HomeMy WebLinkAbout74022_Milton Stewart_20190701 l e /5 '."
•
CAMA / '.DREDGE & FILL �0 10440 No. 74022 A C D
GENERAL PERMIT Previous permit# 62 , -
> % New .1Modification _IComplete Reissue HPartial Reissue Date previous permit issued 2:-s - ? ?_o,s
As authorized by the State of North Carolina, Department of Environmental Quality
and the Coastal Resources Commission in an area of environmental concern pursuant to I5A NCAC ;-)74 • / -`"' ) •
jN Rules attached.
Applicant Name/yr i,_-'a' . -7 �,,.4i2 T Project Location: County i5=A- i v z 1—
Address vp '7- 12 c/ Street Address/State Road/Lot#(s) i l S TL. /"y /
City i o-J State "E ZIP 27(3/) (-(' r,_.., 7 --y? 6) ,-li4-2,E X 4r-J-
Phone# (//cj )21VZ-5"7 3 E-Mail _- Subdivision _ vM.-1„, ..2 1-1,1 v e- h l
Authorized Agent .\/1,44 . City /4.445 A-r.J G-r t ZIP ? -) sS`'S?
Affected
❑CW JEW 7PTA ❑ES OPTS Phone# ( ) River Basirc Z ,2- 1�,t�.Co
AEC(s): C OEA 0 HHF 0 IH 0 UBA ❑N/A Adj.Wtr. Body R4rv7///GJ v /-(nat>/man /unkn)
PWS: L. r
ORW: yes / no \i PNA yes I no Closest Maj.Wtr. Body ?A.."' T../ t5 1 LiGO /i)
Type of Project/Activity /A-1 S -I -i. /S A 13 a.-1 c r1 Li ty t t--‘D lR v(4 ,Z, r ;-j
(Scale:/ - )
Pier(dock)length
I I i i r
C=' r
Fixed Platform(s) i I l
`, i I -�
�. +'c> v tar
Floating Platform(s) i ' �
Finger pier(s) \ I ! / - 2
- _ ' /?/d.!lc,J
Groin length ,�+ N`iit f
number I - l h A �-
Bulkhead/Riprap length i y f-. 1' /-; 1 Itj �r ��� t! �4�Jdl-�1'1 .
avg distance offshore ;y"`/Co 6iajg.„ I
max distance offshore 1 1.. . }
l
Basin,channel {
I
- �--,- t ,4 ► PA,-
cubic yards — - i - I
Boat ramp i -
Boathouse/Boatli ,✓ ! Il I
r1TL/ /3 'X,/3 ' _ 1 der
Beach Bulldozing I
Other 1
l—
j
I —__ -_
---�.j
Shoreline Length T w C7' - I T 4-.." ---....-
i 1 i
SAV: not sure yes no — - �— �_......... D 1. 1
o) I •
I I L.
f°) SST
Moratorium: n/a yes n
Photos: yes 1
I
Waiver Attached: yes no--)__-
A building permit may be required by: i-3c-//:,,14 7br7 !G� . FSee note on back regarding River Basin rules.
(Note Local Planning Jurisdiction)
Notes/Special Conditions /v^r- ) / ' , -1"7"--f4',7-/•.r7-7 j 4,i ✓ 7- --
i
x Y( )I0 J 7"r ) fit 1 i-l. �J ;',1 �C�.
Agent or Applicant Printed Name •••-------- Permit() er's Printed Name .
/ G��"Pf
f c r,, }-C-_--.)
Signature
lease read compliances teme back of permit* ignat re
l.
aJ
Application Fee(s) Check# Issuing Date Expiration Date
4.
Statement of Compliance and Consistency
This permit is subject to compliance with this application, site drawing and attached general and specific conditions. Any
violation of these terms may subject the permittee to a fine or criminal or civil action; and may cause the permit to become
null and void.
This permit must be on the project site and accessible to the permit officer when the project is inspected for compliance. The
applicant certifies by signing this permit that I)prior to undertaking any activities authorized by this permit,the applicant will
confer with appropriate local authorities to confirm that this project is consistent with the local land use plan and all local
ordinances, and 2) a written statement or certified mail return receipt has been obtained from the adjacent riparian
landowner(s).
The State of North Carolina and the Division of Coastal Management, in issuing this permit under the best available
information and belief,certify that this project is consistent with the North Carolina Coastal Management Program.
River Basin Rules Applicable To Your Project:
Tar-Pamlico River Basin Buffer Rules Other:
Neuse River Basin Buffer Rules
If indicated on front of permit,your project is subject to the Environmental Management Commission's Buffer Rules for the
River Basin checked above due to its location within that River Basin. These buffer rules are enforced by the NC Division of
Water Resources. Contact the Division of Water Resources at the Washington Regional Office (252-946-648 I) or the
Wilmington Regional Office(910-796-7215)for more information on how to comply with these buffer rules.
