HomeMy WebLinkAboutProblem Drainage Area Evaluation-20001 TVt/N Town of Kitty Hawk Problem Drainage Area Evaluation Submitted by URS 5606B Virginia Beach Blvd Virginia Beach, VA 23462 (757)499-4224 L -i J •,7.� • September 22, 2000 Town of Kitty Hawk Mr. Timothy W. Owens Assistant Town Manager 101 Veterans Memorial Drive Post Office Box 549 Kitty Hawk, North Carolina 27949 Dear Mr. Owens: As agreed to per your telephone conversation with James,Peaco on September, 12, 2000, URS Corporation (URS) is pleased to submit six (6) final copies of the enclosed Problem Drainage Area Evaluation. As you will see, the.evaluation includes recommendations and cost estimates for drainage improvements, at,nine sites, including the Austin Cemetery Road Area. URS appreciates being given the opportunity to assist the Town in meeting its stormwater management needs. Please call Bud Curtis at (757) 499-4224 or James Peaco at (757) 321-1255 if you have any questions. Sincerel LWC.jmj Enclosure URS Corporation Executive Cove Center 5606B Virginia Beach Boulevard Virginia Beach, VA 23462-5631 Tel: 757.499.4224 Fax: 757.473.8214 FUNDING CREDIT • The preparation of this document was financed in part through a grant provided by the North Carolina Coastal Management Program, through funds provided by the Coastal Zone Management Act of 1972, as amended, which is administered by the Office of Ocean and Coastal Resources Management, National Oceanic and Atmospheric Administration. • TOWN OF KITTY HAWK PROBLEM DRAINAGE AREA EVALUATION EXECUTIVE SUMMARY LO INTRODUCTION The Town of Kitty Hawk (Town) is located in the Tidewater region of the coastal plain in northeastern North Carolina. The Town was incorporated in 1981 and is located in Dare County. The Town contains approximately 8.2 square miles of land area and is bordered by the towns of Southern Shores and Kill Devil Hills. Surrounding surface waters include the Atlantic Ocean, Currituck Sound, and Kitty Hawk Bay. Currently, the Town experiences nuisance flooding in some areas when there is a storm of an intensity that occurs on the average of once every two years. The Town currently experiences more serious but still relatively minor flooding problems when there are storms of greater intensity occurring on the average of once every five to ten years. Major flooding regularly occurs during northeasters and hurricanes The Town contracted URS Corporation (URS) to evaluate areas identified by the Assistant Town Manager that experience stormwater-related problems such as street flooding, ponding of runoff, and ocean overwash. This report contains descriptions of the problem areas and provides conceptual recommended design alternatives with cost estimates for alleviating site -specific drainage problems. 2.0IDENTIFICATION AND EVALUATION OF PROBLEM DRAINAGE AREAS Areas in the Town identified as experiencing recurring drainage problems are shown in Figure 1. The individual areas and the associated drainage problems are listed as follows: (1) Kitty Hawk Estates — Poor drainage and standing water. (2) Ponding of Runoff at the Byrd Avenue/Lindbergh Avenue intersection. (3) Ponding of ocean overwash between U.S. 158 and N.C. 12. (4) Ponding of street runoff on Ascension Drive and Tateway Road near U.S. 158. (5) Lot flooding on Lightkeepers Way due to street runoff from Beacon Drive. (6) Flooding on U.S. 158 at Beacon Drive. (7) Kitty Hawk Village — Roadway flooding and blockage of emergency vehicle access during coastal storms. (8) Poor street drainage on Kitty Hawk Road near Austin Cemetery. (9) Kitty Hawk Landing — Poor street drainage on Ivy Lane. • 3.0 PRIORITIZED RECOMMENDATIONS Based on a review of the identified problem drainage areas in Kitty Hawk, URS has developed a priority ranking for the implementation of the proposed drainage improvements. Protection of public health and safety and conformance with North Carolina stormwater management regulations were the primary considerations in the ranking analysis. As shown in Table I on the following page, the Beacon Drive/U.S. 158 intersection was ranked No. 1 by URS. As shown in Photograph 3, a significant potential for accidents exists at this location during routine storm events due to inundation of the road surface and the moderately high speed limit. The areas of ocean overwash between U.S. 158 and N.C. 12 were ranked No. 2 by URS. Although a significant public health and safety concern, the ocean overwash events occur only during moderate to severe storm events and the potential for repetitive automobile accidents is much lower than the Beacon Drive/U.S. 158 intersection. Ascension Drive/Tateway Road and Light Keepers Way were ranked Nos. 3 and 4, respectively, due to the potential for repetitive problems during routine to moderate storms and the potential for damage to private property. Kitty Hawk Estates was ranked No. 5 due to its significant drainage problem but moderately low potential for detriment to public safety or private property. • Kitty Hawk Village was ranked No. 6 because its location in an area of low-lying topography precludes a cost-effective method for significantly minimizing repetitive flooding; however, the poor existing condition of culverts should be addressed. n U Byrd Street, Kitty Hawk Road near Austin Cemetery, and Kitty Hawk Landing are ranked Nos. 7 through 9, respectively, due to their location in residential areas with low speed limits and a low potential for detriment to public safety or private property. it • • Table I Prioritized'Recommendations Rank Site Number and ID Recommended Estimated Cost Alternative 1 Site 6 — Flooding at Swale $1,507,000 intersection of Beacon improvements and Drive and U.S. 158 pump station. 2 Site 3 — Ponding of Sump boxes and $280,500 ocean overwash pipe stands for between U.S. 158 and connecting portable N.C. 12 pumps. 3 Site 4 — Ponding of Construction of $7,900 street runoff on roadside infiltration Ascension Drive and swales. Tateway Road 4 Site 5 — Lot flooding at Construction of $1,000 105 Light Keepers Way roadside infiltration due to street runoff. swales. 5 Site 1 —Poor drainage Culvert $33,500 and standing water in replacement and Kitty Hawk Estates improvement. 6 Site 7 — Roadway Culvert $62,500 flooding in Kitty Hawk replacement and Village improvement. 7 Site 2 — Ponding of Removal of <$200 runoff at the Byrd existing berm and Street/Lindbergh utilization of Avenue intersection. existing swale. 8 Site 8 — Poor street Construction of $5,300 drainage on Kitty roadside infiltration Hawk Road near swales. Austin Cemetery. 9 Site 9 — Poor street Construction of $2,600 drainage on Ivy Lane in roadside retention Kitty Hawk Landing. swales. 0 TOTAL COST: $1,900,500 • 3.1 Cost Considerations As can be seen below Table I, the total cost of the recommended drainage improvements is $1,900,500. Typically, the alternatives recommended in Table I have the lowest associated costs. The recommended alternative for the Beacon Drive/U.S. 158 intersection does not have the lowest associated cost. A discussion of this location is provided as follows. Beacon Drive/U.S. 158 Intersection As discussed in Sections 2.2.1.1 through 2.2.1.3 of the report, the drainage alternatives and associated costs for this location include: • Swale improvements and pump station $1,507,000 • Swale improvements and infiltration basin $1,512,000 • Swale improvements alone $33,700 The infiltration basin alternative was not recommended due to the high cost and safety considerations associated with a relatively deep (4 feet) basin in an area prone to public access. Although the least expensive alternative, swale improvements alone provide • roadway protection for only routine storms and do not meet the NCDOT 50-yr storm design criteria for primary roads. Following moderate to severe storms, the roadway would still be subject to inundation and no method currently exists to remove standing water at this location. In addition, the proposed expansion of U.S. 158 to six lanes would further limit space availability for swale improvements in the future. • The swale improvement and pump station alternative was recommended because it provides the highest level of roadway and water quality protection. During and/or following moderate to severe storms, the pump station can be utilized to remove standing water from the roadway surface. For routine storms, the recommended use of overflow -type inlet structures in the swales will allow most or all of the runoff to be retained and infiltrated. Additionally, if desired, the design and construction of the pump station and HDPE force main can be performed in conjunction with the highway widening project. If space limitations associated with the widening project prevent the construction of swales, a curb and gutter system can be utilized in this area to convey runoff to the pump station. IV TOWN OF KITTY HAWK PROBLEM DRAINAGE AREA EVALUATION 1.0 INTRODUCTION................................................................................................................... 1 2.0 IDENTIFICATION AND EVALUATION OF PROBLEM DRAINAGE AREAS ..................... 1 2.1 Kitty Hawk Estates........................................................................................................ 2 2.1.1 Recommendations....................................................................................... 3 2.2 Intersection of U. S. 158 and Beacon Drive................................................................. 5 2.2.1 Potential Drainage Alternatives.................................................................. 6 2.2.1.1 Option 1-Piped Ocean Outfall......................................................... 6 2.2.1.2 Option 2-Constructed Infiltration Basin ........................................ 11 2.2.1.3 Option 3-Infiltration Swales and Culvert Improvements .............. 14 2.3 Areas Between U. S. 158 and N. C. 12....................................................................... 15 2.3.1 Intersection of Lindbergh Avenue and Byrd Street ................................... 15 2.3.1.1 Potential Drainage Alternatives.................................................... 17 2.3.1.2 Option 1-Regraded (Crowned) Road Surface and Constructed Infiltration Swales......................................................................... 18 2.3.1.3 Option 2-Taffic-Rated Trench Drains and Constructed Infiltration Swales........................................................................................... 19 2.3.1.4 Option 3-Constructed Infiltration Basin and Piped Collection System (Location A).................................................................................. 21 2.3.1.5 Option 4-Constructed Infiltration Basin and Piped Collection System (Location B).................................................................................. 22 2.3.1.6 Option 5-Berm Removal and Utilization of West Parking Area Swale............................................................................................ 23 2.3.2 Sea Dunes Condominium Complex.......................................................... 24 2.3.2.1 Jointly Maintained Infiltration Basin ............................................ 25 2.3.3 Areas of Ocean Overwash......................................................................... 26 2.3.3.1 Potential Drainage Alternatives.................................................... 27 2.3.3.2 Piped Collection System and Gravity Ocean Outfall.................... 28 2.3.3.3 Piped Collection System With Pumping Station and Ocean Outfall.......................................................................................... 28 2.3.3.4 Sump Boxes and Portable Pumps ................................................. 28 2.4 Kitty Hawk Village..................................................................................................... 31 2.4.1 Recommendations.....................................................................................33 2.4.2 Cost Estimates........................................................................................... 34 2.5 Austin Cemetery Road Area....................................................................................... 34 2.5.1 Recommendations.....................................................................................35 2.5.2 Cost Estimates........................................................................................... 36 2.6 Kitty Hawk Landing................................................................................................... 36 2.6.1 Recommendations.....................................................................................37 2.6.2 Cost Estimates........................................................................................... 38 • 2.7 Tateway Road and Ascension Drive........................................................................... 38 2.7.1 Recommendations.....................................................................................40 2.7.2 Cost Estimates........................................................................................... 40 2.8 Light Keepers Way..................................................................................................... 41 2.8.1 Recommendations.....................................................................................42 2.8.2 Cost Estimates........................................................................................... 43 3.0 PRIORITIZED RECOMMENDATIONS............................................................................. 43 3.1 Cost Considerations.................................................................................................... 