Loading...
HomeMy WebLinkAboutLand Use Plan Amendment-1991fah Howard T. Capps T Assoaa es - Landscape XrrhjtWt Land Pkffler 321 North Front Street ftnington North Car6h 7be preparation of- this document was flnancad in ' Part through a grant, provided by the North Carolina oa Cstal Management �Program, througR;funds'provided by, the' Goestal Zone 'Management . Act of, 1972,� as, amended, ,which is administered , the , Office of Ocean', and CoastalResource` Management ,.Rational ''_ Oceanic and Atmospheric Administration: t i 1 1 fl t Town of Holly Ridge 1991 Land Use Plan Amendment This Land Use Plan Amendment should be used in conjunction with the 1988 Land Use Plan locally adopted on April 25, 1989 and certified by the CRC on May 26, 1989. Av/b Howard T. Capps 32 Anodates Landscape Rnhrnct • Land Planner 321 North Front Strad Wdmkoon. North Carolina 7be preparation of this document was fiaaaeed in part through a grant provided by the North Carolina Coastal Management Ptogrem, through funds provided by the Coastal Zone Management Act of 197% as amended, which is administered by the office of Ocean and Coastal Resource Manageaisat, National Oceanic and Atmospheric Adotaistration. TABLE OF CONTENTS Page I. Introduction 1 II. Data Collection and Analysis 2 A. Population 2 B. Economy 3 III. Existing Conditions 5 A. Existing Land Use 5 B. Constraints: Land Suitability 8 1. Soils 8 2. Camp Lejeune Expansion 9 C. Constraints: Capacity of Community Facilities 9 1. Water System 9 2. Wastewater System 10 3. Roads 11 4. Recreation 12 5. Medical Services 12 6. Town Hall 13 IV. Current Plans, Policies, Regulations 14 A. Current Plans 14 1. Capital Facilities Plan - Water and Wastewater Systems 14 2. 1988 Drainage Master Plan 14 3. 1988 Recreation and Open Space Plan 14 B. Current Policies 14 V. Holly Ridge Issues, Policies and Implementation 17 A. Preserving Forested Areas 18 B. Recreation 18 Page C. Providing Services for Development 19 D. Expansion of Camp Lejeune 20 E. 1,800-Acre Residential Development 20 F. Intergovernmental Coordination 21 VI. Public Participation 22 VII. Hazard Mitigation 22 VIII. Land Classification 23 A. Land Classification System 23 1. Developed Land Use 23 2. Transition Land Use 23 3. Community Land Use 23 4. Rural Land Use 24 5. Conservation Land Use 24 B. Holly Ridge Land Classification Map 24 1. Developed 25 2. Transition 25 3. Community 25 4. Rural 25 5. Conservation 25 Appendix Maps ;I Town of Holly Ridge 1991 Land Use Plan Aviendaent Executive Summary The 1991 Land Use Plan Amendment has been prepared in an effort to con- sider several major changes that have taken place since preparing the 1988 Plan. These changes include the establishment of an Extraterritorial Planning Juris- diction, annexation which included three areas with a substantial increase in population, a proposed 1,800-acre residential development adjacent to Holly Ridge, and release of the Camp Lejeune Environmental Impact Statement covering plans for expansion of the base into the Holly Ridge area. Since this is a Plan Amendment, much of the information found in the 1988 Plan is still applicable; therefore, this Plan Amendment should be used in conjunction with the 1988 Land Use Plan. The purpose of the Executive Summary is to briefly outline the major changes found in this Plan Amendment. Population The 1988 Plan showed a 1987 population of approximately 500 people. This amendment reflects a 1990 census of 740 people due to the recent annexa- tion of three areas, and a projected population of 880 by the year 2,000. Economy As reflected in the 1988 Plan, Holly Ridge Foods and Thorn Apple Valley continue to be the largest employers in Holly Ridge. This amendment points out the recent increase in mobile homes and double -wide mobile homes primarily at Holly Hill Mobile Home Estates and the potential positive impact the proposed 1,800-acre residential development can have on the local economy. Existing Land Use Existing land use has remained the same with the exception of the sub- stantial number of new housing units locating in the Holly Hill Mobile Home Estates area. Constraints: Land Suitability The constraints discussed in the 1988 Plan are still applicable. Addi- tional information on soils has been provided to show location of unsuitable soils for septic tanks (see text and table in Appendix). Constraints: Capacity of Community Facilities This Amendment includes information on the 1988 Capital Facilities Plan i for the water and wastewater systems and 1988 Recreation and Open Space Plan 'ow which were not addressed in the 1988 Land Use Plan. �s Current Plans, Policies and Regulations This Amendment includes three plans that were not addressed in the 1988 Plan which are the Capital Facilities Plan, 1988 Drainage Master Plan and 1988 - Recreation and Open Space Plan. All current policies discussed in the 1988 Plan remain the same with the exception of Recreation and Preservation of Forestry Lands which are discussed in Section V of the Plan Amendment. Holly Ridge Issues, Policies and Implementation All issues, policies and implementation discussed in the 1988 Land Use Plan have remained unchanged with the exception of Preserving Forested Areas, Recreation, Providing Services for Development, Expansion of Camp Lejeune and the Future Residential Development. Preserving Forested Areas This policy statement and one implementation statement have been changed as follows: Policy: It will be the policy of the Town to retain forested areas along King Creek and Cypress Creek as part of an open space system. Implementation: Town officials will begin promotion of the idea that forested areas along Cypress Swamp and King Creek be dedicated to the Town of Holly Ridge or Onslow County for use as a greenway system and in an effort to protect forested areas along these tributaries. 1988 Policy Statement: It will be the policy of the Town to retain some of its land as forested areas. This policy statement and one implementation statement have been changed as follows: Policy: Holly Ridge officials will continue to work toward improvement of the current recreation program and facilities. Officials will also work to obtain any County, State or Federal financial assistance in obtaining grants or low -interest loans to improve recreation facilities and to implement the 1988 Recreation and Open Space Plan. Implementation: Town officials will work with County, State and Federal officials in obtaining grants to provide more and better recreation facilities. 1988 Policy Statement: It is the Town's policy to have a good recreation program. Providing Services for Development This policy statement and one implementation statement have been changed as follows: Policy: The Town's policy is to provide services to development as needed and as financially feasible. Implementation: The Town will make every effort to obtain grants or low -interest loans to expand the wastewater treatment plant or water treatment facilities and distribution systems to be able to provide needed services to encourage economic growth in the area. 1988 Policy Statement: The Town's policy is to provide services to development as needed. 