Division of Coastal Management Offices
Morehead City Headquarters Washington District
400 Commerce Ave 943 Washington Square Mall
Morehead City, NC 28557 Washington, NC 27889
252-808-2808/ I-888-4RCOAST 252-946-6481
Fax: 252-247-3330 Fax: 252-948-0478
(Serves:Carteret,Craven,Onslow- (Serves: Beaufort, Bertie, Hertford, Hyde,
North of New River Inlet-and Pamlico Tyrrell and Washington Counties)
Counties)
Elizabeth City District Wilmington District
401 S. Griffin St. 127 Cardinal Drive Ext.
Ste. 300 Wilmington, NC 28405-3845
Elizabeth City, NC 27909 910-796-7215
252-264-3901 Fax: 910-395-3964
Fax: 252-264-3723 (Serves: Brunswick, New Hanover,
(Serves:Camden,Chowan,Currituck, Onslow-South of New River Inlet-
Dare, Gates, Pasquotank and Perquimans and Pender Counties)
Counties)
http://portal.ncdenr.org/web/cm/dcm-home
Revised 7/06/17
//1/ 111) //Yr/� 4
1'
ROY COOPER
{.? Governor
MICHAEL S. REGAN
Secretary
Coastal Management BRAXTON DAVIS
ENVIRONMENTAL QUALITY Director
BUFFER AUTHORIZATION CERTIFICATE FOR SHORELINE STABILIZATION
A riparian buffer authorization is required for shoreline stabilization activities within the Neuse and Tar-Pamlico River
basins per Division of Water Resources(DWR) regulations 15A NCAC 02B.0233 and 0259. The Division of Coastal
Management(DCM)through a Memorandum of Understanding with the Division of Water Resources(DWR) has
reviewed your project proposal and has determined that the project as proposed complies with the aforementioned
regulations.
Those activities covered by your Coastal Area Management Act(CAMA) permit have received Buffer Authorization
provided the project is constructed in a manner that continues to meet all of the conditions listed below. Failure to
comply with this Buffer Authorization may subject the property owner and the party(contractor) performing the
construction and/or land clearing to a civil penalty by DWR of up to$25,000 per day per violation.
1. Impacts: Impacts to woody vegetation from clearing and filling in Zone 1(begins at the most landward of either
normal water line(NWL)or normal high water line(NHWL)and extends 30 feet landward)shall be minimized to
what must be impacted for the sound installation of the shoreline stabilization project. Unnecessary clearing and
filling in the buffer is a violation of the riparian buffer rules.
2. Clearing& Grading:Clearing and grading of Zone 2 (begins at the landward edge of Zone 1 and extends 20 feet
landward) is allowed provided that it is re-vegetated immediately and Zone 1 is not compromised,which includes
maintaining diffused (non-channelized) flow of storm water runoff through the buffer.
3. Construction Corridors: Construction corridors are allowed for shoreline stabilization projects, but they must be
satisfactorily restored as described in condition 5 below.
4. Potential Dverwash: For vertical shoreline stabilization projects (bulkheads)only;sites where wave overwash is
expected to be severe,the first ten(10)feet landward (unless specifically authorized otherwise by DCM)from the
structure may be maintained as a stable lawn in order to provide for structural stability.
s. Temporary Stabilization: Immediately post-construction, bare soils must be stabilized as quickly as possible by
providing a temporary ground cover. Newly seeded areas should be protected with mulch and/or erosion matting.
This ground cover is a temporary measure used to address erosion until site restoration can be accomplished.
6. Site Restoration:At minimum, pre-project site conditions must be re-established.A site that was wooded prior to
this shoreline stabilization project must be restored with woody vegetation at a stem density of 260 stems per acre.
Non wooded sites may be re-vegetated with woody vegetation. Restoration must be completed by the first
subsequent planting season (November 1 through March 30)after completion of the bulkhead.
• Pre-project site conditions:
7. Project Drawing:The drawing on the CAMA General Permit is considered the project drawing of your property
indicatingthe location of the shoreline stabilization structure and anyassociated clearing,
grading,and construction
corridors.This drawing will be used to aid in compliance and monitoring efforts.
By your signature below you agree to be held responsible for meeting all of the above listed conditions and verify that all
information is complete and accurate.
Agent or Applicant Printed Name Permit Officer's Signature
Agent or Applicant Signature Issue Date
CAMA GENERAL PERMIT#:
State of North Carolina I Environmental Quality I Coastal Management
Washington Office 1943 Washington Square Mall Washington.NC 27889 1252-946-6481
Wilmington Office 127 Cardinal Drive Ext.Wilmington,NC 26405-3845 1910-796-7215
Morehead City Office 1400 Commerce Avenue Morehead City.NC 28557 1252-808-2808
NC Division of Coastal Mgt. Habitat Impact Computer Sheet
Applicant: \AI\.r�►J �," t-T
Date: - . —ID I 1
General Permit#:
LY J z'7-3
Describe below the HABITAT disturbances for the application. All values should match he name,and units of measurement
found in your Habitat code sheet.
TOTAL Sq. Ft. FINAL Sq. Ft. TOTAL Feet FINAL Feet
(Applied for. (Anticipated final (Applied for. (Anticipated final
DISTURB TYPE Disturbance total disturbance. Disturbance disturbance.
Habitat Name Choose One includes any Excludes any total includes Excludes any
anticipated restoration any anticipated restoration and/or
restoration or and/or temp restoration or temp impact
temp impacts) impact amount) temp impacts) amount)
oL,, Dredge❑ Fill❑ Both ❑ Other ca. 4,9 fi ) to I. 11-
Dredge❑ Fill❑ Both ❑ Other El --
Dredge❑ Fill❑ Both 0 Other 0
Dredge❑ Fill❑ Both ❑ Other ❑
Dredge❑ Fill❑ Both 0 Other ❑
Dredge❑ Fill❑ Both ❑ Other ❑
Dredge❑ Fill❑ Both 0 Other ❑
Dredge❑ Fill❑ Both ❑ Other ❑
Dredge❑ Fill❑ Both 0 Other ❑
Dredge❑ Fill❑ Both ❑ Other ❑
Dredge❑ Fill❑ Both ❑ Other ❑
Dredge❑ Fill 0 Both ❑ Other ❑
Dredge❑ Fill❑ Both ❑ Other El
• Dredge❑ Fill❑ Both 0 Other ❑
•. i. 1:2-)3 ..