45 • • • Figure FIGURES Follows 1 Problem Drainage Areas Page 1 2 Kitty Hawk Estates Page 2 3 Proposed Pond Outlet Structure and Drainage Culvert Page 4 4 Beacon Drive-U.S. 158 Intersection Page 6 5 Beacon Drive Drainage (Option 1) Page 8 6 Beacon Drive Drainage (Option 2) Page 12 7 Byrd Avenue Drainage (Option 1) Page 18 8 Byrd Avenue Drainage (Option 2) Page 19 9 Byrd Avenue Drainage (Option 3) Page 21 10 Byrd Avenue Drainage (Option 4) Page 22 11 Type I Sump Box Page 28 12 Type H Sump Box Page 28 13 Proposed Sump Box Locations Page 29 14 Proposed Sump Box Locations Page 29 15 Proposed Sump Box Locations Page 29 16 Austin Cemetery Road Area Page 35 • 17 Kitty Hawk Landing Page 38 18 Tateway Road and Ascension Drive Page 40 19 Light Keepers Way Page 43 r 1 L_J Table TABLES Page 2.1 Cost Estimates for Kitty Hawk Estates 4 2.2 Cost Estimates for Beacon Drive/U.S. 158 (Option 1) 11 2.3 Cost Estimates for Beacon Drive/U.S. 158 (Option 2) 14 2.4 Cost Estimates for Beacon Drive/U.S. 158 (Option 3) 15 2.5 Cost Estimates for Byrd Street (Option 1) 19 2.6 Cost Estimates for Byrd Street (Option 2) 20 2.7 Cost Estimates for Byrd Street (Option 3) 22 2.8 Cost Estimates for Byrd Street (Option 4) 23 2.9 Cost Estimates for Areas of Ocean Overwash 31 2.10 List of Culverts in Kitty Hawk Village Study Area 32 2.11 Cost Estimates for Kitty Hawk Village 34 2.12 Cost Estimates for Austin Cemetery Road Area 36 2.13 Cost Estimates for Kitty Hawk Landing 38 2.14 Cost Estimates for Tateway Road and Ascension Drive 41 2.15 Cost Estimates for Light Keepers Way 43 3.1 Prioritized Recommendations 44 171 TOWN OF KITTY HAWK PROBLEM DRAINAGE AREA EVALUATION 1.0 INTRODUCTION The Town of Kitty Hawk (Town) is located in the Tidewater region of the coastal plain in northeastern North Carolina. The Town was incorporated in 1981 and is located in Dare County. The Town contains approximately 8.2 square miles of land area and is bordered by the towns of Southern Shores and Kill Devil Hills. Surrounding surface waters include the Atlantic Ocean, Currituck Sound, and Kitty Hawk Bay. Currently, the Town experiences nuisance flooding in some areas when there is a storm of an intensity that occurs on the average of once every two years. The Town currently experiences more serious but still relatively minor flooding problems when there are storms of greater intensity occurring on the average of once every five to ten years. Major flooding regularly occurs during northeasters and hurricanes The Town contracted URS Corporation (URS) to evaluate areas identified by the Assistant Town Manager that experience stormwater-related problems such as street flooding, ponding of runoff, and ocean overwash. This report contains descriptions • of the problem areas and provides conceptual recommended design alternatives with cost estimates for alleviating site -specific drainage problems. 2.0IDENTIFICATION AND EVALUATION OF PROBLEM DRAINAGE AREAS Areas in the Town identified as experiencing recurring drainage problems are shown in Figure 1. The individual areas and the associated drainage problems are listed as follows: (1) Kitty Hawk Estates — Poor drainage and standing water. (2) Ponding of Runoff at the Byrd Avenue/Lindbergh Avenue intersection. (3) Ponding of ocean overwash between U.S. 158 and N.C. 12. (4) Ponding of street runoff on Ascension Drive and Tateway Road near U.S. 158. (5) Lot flooding on Lightkeepers Way due to street runoff from Beacon Drive. (6) Flooding on U.S. 158 at Beacon Drive. (7) Kitty Hawk Village — Roadway flooding and blockage of emergency vehicle access during coastal storms. (8) Poor street drainage on Kitty Hawk Road near Austin Cemetery. (9) Kitty Hawk Landing — Poor street drainage on Ivy Lane. • Evaluations, cost estimates, and recommended alternatives for the individual problem areas are provided in the following sections. PROBLEM DRAINAGE AREAS O 0 i O to O cn 9 KITTY HAWK r; ESTATES_ ll W P' Q �+��]11j KITTY HAWK LANDING THE INFORMA TION SHO WN IN THIS FIGURE WAS REFORMATTED BY UR S GREINER WOOD WARD CL YDE FROM Y MAPPING PR 0 VIDED BY OTHERS IN 04 lt- THE KITTY HA WK LAND USE PLAN. a CULVERT (TYP) KITTY HAWK VILLAGE GRAPHIC SCALE 1000' 0 1000' 1 " = 1000' a 7 8 :o`voa� o ,eeoo 0 Ip�, oeeo O��e eeeQ env a e� op\ 77 OKITTY HAWK ESTATES —POOR DRAINAGE AND STANDING WATER OPONDING OF RUNOFF AT THE BYRD AVE/LINDBERGH AVE INTERSECTION OPONDING OF OCEAN OVERWASH BETWEEN U.S. 158 AND N.C. 12 OPONDING OF STREET RUNOFF ON ASCENSION DRIVE AND TATEWAY ROAD NEAR U.S. 158 OLOT FLOODING ON LIGHT KEEPERS SPAY DUE TO STREET RUNOFF FROM BEACON DRIVE O6 FLOODING ON U.S. 158 AT BEACON DRIVE OKITTY HAWK VILLAGE — ROADWAY FLOODING AND BLOCKAGE OF EMERGENCY VEHICLE ACCESS DURING COASTAL STORMS D 3OPOOR STREET DRAINAGE ON WEST KITTY HAWK ROAD AT AUSTIN CEMETERY OKITTY HANK LANDING —POOR STREET DRAINAGE 9 AND STANDING WATER ON IVY LANE �n 5 K� 3 ►V �OJ�O THE PREPARATION OF THIS FIGURE WAS FINANCED IN PART THROUGH A GRANT PROVIDED BY THE NORTH CAROLINA COASTAL MANAGEMENT PROGRAM, THROUGH FUNDS PROVIDED BY THE COASTAL ZONE MANAGEMENT ACT OF 1972, AS AMENDED, WHICH IS ADMINISTERED BY THE OFFICE OF OCEAN AND COASTAL RESOURCES MANAGEMENT, NATIONAL OCEANIC AND ATMOSPHERIC ADMINISTRATION. TOWN OF KITTY HAWK DARE COUNTY, NORTH CAROL[NA KITTY HAWK STORMWATER MANAGEMENT PLAN PROBLEM DRAINAGE AREAS FIGURE 1 URS Greiner 5606E VIRGINIA BEACH BOULEVARD Wood ward — CI yd e VIRGINIA BEACH, VIRGINIA 23462 • • 2.1 Kitty Hawk Estates As can be seen in Figure 1, the Kitty Hawk Estates subdivision is located in northern Kitty Hawk adjacent to U.S. 158. A visual inspection of the subdivision performed by URS Corporation indicated that the existing drainage system for Kitty Hawk Estates includes lot -line grassed swales, driveway culverts, and residential lakes. The grassed swales along Windsor Place, Sycamore Lane, Poplar Court, Locust Court, and the east side of Birch Lane appeared to have been designed to collect and discharge street and yard runoff to two lakes generally bounded by Birch Lane, Treasure Street and Windsor Place (see Figure 2). Lot - line grassed swales along the west side of Birch Lane appeared to convey runoff to the southwest side of the intersection of Birch Lane and Treasure Street, where the runoff tended to pool. Two additional lakes, located west of Birch Street, were located in a wooded section of Kitty Hawk Estates that was undeveloped at the time of the visual inspection. Existing drainage problems identified in Kitty Hawk Estates by URS Corportation included standing water in lot -line swales as shown in Photograph 1 and high lake water surface elevations as shown in Photograph 2. The visual inspection of the subdivision revealed that the lake drainage problems appeared to have been created by the failure of existing corrugated metal lake inlet and outlet culverts due to a combination of corrosion and sedimentation. With no effective drainage outlets, the water surface elevations in the two residential lakes had apparently risen and caused water to pond in swales along Treasure Street. In addition to the lake drainage issues, some of the driveway culverts in Kitty Hawk Estates appeared to be plugged due to lack of maintenance or blocked by residents. Generally, standing water in swales was observed in all areas of Kitty Hawk Estates except for the northeast quadrant, which was characterized by high ground 2 • Ir I THE PREPARATION OF IRIS FIGURE WAS FINANCED IN PART THROUGH A GRANT PROVIDED BY IRE NORTH CAROLINA COASTAL MANAGEMENT PROGRAM, THROUGH FUNDS PROVIDED BY THE COASTAL ZONE MANAGEMENT ACT OF 1972, AS AMENDED, WHICH IS ADMINISTERED BY THE OFFICE OF OCEAN AND COASTAL RESOURCES MANAGEMENT, NATIONAL OCEANIC AND ATMOSPHERIC ADMINISTRATION. LJ G 19 0 a WMDSOR SCALE. 1 =300' U.S. 158 '9 Ir�.11Un PROPOSED CORRUGATED IPAi HDPE REPLACEMENT CULVERT PROPOSED RIPRAP FO EROSION ONTROL ( ) PROPOSED CORRUGATED HDPE REPLACEMENT CULVERT KRIY HAWK WOODS D surface elevations relative to the rest of the subdivision, steep swale slopes and • sandy soils. This was confirmed by a review of the Soil Survey of Dare County, North Carolina, which was prepared by the U.S. Soil Conservation Service (SCS). The Dare County soil survey indicates that the northeast quadrant of Kitty Hawk Estates is characterized by Fripp fine sand, which drains readily due to high infiltration capacity and has a seasonal minimum depth to the high groundwater table elevation of greater than 6 feet. The northwest, southwest, and southeast quadrants of Kitty Hawk Estates are generally characterized by Ousley fine sand, which drains poorly when wetted due to slow infiltration capacity and has a seasonal minimum depth to the high groundwater elevation of 1.5 to 3 feet. It should be noted that the current Dare County soil survey was prepared from aerial photography completed in 1982. At that time, Kitty Hawk Estates had not been developed; therefore, the drainage capacity of the subdivision soils has likely been reduced by the subsequent placement of imported fill material during the construction of house foundations and streets. 2.1.1 Recommendations When Kitty Hawk Estates was constructed, the two lakes within the developed portion of the subdivision were utilized to receive street and yard drainage. Outlet culverts for the two lakes discharged into the northern end of the current Kitty Hawk Woods Conservation Easement, which is consistent with the original natural drainage pattern. Kitty Hawk Woods is approximately 461 acres of • maritime forest for which the Town owns the title to the lands and the State holds the conservation easement. The culvert discharge points are currently located in a privately owned tract of land on the south side of Treasure Street. Kitty Hawk Estates is currently located in Town zoning district BR-1 (Low - Density Beach Residential). Stormwater Best Management Practices (BMPs) in coastal county low -density zoning districts are limited by North Carolina regulations to predominantly vegetated conveyances and/or curb and gutter systems which discharge to vegetated buffers. Kitty Hawk Estates meets State low -density BMP requirements because all street and yard drainage are conveyed by grassed swales and ultimately is discharged to the heavily wooded and vegetated "buffer area" comprised by Kitty Hawk Woods. In addition, State low - density BMP design criteria are exceeded in Kitty Hawk Estates because the majority of the grassed swale drainage enters two residential lakes, which essentially serve as wet detention ponds for stormwater discharges prior to entering Kitty Hawk Woods. Because of the water quality protection provided by the existing drainage system, the following improvements are recommended for the Kitty Hawk Estates drainage system: (1) It is recommended that the existing lake inlet and outlet culverts be replaced • for the two lakes in the developed area of Kitty Hawk Estates. Replacing these culverts will reinstate positive drainage for the subdivision, lower the existing • lake water surface elevations, and improve driving conditions in low-lying areas of the neighborhood during storm events. By lowering the lake water surface elevations, the adjacent swales will be able to drain more freely and the amount of standing water will be reduced. Because of its strength and corrosion resistance, corrugated HDPE piping is recommended for the replacement culverts. Inlet weir structures are recommended for the culverts to minimize the introduction of vegetation, sediment and debris. Outlet protection for erosion control should be provided by the placement of rip -rap at the culvert discharge points. Proposed outlet culvert replacement locations are shown in Figure 2 and a conceptual cross section for the culvert and weir structures is shown in Figure 3. (2) It is recommended that existing street and driveway culverts should be cleaned and/or replaced as necessary. New culverts should be installed for all driveway entrances that do not have existing culverts and block the swale drainage system. New culverts and replacement culverts should be constructed of corrugated HDPE and have a minimum diameter of 15 inches. Metal culverts should not be used. (3) Following the restoration of the lake outlet culverts, regrading of the existing swale system should be accomplished, as required, to provide positive drainage for all lot -line swales. In the absence of current survey mapping, the extent or cost of potential swale regrading requirements cannot be accurately estimated at this time. • Cost Estimates • Costs for the replacement of the existing lake drainage culverts are provided as follows in Table 2.1. Costs for cleaning and repairing driveway/street culverts and regrading lot -line swales are considered maintenance items and cannot be accurately estimated at this time Table 2.1 Cost Estimates for Drainage Improvements Katy Hawk Estates, ,. Unit Amount Cost Total Weir Inlet Structures ea. 4 $2,500 $10,000 Headwalls ea. 4 $1,900 $7,600 Corrugated HDPE (24-inch) l.f. 200 $10.50 $2,100 Pavement Removal S.Y. 54 $7.30 $400 Pavement Replacement S.Y. 54 $35.00 $1,900 Trenching C.Y. 108 $10.00 $1,100 Backfill/Compaction C.Y. 90 $40.00 $3,600 Rip Rap c.y. 40 $30.00 $1,200 Subtotal $27,900 20% Contingency $5,600 Total $33,500 4 • • 8 FRP GRATING 5'-0" MOUNTED ON EXTERIOR OF 2'xl' S-8" ROAD SURFACE SIDE OPENING 8„ 2 —0' (TYP) 2'-0„ 2'-0" POND OVERFLOW W.S.E. e = CORRUGATED HPDE 2'-6" TRANSITION FITTING FERNCO COUPLING NORMAL POND sz W.S.E. 2'-0" HEADWALL SS PIPE CLAMPS H-25 TRAFFIC RATED CORRUGATED HDPE MOLDED HOPE SELECTED BACKFILL FLOW--- STUB END RIP RAP MOLDED HDPE DISCHARGE TO (T�) -� STUB FND L �T 11 II II II UPPER KITTY HAWK WOODS SELECTED BACKFILL RIP RAP ; (TYP) CONCRETE PIPE CORRUGATED HPDE HDPE SPOOL PIECE e SUPPORT TRANSITION FITTING CONCRETE PIPE \�FERNCO COUPLING SUPPORT DPE SPOOL PIECE SCALE: 1 "=50' THE PREPAAATON OF THIS FIGURE WAS FINANCED IN TOWN OF KITTY HAWK n r CAROLNA'COASTAL MANAGEMENT PROGRAM. IHRRO GII DARE COUNTY, NORTH C.AROLINA IOITTHAyM glpgMp,KiER MAN 'X'TPI„1N pROP05®PoND OVRGf SDtUCI11RE AND DRAINAGE CUINE �O FUNDS PROVIDED BY THE COASTAL ZONE MANAGEMENT ACT OF 1972. AS AMENDED, MICH IS ADMINISTERED BY THE OFFICE OF OCEAN AND COASTAL RESOURCES FIGURES 6 MANAGEMENT, NATIONAL OCEANIC AND ATMOSPHERIC i2 ADMINISTRATION. �x, 0� a W • 2.2 Intersection of U.S. 158 and Beacon Drive As can be seen in Figure 1, the intersection of U.S. 158 and Beacon Drive is located in the southeast portion of Kitty Hawk. A more detailed view of the study area is provided in Figure 4, The mapping shown in Figure 4 was generated by URS Corporation using digital base mapping provided by the Town and topographic mapping of the beach area, provided by the U.S. Army Corps of Engineers (COE), from a 1996 Dare County Feasibility Study For Shore Protection. As can be seen in Figure 4, the boundary of the topographic beach mapping provide by the COE is the southwest edge of U.S. 158. Current topographic mapping for areas in Kitty Hawk located southwest of U.S. 158 was not in existence at the time of this evaluation. • Existing drainage problems observed by URS Corporation include localized ponding and inundation of the U.S. 158 road surface during a moderate (1.3-inch) rainfall event on April 15, 2000. As shown in Photograph 3, runoff from Beacon Drive and the south -bound lanes of U.S. 158 tends to pond on the shoulder near the Beacon Drive intersection. Town administrators indicated that several accidents have occurred at this location due to automobiles hydroplaning at approximately 50 miles per hour on the standing water. Additionally, U.S. 158 is a designated hurricane evacuation route and the potential for restricted travel capability due to roadway inundation is a critical safety issue for the Outer Banks as a whole. A visual inspection performed by URS Corporation indicated that the existing drainage system at the intersection consists of shallow grassed swales along U.S. • 158 (see Photograph 3). Runoff discharged to these swales includes sheetflow from the U.S. 158 road surface, piped outlet discharges from adjacent commercial 5 parking lots, and swift downhill flow from the section of Beacon Drive that • originates in relatively high (approximately 30 ft.) dune areas. The drainage along U.S. 158 in the area between West Kitty Hawk Road and the first driveway crossing southeast of the Noland Corporation appeared to be poor due to (1) the limited storage capacity of the existing swales, (2) the inability of runoff to pass through or across the grassed road shoulder into the existing swales, and ineffective or non-existent roadway entrance culverts. Because of these conditions, runoff is confined to the southwest side of U.S. 158 in the general area of the Beacon Drive intersection. 