1 F Expansion of Camp Lejeune This policy statement and one implementation statement have been changed as follows: Policy: Holly Ridge officials oppose expansion of Camp Lejeune into the Holly Ridge area for helicopter training and a weapons firing range im- pact area. Implementation: Local officials will adopt and forward a resolution to Camp Lejeune officials expressing opposition to plans for expansion of Camp Lejeune into the Camp Davis area for a weapons training impact area. 1988 Policy Statement: The development of the Great Sandy Run Pocosin area, especially by Camp Lejeune, is opposed by the Town. — Future Residential Development At this time, an 1,800-acre residential development has been pro- posed. Approximately 400 acres of this development lie within the planning jurisdiction of the Town of Holly Ridge. Current policy is as follows: Policy: Holly Ridge officials will make every reasonable effort to cooperate with development of this and any other large-scale development that will bring about needed housing, commercial development or job opportunities for Holly Ridge citizens. Existing Land Use Map and Land Classification Map A new Existing Land Use Map was prepared showing more detailed land use information than was shown on the 1988 map. A new Land Classification Map was prepared with additional Conservation areas shown on the west side of U.S. 17 and a large Transition area on the east side of U.S. 17 to accommodate a portion of the 1,800-acre residential development. Public Participation With assist ance from the Planning Board and Town Manager, a Planning n ,�- Questionnaire was prepared and distributed within the corporate limits and the recently established extraterritorial planning area. One of the primary pur- poses of the Plan Amendment was to give citizens living in the extraterritorial planning area the opportunity to be involved in planning for the future of Holly Ridge. However, there was a very small response to the questionnaire; and therefore it cannot be considered significant as a basis for policy development. r� a I. IMODUCTIOB This Land Use Plan Amendment to the 1988 Holly Ridge Land Use Plan has been prepared for several reasons. During the 1988 land use plan- ning process, the Town had not officially established its Extraterrito- rial Planning Jurisdiction although such a district was being considered. Since completion of the 1988 Plan, the Town has annexed an area located on the southeastern side of Holly Ridge as of July 1, 1989, which has increased the Town's population from the estimated 500 in 1987 as dis- cussed in the 1988 Plan, to a population of 740 in 1990, which repre- sents a substantial increase in population. The preparation of this 1991 Plan Amendment has given residents living in the annexed area as well as - those in the new extraterritorial planning area an opportunity to be in- volved in the planning for the future of Holly Ridge. Two other major developments that will impact on Holly Ridge include the proposed expansion of Camp Lejeune into the Extraterritorial Planning Jurisdiction on the west side of Holly Ridge and recent plans to begin de- velopment of an 1,800-acre residential community from the east side of Holly Ridge to the Intracoastal Waterway. This proposed residential de- velopment could have a major impact on Holly Ridge in bringing about some of the commercial and service growth residents would like to see as dis- cussed in the 1988 Plan. 1 1 71 II. DATA COLLECTION AND ANALYSIS A. Population The 1988 Land Use Plan pointed out that Holly Ridge lost popula- tion between 1950 and 1970 due to the reduced use of Camp Davis follow- ing World War II. The 1988 Plan further stated that there had been a slight increase in population from 489 people in 1980 to slightly more than 500 people in 1987. This net increase of approximately 11 peo- ple over a seven-year period obviously represents a very slow growth rate. Figure 1 below reflects a substantial increase in population in 1989 due primarily to the annexation of an area along NC 50 south- east of Holly Ridge subsequent to completion of the 1988 Land Use Plan. Figure 1 HOLLY RIDGE POPULATION 10 950 900 880 850 800 750 750 740 700 650 600 550 500 489 500 450 400 1980 1987 1990 2000 Source: 1980, 1987 U. S. Census and N. C. Office of State Budget and Manage- ment; 1990 Census; 2000 Howard T. Capps and Associates projection. Page 11 of the 1988 Land Use Plan Update discussed two methods for projecting population. Using a base population of 500 persons in 1987 and averaging the linear and exponential population estimate for the year 2000, the 1988 Plan arrived at a 19% growth rate during the 2 Iperiod from 1980 to the year 2000. Using this same 19% growth rate with base population, including the recently annexed areas, of 740 people from the 1990 census, we estimate a population of 880 people by the year 2000. In addition to this projected population, the de- velopers of the 1,800-acre site anticipate a population inside the Town's planning jurisdiction of up to 200 people by the year 2,000. Obviously, the figure could change substantially if additional areas are annexed during the planning period or if the 1,800-acre site on the east side of Holly Ridge's corporate limits is developed with residential development more rapidly during the 10-year planning period than currently anticipated. - B. Economy As discussed in the 1988 Land Use Plan, the two primary employers in Holly Ridge are Holly Ridge Foods employing approximately 95 peo- ple and Thorn Apple Valley, a meat processing plant, which employs approximately 500 people. The remaining employment opportunities in Holly Ridge are primarily small service or retail businesses located along U.S. 17 or N.C. 50 such as convenience stores, small shops, service stations and a dentist office. The 1988 Plan points out that many of those employed in Holly Ridge, specifically at Holly Ridge Foods and Thorn Apple Valley, are living outside the community due primarily to the lack of housing and commercial facilities such as a grocery store, drug store or other retail facilities. Although the lack of housing has been a problem in the past, some additional housing has been provided since comple- tion of the 1988 Land Use Plan. Approximately 28 mobile homes have 1 been located in Holly Hill Mobile Home Estates during the last year to 18 months. If this increase in housing inside the Town Limits con- tinues with its increase in population, Holly Ridge may become more of a viable market for such desired facilities as a grocery store, drug store, etc. The critical factor, as pointed out in the 1988 Plan, is how Holly Ridge officials and citizens market this current growth. Another factor that could have a positive effect on the local economy is the recent availability of land for sale along the U.S. 17 corri- dor. During the last several years one concern affecting possible economic growth in Holly Ridge was the lack of available suitable land for development. It appears that this factor may be slowly changing. Another major factor that may have a very positive impact on the local economy is the proposed 1,800-acre residential development being planned between Holly Ridge and the Intracoastal Waterway by Weyerhaeuser. However, the proposed expansion of Camp Lejeune into an area just west of the Town's corporate limits as presently proposed probably would have a very negative socioeconomic impact on existing residents of Holly Ridge and potential new development due to anticipated noise generated by weapons firing. On the one hand the community would like to see more housing and commercial development, and on the other hand a proposed military expansion could adversely affect the commun- ity's ability to reach that goal. H IIII. EXISTING CONDITIONS A. Existing Land Use Since preparing the 1988 Holly Ridge Land Use Plan, the Town has officially established an Extraterritorial Planning Jurisdiction which has more than doubled the land area which Holly Ridge is now respon- sible for planning and regulating for future development. As discussed in the 1988 Land Use Plan, the land uses within the Town limits are between mixed residential and industrial uses which causes obvious compatibility problems. Because of this current mixing of land uses, there are no well-defined functional areas such as residential or commercial (CBD) and industrial which are typically found in most _ smaller communities. This mixing of land uses occurred prior to the adoption of a Zoning Ordinance. The Zoning Ordinance and recently adopted Subdivision Regulations should help guide future residential and commercial growth. The two major thoroughfares serving Holly Ridge are U.S. 17 running approximately north and south and N.C. 50 running east and west. U.S. 17 provides good access to Wilmington which is approxi- mately 30 miles south, and Jacksonville which is approximately 25 miles north of Holly Ridge. The planned widening of U.S. 17 directly through Holly Ridge will tend to cut the community into two sections east and west of U.S. 17. Local officials may want to look at pro- posing a by-pass on the western side of the community rather than having U.S. 17 going directly through the community. N.C. 50 provides good access to the beach communities of Surf City and Topsail Beach which are a short driving distance from Holly Ridge. The Intracoastal Waterway bridge at Surf City is approximately 4.5 miles from U.S. 17 in Holly Ridge. 