected to be severe,the first ten(10)feet landward(unless specifically authorized otherwise by DCM)from the
structure may be maintained as a stable lawn in order to provide for structural stability.
s. Temporary Stabilization: Immediately post-construction, bare soils must be stabilized as quickly as possible by .
providing a temporary ground cover. Newly seeded areas should be protected with mulch and/or erosion matting.
This ground cover is a temporary measure used to address erosion until site restoration can be accomplished.
6. Site Restoration:At minimum,pre-project site conditions must be re-established.A site that was wooded prior to
this shoreline stabilization project must be restored with woody vegetation at a stem density of 260 stems per acre.
Non wooded sites may be re-vegetated with woody vegetation. Restoration must be completed by the first
subsequent planting season (November 1 through March 30) after completion of the bulkhead.
• Pre-project site conditions: . .
- I
7, Project Drawing:The drawing on the CAMA General Permit is considered the project drawing of your property
indicating the location of the shoreline stabilization structure and any associated clearing, grading,and construction
corridors.This drawing will be used to aid in compliance and monitoring efforts.
By your signature below you agree to be held responsible for meeting all of the above listed conditions and verify that all
information is complete and accurate.
Ap-----
Agent or licant Printed Name Permit Offt' is Signature
27 �yr1E2o/ i
Agent or A `ant Signature Issue Date
CAMA GENERAL PERMIT#: 7 UO Ip/3 .
State of North Carolina I Environmental Quality I Coastal Managernent
Washington Office 1943 Washington Square Mall Washington.NC 27889 1 252-946-6481
Wilmington Office 1127 Cardinal Drive Ext.Wilmington,NC 28405-38451 910-796-7215
Morehead City Office 1400 Commerce Avenue Morehead City,NC 28557 1252-808-2808
\--% .r:NK < ".• \*\. \TT) cf\
/ -
NC Division of Coastal Mgt. Habitat impact Computer Sheet
Applicant: Ite.y S 11-1-4
Date: 2--� �ti r?r Z" i )
General Permit#: 7 p !0
Describe below the HABITAT disturbances for the application. All values should match the name,and units of measurement
found in your Habitat code sheet.
TOTAL Sq. Ft FINAL Sq. Ft. TOTAL Feet FINAL Feet
(Applied for. (Anticipated final (Applied for. (Anticipated final
DISTURB TYPE Disturbance total disturbance. Disturbance disturbance.
Habitat Name Choose One includes any Excludes any total includes Excludes any
anticipated restoration any anticipated restoration and/or
restoration or and/or temp restoration or temp impact
temp impacts) impact amount) temp impacts) amount)
Dredge❑ Fill❑ Both ❑ Other
/I1yia
�7 lLOv Dredge❑ Fill❑ Both ❑ Other 43 4.8 li d
4 LL o W7,t9 2 Z
rriNM Dredge❑ Fill/ Both ❑ Other ❑ i_24„ F - r o
Fill
Dredge❑ ❑ Both ❑ Other ❑
Dredge❑ Fill❑ Both ❑ Other ❑
Dredge❑ Fill❑ Both ❑ Other ❑
Dredge❑ Fill❑ Both ❑ Other ❑
Dredge❑ Fill❑ Both ❑ Other ❑
Dredge❑ Fill❑ Both ❑ Other ❑
Dredge❑ Fill❑ Both ❑ Other ❑
Dredge❑ Fill❑ Both ❑ Other ❑
Dredge❑ Fill❑ Both ❑ Other ❑
Dredge❑ Fill❑ Both ❑ Other ❑
Dredge❑ Fill❑ Both ❑ Other ❑