2.2.1 Potential Drainage Alternatives Potential drainage alternatives for this location include (1) A piped ocean outfall (2) a constructed infiltration basin, and (3) improvement of roadside swales and culverts. Discussions of each alternative are provided in the following paragraphs. 2.2.1.1 Option 1- Piped Ocean Outfall A piped roadway inlet drainage system with curb -and -gutter and a gravity -flow ocean outfall does not appear to be feasible at this location because, as can be seen in Figure 4, the invert of a junction box outlet on the southwest side of U.S. • 158 would have to be set at an elevation of approximately 6 feet or less. Progressing toward the ocean, the next location where an elevation of 6 feet occurs is the surf zone (approximately 130 feet northeast of N.C. 12). In addition to the lack of differential elevation required for substantial gravity flow, a storm sewer outlet in the surf zone would pose a high risk of flooding on U.S. 158 due to backflow during a storm surge (which could potentially generate tidal elevations of 11-16 feet during a 100-year storm event). Although "Tide -flex'"" type flexible check valves (duckbills) are frequently used for coastal outfall applications, they typically are susceptible to damage in areas prone to severe storm surges and wave action. An existing 36-inch diameter gravity stormwater outfall in nearby Kill Devil Hills (the Lake Drive outfall) is shown in Photograph 4. As can be seen in Photograph 4, the outfall invert is located in the surf zone. The Lake Drive outfall is constructed of reinforced concrete pipe, which is mounted to wooden piles using U-shaped metal saddles and stainless steel bolts. A town maintenance employee from Kill Devil Hills indicated that although originally installed with a flexible check valve when constructed, the check valve was damaged during storms and not subsequently replaced. Currently, the Lake Drive outfall reportedly tends to become plugged with sand following severe storm events and the concrete storm sewer pipeline has experienced joint separation due to settlement in the dune and beach sand. is • 10 N. G 12 BLACK PELICAN RESTAURANTCZD oD POST POST OFFIC t 1 ^ 20 a THE PRBPARATION OF THIS FIGURE WAS FINANCED IN ! PART THROUGH A GRANT PROVIDED BY THE NORTH CAROLINA COASTAL MANAGEMENT PROGRAM, THROUGH FUNDS PROVDED BY THE COASTAL ZONE MANAGEMENT ACT OF 1972, AS AMENDED, WHICH IS ADMINISTERED BY THE OFFICE OF OCEAN AND COASTAL RESOURCES MANAGEMENT, NATIONAL OCEANIC AND ATMOSPHERIC ADMINISTRATION. 0 ATLANTIC OCEAN l !mu F-1W PONDING AREA ON U.S. 158 U.S. 158 SCALE: 1 "=200' Photograph 4 — Lake Drive storm sewer outfall (36-inch diameter reinforced concrete) in Kill Devil Hills. In lieu of a gravity storm sewer outfall, a stormwater pump station and ocean outfall force main that would include approximately 1,000 feet of high density polyethylene (HDPE) piping could be constructed to the beach on the northeast side of N.C. 12. Due to the lack of space availability on the southwest side of U.S. 158 , the proposed pump station location is on the northeast side of U.S. 158 in • an open area that is currently part of U.S. Post Office property. To convey roadway runoff to the proposed stormwater pump station, swale improvements and collector inlets will be required on the southwest side of U.S. 158 between West Kitty Hawk Road and the first driveway entrance southeast of the Noland Corporation property. By widening and deepening the existing swales, the runoff storage volume of the existing swales can be significantly increased. By utilizing an overflow -type weir configuration and filter screens for the drainage system inlet structures, the increased storage capacity of the swales can be utilized to retain and infiltrate the runoff from light to moderate storm events without activation of the stormwater pumps. Infiltration in the swales is feasible at this location because of the high permeability (> 20 inches per hour) of the Newhan sands present and the associated minimum seasonal depth to the high ground water table of greater than 6 feet (as listed in the SCS Dare County Soil Survey). For intense storm events during which runoff enters the pump station sump pit, the pumps will cycle on -and -off based on level controllers. Preliminary Design Criteria The preliminary design criteria utilized for developing cost estimates for Option I are listed as follows: 0 • The estimated impervious asphalt surface area contributing runoff to the • site is 5 acres. This estimate conservatively includes impervious surfaces on the Noland Corporation facility, which currently utilizes an on -site infiltration basin to retain runoff. The runoff generated by Newhan sand in elevated dune areas southwest of U.S. 158 and is considered minimal. • Using the Rational Method with a 50-year design storm (to meet North Carolina primary road drainage standards) and a minimum time of concentration (Tc) of 10 minutes, the associated design storm intensity is 7.0 inches/hour (as derived from the Hatteras rainfall intensity duration curve in the North Carolina Erosion and Sediment Control Design Manual). Using an intensity of 7.0 in./hr, a runoff factor (C) of 0.95 for asphalt, and a contributing watershed of 5 acres yields a peak runoff rate of 33.3 cubic feet per second (cfs). This is equivalent to 14,920 gallons per minute (gpm) or 21.4 million gallons per day (mgd). • Approximately 1,175 feet of swale improvements are possible between West Kitty Hawk Road and the first driveway entrance southeast of the Noland Corporation. The conceptual Swale design is V-shaped (due to the sandy soils) with a top width of 18 feet, a depth of 3 feet, and a cross - sectional area of 27 square feet (ft). The control elevation for the drainage system inlet screens relative to the swale bottom is 2 feet, which provides 21,255 cubic feet (ft) of storage volume in the swales prior to runoff entering the stormwater pump station. Note: 21,255 ft3 of storage volume in the infiltration swales is equivalent to the runoff volume • generated by 1.2 inches of rainfall on the five estimated acres of impervious surface in the study area. 1.2 inches exceeds State BMP design criteria requirements for coastal county infiltration devices, which must have sufficient volume to retain the first (1) inch of rainfall. • Two 11-mgd stormwater pumps (vertical turbine or submersible) are proposed in a lead/lag configuration. Using a peak design flow of 22-mgd and a design velocity of 10 feet per second (fps) in the force main, a pipe diameter of 24 inches (2 feet) is required for the outfall pipe. A conceptual plan view of the stormwater pump station system layout, along with section views of the proposed overflow -type inlet structures, are shown in Figure 5. Potential benefits and drawbacks of the ocean outfall force main alternative are listed as follows: Benefits • Flooding problems on U.S. 158 at this location can be minimized during routine to moderate storm events, which will substantially improve driver safety and reduce accidents caused by hydroplaning. Boring and jacking with a concrete carrier pipe or horizontal directional drilling (HDD) with an SDR 11 wall thickness can potentially be used • to route the HDPE pump station inlet and discharge pipes under U.S. • • b f FORCE MAIN_ —IJ• ILI I CJ EXISTING SE I Q DRAIN FIELD � 1 SEA DUNES CONDOMINIUM POSTorric 0 PROPOSED PAR 0 A PROPOSED MW R PUMP STAT11 LtDJ t t U.S. ISB PROPOSED HPDE GRAVITY COLLECTION SY p ROPO D SWA 2 Q MPROV EN P 1 NOUN I� � CORP. �O HE PREPARATION OF THIS FIGURE WAS FINANCED IN SCALE: 1 "=200' " PART THROUGH A GRANT PROVIDED BY THE NORTH 3 CAROLINA COASTAL MANAGEMENT PROGRAM, THROUGH " FUNDS PROVIDED BY THE COASTAL ZONE MANAGEMENT ACT OF 1`072. AS AMENDED, WHICH IS ADMINISTERED BY THE OFFICE OF OCEAN AND COASTAL RESOURCES MANAGEMENT, NATIONAL OCF"IC AND ATMOSPHERIC ADMINISTRATION. 1 �umoblkr• FRP GRATING STANDARD MANHOLE COVER MOUNTED ON EXTERIOR OF 8'zf' SIDE OPENING TOP OF �' (TYP) SHALE 7' -0. S.-O.2'-0' •� BOTTOM OF Z'-O" HALE MOLDED 45' EDPE FI777NO HOPE STUB END CONCRETE INLET NCONC STRUCTURE NDPE FLANOE RETE PIPE ADAPTER (TYP SUPPORT TO FROM UPSTREAM JUNCTION DUCTILE COLLECTION MANHOLE f IRON WYE INLETS SECTION B—B La. SECTION A —A T TOWN OF KITTY HAWK DARE COUNTY. NORTH CAROLINA I WEND KITTY HAWK SDORMWATER MANAGEMENT PLAN O PROPOSE, JUNCTION BEACON BEACON DRIVE DRAINAGE (OPTION II ❑ PROPOSE, (NUT STRUCNRE - HOPE SUC1`10H UNE _ - FIGURES • 158 and N.C. 12 with minimal traffic disruption. In addition, boring and jacking or horizontal directional drilling (HDD) can be used to route the force main underneath the frontal dunes on the northeast side of N.C. 12 without damaging them. Conventional excavation can be utilized for constructing the force main between U.S. 158 and N.C. 12. The HDPE force main will require concrete anchor collars in areas of conventional excavation to prevent pipe movement due to thrust and buoyancy. At the outfall end, the HDPE force main can be mounted on pilings similar to the Lake Drive outfall shown in Photograph 4; however, stainless steel clamps must be provided on the pilings for thrust support and to prevent floatation of the HDPE pipe. Unlike a gravity storm sewer outfall, mechanical check valves can be installed on the force main discharge header at the pump station. The check valves will prevent potential backflow and flooding of the pump station due to storm surge, and eliminate maintenance issues associated with a flexible check valve located in the surf zone. By utilizing a force main system, sand that enters the open-ended HDPE pipeline will be flushed out during pump operating cycles due to the scouring action of the 6 fps discharge design velocity. Currently, a buried 16-inch HDPE force main outfall is used in Kill Devil Hills for the discharge of concentrate (brine) from the Dare County North Reverse Osmosis (RO) Water • Treatment Plant. The RO force main flow is typically between 500 to 600 gpm (0.72 to 0.86 mgd) and no check valve is used at the discharge point. The outfall point for the RO discharge line, located in the surf zone, is shown in Photograph 5. The high corrosion resistance and inherent flexibility of HDPE piping minimize the potential for storm damage to the buried beachfront force main discharge point. • 0 • • Because HDPE pipe sections are joined by heat -fusion, there are no joints that can separate and allow sand or septic tank effluent to infiltrate into the pipeline. • The Town has indicated that the Outer Banks Chapter of the Surfrider Foundation, a non-profit environmental organization "dedicated to the protection of the world's oceans, waves, and beaches," is adamantly opposed to the construction of ocean outfalls in the Outer Banks. According to Town administrators, the Surf Rider Foundation successfully opposed the construction of a recent North Carolina Department Of Transportation (NCDOT) gravity storm sewer ocean outfall design to alleviate drainage problems at this same location. The stormwater pump station/HDPE force main proposed by URS Corporation is conceptually designed as an intermittent discharge used to alleviate severe driving safety hazards along U.S. 158 during moderate to severe storm events. It is not a gravity -type concrete storm sewer that can unintentionally serve as a conduit for continuous discharges of septic tank effluent due to joint infiltration. As previously described, the proposed pump station alternative exceeds North Carolina design criteria for infiltration devices by providing sufficient storage volume to retain more than the required first (1) one inch of rainfall. This is accomplished through the proposed use of roadside infiltration swales and drainage system inlet elevation control. Based on • the combination of water quality protection and critical public safety improvements associated with this design alternative, the Surfrider Foundation may be amenable to its acceptance. Drawbacks • High cost for facilities, equipment and construction easements. • Maintenance for the pump station, swales, inlet structures, and force main discharge point would have to be provided on an on -going basis. NCDOT funding and participation for this effort would be expected because the flooding issue effects U.S. 158. • The Surfrider foundation is opposed to stormwater system ocean outfalls in the Outer Banks. • Space availability for the proposed swale improvements and inlet structures may be limited by a proposed expansion of U.S. 158 to six lanes and existing utility systems. • Potential power outages during severe storm events would require that a diesel generator be included as a permanent part of the pump station design. is • Cost Estimates Cost estimates for this design alternative are listed in Table 2.2. Table 2.2 Cost Estimates for Drainage Improvements Beacon Drive/U.S. 158—Option I Cnit Amount Cost I old Excavation (Sw.des and Basin) C.Y. 1,500 $2.00 $3,000 Hauling C.Y. 1,450 $3.50 $5,100 Inlet Structures/Manholes ea. 6 $2,100 $12,600 HDPE Piping (24-inch SDR-I1) I.f. 2,300 $40.00 $92,000 Horizontal Directional Drilling 1. 1. 