5 The 1988 Land Use Plan included on pages 13 and 15 acreage of land use for both the area inside the Town limits and the Extra- territorial Planning Jurisdiction. Because of the small amount of land use change since the 1988 Land Use Plan was completed, this amendment reflects in the Tables below the changes in land use acreage brought about by the recently completed annexation. TABLE 1 ACREAGE OF LAND USES IN HOLLY RIDGE Land Use Present Acreage % of Total Residential 124.6 14.1% Open Space 561.8 63.8% Commercial 25.4 2.9% Industrial 16.5 1.9% Institutional 8.3 .9% Vacant 20.2 2.3% Roads and R/W 123.9 14.1% Total 880.7 100.0% TABLE 2 ACREAGE OF LAND USES IN EXTRATERRITORIAL PLANNING JURISDICTION Land Use Present Acreage % of Total Residential 2.0 .1% Open Space 3,391.0 95.9% Commercial Institutional 27.8 21.1 .8% .6% Roads and R/W 92.7 2.6% Total 3,534.6 100.0% 6 IAs discussed in the 1988 Land Use Plan Update, Holly Ridge has experienced very little land use change since the previous Land Use Plan was prepared, with the exception of a substantial number of new mobile homes being located in the Holly Hill Mobile Home Park between U.S. 17 and N.C. 50 in the southeastern corner of the Holly Ridge Town limits and the annexation of three areas. The 1988 Land Use Plan shows this area as undeveloped; however, during a windshield survey conducted in early May, 1989 to update the Existing Land Use Map (see map in Appen- dix), we found 37 mobile homes that have been recently located in this area, with the extension of Hines Street and Jenkins Street as unpaved road rights -of -way. We also found what appears to be a large borrow - pit with two mobile homes at the end of Camp Davis Road in the south- eastern section of the Extraterritorial Planning Jurisdiction. Nearly all of the developed land outside the Town's corporate limits but still within the recently established planning jurisdiction is found along or adjacent to N.C. 50 between Holly Ridge and Surf City. This area is primarily residential in use with some commercial uses such as flea market, grocery store, tavern and vacant warehouse. Much of the residential land use in this area is served by unpaved streets connecting to paved N.C. 50. Many of these streets, and the few paved streets in this area, are in very poor condition. The remaining land use in the southeastern corner of the Extraterritorial Planning Juris- diction is primarily forested areas. Much of the northeastern corner of the Extraterritorial Planning Jurisdiction is forested areas with access from U.S. 17 and S.R. 1538. The only other significant land uses are the grassed landing strip north of S.R. 1538 and a large utility easement that runs in a north- easterly direction through this area and the Surf City Wastewater ITreatment Plant. It is worth noting that much of this area is part of a large tract of land being considered for future residential de- velopment between Holly Ridge and the Intracoastal Waterway (Westmin- ster site described in Section II.B). The major portion of the land area not already developed on the west side of U.S. 17 but within the extraterritorial planning area of Holly Ridge is part of the Camp Davis site and is being considered for expansion by Camp Lejeune. This area also includes a military runway and unused asphalt streets with primary access to the area provided by U.S. 17 and N.C. 50. B. Constraints: Land Suitability -- 1. Soils The 1988 Land Use Plan addressed hazard areas, soil limita- tions, sources of water supply, slope, fragile areas and resource potential. None of these Land Suitability factors have changed Isince adoption of the 1988 Plan. However, in an effort to expand on the soil limitations discussed in the Plan, the Plan Amendment contains detailed information more on the location of these un- suitable soils in the hope that future development will be direct- ed away from these areas unless water and sewer facilities can be extended into these areas as suggested in the 1988 Plan. The soils map (see Appendix) is based on the detailed soils map of �1 Onslow County. The map reflects Muckalee Loam and Murville Fine Sand found primarily along creeks and tributaries. The 1988 Land Classification Map had many of these areas shown as Conservation. The map also shows the general location of soils that are wet soils with high water tables as well as soils that are suitable for septic tank use. Wet soils are an obvious constraint to 8 development and should be considered determining when utility extension policy and location. 2. Camp Lejeune Expansion Camp Lejeune has proposed a 41,000-acre expansion (see Pro- posed Expansion Map in Appendix) for purposes of providing needed additional space for firing ranges and helicopter landings. Based on the July 1989 Draft Environmental Impact Statement, much of the Extraterritorial Planning Jurisdiction west of U.S. 17 would be included in the acquisition, limiting future growth to the areas along U.S. 17 and east of U.S. 17. The impact statement on page S-7 indicates that the restriction of airspace would impede free _ public access, and "noise generated by weapons firing in the Greater Sandy Run Area (GSRA) has been projected to reach levels which may adversely affect the nearby communities of Verona, Dixon, Folkstone and Holly Ridge." (See Weapons Noise Map in Appendix) C. Constraints: Capacity of Community Facilities The 1988 Land Use Plan addressed the Holly Ridge Water System, wastewater system, schools, roads, fire and rescue, recreation and medical services, solid waste and police. Since completion of the 1988 Plan, several.of these facilities have had changes not addressed or there are new plans available that were not available or addressed �1 in the Plan last year, specifically the following: 1. Water System Since completion of the 1988 Land Use Plan, a Capital Facili- ties Plan for the Water and Wastewater Systems has been completed by Andrew and Kuske Consulting Engineers, Inc. The Plan has recommended that the Town remain connected to the Onslow County Water System while working toward the goal of placing the exist- ing water treatment facilities of Holly Ridge back in operation. Holly Ridge has water treatment facilities that were built in the 1970's but not used in the last several years. The Town has an existing well with a yield of 250 gallons per minute, and a second well located near the public housing area with an unknown yield. The Plan points out that the 75,000-gallon elevated tank will be adequate for storage as long as the Holly Ridge water system re- mains connected to the Onslow County system. The distribution system consists of 8", 6" and some 2" distribution lines which have been experiencing numerous leaks. The system has a water - demand of approximately 114,000 gpd. Usage is approximately 68.6 percent of the current 166,226 gpd capacity. With only a 75,000 gallon storage capacity, Holly Ridge is currently purchasing over two million gallons per month and using the County tank to meet current storage and water needs. The system currently serves much of the developed area inside the corporate limits. Portions Burnes of Street, Jenkins Street, Crawford Street and Green Street east of U,.S. 17 are primarily undeveloped and are not served. On the west side of U.S. 17, portions of Jones Street (S.R. 1126), Lloyd Street (S.R. 1127), and Holly Street (S.R. 1128) are also undeveloped and not being served. (See map in Appendix) 2. Wastewater System The 1988 Plan points out that having a good wastewater system in operation is very important from an environmental standpoint in an area with very poor soils for septic tank use. The Plan also recommends that local officials continuously monitor the capacity of its wastewater treatment as annexation takes plant 10 place. During preparation of the 1988 Land Use Plan, a Capital Facilities Plan was being prepared which was not addressed in the Plan. This study indicated that the present wastewater collection system is composed of approximately 25,800 linear feet of 8", 10" and 12" gravity sewer mains with approximately 100 manholes and 2 pump stations with 6" forcemains. The treatment facility is a 120,000 gallon per day plant with some of the system dating back to the 1940's with updating in 1985. The system after treatment discharges into King's Creek. Prior to annexation this system was serving 226 customers, which includes most of the developed portion of the Town. Those areas not _ being served were the same areas listed as not being served by the water system. (See map in Appendix) During normal operating conditions, the treatment facility was treating at approximately 50% capacity. With recent completion of annexation, the Town will add approximately 225 people to the system, bringing - the total usage at the plant to 82,500 gpd or 68.6% of capacity. With the Town's relatively slow rate of growth, the current system should meet the Town's needs during the five-year planning period. 