300 S400 $120,001) Pavement Removal(Replacement I.S. 1 $2,000 $2,000 Trenching/Dewatering I.S. 1 $80,000 $80,000 Backfill/Compaction C.Y. 1400 $40.00 $56,000 Rip Rap/Headwalls I.S. 1 $16,000 $16,000 Pump Station ea. 1 $700,000 $700,000 Property/Easement Acquistion s.f. 37,000 $3.00 $1I1,00(I Outfall Pile Supports I.S. 1 $8,000 $8,000 Subtotal $1,205,700 25% Contingency $301,400 Total $1,507,000 2.2.1.2 Option 2 - Constructed Infiltration Basin • Infiltration basins are currently utilized to capture and treat stormwater discharges from the Kitty Hawk post office parking lot (which is located on the opposite [northeast] side of U.S. 158 from the Beacon Drive intersection) and from the Noland Corporation building and parking lots (which are located at the intersection of Beacon Drive and U.S. 158). Photograph 6 shows the Noland Corporation infiltration basin during a 1.3-inch rainfall event on April 15,2000. • Photograph 6 — Noland Corporation infiltration basin during 1.3- inch rain event on April 15, 2000. The operation of infiltration devices is successful at these locations because of the • high permeability (> 20 inches per hour) of the Newhan sands present, and the associated minimum seasonal depth to the high ground water table of greater than 6 feet (as listed in the SCS Dare County Soil Survey). It appears that sufficient land area may be available on the southern end of the Post Office property to construct an infiltration basin of sufficient size to accommodate problem runoff generated near the U.S. 158 and Beacon Drive intersection. As previously described in Option 1, the topography of the study area and the required surf zone discharge location are not considered suitable for a gravity storm sewer system at this location. As such, Option 2 also requires the construction of a stormwater pump station and HDPE force main, improvements to the existing swales on the southwest side of U.S. 158, and the installation of overflow -type inlet structures. A conceptual layout of the stormwater pump station, HDPE force main, and constructed infiltration basin is shown in Figure 6. Preliminary Design Criteria The preliminary design criteria utilized for developing cost estimates for Option 2 are listed as follows: • Pump station, force main, and Swale/culvert criteria are the same as in Option 1. • • An evaluation of aerial photography provided with the 1996 COE shoreline protection study indicates that an area of approximately 48,750 ft2 (1.12 acres) on the existing post office property could potentially be used as a site for a constructed infiltration basin. Assuming a basin depth of 4 feet and a water depth of 3 feet, an infiltration device of this size could hold approximately 146,250 ft3 of runoff with one foot of freeboard elevation. The retention volume associated with 3 feet of water depth in the basin is sufficient to capture 8 inches of rain from the study area impervious surface of 5 acres. The one foot of freeboard elevation would account for the 8 inches of rain that would fall directly on the infiltration basin. Potential benefits and drawbacks of Option 2 are listed as follows: Benefits • Flooding problems on U.S. 158 at this location can be minimized during routine to moderate storm events, which will substantially improve driver safety and reduce accidents caused by hydroplaning. • Boring and jacking or HDD technology can potentially be used to route the HDPE force main under U.S. 158 with minimal traffic disruption. A concrete carrier pipe may be needed for structural protection of the HDPE • 12 • ATLANTIC OCEAN t 1 o N. C. 12 1 BLACK PELICAN cj RESTAURANT a G:3 1 0 � 1 ter EXISTING SEP i O ❑ Q � DRAIN FIELD t SEA DUNES a CONDOMINIUM PRO OSED I FILTRATION BASIN POST OFFIC � s PROPOSED HD STORMWATER FORCE MAIN PROPOSED OR TE PROP SED PA NO AREA PUMP STATI t 1 1 U.S. TSC PROPOSED HPDE GRAVITY COLLECTION SY ------------------- ROPO D SWALE PROM MENT (TYP) NOLAN CORP. 00 THE PREPARATION OF THIS FIGURE WAS FINANCED IN n PART THROUGH A GRANT PROVIDED BY THE NORTH r CAROLINA COASTAL MANAGEMENT PROGRAM, THROUGH FUNDS PROVIDED BY THE COASTAL ZONE MANAGEMENT ACT OF 1972, AS AMENDED. IFIIICH IS ADMINISTERED BY THE OFFICE OF OCEAN AND COASTAL RESOURCES MANAGEMENT, NATIONAL OCEANIC AND ATMOSPHERIC ADMINISTRATION. SCALE: 1 "=200' FRP GRATING STANDARD MANHOLE COVER MOUNTED ON EXTERIOR OF 2'x1' SIDE OPENING TOP OF "''' (TYP) SHALE 0 1-0- s'-0• 2'_O• t+ BOTTOM OF 2'-0- , SWALE MOLDED 46• HOPE FITTING HDPE STUB END CONCRETE INLET STRUCTURE ;• + HDPE FLANGE CONCRETE PIPE ADAPTER (TYP SUPPORT TO FROM UPSTREAM JUNCTION DUCTILE COLLECTION f MANHOLE IRON IIYE INLETS SECTION B—B La. SECTION A —A i EG= O PROPOSED JUNCTION MANHOLE 0 PROPOSED INLET STRUCTURE HDPE SUCTION LINE pipe at this road crossing. Conventional excavation can be utilized for • construction on the northeast side of U.S. 158. • This option provides complete retention and pumping capacity for the 50- year design storm, which meets North Carolina highway drainage requirements for primary roads, and does not require an ocean outfall. Additional retention volume capacity is provided in the improved roadside infiltration swales through the use of pump station inlet elevation control. Runoff volumes generated by precipitation totals of approximately 1.2 inches or less are confined in the improved roadside infiltration swales, which meets North Carolina standards for infiltration basin design. • Because the infiltration basin should normally be dry, public safety issues and the potential for mosquito breeding should be minimized. • Sand excavated during construction can be used to bolster the frontal dunes along N.C. 12. Drawhacks • High cost for facilities, equipment, property and construction easements. • Maintenance for the pump station, swales, inlet structures, and infiltration basin would have to be provided on an on -going basis. NCDOT funding and participation for this effort would be expected because the flooding issue effects U.S. 158. • Space availability for the swale improvements and inlet structures may be • limited by a proposed expansion of U.S. 158 to six lanes. • Potential power outages during severe storm events would require that a diesel generator be included as a permanent part of the pump station design. • In addition to the flooding problem on the southwest side of U.S. 158, the Sea Dunes condominium complex, located across U.S. 158 from Beacon Drive (see Figure 4), also experiences flooding problems during moderate to severe rainfall events. As an infiltration basin is also a remedial drainage alternative for the apartment complex, land space availability options adjacent to the post office become more limited. During a site inspection by URS, a large septic tank drain field was observed on the post office property (see Figure 6) adjacent to the condominium complex, which may preclude the use of an infiltration basin at this location. • The proposed site of the infiltration basin has been inundated by ocean overwash in the past, and public safety/access issues must be considered. 13 • Cost Estimates Cost estimates for this design alternative are listed on the following page in Table 2.3. Table 2.3 Cost Estimates for Drainage Improvements Beacon Drive/U.S. 158 — Option 2 Unit Amount Cost Total Excavation (Swales and Basin) C.Y. 8,750 $2.00 $17,500 Hauling C.Y. 8,750 $3.50 $30,600 Inlet Structures/Manholes ea. 6 $2,100 $12,600 HDPE Piping (24-inch SDR-11) I.f. 1,500 $40.00 $60,000 Horizontal Directional Drilling (U.S. 158) 11 200 $400 $80,000 Pavement Removal/Replacement I.s. 1 $2,000 $2,000 Trenching/Dewatering I.s. 1 $60,000 $60,000 Backfill/Compaction C.Y. 900 $40.00 $36,000 Rip Rap/Headwalls I.S. I $16,000 $16,000 Pump Station ea. 1 $700,000 $700,000 Property Acquisition s.f. 65,000 $3.00 $195,000 Subtotal $1,209,700 25% Contingency $302,400 Total $1,512,100 • 2.2.1.3 Option 3 - Infiltration Swales and Culvert Improvements As described in Option 1, swale and culvert improvements on the southwest side of U.S. 158 could provide sufficient retention and infiltration volume to accommodate precipitation totals of approximately 1.2 inches or less. Used alone, this option would not provide highway inundation protection for the 50-year storm as required by NCDOT for primary roadways; however, a significant improvement in drainage would be obtained for more frequent storms. A precipitation total of 1 inch or more is considered a significant rain event, and the ability to provide drainage capacity for a 1-inch rainfall event would improve driving conditions considerably at this location for routine storm events. Existing shallow swale conditions at the intersection of Beacon Drive and U.S. 158 are shown in Photograph 7. is 14 Cost Estimates • Cost estimates for this design alternative are listed in Table 2.4. Table 24 ✓ Cost Estimates for=Drainage improvements ;Beacon Drive%U.S.158= O tion 3 Unit Amount Cost Total Excavation C.Y. 1,175 $2.00 $2,350 Hauling C.Y. 1,175 $3.50 $4,100 Pavement Removal S.Y. 40 $7.30 $300 Pavement Replacement S.Y. 40 $35.00 $1,400 Corrugated HDPE Piping (304nch) l.f. 150 $21.00 $3,150 Trenching C.Y. 81 $10 $800 BackfilUCompaction C.Y. 54 $40.00 $2,150 Rip Rap C.Y. 60 $30 $1,800 Headwalls ea. 6 $2,000 $12,000 Subtotal $28,050 20% Contingency $5,600 Total $33,700 2.3 Areas Between U.S. 158 and N.C. 12 • As shown in Figure 1, various areas generally bounded by U.S. 158 and N.C. 12 experience periodic flooding due to poor drainage or ocean overwash. Areas with poor drainage include (1) the intersection of Lindbergh Avenue and Byrd Street and (2) the Sea Dunes condominium complex. Alternatives to alleviate the drainage problems at these locations are provided in the following sections. 2.3.1 Intersection of Lindbergh Avenue and Byrd Street Typical streets in residential areas between U.S. 158 and N.C. 12 do not have storm sewer collector systems, ditches or swales. Street runoff is typically confined to the roadway surface due to the higher relative elevation of street shoulders and yards. In most areas, street runoff eventually migrates to a low point on the road surface where it leaves the street and enters open sandy areas between homes. In these areas, street runoff generated by routine storm events is typically conveyed, retained and infiltrated without significant inundation of the road surface. As shown in Photographs 8 and 9 on the following page, a fenced public beach access parking area has been constructed at the intersection of Lindbergh Avenue and Byrd Street. Street runoff from Lindbergh Avenue and Byrd Street tends to pool in a low point at the intersection of the two roads. This is caused by the existing downward road surface slopes, which converge at the intersection, and • the lack of an outlet point. 15 • Prior to the construction of the parking area, it is likely that most of the street runoff migrated from the intersection road surface into the formerly open area on which the parking lot is now located. As part of the parking lot design, sidewalks, fencing and infiltration swales were constructed around the perimeter of the parking lot. The swales, which are linked by culverts, do not have an outlet system and receive runoff from the paved parking lot surface. Because no outlet system is provided, the swales essentially operate as infiltration devices in which runoff percolates into the sand. • As shown in Photographs 8 and 9, it was observed by URS during a 1.3-inch rain event on April 15, 2000, that street runoff at the intersection of Lindbergh Avenue and Byrd street tended to flow into the infiltration swale on the south comer of the public parking area. As can be seen in the center of Photograph 9, the infiltration swale at the south comer of the public parking area is separated from a larger infiltration swale, located on the western side of the parking area, by a grassed berm underneath a section of fencing. As shown in Photograph 10 on the following page, the larger infiltration swale on the western side of the parking area remained dry while the smaller infiltration swale at the south end of the parking area was filled with street runoff from Byrd Street and Lindbergh Avenue. The fact that the infiltration swale on the western side of the parking area remained dry during a 1.3-inch rain event, while the infiltration swale on the south side of the parking area flooded due to the inclusion of street runoff, indicates that: (1) The runoff generated by the parking area during a 1.3-inch precipitation event did not produce a significant volume of water in the western infiltration swale. This likely indicates that the storage capacity of the parking lot • infiltration swale system as constructed is significantly higher than that required by North Carolina BMP design criteria, which require that an infiltration device 16 • be able to accept the first 1-inch of rainfall (on a volumetric basis) from the associated drainage area. (2) The available storage capacity in the western infiltration swale could be used to receive street runoff from the Lindbergh Avenue and Byrd Street intersection for routine to moderate storms. This could be accomplished by removing the existing berm (see Photograph 9) between the south and western swales or by installing a culvert that connects the two swales. 2.3.1.1 Potential Drainage Alternatives Piped storm sewer collection systems and gravity ocean outfalls are generally not desired by the Town in beachfront areas due to their high construction costs and tendency to become filled with sand. As described earlier in this report, the Surfrider Foundation opposes gravity ocean outfalls due to the potential for surface water pollution caused by the infiltration of septic tank effluent. The ponding of street runoff at this location is considered by URS to be of the "nuisance" variety and does not justify the construction of a gravity storm sewer system or a stormwater pump station and force main outfall system. Having eliminated the ocean outfall options, the removal of runoff at the intersection can be accomplished by: (1) re -grading the road surface and directing runoff to constructed infiltration swales, similar to those used for the public access parking area, which are located in the Town right-of-way along Lindbergh Avenue and Byrd Street; (2) utilizing traffic -rated trench drains, in lieu of regrading the road surface, to capture sheet flow runoff from the road surface and direct it into constructed infiltration swales along Lindburgh Avenue and Byrd Street; (3) utilizing a constructed infiltration basin, located in an open lot on the southwest comer of the Lindburgh Avenue and Byrd Street intersection, and a • piped collection system; and, (4) utilizing a constructed infiltration basin, located in an undeveloped area on the north side of Byrd Street near its intersection with 17 U.S. 158 and, (5) removing the berm between the south and west parking area • swales and utilizing the excess storage capacity of the west swale to accept street runoff from the Lindbergh Avenue and Byrd Street intersection. The benefits and drawbacks of these options are described in the following paragraphs. 2.3.1.2 Option 1 - Regraded (Crowned) Road Surface and Constructed Infiltration Swales As shown in Figure 7, Option 1 includes constructed infiltration swales in Town right-of-ways along Lindbergh Avenue and Byrd Street. Crowning (regrading) of the road surface is recommended to ensure that runoff flows to infiltration swales on both sides of the road. Because of the downward slope of Lindbergh Avenue and Byrd street toward their intersection, intermittent check dams or berm dividers are recommended in the swales to prevent runoff from flowing downhill and continuing to pond at the intersection. Preliminary Design Criteria • The estimated impervious surface area contributing runoff to the study site is 48,960 square feet (1.12 acres). This area was determined using a combination of visual inspection during a rainfall event on April 15, 2000 and topographic mapping provided in the aforementioned 1996 COE shoreline protection feasibility study. The contribution of runoff from • yards is considered minimal. • Linear street footage, which can accommodate the installation of swales along Lindbergh Avenue and Byrd Street within the study area drainage boundary, is estimated to be 3600 ft. A parabolic swale design with a top width of 6 feet and a depth of 2 feet yields a total swale storage capacity of 43,200 cubic feet. The retention volume associated with 43,200 cubic feet of swale storage capacity is sufficient to capture 10.6 inches of rain from the estimated study area impervious surface area of 48,960 square feet. The ability to capture 10.6 inches of rain is well in excess of the 10-year, 24-hr precipitation total of 6.5 inches for Kitty Hawk. As such, Option 2 meets Kitty Hawk BMP drainage design criteria for town roads (10-yr storm) and North Carolina BMP design criteria for infiltration devices, which must capture the first (1) inch of rainfall. Benefits • Low cost for construction and maintainenance. • Meets Town and State BMP design criteria. • Provides roadway protection for severe (up to approximately 10.5-inch) rainfall events. • Sand excavated during construction can be used to bolster frontal dunes along N.C. 12. • 18 • 7 • a THE PREPARATION OF THIS FIGURE WAS FINANCED IN SCALE: I" =200' B PART THROUGH A GRANT PROVIDED BY THE NORTH TOWN OF KITTY HAWK S i CAROLINA COASTAL MANAGEMENT PROGRAM, THROUGH DARE COUNTY, NORTH CAROLINA FUNDS PROVIDED BY THE COASTAL ZONE MANAGEMENT ACT OF 1972, AS AMENDED, WHICH IS ADMINISTERED BY ICITTYxAwR SICNtAtwaTER MANAceMeNT RLaN STO N W THE OFFICE OF OCEAN AND COASTAL RESOURCES gW AINAOE-NAGE I MANAGEMENT, NATIONAL OCEANIC AND ATMOSPHERIC FIGURE 7 on ADMINISTRATION. •- " �4"" remer ��. ' j2 Woodward —CI a • As with the existing public parking area infiltration swales, the proposed • streetside swales should remain normally dry and not generate problems with nuisance odors or mosquito breeding. • Drawbacks Traffic disruption during construction. Space availability may be limited by public utilities. Even with proposed crowning of the roadway surface, the downward slope of Lindbergh Avenue and Byrd Street may continue to channel sheetflow to the drainage low point in the intersection, rather than into the proposed infiltration swales. This tendency would significantly reduce the usable storage volume of the total Swale system. Cost Estimates Cost estimates for this design alternative are listed in Table 2.5. Table 2S Cost ksthnates for Drainage Improvements . _ r Llt dbergit-Ave.IBy>rd Street Innters'ection Opon Unit Amount Cost Total Swale Excavation C.Y. 1,600 $2.00 $3,200 Hauling C.Y. 1,600 $3.50 $5,600 Driveway Culverts (18-inch corrugated HDPE) LE 400 $7.00 $2,800 Pavement Removal S.Y. 160 $7.30 $1,200 Pavement Replacement S.Y. 160 $35.00 $5,600 Pavement Crown ton 578 $35.00 $20,200 Trenching C.Y. 213 $10 $2,100 Backfill/Compaction C.Y. 187 $40.00 $7,500 Crushed Stone (check dams) C.Y. 19 $25.00 $500 Subtotal $48,700 20% Contingency $9,700 Total $58,400 2.3.1.3 Option 2 - Traffic -Rated Trench Drains and Constructed Infiltration Swales As shown in Figure 8, Option 2 includes constructed infiltration swales in Town right-of-ways and traffic -rated trench drains along Lindbergh Avenue and Byrd Street. Because of the downward slope of Lindbergh Avenue and Byrd street toward their intersection, trench drains installed perpendicularly across the street surface are proposed to intercept downhill sheetflow runoff and discharge it into infiltration swales. As in Option 1, check dams or berms are proposed to prevent water from flowing downhill, to the intersection of Lindbergh Avenue and Byrd • Street, after entering the roadside infiltration swales. 19 Preliminary Design Criteria • • Thepreliminary drainage design criteria are the same as in Option 1. Benefits • Runoff cannot migrate to the low point in the roadway intersection. • Meets Town and State BMP design criteria. • Provides roadway protection for severe (up to approximately 10.5-inch) rainfall events. • Sand excavated during construction can be used to bolster frontal dunes along N.C. 12. • As with the existing public parking area infiltration swales, the proposed streetside swales should remain normally dry and not generate problems with nuisance odors or mosquito breeding. • Trench drains can be easily cleaned with pressurized water. Drawbacks • Space availability may be limited by public utilities. • Traffic is disrupted because roadway cuts are required for construction. • Trench costs are higher than road crowning. isCost Estimates • Cost estimates for this design alternative are listed in Table 2.6. Table 2.6 Cost Estimates iar Drainage Improvements . Lindbei� h:AveB rd Street Intersection O"tion 2:'_ Unit Amount Cost Total Swale Excavation C.Y. 1,600 $2.00 $3,200 Hauling C.Y. 1,600 $3.50 $5,600 Driveway Culverts (18-inch corrugated HDPE) l.f. 400 $7.00 $2,800 Pavement Removal S.Y. 230 $7.30 $1,700 Pavement Replacement S.Y. 207 $35.00 $7,200 Trench Grates l.f. 210 $140.00 $29,400 Trenching C.Y. 283 $10 $2,800 Backfill/Compaction C.Y. 210 $40.00 $8,400 Crushed Stone (check dams) C.Y. 19 $25.00 $500 Subtotal $61,600 20% Contingency $12,300 Total $73,900 20 2.3.1.4 Option 3 - Constructed Infiltration Basin and Piped Collection System • (Location A) As shown in Figure 9, Option 4 includes a proposed infiltration basin in an empty lot at the southwest corner of the Lindbergh Avenue and Byrd Street intersection (this lot is visible in the upper right-hand corner of Photograph 9 and is designated as "Location A") and a localized storm sewer collection system. Preliminary Design Criteria • As previously described, the estimated impervious surface area contributing runoff to the study site is 48,960 square feet (1.12 acres).. The contribution of runoff from yards is considered minimal. Using the Rational Method with a 10-year design storm (to meet Kitty Hawk drainage criteria for subdivision streets) and a minimum time of concentration (Tc) of 10 minutes, the associated design storm intensity is 5.5 in./hr (as derived from the Hatteras rainfall intensity duration curve in the North Carolina Erosion and Sediment Control Design Manual). Using an intensity of 5.5 in./hr, a runoff factor (C) of 0.95 for asphalt, and a contributing watershed of 1.12 acres yields a peak runoff flow rate of 5.9 cfs. Assuming a pipe velocity of 3 fps to maintain internal scouring capability, a pipe diameter of 2 ft (24 inches) is required for the inlet pipe to the infiltration basin. For all other collection system pipes, a diameter • of 1.5 ft (18 inches) can be used. • Space availability at Location A is estimated to be 5,200 square feet (0.12 acres). With an assumed storage depth of 3 feet and one foot of freeboard, an infiltration basin constructed at this location could hold the runoff generated by 3.8 inches of rain on the study area impervious surface. Benefits • Meets North Carolina BMP design criteria for infiltration basins, which must retain the runoff generated by the first (1) inch of rainfall. • Provides roadway drainage for severe (up to approximately 3.8-inch) rainfall events with one foot of freeboard. • Sand excavated during construction can be used to bolster frontal dunes along N.C. 12. • Based on USGS soils data for Dare County, the proposed infiltration basin should remain normally dry and not generate problems with nuisance odors or mosquito breeding. Drawhacks • High cost for property acquisition. • • Space availability may be limited by public utilities, septic tank drain fields or repair areas. 21 • Proximity to ground -level residence foundations. • • Traffic will be disrupted during installation of the storm sewer piping system. • Periodic cleaning of the piped collection system may be required to remove sand. • • Cost Estimates Cost estimates for this design alternative are listed in Table 2.7. Table 2.7 Cost,Estimates for Drainage improvements Lindbergh Ave.Byrd ;Street Intersection _` Optlon.3 ; .. . Unit Amount Cost Total Excavation C.Y. 819 $2.00 $1,600 Hauling C.Y. 819 $3.50 $2,900 Manholes/Drop Inlets ea. 3 $2,000 $6,000 Pavement Removal S.Y. 49 $7.30 $350 Pavement Replacement S.Y. 37 $35.00 $1,300 Trenching C.Y. 55 $10 $550 Backfill/Compaction C.Y. 40 $40.00 $1,600 Headwall/Rip Rap I.S. 1 $2,400 $2,400 18-inch and 24-inch corrugated HDPE piping I.S. 1 $1,100 $1,100 Property Acquisition SJ 7,500 $3.00 $22,500 Subtotal $40,300 20% Contingency $8,000 Total $48,300 2.3.1.5 Option 4 - Constructed Infiltration Basin and Piped Collection System (Location B) As shown in Figure 10, Option 5 includes a proposed infiltration basin at Location B, which is an undeveloped area on the north side of Byrd Street at its intersection with U.S. 158. Preliminary Desijln Criteria • Runoff design criteria for Option 5 are the same as for Option 4. • Space availability at Location B is estimated to be 12,750 square feet (0.29 acres). With an assumed storage depth of 3 feet and one foot of freeboard, an infiltration basin constructed at this location could hold the runoff generated by 9.4 inches of rain on the study area impervious surface. 22 Benefits • • Meets North Carolina BMP design criteria for infiltration basins which g , must retain the runoff generated by the first (1) inch of rainfall. • Provides roadway protection for severe (up to approximately 9.4-inch) rainfall events with one foot of freeboard. • Sand excavated during construction can be used to bolster frontal dunes along N.C. 12. • The proposed infiltration basin should remain normally dry and not generate problems with nuisance odors or mosquito breeding. • Location B is adequately distanced from ground -level residence foundations. • Drawbacks • High cost for property acquisition. • Space availability may be limited by public utilities, septic tank drain fields or repair areas. • Traffic will be disrupted during installation of the storm sewer piping system. • Periodic cleaning of the piped collection system may be required. Cost Estimates Cost estimates for this design alternative are listed in Table 2.8. Table 2 8 - Cost Estimates for Drainage Improvements Lindbergh Ave.Byrd Street=lntersectioin - Option 4 3 Unit Amount Cost Total Excavation C.Y. 1,889 $2.00 $3,800 Hauling C.Y. 1,889 $3.50 $6,600 Manholes/Drop Inlets ea. 3 $2,000 $6,000 Pavement Removal S.Y. 110 $7.30 $800 Pavement Replacement S.Y. 86 $35.00 $3,000 Trenching C.Y. 137 $10 $1,400 Backfill/Compaction C.Y. 100 $40.00 $4,000 Headwall/Rip Rap I.S. 1 $2,400 $2,400 184nch and 24-inch corrugated HDPE piping I.S. 1 $2,100 $2,100 Property Acquisition s.f 34,700 $3.00 $104,000 Subtotal $134,100 20% Contingency $26,800 Total $160,900 2.3.1.6 Option 5 - Berm Removal and Utilization of West Parking Area Swale isThis option includes removing the berm shown in Photograph 9 and allowing street runoff to enter the infiltration Swale on the west side of the public parking 23 • area. The benefits associated with this option are minimal cost and expedience of implementation. The drawback associated with this option is reduced capacity of the western swale to receive parking lot runoff, however, as shown in Photograph 10, sufficient capacity appears to be present for the western swale to accept street runoff during routine to moderate storms. The cost of this option is considered negligible (less than $200). • 2.3.2 Sea Dunes Condominium Complex As shown in Figure 1, the Sea Dunes condominium complex is located on N.C. 12 between East Kitty Hawk Road and Hurdle Street. The privately owned complex is located in a topographic depression and has no stormwater collection system. Historically, the complex has experienced problems with flooding and standing water following incidents of ocean overwash and/or moderate to heavy rainfall. As shown in Photograph 11, sheetflow runoff from Sea Dune streets and parking areas tends to pond in a low area on the northwest side of the complex. The Sea Dunes manager (Doug Young) indicated in April 2000 that a landscape architect was working on a regrading plan to improve the site drainage, which reportedly included allowing runoff to enter a drainage easement along a fence line on the northern property boundary. During the conversation, URS noted that an open area, on the western side of the complex near Hallet Street, appeared to be suitable for the construction of an infiltration basin. Mr. Young indicated that this area was reserved as a repair area for the on -site septic tank system. As described in section 2.2.1.2, approximately 1.1 acres of empty land space appeared to be available on Post Office property where an infiltration basin could • potentially be constructed. This acreage excludes an area in which the Post Office septic tank drain field is currently located. Although the Sea Dunes condominium 24 complex is a private development, the construction of an infiltration basin that • could be used to capture runoff jointly from the Beacon Drive/U.S. 158 intersection and the Sea Dunes complex is possible at this location. A discussion regarding a joint infiltration basin is provided in the following paragraphs. 2.3.2.1 Jointly Maintained Infiltration Basin The construction of a jointly maintained infiltration basin to receive runoff from the Beacon Drive/U.S. 158 intersection and the Sea Dunes condominium complex is desirable because it could concurrently relieve poor drainage conditions for two problem locations. Costs for construction and maintenance of the basin could be shared between the Town and the Sea Dunes based upon a signed agreement. Design issues related to a joint infiltration basin are discussed as follows. Preliminary Desilln Criteria • Runoff design criteria are the same as in section 2.2.1.2, with an estimated impervious surface area of 332,000 square feet (7.62 acres) used for the Sea Dunes complex and 217,800 square feet (5 acres) used for the Beacon Drive/U.S 158 intersection impervious surface area. The corresponding percentages of the combined total drainage area for the infiltration basin are 60 percent for the Sea Dunes complex and 40 percent for the Beacon Drive/U.S. 158 intersection. • • With an assumed storage depth of 3 feet and one foot of freeboard, a 1.12- acre infiltration basin constructed at this location could hold approximately 146,250 cubic feet of runoff. Using 60 percent of the available basin volume for the Sea Dunes complex and 40 percent for the Beacon Drive/U.S. 158 intersection, the runoff generated by approximately 3.2 inches of rainfall can be accepted from both sites. is Benefits • Meets North Carolina BMP design criteria for infiltration basins, which must retain the runoff generated by the first (1) inch of rainfall. • Provides roadway protection and condominium drainage for moderately severe (up to approximately 3.2-inch) rainfall events with one foot of freeboard. • Sand excavated during construction can be used to bolster frontal dunes along N.C. 12. • The proposed infiltration basin should remain normally dry and not generate problems with nuisance odors or mosquito breeding. • Construction and maintenance costs can be shared by the Town and the Sea Dunes condominium complex. 