3. Roads The 1988 Plan briefly discussed the extensive unimproved and unpaved roads and roads in disrepair found in Holly Ridge. Based on information from the Holly Ridge Town Clerk's office, there presently exist 6.84 miles of paved roads in the Town with 1.86 miles of soil roads and 2.24 miles of unpaved graveled roads for a total of 10.94 miles of roads. Since completion of the 1988 Plan, Holly Ridge has completed paving a section of Sanders 11 i 'i on inLormation from the Holly Ridge Town Clerk's office_, there presently exist 6.84 wiles of paved goads in the Town ;riz1. 1.06 ti=1.?es of soil roads and 2.24-, miles of unpaved graveled roads for a total of 10.94 miles of -roads. Since completion of the: 1988 Plan, Holly Ridge has completed paving a section of Sanders Street with plans to pave sections of Dyson Street and GreFn Stre.-at. In addition to these improvements, the 1989 General Assembly ra- tified the Highway Bill which will provide additional revenue for improveme*it and maintenance of munica.pt�', streets. The Le._-;ue of Muni.cip,alities hay prepared a preliminary analysis of 'Inc Bill and estimates that the October 1990 distr4l.bution of funds vi:l be over 20% more than current amounts, rising to 25i for the second year and possibly as high as 50% more by 1997 than current levels. This increase in Powell Bill -funds should help expedite paving and repairing of roads in holly Ridge. i,. 'R4( ratio Since completion of the 1988 Plan) a Recreation and Open Space Flan for 'molly Ridge has been completed. The plan inc'_uce-a a site play: and general cost estimates for improvements to the e:<9.sting pa'}= discussed in the Plan. The Plan also recormnended a possible gr.een:ray system along existing creeks and tributaries that would help accomplish two thin-- discussed in the 1988 Plan, pro -vide scr passive recreation opportunities and retain existing wooded ar!!as in and around Holly Ridge. Readers are directed to thn 1: ' ` Recreation and Open Space flan for morn de-ai.le . r,f ar^,atian . i>:isting medical facilities discuss_ d in the 1 M; Plan are 12 puce. baring preparation of the 1985 nand Use Plan, a Capital Facilities Plan was bei:lg, prepared whi ob was not addre; sed in the r'ian• This study indicated that the present wastewater collection S','8te:A iS OWPDOSed of approximately 25,800 linear 'feet o: anti R-raVi.t)' Setter mains w-�th approximately 100 manfTCle: ?71C1 2 stations with 6` forcemain The ri?atmsnt facili., i. t�", C)CIU gallon per day plant with some of t?]e system dating back to the 1940's with updating in 1985. The system after ��eatr;e:at discharges into King's Creek. Prior to ;.nnexation this Sy steriI was serving 226 customers, which include: most of the dev .,Roped portion of the Torn. TIIOse ar,_as rvt we —le the same areas listed a : not being st m (See ma _n Appendix) by he water sy e y p ppF ) Uuz•i.r :vrmal Gi�E_':tillt conditions, the treatment _'acil.a.t) was t:eat-Ing at ap :oXiM,ate.l)' 50% Capacity. With recent completion of alitle.xa.t7.on, t^e Town will add approximately 225 people to the system, bringing t ;e total usage at the plant to 82, 50C gpd or 68.67:.' of capacity. ' BC— =Use of the numerous leaks in the T7' nls Water systeyj, the wastewater, system is treating less than the water s•"st-:T; wbicb will reira'n true u =ti1 the water Svc. `r:i..__ the Town s rela ,.ivel)' sloe rate th. tb; cut'ien`.. syttel% 8?:t�i:id vieet the j,ot,'o's needs during ttic five-year pla.nt.ing, pc:"�vd. The 1988 Plan briefly discussed the extensive unimpro'J;U and tin-j:a"✓ed roads and ro?dS in di.sT_'epalr found in molly xid..;;e.. Based Street with plans to pave sections of Dyson Street and Green Street. In addition to these improvements, the 1989 General Assembly ra- tified the Highway Bill which will provide additional revenue for improvement and maintenance of municipal streets. The League of Municipalities has prepared a preliminary analysis of the Bill and estimates that the October 1990 distribution of funds will be over 20% more than current amounts, rising to 25% for the second year and possibly as high as 50% more by 1997 than current levels. This increase in Powell Bill funds should help expedite paving and repairing of roads in Holly Ridge. 4. Recreation _ Since completion of the 1988 Plan, a Recreation and Open Space Plan for Holly Ridge has been completed. The plan included a site plan and general cost estimates for improvements to the existing park discussed in the Plan. The Plan also recommended a possible greenway system along existing creeks and tributaries that would help accomplish two things discussed in the 1988 Plan, provide for passive recreation opportunities and retain existing wooded areas in and around Holly Ridge. Readers are directed to the 1988 Space Plan for detailed information. Recreation and Open more 5. Medical Services Existing medical facilities discussed in the 1988 Plan are still available. Holly Ridge also has the 911 Emergency Service number available; however, assistance must come from Jacksonville. .1 12 Holly Ridge_ also has the 911 Emergency Service numbti:: available; however, assistance must come from Jacksonville. 6. 'ior:n lull Town officials have been discussing the need for a new Hall for the last several months. Plans are now being prepared by an arc*.itect to build. a new facility on Dyson Street. 6. Town Hall Town officials have been discussing the need for a new Town Hall for the last several months. Plans are now being prepared by an architect to build a new facility on Dyson Street. 11 U FJ 1 13 I IV. MWMT PLANS, POLICIES AND REGULATIONS A. Current Plans The 1988 Land Use Plan included a brief discussion of the prior Land Use Plans, Building Code, Subdivision Regulations, Zoning Ordi- nance and all other plans, policies and regulations as of 1988. Since that time three new plans have been prepared that were not included in the 1988 Plan which are the following: 1. Capital Facilities Plan - Water and Wastewater Systems This plan provides information on the existing water and wastewater systems for Holly Ridge with recommendations and cost estimates for proposed improvements. 2. 1988 Drainage Master Plan This plan provides an inventory of existing drainage facili- ties with recommendations on needed drainage improvements. 3. 1988 Recreation and Open Space Plan This plan includes recommendations for improvements to the existing Town Park and a proposed greenway system with site plan and cost estimates. B. Current Policies Two policies discussed in the 1988 Plan that have changed as part of this Plan Amendment deal with recreation and preservation of forestry land and land use in the conservation area shown on the Land Classification Map. Discussion on these issues can be found in Section V and Section VIII of this Plan Amendment. Current policies discussed in the 1988 Plan that remain unchanged include the following: 1. Holly Ridge continues to support protection and management of estuarine AEC's although there are none located within Holly Ridge. 14 Holly Ridge continues to support the Coastal Management Program. 2. Holly Ridge continues to support the programs of the State and U.S. Soil Conservation Service. The 1988 Plan indicated that the Town needed to improve the storm sewer system. Since that time the Town has had completed a Drainage Master Plan using CAMA plan- ning funds as a first step in implementation of this policy to reduce stormwater runoff. 3. Holly Ridge continues to insure the availability of fresh useable water. Since 1988 the' Town has received a Capital Improvements Plan which addresses needed improvements to put the existing water treatment plant and system back in working order rather than buying County water. 