25 Drawbacks • • High cost for property acquisition. • Space availability may be limited by public utilities, septic tank drain fields or repair areas. • The ability to capture 3.2 inches of rainfall from the Beacon Drive/U.S. 158 intersection drainage area will provided a substantial improvement in driving safety conditions; however, the ability to capture 3.2 inches of rainfall (neglecting infiltration) is not sufficient to provide drainage for the 50-yr design storm (7.0 inches in 24 hours) as required by NCDOT for primary roads. • The proposed location of the infiltration basin has been inundated by ocean overwash in the past. Cost Estimates Cost estimates for this design alternative are the same as shown in Table 2.3. 2.3.3 Areas of Ocean Overwash As shown in Figure 1, the Town has identified six areas between Lindbergh Avenue and N.C. 12 that are prone to ocean overwash and standing water during northeasters and hurricanes. As identified by the Town, the general areas of • standing water include the following: • The intersection of Eckner Street and N.C. 12. • The intersection of Bleriot Street and N.C. 12. • The area west of N.C. 12 between Wilkins Street and Hawks Street. • The intersection of Balchen Street and N.C. 12. • The area west of N.C. 12 between Historic Street and "Unnamed" Street. • The area west of N.C. 12 between East Kitty Hawk Road and the Sea Dunes Condominium Complex. These areas identified above are subject to flooding during coastal storms due to the combined effects of periodic soil saturation caused by intense precipitation and tidal surges that breach the frontal dunes along the east side of N.C. 12. As shown in Photograph 12 on the following page, the potential for tidal surges to cross N.C. 12 is enhanced by openings in the frontal beach dunes, which are created by existing homes and cottages. In areas where houses no longer exist and the frontal dunes have been re-established, such as across from the Black Pelican Restaurant at the intersection of East Kitty Hawk Road and N.C. 12 (see Figure 4), ocean overwash has been substantially minimized. As part of an effort to further mitigate ocean overwash through the re- establishment of it's frontal dune system, Town ordinances do not allow the rebuilding of houses on the east side of N.C. 12 that have been destroyed by 26 • coastal storms. In addition, Town ordinances prescribe special flood protection requirements in residential areas along N.C. 12. As time progresses and more of the frontal dune system is re-established, instances of flooding in areas west of N.C. 12 will become much less frequent. Even with re-established dunes, however, some overwash can be expected during severe storms in areas where dunes become destroyed by wave action. • Currently, when ocean overwash crosses to the west side of N.C. 12, it flows into low areas of the natural topography where it often becomes trapped by existing frontal dunes and/or the high relative elevation of the N.C. 12 road surface. With no existing storm drainage system, the ocean water has no conduit by which to return to the ocean and it may stand in lots and streets for several days before evaporating or infiltrating into the sand. The two primary hazards of this standing water are (1) public safety issues associated with impeded travel along N.C. 12, which hinders evacuation efforts prior to major storms and the progress of medical and rescue vehicles following these storms, and (2) public health issues associated with the potential surcharge of submerged septic tank systems. 2.3.3.1 Potential Drainage Alternatives Trapped ocean overwash at these locations is considered by the Town to be a significant public safety and health issue. The removal of the standing overwash should be accomplished as quickly as feasible in order to restore roadway access and prevent surcharging of existing septic systems. Alternatives for removing trapped ocean overwash are discussed in the following sections. 27 2.3.3.2 Piped Collection System and Gravity Ocean Outfall • Piped storm sewer collections stems and gravity ocean outfalls are generally not Y tY desired by the Town in beachfront areas due to their high construction costs and tendency to become filled with sand. As described earlier in this report, the Surfrider Foundation opposes gravity ocean outfalls due to the potential for surface water pollution caused by the infiltration of septic tank effluent into separated joints. Although ocean overwash at these locations is considered by URS to be a significant public safety and health issue, the implementation of this alternative does not appear warranted due to high cost, maintenance considerations, and the potential for beachfront water quality degradation. 2.3.3.3 Piped Collection System With Pumping Station and Ocean Outfall. Although technically feasible, this alternative entails extremely high construction costs and maintenance requirements for a collection system, pumping station and ocean outfall in the Kitty Hawk beachfront area. Based on discussions with Town administrators, this alternative is impractical from a budgetary and maintenance standpoint and will not be evaluated in detail for the purpose of this report. 2.3.3.4 Sump Boxes and Portable Pumps Having eliminated the gravity outfall and pump station options, the removal of • overwash along the Kitty Hawk beachfront can be accomplished through the use of concrete sump boxes with permanent pipe stand connections used to attach portable pumps. Conceptual drawings of two options (Type I and Type II) for sump box and pipe stand arrangements are shown in Figures 11 and 12, respectively. Descriptions of the two types of sump boxes are provided in the following paragraphs. Type I Sump Boxes As can be seen in Figure 11, the sump box consists of a concrete box with slot - type openings on the sides and an square access port on top. The side openings are covered with fiberglass reinforced polyethylene (FRP) grating to prevent access by people and animals; and, to prevent debris such as vegetation or garbage from entering the sump box during overwash pumping conditions. The access port on top is covered by a removable steel grate also serves as an overflow -type inlet during ocean overwash pumping operations. Type I sump boxes are recommended for installation in easily accessible Town right-of-ways along streets. Proposed locations for the installation of Type 1 sump boxes are shown in Figures 13 through 15. As shown in Figure 11, the sump box discharges to a vertical pipe stand using buried HDPE piping. The buried HDPE suction piping is mounted to the sump is box and pipe stand foundation with stainless steel anchor straps and weighted 28 • • • • • PROPOSED 12" HDPE FLANGE ADAPTER :EL CLAMP PAVEMENT CUT STANLESS STEEL CLAMP DE SUPPORT STUB END .. ,., ..,. EXTERIOR OF 2'x1' SIDE OPENING (TYP) CONCRETE SUMP BOX EL. 2.0 EL. 0.33 7'-8" 6'-4" ' SS CLAMP (TYP. OF 2) 5'-0" 4'_6" 12" SDR 17 HDPE PIPING CONCRETE PIPE SUPPORT MOLDED HDPE STUB END 12"x8" REDUCER N.C. 12 CONCRETE PIPE SUPPORT BOLLARD (TYP) ROAD SURFACE G.S.E.=0.0 12" SDR 11 HDPE PIPING 8" SDR 17 HDPE PIPING 12" SDR 17 HDPE PIPING CONCRETE ANCHOR COLLAR 12"x8" REDUCER (SIZE AND SPACING AS RECOMMENDED BY THE PIPE CONCRETE PIPE SUPPORT MANUFACTURER) TYPICAL ROAD CROSSING (N.C. 12) SECTION A -A PROPOSED SUMP BOX AND CONNECTION FOR PORTABLE PUMP NOT TO SCALE 3 THE PREPARATION OF THIS FIGURE WAS FINANCED IN n PART THROUGH A GRANT PROVIDED BY THE NORTH w CAROLINA COASTAL MANAGEMENT PROGRAM, THROUGH FUNDS PROVDED BY THE COASTAL ZONE MANAGEMENT ACT OF 197Z AS AMENDED, WHICH IS ADMINISTERED BY yI THE OFFICE OF OCEAN AND COASTAL RESOURCES 6 MANAGEMENT, NATIONAL OCEANIC AND ATMOSPHERIC n� ADMINISTRATION. 6'-0" 90' FLANGED COUPLING CONNECTION " HDPE FLANGE ADAPTER --BOLLARD (TYP OF 4) -- 90' FLANGED 8" COUPLING CONNECTION 12'-0" 2'-6" 14'-0' 6'-0" - L 8" • • R 10'-4" 7'-$" 16'-4„ 5'-0" 4" WEEP HOLE (TYP) 10'-4" • • omm 4'-6" a LTANLESS STEEL CLAMP CONCRETE PIPE SUPPORT MOLDED HDPE STUB END FRPI GRATING MOUNTED ON EXTERIOR OF 2'x1' SIDE OPENING (TYP) CONCRETE SUMP BOX -PROPOSED 12" HDPE FLANGE ADAPTER PAVEMENT CUT STANLESS STEEL CLAMP 12"x8" REDUCER N.C. 12 CONCRETE PIPE SUPPORT - BOLLARD (TYP) ROAD SURFACE EL. 0.33 G.S.E.=0.0 -PEA GRAVEL _SS CLAMP (TYP. OF 2) 8" SDR 17 HDPE PIPING 12" SDR 11 HDPE PIPING 12��SDR 17 HDPE PIPING 12" SDR 17 HDPE PIPING L ui _ I'L U d CONCRETE ANCHOR COLLAR AS CONCRETE PIPE SUPPORT REICOMMENDED ZE BANDIY THE PIPE MOLDED HDPE MANUFACTURER) STUB END TYPICAL ROAD CROSSING (N.C. 12) SECTION A -A PROPOSED SUMP BOX AND CONNECTION FOR PORTABLE PUMP NOT TO SCALE 3'-0" 12"x8" REDUCER -A CONCRETE PIPE SUPPORT THE PREPARATION OF THIS FIGURE WAS FINANCED IN PART THROUGH A GRANT PROVIDED BY THE NORTH CAROLINA COASTAL MANAGEMENT PROGRAM, THROUGH FUNDS PROVIDED BY THE COASTAL ZONE MANAGEMENT ACT OF 197Z AS AMENDED, WHICH IS ADMINISTERED BY THE OFFICE OF OCEAN AND COASTAL RESOURCES MANAGEMENT, NATIONAL OCEANIC AND ATMOSPHERIC ADMINISTRATION. 90' FLANGED COUPLING CONNECTION 8" HDPE FLANGE ADAPTER ,,.--BOLLARD (TYP OF 4) i- 90' FLANGED 8" COUPLING CONNECTION 2'-6" 6'-0" 8" with concrete collars. The concrete collars serve to prevent floatation of the • buoyant HDPE and to allow flexibility in the pipeline to account for potential thermal expansion and contraction. For the vertical pipe stand, a fabricated 45-degree HDPE fitting and piping are cast into a concrete block. The concrete block serves the dual purpose of providing support for the vertical pipe stand and thrust restraint for the pipeline. On top of the concrete support block, an HDPE flange adapter is used to attach a 90-degree galvanized steel connector coupling for the discharge line. The vertical pipe stand is supported by a stainless steel collar with welded support legs and surrounded by bollards for damage protection. The flanged connector coupling can remain in place on a permanent basis or be installed when necessary by utilizing a removable blind flange at the HDPE connection point. Utilizing existing Town beach access right-of-ways, ponded ocean overwash will be discharged back to the beachfront and ocean using a temporary pipeline connected to a portable trash pump. The temporary pipeline is made of interlocked galvanized steel segments and can be covered by protective portable ramps at road crossings (if necessary). Type II Sump Boxes The proposed Type II sump box and pipe stand, shown in Figure 12, is • substantially similar to the Type I sump box shown in Figure 11; however, the Type II sump box is surrounded by a structural trash/sand sump. The proposed Type II sump box is intended for installation in ponding areas between N.C. 12 and Lindbergh Avenue that are well removed from existing Town right-of-ways. As can be seen in Figure 13, a Type II sump box is proposed in a natural depression (shown in Photograph 13 on the following page) on the northwest side of Hawks Street. The benefits of a structural trash/sand sump at this location include: • The ability to minimize the introduction of vegetation, debris, and sand into the sump box during periods between severe storms. 0 The ability to capture and hold vegetation, debris, and garbage during pumping activities as the water surface is drawn down. • The ability to minimize the introduction of stormwater runoff into the sump box during periods between severe storms. • The ability to exfiltrate standing water using a gravel layer and weep holes. Proposed locations for sump boxes and valve stands to serve the six problem drainage areas described above are shown in the following figures: • • Eckner Street and N.C. 12. (Figure 13) 29 7 0 A wm h'n I u1 THE PREPARATION OF THIS FIGURE WAS FINANCED IN 3 n PART THROUGH A GRANT PROVIDED BY THE NORTH CAROLINA COASTAL MANAGEMENT PROGRAM, THROUGH FUNDS PROVIDED BY THE COASTAL ZONE MANAGEMENT ACT OF f 872, AS AMENDED, IIHICH IS ADMINISTERED BY ly THE OFFICE OF OCEAN AND COASTAL RESOURCES JANAGEMENT, NATIONAL OCEANIC AND ATMOSPHERIC n ADMINISTRATION. ATLANTIC OCEAN l I I I I I 1 f TTl i t UNDBERGH AVE 1 �' 4 fA Z 1 m a c SCALE: >"=200' U. S 158 I EGEN G PROPOSED SUMP BOX O PROPOSED CONNECTION POINT FOR PORTABLE PUMP HDPE SUCTION LINE TOWN RIOHT-OF-WAY W 1 TOWN OF KITTY HAWK DARE COUNTY, NORTH CAROLINA KITTY HAWK STORMWATER MANAGEMENT Ih AN PROPOSED SUMP BOX LOCATIONS FIGURE 19 dword -Clr a �' i • 0 3 ATLANTIC OCEAN N.C. 12 t (� ❑ o o a 1 �l o t ❑ �t ❑ LJNDBERGH AVE. 1 E o t U.S. 158 0 1 4 �❑ao THE PREPARATION OF THIS FIGURE WAS FINANCED IN PART THROUGH A GRANT PROVIDED BY THE NORTH CAROLINA COASTAL MANAGEMENT PROGRAM, THROUGH FUNDS PROVIDED BY THE COASTAL ZONE MANAGEMENT ACT OF 1972, AS AMENDED, WHICH IS ADMINISTERED BY THE OFFICE OF OCEAN AND COASTAL RESOURCES MANAGEMENT, NATIONAL OCEANIC AND ATMOSPHERIC a ADMINISTRATION. Y SCALE: 1=200' Ful IFGFNn 0 PROPOSED SUMP BOX 0 PROPOSED CONNECTION POINT FOR PORTABLE PUMP — HOPE SUCTION LINE — TOWN RIGHT-OF-WAY 0 • Bleriot Street and N.C. 12. (Figure 13) • Between Wilkins Street and Hawks Street. (Figure 13) • Balchen Street and N.C. 12. (Figure 14) • Between Historic Street and "Unnamed" Street. (Figure 14) • Between East Kitty Hawk Road and the Sea Dunes Condominiums. (Figure 15) • r LJ Preliminary Design Criteria • The estimated size of an area (a typical block along N.C. 12) to be drawn down with a single portable pump is 850 feet by 350 feet (840,000 square feet). Assuming a standing water depth of 3 feet after an ocean overwash event, 6.28 million gallons of water will need to be removed. • Using a 2100 gpm pump, 6.28 million gallons of water can be removed in approximately two days. Note: A draw down time of 2 days is consistent with the North Carolina stormwater BMP design criterion of 2-5 days for wet detention ponds. By utilizing a draw down time of 2 days, significant water quality protection will be provided because suspended solids in the ocean overwash will settle out of the water column prior to being pumped back to the ocean. In addition, the draw down time of 2 days is sufficiently expedient to minimize the potential for water quality degradation associated with surcharging of submerged septic tanks. U11 • Portable "dry priming" trash pumps which can operate under net positive • suction head conditions of up to 28 feet will be utilized for pumping operations. The HDPE suction line between the sump box and pipe stand will be 12 inches in diameter to minimize friction head loss. The suction line will reduce to 8 inches in diameter at the pipe stand to