4. Holly Ridge continues to support the preservation of the Great Sandy Run Pocosin in its state. natural 5. Holly Ridge continues to support and is actively seeking light industrial development. 6. Holly Ridge will continue to have a policy to provide public services within the Town limits first. 7. Holly Ridge continues to support low to medium density urban growth within the Town limits. 8. Holly Ridge will continue to seek outside funding assistance to redevelop areas in need of such assistance. 9. Holly Ridge continues to support State and Federal programs in- cluding erosion control, public water access, highway improvements, port facilities, dredging and military facilities. 10. Holly Ridge continues to reserve the right to comment, support or oppose any proposed energy facility on an individual basis. 1 15 11. Holly Ridge continues to support any efforts to increase the benefits of tourism for Holly Ridge. C. Water and Sewer Extension Policy The Water and Sewer Extension Policy for Holly Ridge was adopted on April 14, 1987 (see policy in Appendix). There are essentially three methods by which water and sewer extensions can be accomplished. 1. Petition by residents, 2. Application by property owners, and 3. Action by Board of Commissioners. In addition, if a project outside the corporate limits requests ex- tension of water and/or sewer, they must also simultaneously petition _ for annexation including satellite annexation. i L' r� 1 1 16 V. HOLLY RIDGE ISSUES, POLICIES AHD 1EPLEMEIRPATIOA The 1988 Plan addressed issues and established policy for the follow- ing items which remain unchanged and may be reviewed in the 1988 Plan: Groundwater Protection Great Sandy Run Pocosin Protection Preservation of Camp Davis Sand Quarrying Effectiveness of Sewage Treatment Plant Residential and Commercial Growth Town Growth Commitment to State and Federal Programs Provide Services for Development Attract People to Locate in Holly Ridge Annexation Housing Mix Soil Suitability Preserving Prime Farm Land Commercial Growth Industrial Growth Town Appearance Since adoption of the 1988 Land Use Plan, several events have necessi- tated refinement of several policy statements or implementation strategies. These events include designation of Stump Sound as an Outstanding Resource Waters (ORW) area, with King's Creek draining into these ORW waters from Holly Ridge. Camp Lejeune has completed their Draft Environmental Impact Statement concerning plans to expand Camp Lejeune training facilities into the Holly Ridge area. The third major event that was not addressed in the 1988 Land Use Plan is plans to develop an 1,800-acre residential develop- ment between Holly Ridge and the Intracoastal Waterway. Since 1988 Holly Ridge has completed a Recreation and Open Space Plan that included recom- mendations to include existing forested areas along creeks and tributaries such as Cypress Swamp and King's Creek in a greenway system. Implementation of this recommendation could help in the implementation of three previous policies; specifically, preserving forested areas, providing passive re- creation areas and improving water quality by preserving forested areas adjacent to existing creeks and tributary areas. 17 IA. Preserving Forested Areas In an effort to protect forested areas primarily along creeks and tributaries such as Cypress Swamp and King Creek and to begin imple- mentation of the recommendation found in the 1988 Recreation and Open Space Plan, local officials have revised policy dealing with pre- serving forested areas as follows: Policy: It will be the policy of the Town to retain forested areas along King's Creek and Cypress Swamp as part of an open space system. Implementation: i) The Town will require a specified amount of open space in its - Subdivision Regulations, part of which can be forested. ii) When the Zoning Ordinance is updated, some areas should be zoned for low density residential development, which will encourage preservation of forested areas. iii) When the Town budget allows, the Town will purchase tracts of forested land for additional open space. iv) All commercial and industrial zones that abut residential zones should be buffered and the Zoning Ordinance will reflect such a requirement. v) Town officials will begin promotion of the idea that forested areas along Cypress Swamp and King's Creek be dedicated to the Town of Holly Ridge or Onslow County for use as a greenway system and in an effort to protect forested areas along these tributaries. B. Recreation Since 1988, Holly Ridge has completed a Recreation and Open Space Plan. The Recreation Plan inventoried existing recreational facilities, outlined minimum acreage and facility standards and provided an outline 18 of proposed facilities as established by the Recreation Committee of Holly Ridge. The Plan also included a site plan and cost estimates for proposed improvements to the Town's existing 10.0-acre park. Policy: Holly Ridge officials will continue to work toward im- provement of the current recreation program and facilities. Officials will also work to obtain any County, State or Federal financial assistance in obtaining grants or low -interest loans to improve re- creation facilities and to implement the 1988 Recreation and Open Space Plan. Implementation: i) Local officials will support a community recreation facility in _ combination with other towns in the area and in cooperation with Onslow County the Recreation Program. ii) Town officials will work with County, State and Federal officials in obtaining grants to provide more and better recreation facili- ties. C. Providing Services for Development The Town of Holly Ridge desires residential, commercial and some industrial growth. It recognizes that it must provide the proper services to accommodate this growth. (See Appendix for Town Policy.) Policy: The Town's policy is to provide services to development as needed and as financially feasible. Implementation: i) To continue to work on repairing the problem with the storm water infiltration with the sewer system. ' ii) Work to place Town's water system back into operation. iii) Town officials will work with developers in providing services such as water and sewer inside or outside the Town limits of 1 19 1 Holly Ridge if providing such facilities is financially feasible and in the best interest of Holly Ridge in providing for desired residential, commercial or industrial growth. iv) The Town will make every effort to obtain grants or low -interest loans to expand the wastewater treatment plant or water treatment facilities and distribution systems to be able to provide needed services to encourage economic growth in the area. D. Expansion of Camp Lejeune ' The 1988 Land Use Plan included a policy statement that was in opposition to expansion of Camp Lejeune into the area west of Holly ' Ridge. Since adoption of that policy, Camp Lejeune has issued the Draft Environmental Impact Statement. Based on a review of the Impact Statement, no mention was made of Holly Ridge's Land Use Plan policy statement. Specifically, page III-25 of the Environmental Impact Statement includes information from the 1986 Onslow County Land Use Plan but no reference to Holly Ridge's 1988 Land Use Plan. Policy: Holly Ridge officials oppose expansion of Camp Lejeune ' into the Holly Ridge area for helicopter training and a weapons firing range impact area. Implementation: i) Local officials will adopt and forward a resolution to Camp Lejeune officials expressing opposition to plans for expansion of Camp Lejeune into the Camp Davis area for a weapons training impact area. E. Future Residential Development At this time, an 1,800-acre residential development has been proposed. Approximately 400 acres of this development lie within the planning juris- diction of the Town of Holly Ridge. Development of this area can provide 1 20 Holly Ridge with housing additional resources and thereby commercial ' activity which is a primary goal of Holly Ridge. For that reason, Holly Ridge officials will cooperate with developers in bringing about this project as long as local officials feel that such develop- ment will be beneficial to the community. If developed as presently ' being discussed, approximately one -fifth of the development would be inside either the Town limits or Extraterritorial Planning Jurisdic- tion of Holly Ridge. Recent discussions on scheduling for the deve- lopment