match the standard suction and discharge diameter for a 2,100 gpm portable pump. is Cost Estimates Cost estimates for the proposed Type I and Type II sump boxes and pipe stands, as shown in Figures 13 through 15, are provided in Table 2.9. Table 29 . Cost Estimates for'Drainage Improvements Areas of Ocean Oyerwash,'Along N. C.12 Unit Amount Cost Total Trenching Hauling C.Y. C.Y. 1,700 500 $10.00 $3.50 $17,000 $1,750 Type I Sump Box Type II Sump Box ea. ea. 7 1 $2,100 $4,200 $14,700 $4,200 Pipe Stands ea. 7 $2,000 $14,000 8-inch HDPE (SDR 11) l.f. 80 $9.00 $700 12-inch HDPE (SDR 11) l.f. 3,080 $20.00 $61,600 Concrete Anchor Collar Pavement Removal ea. S.Y. 60 178 $500 $7.30 $30,000 $1,300 Pavement Replacement S.Y. 178 $35.00 $6,200 Backfill/Compaction C.Y. 1600 $40.00 $64,000 Property Acquisition/Easement s.f 6000 $3.00 $18,000 Subtotal $233,450 20% Contingency $47,000 Total $280,500 2.4 Kitty Hawk Village As can be seen in Area 7 of Figure 1, Kitty Hawk Village is generally located in the central sound -side area of the Town. The area, which is traversed by West Kitty Hawk Road and populated mainly by longtime residents ("locals"), is subject to tidal flooding during coastal storm events. Generally, any storm event accompanied by significant winds that drive ocean water into Currituck Sound can create flooding conditions in Kitty Hawk Village, which is connected to the sound by a series of creeks and guts. The average ground surface elevation in the area, obtained from 1982 USGS topographic mapping, is approximately 1.5 meters (4.9 feet). The area lies completely within the AE flood zone (100-yr storm event elevation of 9 feet) and is characterized by poorly drained soils with seasonal groundwater table elevations of 0 to 3 feet. During on -site interviews conducted by URS, Village residents indicated that the • watercourses that cross Kitty Hawk Road are not significantly influenced by normal tides or routine rain events; however, when the surface elevation of 31 • Currituck Sound rises due to wind -driven tidal surge, significant flooding routinely occurs. Reportedly, water depths of approximately 3 to 4 feet were encountered on low-lying areas of Kitty Hawk Road during Hurricane Floyd in 1999. The presence of this water impeded the access of emergency vehicles to residents on the western side of Kitty Hawk Village and to Kitty Hawk Landing. The flooding reportedly began to subside after approximately 8 hours when low tide reoccurred. Because of Kitty Hawk Village's unique location and low-lying topography, there is little that can be done to prevent the inundation of Kitty Hawk Road during periods of significant tidal surge. An inspection of Kitty Hawk Road by URS revealed that there are six cross culverts (designated as A through F) located in the study area shown in Figure 1. Table 2.10 lists the culverts, their estimated size and material, and the associated drainage systems. • • Table 2.1.0 List of Kitty Hawk Road Culverts in the Kitty Hawk Village Study Area Culvert ID Estimated Size and Material Associated Drainage System A 2 — 18" corrugated metal Sage Swamp B I — 24" corrugated metal Ash Swamp C 1— 18" corrugated metal 1— 24" corrugated metal Ash Swamp D 1 — 36" corrugated metal 1— 42" corrugated metal Duck Pond Swamp E 2 — 24" corrugated metal Sandy Run Swamp F 2 — 36" corrugated metal Minger's Ridge Creek During the site inspection by URS, it was observed that many of the existing corrugated metal culverts appeared to be in poor condition due to corrosion caused by the existing brackish environment. An example of an existing culvert (Culvert C located near the intersection of Kitty Hawk Road and Bob Perry Road) with significant corrosion evident is shown in Photograph 14 on the following page.As can be seen in Photograph 14, the culvert on the right has deteriorated to the point where debris has become trapped in the missing crown section and potentially impedes flow. 32 • In addition to the evidence of corrosion, recent road surface and shoulder repairs (related to Hurricane Floyd) were observed at some of the culvert crossings. One such location (Culvert E) is shown in Photograph 15. is As shown in Figure 1 and Photograph 15, Culvert E conveys drainage from Sandy Run Swamp underneath West Kitty Hawk Road via Sandy Run Ditch. As shown in Figure 1, Sandy Run Ditch runs parallel to West Kitty Hawk Road for approximately 600 feet at the southeast end of Culvert E. Because of the parallel orientation of the road and ditch, a significant portion of West Kitty Hawk Road can be flooded during storms at this location due to northerly tidal surge and the limited flow capacity of the existing culverts. In addition, water that crosses to the north side of West Kitty Hawk Road will be restricted from draining back to Kitty Hawk Bay in a southerly direction. As shown in Photograph 15, evidence of damage and repair to the road shoulder at Culvert E is visible. 2.4.1 Recommendations Due to Kitty Hawk Village's location in a coastal flood plain that is annually subjected to tidal surge from hurricanes and northeasters, the complete prevention of roadway inundation along West Kitty Hawk Road during severe storm events is not economically feasible. However, URS believes that the ability to minimize roadway damage and repair requirements by improving the drainage capability at existing culvert locations is desirable. Based upon the deteriorated condition of the existing corrugated metal culverts • and evidence of roadway damage observed on -site, URS recommends that a 33 hydraulic analysis should be performed for Culverts A through F and that isCulverts A, B, C, D, and F should be replaced with corrugated HDPE for corrosion protection. Because of the potential for significant roadway flooding due to the parallel orientation of Sandy Run Ditch to West Kitty Hawk Road at Culvert E, and the observed condition of the existing road surface (Photograph 15), URS recommends the installation of a box culvert or bridge at this location. • 2.4.2 Cost Estimates Because a hydraulic evaluation of the existing culverts is not available at this time, size requirements for replacement cost estimates are based on the existing (estimated) culvert sizes shown previously in Table 2.10. Cost estimates for replacing Culverts A-F are shown in Table 2.11. Table 2»1 it Esttmates fob 3ramage mprovemen -ME y Kltty_Ha kYilla e, s,,...., _... ,. O .., , Unit Amount Cost Total 184nch Corrugated HDPE pipe 11. 150 $7.00 $1,050 244nch Corrugated HDPE pipe 1.f. 100 $10.50 $1,050 36-inch Corrugated HDPE pipe LE 150 $25.00 $3,750 42-inch Corrugated HDPE pipe I.f. 50 $40.00 $2,000 Pavement Removal S.Y. 200 $7.30 $1,500 Pavement Replacement S.Y. 200 $35.00 $7,000 Trenching C.Y. 267 $10.00 $2,700 Backfill/Compaction C.Y. 200 $40.00 $8,000 Box Culvert (Total Cost) I.S. 1 $25,000 $25,000 Subtotal $52,100 20% Contingency $10,400 Total $62,500 2.5 Austin Cemetery Road Area As can be seen in Area 8 of Figure 1, Austin Cemetery is located on the west side of Kitty Hawk Village in the central sound -side area of the Town. Austin Cemetery is bordered by Austin Cemetery Road to the west, Rodger's Street to the north, and West Kitty Hawk Road to the east and south. During an on -site inspection performed by URS during a 1.3-inch rain event on April 15, 2000, standing water was observed on the southeast side of Austin Cemetery along both sides of West Kitty Hawk Road (see Photographs 16 and 17 on the following page). Based on a visual assessment of the existing site topography, runoff from all of the road surfaces surrounding Austin Cemetery tended to migrate to a low point on the southeastern side of the cemetery at the intersection of West Kitty Hawk Road and Ivy Lane. Excluding the impact of severe storms, the existing drainage conditions observed at this site are considered by URS to be of the is"nuisance" variety and not an immediate hazard to public safety. 34 • As can be seen in Photographs 16 and 17, the existing stormwater drainage system at this location consists of shallow roadside swales with no outlet point. The area is low-lying and is characterized by the USGS Dare County Soil Survey as being located in an area of Fripp Fine Sand with seasonal high groundwater • depths of greater than 6 feet. Based on a visual inspection of the area, the drainage capability of the existing soils (which have been modified to some extent by development) is moderate to poor. 2.5.1 Recommendations Austin Cemetery is located in Low -Density Village Residential District VR-1. Per State stormwater management regulations and existing town policy, piped stormwater collection and conveyance systems are not permitted in this area. As shown in Photographs 16 and 17, open land space is available on the southeast side of the cemetery that could be utilized for the installation of a retention pond or infiltration basin. Neither of these alternatives, however, is recommended at this location due to the proximity of existing graves. With the piped collection system and retention/infiltration basin options eliminated, URS recommends that the existing swale system be improved in the Town right-of-way along both sides of West Kitty Hawk Road between Rodger's Street and Ivy Lane. As shown in Figure 16, recommended improvements include (1) widening and deepening the existing grass swales to provide improved runoff storage capacity (2) creating retention sections in the improved swales, using intermittent check dams or berms, to prevent ponding near Ivy Land due to the downhill migration of flow in the swale system and (3) the construction of small concrete flumes used to enhance to ability to remove runoff from the • roadway surface and to channel runoff into swale retention sections M • • I• 0 THE PREPARATION OF THIS FIGURE WAS FINANCED IN S� PART THROUGH A GRANT PROVIDED BY THE NORTH �r CAROLINA COASTAL MANAGEMENT PROGRAM, THROUGH FUNDS PROVIDED BY THE COASTAL ZONE MANAGEMENT 3 ACT OF 1972, AS AMENDED, WHICH IS ADMINISTERED BY THE OFFICE OF OCEAN AND COASTAL RESOURCES MANAGEMENT, NATIONAL OCEANIC AND ATMOSPHERIC ADMINISTRATION. i2 AUSTIN CEMETERY O Ko HPWK c:J ❑ SCALE: 1=200' I Y 3 PROPOSED SWALE OO IMPROVEMENTS I • 2.5.2 Cost Estimates Cost estimates for the recommended Austin Cemetery Road Area drainage improvements are shown in Table 2.12. Table 2.12 Cost Estimates for Drainage Improvements Austin Cemetery Road Area Unit Amount Cost Total Swale excavation C.Y. 767 $2.00 $1,500 Hauling C.Y. 767 $3.50 $2,700 Subtotal $4,400 20% Contingency $900 Total $5,300 2.6 Kitty Hawk Landing As can be seen in Area 9 of Figure 1, Kitty Hawk Landing is located in the southwestern corner of Kitty Hawk. During an on -site inspection performed by URS during a 1.3-inch rain event on April 15, 2000, standing water was observed at two locations on the southern end of Ivy Lane (see Photographs 18 and 19). Based on a visual assessment of the existing site topography, runoff from the northern and southern ends of Ivy Lane appeared to migrate to low points at the locations where standing water was observed. As can be seen in Photographs 18 and 19, no existing drainage swales are present Along Ivy Lane. With no swales present, street runoff is confined to the roadway surface where it ponds near addresses 3921 and 3923. Excluding the impact of severe storms, the existing drainage conditions observed at this site are considered by URS to be of the "nuisance" variety and not an immediate hazard to public safety. 01 • 2.6.1 Recommendations Soils in the Ivy Lane section of Kitty Hawk Landing are classified in the USGS Dare County Soil Survey as "Psamments," which are areas where most or all of the natural soil (Currituck mucky peat) has been removed or covered with new soil for building or construction activities. Coupled with low-lying elevation and a continuously high ground water table, the altered soil conditions along Ivy Lane tend to impede the natural percolation of runoff. Because of this, infiltration devices cannot be used in this area. Because Kitty Hawk Landing is located in a low -density zoning district (VR-1), the use of piped stormwater collection systems is prohibited by Town Ordinance and State stormwater management regulations. With the piped collection system and infiltration basin options eliminated, the use of wet detention ponds and/or swales must be considered. As shown in Photographs 20 and 21 on the following page, empty lots are present on both sides of Ivy Lane adjacent to the areas of existing street ponding. While technically feasible, the construction of a wet detention pond on the eastern side of Ivy Lane between addressed 3921 and 3923 (Photograph 20) would be expensive due to land acquisition (approximately $130,000 per acre), construction costs, and maintenance costs. In addition, URS believes that significant opposition to this alternative would be encountered from adjacent residents along Ivy Lane. Photograph 20— View, looking southwest, of Town right-of-way (see fire hydrant) adjacent to empty lot beside 3921 Ivy Lane in Kittv Hawk Landing. The Assistant Town Manager, Mr. Tim Owens, indicated that residents on Ivy Lane have historically been opposed to the construction of drainage swales due to aesthetic concerns, mosquitoes, and the desire to preserve the ability to move boat trailers into and out of yards. As can be seen in Photographs 20 and 21, there is ample space present in the Town right-of-way (see location of fire hydrant in Photograph 20) to construct localized shallow retention swales on both sides of • Ivy Lane between addresses 3934 and 3942 to the west and 3921 and 3923 to the east. The purpose of these swales is to provide retention volume capacity for the 37 • removal of road surface runoff at the two observed ponding locations, without conveying the runoff to the adjacent canals. Swales along the entire length of Ivy Lane did not appear necessary because ponding was only observed at the two locations shown in Photographs 18 and 19. To accommodate future development of the existing empty lots, the recommended swales can be constructed in a fashion that allows ample space for a wide driveway and boat trailer access. In addition to the swales, the construction of small concrete flumes on the road shoulder is recommened to enhance the ability to expediently remove runoff from the roadway surface. The proposed locations of the recommended swales are shown in Figure 17. • • 2.6.2 Cost Estimates Cost estimates for the recommended Kitty Hawk Landing drainage improvements are shown in Table 2.13. Table 2.13 Cost Estimates for Drainage Improvements Kitty Hawk Landing Unit ,%mount Cost Total Swale excavation C.Y. 400 $2.00 $800 Hauling C.Y. 400 $3.50 $1,400 Subtotal $2,20() 20% Contingency S400 Total $2,600 2.7 Tateway Road and Ascension Drive As can be seen in Area 4 of Figure 1, Tateway Road and Ascension Drive are located in the southeastern corner of Kitty Hawk near the border of Kill Devil Hills. During an on -site inspection performed by URS during a 1.3-inch rain event on April 15, 2000, standing water was observed at the eastern end of Tateway Road and Ascension Drive near their respective intersections with U.S. 158. The standing water observed on Tateway Road is shown in Photographs 22 and 23 and the standing water observed on Ascension Drive is shown in Photographs 24 and 25 (following page). As illustrated in Photograph 22, the source of the standing water at the two locations is runoff generated by impervious surfaces associated with residential development in elevated dune areas. 