have included plans for a possible residential development and golfing school adjacent to Holly Ridge during the planning period and development along the Intracoastal Waterway also beginning during the - ten-year planning period. Policy: Holly Ridge officials will make every reasonable effort to cooperate with development of this and any other large-scale development that will bring about needed housing, commercial development or job opportunities for Holly Ridge citizens. F. Intergovernmental Coordination ' The Town will consider planning issues and concerns of adjoining planning jurisdictions in all planning matters of the Town. Policy: Holly Ridge Officials will make meaningful attempts to communicate and settle conflicts with officials in other planning jurisdictions when policies may be in conflict. ' Impleaentation: i) Town officials will cooperate to the best extent possible with outside utility providers. ii) When planning for the extraterritorial jurisdiction, Town officials will contact abutting planning jurisdiction officials to determine 1 21 if there is a need for negotiation or collaboration. iii) The Town will aid in county -wide cooperation by working with other local governments and service providers on matters relating to roadways, water and sewer services, solid waste disposal, ' coastal management, and planning activities in general. VI. PUBLIC PARTICIPATION Public participation opportunities have been provided during the plan- ning process through the use of a planning questionnaire that was distributed throughout the Town of Holly Ridge and the planning jurisdiction. ' In addition, all Planning Board meetings and Town Council meetings in which the Land Use Plan Amendment has been discussed have been open to the public. (See Appendix for list of public meeting dates.) Prior to final approval of the Plan, a public hearing will be held to re- view the plan and give citizens the opportunity to comment on the plan. fVII. HAZARD IIITIGATION The Hazard Mitigation section of the 1988 Land Use Plan has remained unchanged. 1 1 1 22 ' PIII. LAND CLASSIFICATION The 1988 Holly Ridge Land Use Plan Land Classification Section found on page 35 included the five recommended land classification categories ' which are Developed, Transition, Community, Rural and Conservation. These types of classifications have not changed; however, the location for the Transition areas and Conservation areas have changed on the Amended Land Classification Map from that shown in the 1988 Plan. The new Land Classification Map includes the following: A. Land Classification System The land classification system recommended in the Land Use Plan- ning Guidelines (Subchapter 7B) which is part of the State's adminis- trative code includes the following land classification categories: 1. Land Use Developed ' Developed areas provide for continued intensive development. These areas have been and continue to be developed for urban areas including: 1) residential, 2) commercial, 3) industrial, and 4) institutional. Usually, these uses are served by streets, water, sewer, and fire police protection. 2. Transition Land Use Transition areas provide for future intensive development. These areas are considered appropriate for urban growth in the future and should be scheduled for the necessary urban services as development occurs. 3. Community Land Use Community areas provide for clustered development in rural areas. These areas allow for additional housing, shopping and public services. They are considered to be crossroad communities . 23 1 and tend to serve the immediate community and nearby rural areas. ' This category is not appropriate or used in this Plan. 4. Rural Land Use Rural areas provide for agriculture, woodlands, mining or quarrying, and low -density residential uses. These areas allow for the usual rural land uses which include farming, forests, farmsteads, passive recreation, processing of farm and forest products, farm and forest services, schools, churches, community centers, scattered non -farm residences and general stores. S. Conservation Land Use ' The Conservation class is to provide effective long-term man- agement and protection of significant, limited, or irreplaceable areas. Management is needed due to natural, cultural, recreational, ' scenic, or natural productive values of both local and more than local concern. Activities that would significantly disrupt the ' natural plant and wildlife habitats in these areas would not be appropriate uses for the Conservation class. While agriculture ' and forestry in as floodplains may occur certain situations such ' and pocosins, they are to be managed so that the impact on the environment is minimal. B. Holly Ridge Land Classification Map The Holly Ridge Land Classification Map shown in the 1989 Plan ' Update has been amended to show both increased areas of Conservation and increased areas of Transition. Listed below are the locations and and recommended guidelines for appropriate use in each land classifi- cation category (the Revised Land Classification Map for Holly Ridge is located in the Appendix): 1 24 1. Developed - The Developed land classification is located inside the corporate limits of Holly Ridge and inside the recently annexed areas. Both water and sewer serves much of this area ' with the possibility of utility extensions. This area contains ' numerous parcels of land for additional development adjacent to existing utilities. ' 2. Transition - The Transition land classification is located along both sides of U.S. 17 on the northern and southern side of Holly Ridge in the Extraterritorial Planning Jurisdiction. Transi- new tion has also been shown along both sides of N.C. 50 from the new corporate limits to the extraterritorial boundary. The remaining Transitional area is located along both sides of Sound Road or S.R. 1538 and east of U.S. 17 and encompasses the portion of the ' 1,800-acre residential development proposed by Weyerhaeuser located ' inside the Town's planning jurisdiction. All Transitional areas have been designated in potential growth areas to allow for exten- sion of utilities to accommodate future growth in these areas. 3. Community - The Community land classification is not applicable to Holly Ridge since this is an incorporated town. 4. Rural - All remaining areas in the Extraterritorial Planning Jurisdiction, with the exception of Conservation, have been ' designated Rural. This area consists primarily of forested areas or open fields. ' 5. Conservation - The Conservation land areas are those Muckalee Loam and Murville Fine Sand soils found along tributaries on the ' 17. Muckalee east side of U.S. Loam, Murville Fine Sand Soils and wet soils with a high water table have been included in the Extra- ' 25 territorial planning jurisdiction on the west side of U.S. 17. The hydric soils found on the west side of U.S. 17 are adjacent to a large pocossin and for that reason have been included in the ' Conservation classification to protect this sensitive environ- ment. The Plan Amendment has recommended that these areas be preserved as part of a greenway system and to provide a buffer between existing and future development and area streams as recommended in the Holly Ridge Recreation and Open Space Plan. These areas are also suitable for low -density ' residential use, forestry or other uses allowed by zoning, health regulations, flood insurance program and other local, county, State and federal regulations. The Conservation area west of U.S. 17 also includes Muckalee Loam soils and Murville Fine Sand soils ' and wet high soils with water tables as outlined on page 26 of the ' Plan Amendment Appendix. Because of the extensive nature of nearby Pocosins and extensiveness of hydric soils, appropriate ' use would include agriculture, forestry, passive recreation, and low density residential meeting all local, State and federal ' regulations including flood insurance, CAMA, Corps of Engineers, and Health Department regulations. Uses specifically not per- mitted would include the following: ' a. The Town opposes military use in the area other than housing and recreation. ' b. The Town opposes this use due to the fact that it will 1 26 1 adversely affect the public health, safety, and welfare. ' c. The noise impacts from military use will limit the Town's ' future opportunities for residential growth. The purpose of the Land Classification Map and text is to pro- vide a system to guide the direction of future growth for Holly 1 Ridge during the planning period. All final decisions concerning location of Conservation areas shall be based on field investigation of conditions. 1 27 H zA W a a M ! M := M M M M i M M = � m M = M ,M M ui L7 12 'a CL 5. j •' ..:•�.�ti • Q •Corporate Limit US 17 Ow. OFA '0 Ok VA 10, I of U.S. DEPARTMENT OF AGRICULTURE Technical Guidp Soil Conservation Service Section II-A-2 North Carolina October, 1986 HYDRIC SOILS Ons low County, North Carolina A. Mapping units that are all hydric soils or have hydric soils as a major component. Map Unit Symbol Map Unit Name Bo - Bohicket soils ,a - Carteret soils Ct - Croatan muck Da - Dorovan muck Gt - Grifton fine sandy loam La - Lafitte muck Le - Lenoir loam Ln - Leon fine sand Mk - Muckalee loam Mu - Murville fine sand Pn - Pantego mucky loam Ra - Rains fine sandy loam To - Torhunta fine sandy loam Wo - Woodington loamy fine sand B. Mapping Units with inclusions of hydric soils or have wet spots Map Unit Hydric Normal location Symbol Map Unit Name Inclusion of inclusions AuB Wo Depressions FoA Wo Depressions NoA Norfolk LFS Rains Depressions 0 to 2 NoB Norfolk LFS Rains Depressions 2to6 Mk Bottom r �r �r �r �r r rr � r � r.� r� rr ri >.r rr r� M■r rr SOURCE: HARLAND DARTHOLOMtW PROPOSED EXPANSION a ASSOC.. 1985 , p M.C.B. Camp Lejeune, North Carolina STARRE MEADOWS MEADOWS IASP T4 G-10 Ar ti ;�✓ , �� t . F F=OE 121 INSTALLATION BOUNDARY C ♦ RED-COpCGDED WOODPECKER HABITAT DP ® IMPACT MEA ALTERNATIVE B 1 0 I 23 4 PROPOSED ACQUISITION AREA �m�i-•-- -1�®J --ins.+ :,(.;Al F IN Mil 1 ;; VANEUVER CORRIDOR JULY 1989 CP#ggg Figure 8 mom am same mw�-Nwmlmmm NVIRONMENTAL TECHIN. LEGEND ROADS = PROPERTY BOUN. = ABANDONED RAIL = POWERLINE CORI O = HOVER NOISE Ci HOVER NOISE CI T�L = TACTICAL LANDIi I = FLYOVER NOISE 65dB TER SANDY I ,ELICFIPTER i JULY 1989 � .., .11% NV1,J b3MS XSV-LINV9 wsrngs �vimS u u I , I I Li !j I !I I! I l � it I , I i u.�. L-J Lj Ll LiL F, H Ul I I ------- e 0 WATEK SYSTEM PLAN --z *-..; LEGEND "I,5,nwG WATEKLIWES EYISTIWC. FIKL WYOPIAJT MoftsEo "TTAME P"t�, TOWN OF HOLLY RIDGE WATER AND SEWER EXTENSION POLICY 1 I I. GENERAL STATEMENT An adequate supply of potable water is an increasingly difficult and expensive commodity to provide citizens. The individual well-being of its residents and the commercial and industrial vitality of an area indirectly depend upon the availability of a useable water supply. Likewise the wastewater treatment system is designed to treat and dispose sewage in a safe and sanitary means. When the treatment and disposal is conducted properly, the contamination of the groundwater supply and the threat of health hazards in populated areas is minimized. The Town of Holly Ridge is dedicated to the premise that our water and sewer systems have been paid for substantially by the citizens of Holly Ridge and therefore, should be judiciously used to enhance the well-being of all our citizens. The Town of Holly Ridge intends to follow a program of aggressive orderly growth without the over -extension of our resources which could result in a long-term devastating effect upon the municipality. The Town intends to comply with its growth policies and enumerated in the Holly Ridge Land Use Plan pursuant to the Coastal Area Management Act of 1974. Furthermore, the Town intends to cooperate with the County of Onslow where at all possible on any program which will mutually benefit both governments and their citizens. The Town will continue to strive to improve all services in all areas which will compliment our quality of life without endangering our fiscal responsibility. II. PLANNING AND EXTENSION OF WATER AND SEWER SYSTEMS The planning and extension of the water and sewer system shall be accomplished in accordance with the following general policies: A. The Town shall be responsible for the maintenance, operation and control of all water and sewer facilities when connected to and/or dedicated to the Town. B. Each developer of land whether subdivided or not shall be responsible for all costs associated with the extension of water and sewer service including rights -of -way costs. C. All water and sewer service extension costs in and to subdivisions shall be borne by the subdivider in accordance with Holly Ridge Subdivision Regulations. D. All water and sewer extension plans and installations shall meet the specifications of t.he.Town of Holly Ridge. The Town shall be authorized to inspect at any time the installation of all water and sewer extensions which are to be connected to the Town's facilities and all fees for said inspections shall be borne by the owner or developer. E. All water and sewer lines and appurtenances connected to the Town's facilities shall be dedicated to the Town and accepted by the Town immediately upon approval of the same by the Town Engineer. III. INITIATION OF PROJECTS WITHIN THE CORPORATE LIMITS There are three methods by which water and sewer extensions can be accomplished. A. On Petition by Residents (1) Water and/or sewer line extensions may be made upon receipt of a petition requesting such improvements. The Petition shall be signed by at least 50% in number of the owners of property who also own at least 50% of the lineal feet of frontage of the lands abutting the proposed improvements. One hundred percent of such improvements shall be financed by special 1 assessments against the benefitted property utilizing the procedures set forth in Chapter 160A, Article 10 of the NC General Statutes. (2) The Town of Holly Ridge shall assess 100% of the full cost of the water and/or sewer improvement against the abutting property owner. Town property shall be assessed just like any other property owner. The Town shall adopt from time to time a maximum price per foot for water and/or sewer lines which shall be assessed against abutting property. Where the size of the property exceeds the normal building lot size in a particular zoning district, the Town may adopt an acreage fee to assess the benefitted property owner in addition to the front foot rate. In any event the maximum front foot rate and the acreage fee shall be applied uniformly to all projects approved by the Board of Commissioners. These fees shall be in addition to normal tap fees, usage charges or impact fees which the Town may have already adopted. (3) The Town of Holly Ridge by action of the Board of Commissioners may amend, modify or repeal said maximum assessment rate and the acreage fee at any time. (4) All petitions for improvements shall specify that the assessments shall be paid in three years plus interest to be determined by the Board of Commissioners. B. On application by Property Owners (1) Any property owner; owners or developer desiring to have water or sanitary sewer services extended to and along any public street or other public way shall apply in writing to the Town requesting such water and/or sewer service. The application shall contain plans in sufficient detail in order to allow the Board of Commissioners to determine the adequate size of facilities necessary for the proposed extension. (2) Upon approval of the extension -plans by the Holly Ridge Board of Commissioners, the property owner or developer shall be responsible for providing 100% of the full cost of the water and/or sewer improvements including all approved pump stations, lift stations and fire hydrants between the owner's property and the Town's water and/or sewer system. (3) If public right-of-way is not available the property owner or developer shall obtain the necessary rights -of -way and/or easements in favor of the Town. (4) All contracts for the installation ofi,iwater and/or sewer lines and the construction and installation of same shall be subject to the inspection and approval by the Town of Holly Ridge and its Engineer and the fee for said inspection shall be borne by the owner or developer. C. Action by Board of Commissioners (1) In the event that the Board of Commissioners of the Town of Holly Ridge determine that a proposed water and/or sewer project is both necessary and in the public interest of the citizens of Holly Ridge, the Town may undertake the proposed extension of services on its own motion. (2) In such case no assessments will