38 • • CURRITUCK SOUND PROPOSED RETENTION O O SWALES SHELUBANK POINT :1H F— MY = O u LONE O �d 0 Ln O a� O TEIQ Ci C3 O � � ❑ PINEWAY THE PREPARATION OF THIS FIGURE WAS FINANCED IN PART THROUGH A GRANT PROVIDED BY THE NORTH S CAROLINA COASTAL MANAGEMENT PROGRAM, THROUGH FUNDS PROVIDED BY THE COASTAL ZONE MANAGEMENT ACT OF 1972, AS AMENDED, WHICH IS ADMINISTERED BY wd THE OFFICE OF OCEAN AND COASTAL RESOURCES rc MANAGEMENT, NATIONAL OCEANIC AND ATMOSPHERIC ADMINISTRATION. SCALE: 1=200' I FQFNQ O PROPOSED SUMP BOX O PROPOSED CONNECTION POINT FOR PORTABLE PUMP _ HOPE SUCTION TINE TOWN RIGHT-OF-WAYw TOWN OF KITTY HAWK DARE COUMY. NORTH CAROLINA KITTY HAWK STORMWATER MANAGEMENT PLAN KITTY HAWK LAND[ NG FIGURE fl remer �;,,�ry Woodward —CI e During the site inspection by URS on April 15, 200 it was observed that runoff from impervious street and driveway surfaces was channeled downhill along Tateway Road and Ascension Drive to low points with no associated drainage swales or outlets. The ponding problem appeared to be more severe on Tateway Road, as evidenced by the vehicle shown in Photograph 23 and the "high water" sign shown in Photograph 22. Photograph 25 - Stalli ilo, auto on Ascension Drive during 1.3-inch rain event on April 15,2000. 2.7.1 Recommendations Natural soils at the two problem sites are generally classified in the USGS Dare County Soil Survey as Newhan/Corolla Complex fine sands, which have high infiltration capacities and a seasonal maximum groundwater table depth of 6 feet or less. Because of this, infiltration devices can be utilized successfully in this area. Wet detention ponds are not recommended at this location due to the high infiltration capacity of the existing soil and lack of land space. Because Tateway Road and Ascension drive are located in a low -density zoning district (BR-1), the use of piped stormwater collection systems is prohibited by Town Ordinance and • State stormwater management regulations. M • With the piped collection system and wet detention basin options eliminated, the use of infiltration basins and/or swales must be considered. As shown in Photographs 22 through 25, empty wooded lots (privately owned) are present on both Tateway Road and Ascension Drive adjacent to the areas of existing street ponding. While technically feasible, the construction of infiltration basins in the existing wooded lots at these locations would be expensive due to land acquisition costs (approximately $130,000 per acre), construction costs, and maintenance costs. As can be seen in Photographs 22 through 25, there is ample space present in the Town right-of-way (see location of telephone pedestal in Photograph 24) to construct infiltration swales on both sides of Tateway Road and Ascension Drive in the areas of existing ponding on the road surface. The purpose of these proposed swales is to provide retention volume capacity for the removal and infiltration of road surface runoff at the two observed ponding locations. In addition to the swales, the construction of small concrete flumes on the road shoulder is recommended to enhance the ability to expediently remove runoff from the roadway surface. As shown by the conditions observed in Photograph 23 during a 1.3-inch rain event, the ability to remove runoff from Tateway Road and Ascension Drive by utilizing infiltration swales during routine to moderate rain events will provide a is significant improvement in public safety at these locations. The proposed locations of the recommended swales are shown in Figure 18. 2.7.2 Cost Estimates Cost estimates for the recommended Tateway Road and Ascension Drive drainage improvements are shown in Table 2.14. 40 • rm a . o . ao oa v4SIDRNE ACS ON ❑ �a 0 U ED �u z p: TATEWAY ROAD ID PROPOSED INFILTRATION 5 SWALES (TYP.) ON p D W.- El o I THE PREPARATION OF THIS FIGURE WAS FINANCED IN PART THROUGH A GRANT PROVIDED BY THE NORTH CAROLINA COASTAL MANAGEMENT PROGRAM, THROUGH FUNDS PROVIDED BY THE COASTAL ZONE MANAGEMENT ACT OF 1972, AS AMENDED, IIHICH IS ADMINISTERED BY THE OFFICE OF OCEAN AND COASTAL RESOURCES r MANAGEMENT, NATIONAL OCEANIC AND ATMOSPHERIC 1 ADMINISTRATION. is SCALE: 1=200' IBM@ rcal Efful Now ATLANTIC OCEAN • • • 2.8 Light Keepers Way As can be seen in Area 5 of Figure 1, Light Keepers Way is located in the southeastern corner of Kitty Hawk near the northern shore of Kitty Hawk Bay. During an on -site inspection performed by URS during a 1.3-inch rain event on April 15, 2000, standing water was observed at the intersection of Light Keepers Way and Beacon Drive (see Photograph 26). Photograph 26 — Runoff from Beacon Drive and Light Keepers Way being channeled to front of residence at 105 Light Keepers Way during 1.3-inch rain event on April 15, 2000. The source of the standing water at the intersection of Light Keepers Way and Beacon Drive was runoff generated by impervious surfaces associated with residential development. During the site inspection by URS on April 15, 2000 it was observed that runoff from impervious street and driveway surfaces in an elevated dune area was channeled downhill in a southwesterly direction along Beacon Drive. Upon reaching the intersection with Light Keepers Way, the runoff stream followed the edge of the road surface in a southeasterly direction along Light Keepers Way. Additionally, it was observed that street runoff from a cul- de-sac at the end of Light Keepers Way flowed in a northwesterly direction and converged with the runoff from Beacon Drive in front of a private residence (105 Light Keepers Way) near the intersection of the two roads (see Photograph 26). The resident at 105 Light Keepers Way indicated to URS during an on -site interview that, during severe storms, runoff from the ponding area on the street is channeled into his backyard via his driveway. A visual inspection of the resident's yard indicated that the existing ground surface elevation is well below the roadway elevation and that a significant depression was present in the backyard. Recent repairs to the landscaping near the depression were evident, and the resident attributed them to damage caused by flooding during various storms during the previous six months. 41 2.8.1 Recommendations isNatural soils at this site are classified in the USGS Dare County Soil Survey as Newhan fine sands, which have high infiltration capacities and a seasonal maximum groundwater table depth of 6 feet or less. Because of this, infiltration devices can be utilized successfully in this area. Wet detention ponds are not recommended at this location due to the high infiltration capacity of the existing soil and lack of land space. Because Light Keepers Was is located in a low - density zoning district (BR-1), the use of piped stormwater collection systems is prohibited by Town Ordinance and State stormwater management regulations. With the piped collection system and wet detention basin options eliminated, the use of infiltration basins and/or swales must be considered. A wooded depression (privately owned) is present on the opposite (southwest) side of Light Keepers Way from residence 105. During an on -site inspection by URS during a 1.3-inch rainfall event on April 15, 2000, it was observed that water ponding in front of residence 105 tended to migragte across the street toward the existing depression when the water level became high enough (see Photograph 26). While technically feasible, the construction of an infiltration basin in the depression on the southwest side of Light Keepers Way would be expensive due to land acquisition costs (approximately $130,000 per acre), construction costs, and maintenance costs. • As can be seen in Photograph 26, there is ample space present in the Town right- of-way in on the east side of the Beacon Drive/Light Keepers Way intersection to construct an infiltration swale in the area of existing ponding on the road surface. The purpose of this proposed swale is to provide retention volume capacity for the removal and infiltration of road surface runoff during routine to moderate storm events. In addition to the swale, the construction of small concrete flumes on the road shoulder is recommended to enhance the ability to expediently remove runoff from the roadway surface. �J As shown by the conditions observed in Photograph 26 during a 1.3-inch rain event, the ability to remove runoff from Light Keepers Way by utilizing infiltration swales during routine to moderate rain events will provide a significant improvement in public safety at these locations and help to prevent street runoff from entering the lot at residence 105. The proposed location of the recommended swale is shown in Figure 19. 42 0 0 KITTY HAWK BAY THE PREPARATION OF THIS FIGURE PAS FINANCED IN PART THROUGH A GRANT PROVIDED BY THE NORTH CAROLINA COASTAL MANAGEMENT PROGRAM, THROUGH FUNDS PROVIDED BY THE COASTAL ZONE MANAGEMENT o ACT OF 1972, AS AMENDED, WHICH IS ADMINISTERED BY THE OFFICE OF OCEAN AND COASTAL RESOURCES Y MANAGEMENT, NATIONAL OCEANIC AND ATMOSPHERIC 1 ADMINISTRATION. ul m DORY .o a � O o O�G o O �N SWALE ED nOt� SCALE: 1=200' I FGFND 17 PROPOSED SUMP BOX O PROPOSED CONNECTION POINT _ FOR PORTABLE PUMP K — HDPE SUCTION LINE — TOWN RIGHT-OF-WAY �'<a O O O \;,Xo P TOWN OF KITTY HAWK DARE COUNTY, NORTH CAROLINA KITTY HAWK STORMWATER MANAGEMENT PLAN LIGHTKEEPERS WAY FIGURE 19 relner W-M� Woodward —CI e 2.8.2 Cost Estimates • Cost estimates for the recommended Light Keeper's Way drainage improvements g p are shown in Table 2.15. 3.0 PRIORITIZED RECOMMENDATIONS Based on a review of the identified problem drainage areas in Kitty Hawk, URS has developed a priority ranking for the implementation of the proposed drainage improvements. Protection of public health and safety and conformance with North Carolina stormwater management regulations were the primary considerations in the ranking analysis.. As shown in Table 3.1 on the following page, the Beacon • Drive/U.S. 158 intersection was ranked No. 1 by URS. As shown in Photograph 3, a significant potential for accidents exists at this location during routine storm events due to inundation of the road surface and the moderately high speed limit. • The areas of ocean overwash between U.S. 158 and N.C. 12 were ranked No. 2 by URS. Although a significant public health and safety concern, the ocean overwash events occur only during moderate to severe storm events and the potential for repetitive automobile accidents is much lower than the Beacon Drive/U.S. 158 intersection. Ascension Drive/Tateway Road and Light Keepers Way were ranked Nos. 3 and 4, respectively, due to the potential for repetitive problems during routine to moderate storms and the potential for damage to private property. Kitty Hawk Estates was ranked No. 5 due to its significant drainage problem but moderately low potential for detriment to public safety or private property. Kitty Hawk Village was ranked No. 6 because its location in an area of low-lying topography precludes a cost-effective method for significantly minimizing repetitive flooding; however, the poor existing condition of culverts should be addressed. 43 • • • Rank Site Number and ID Recommended Estimated Cost Alternative 1 Site 6 — Flooding at Swale $1,507,000 intersection of Beacon improvements and Drive and U.S. 158 pump station. 2 Site 3 — Ponding of Sump boxes and $280,500 ocean overwash pipe stands for between U.S. 158 and connecting portable N.C. 12 pumps. 3 Site 4 — Ponding of Construction of $7,900 street runoff on roadside infiltration Ascension Drive and swales. Tateway Road 4 Site 5 — Lot flooding at Construction of $1,000 105 Light Keepers Way roadside infiltration due to street runoff. swales. 5 Site 1— Poor drainage Culvert $33,500 and standing water in replacement and Kitty Hawk Estates improvement. 6 Site 7 — Roadway Culvert $62,500 flooding in Kitty Hawk replacement and Village improvement. 7 Site 2 — Ponding of Removal of <$200 runoff at the Byrd existing berm and Street/Lindbergh utilization of Avenue intersection. existing swale. 8 Site 8 — Poor street Construction of $5,300 drainage on Kitty roadside infiltration Hawk Road near swales. Austin Cemetery. 9 Site 9 — Poor street Construction of $2,600 drainage on Ivy Lane in roadside retention Kitty Hawk Landing. swales. TOTAL COST: $1,900,500 44 Byrd Street, Kitty Hawk Road near Austin Cemetery, and Kitty Hawk Landing • are ranked Nos. 7 through 9, respectively, due to their location in residential areas with low speed limits and a low potential for detriment to public safety or private property. 3.1 Cost Considerations As can be seen below Table 3.1, the total cost of the recommended drainage improvements is $1,900,500. Typically, the alternatives recommended in Table 3.1 have the lowest associated costs. The recommended alternative for the Beacon Drive/U.S. 158 intersection does not have the lowest associated cost. A discussion of this location is provided as follows. Beacon Drive/U.S.158 Intersection As discussed in Sections 2.2.1.1 through 2.2.1.3, the drainage alternatives and associated costs for this location include: Swale improvements and pump station $1,507,000 Swale improvements and infiltration basin $1,512,000 Swale improvements alone $33,700 The infiltration basin alternative was not recommended due to the high cost and • safety considerations associated with a relatively deep (4 feet) basin in an area prone to public access. • Although the least expensive alternative, swale improvements alone provide roadway protection for only routine storms and do not meet the NCDOT 50-yr storm design criteria for primary roads. In addition, the proposed expansion of U.S. 158 to six lanes would further limit space availability for swale improvements in the future. The swale improvement and pump station alternative was recommended because it provides the highest level of roadway and water quality protection. Additionally, if desired, the design and construction of the pump station and HDPE force main can be performed in conjunction with the highway widening project. If space limitations associated with the widening project prevent the construction of swales, a curb and gutter system can be utilized in this area to convey runoff to the pump station. 45