be levied against abutting property; however, all owners of property abutting such improvements shall be required to pay a fee equivalent to the amount which would have been assessed as a condition to connecting to said water and/or sewer improvements. (3) The fee charged shall be a maximum price per front foot. Where the size of the property exceeds the normal building lot size in a particular zoning district, the Town may require the payment of an acreage fee in addition to the maximum front foot rate. (4) These fees shall be in addition to the normal tap on fees and usage charges or impact fees which the Town has already adopted. IV. INITIATION OF PROJECTS OUTSIDE THE CORPORATE LIMITS I! i A. The Town of Holly Ridge may permit extensions of water and/or sewer service on written request outside the Town's corporate limits. However, only those areas or �i ±! developments which simultaneously with the request for !I such service agree to petition for annexation (including satellite annexation) where practical and prior to the i extension of the service or otherwise enter into a jj written agreement with the Town for annexation shall be considered. IIB. The application for service shall contain a petition from the applicant requesting annexation or if not practical a statement setting forth the reasons why annexation j would not be practical. II C. The Holly Ridge Board of Commissioners shall have the authority to waive this requirement when in its opinion, annexation would not be practical, legally impossible, or would not be in the best interest of the Town. I; D. The application shall contain written statements agreeing to the provisions of Section II and III above. Furthermore, the applicant shall be responsible for 100% of all costs of the improvements, other related I! i Ij I' facilities and rights -of -way necessary to construct 9 Y Y the lines, and facilities. V. EXTENSIONS MADE BY OTHER GOVERNMENTAL ENTITY A. In the event that the Town of Holly Ridge shall permit an extension of its water and/or sewer lines at the request of and expense of any other governmental unit, including Onslow County, such extensions shall be at the sole expense of the party requesting the extensions. Expenses are to include but not be limited to all labor ' and materials, engineering fees, any and all sums required for rights -of -way and/or easements and any and all -cost incidental to the extensions. B. Upon completion of the water and/or sewer lines, the improvements shall be dedicated to the Town of Holly Ridge. Properties served by such water and/or sewer lines extension shall pay to the governmental unit an assessment or payment in lieu of assessment as established by that governmental unit's extension policy. In any event, the fee collected shall not be less than the prevailing assessment or payment been had the Town of Holly Ridge installed the improvements. VI. OVERSIZED IMPROVEMENTS/REIMBURSEMENT A. When it is in the best interest of the citizens of Holly Ridge that oversized water and/or sewer lines be extended from the existing municipal system, the Board of Commissioners may agree to pay the difference of the i costs of future areas of construction for such to be �I served with the lines accommodating the increased volume. 1 �) If any oversized facility is feasible then a reimbursement agreement shall be entered into between the Town and each �i party installing water and/or sewer. Only those water and sewer lines, fire hydrants, lift stations and pumping stations as may be expressly referred to and covered by i a written contract between the party(ies) and the Town II shall be considered. If B. The cost of installing all lines on property being connected to and the cost of installing all lines between such property being developed and the existing lines of the Town shall be borne by the owner, developer or party being so connected. it C. Oversize improvement costs subject to reimbursement shall be: (1) The actual cost of water lines larger than six iI inches,.sewer lines larger than eight inches, all approved i! �I i� I� �I �I fire hydrants, pumping stations and lift stations between property being developed and the facilities of the Town and which are so located as to serve other properties. (2) The cost of lines within property being developed which will serve other properties and are of a size in excess of six inches for water and eight inches for sewer but only to the extent of the extra cost incurred by installing lines larger than needed to serve the property itself. (3) The proportionate cost of lines of any size to which direct service connections may be made by property other than those by the initial developer. 0. All reimbursements for oversize improvements costs set forth in Items VI (C)(1) and VI (C)(2) above shall be made from water and/or sewer acreage charges collected by the Town from properties initially or subsequently served by lines installed under a reimbursement agreement. Reimbursement costs due from acreage fees under a oversize improvements agreement shall be paid by the Town to the developer made during the quarter. All reimbursement for costs for Item (C)(3) above shall be made only from appropriate front foot charges. E. Only actual costs of the lines together with all necessary fire hydrants, pumping stations and lift stations shall be included in the calculations of costs subject,.to reimbursement. No interest on cost pending reimbursement shall be permitted. F. No reimbursement of any costs shall be made more than ten years after the date of acceptance by the Town of the lines installed under a oversize improvement agreement. G. Acreage charges collected from properties served by lines installed under reimbursement agreement shall be applied so as to satisfy any claims under the different agreements in the order in which such agreements were executed. VII. This ordinance shall have full force and effect from and after its adoption. ADOPTED this the 14th day of April, 1987. BY I J 7---v Howard, Mayor Ann Odum, Town Clerk F-1 1 is EXAMPLE OF USE OF PROPOSED WATER AND SEWER EXTENSION POLICY 1. Developer A constructs a 12" water line from the Town system to the entrance of his subdivision "A" at a cost of $55,000 under a reimbursement agreement. His subdivision "A" has 100 acres of land, thus his acreage fee is 100 x $350 or $35,000. This fee, he in effect pays himself and is then eligible to receive $20,000 in reimbursement from subsequent developers who make use of the line he has installed. Developer A installs all lines in his subdivision "A" at his own expense and without provision for reimbursement from acreage charges. 2. Developer B decides to develop his property and utilized the 12" line installed by Developer A by extending a 10" line from the existing 12" line at a cost of $15,000 under a reimbursement agreement. Like everyone else he installs all lines in his subdivision at his expense with no reimbursement. His subdivision "B" has 50 acres and thus his acreage fee is $17,500 which goes to Developer A. Developer A has now been reimbursed all but $2,500 for which he is eligible. 3. Developer C develops 6 acres by connecting to the 12" line installed by Developer A. His acreage fee is $2,100 all of which goes to Developer A leaving him $400 to recover. I 4. Developer D develops 40 acres by connecting to the 10" line installed by Developer B. Since he is developing 40 acres his acreage fee is $14,000 of which $400 goes to �i Developer A which completes his reimbursement. The balance r of $13,600 goes to Developer B leaving him $1,400 to recover. i I� II I Should later development take place along the 12" line !! installed by Developer A for which he has been fully reimbursed the acreage charges collected would be used for replacement Ii j and enlargement of the present system. Holly Ridge Planning Questionaire April, 1989 The Town of Holly Ridge is in the process of updating its 1987 Land Use Plan by including the extraterritorial planning area. The Town Council would like to have the benefit of your thoughts so that your opinions can be incorporated into the land use planning process. Please review and respond to the follow- ing questions and return to the Town Hall by Monday, April 24, 1989. We ask that each adult member of each household respond to the questionnaire. Thank you in advance for your assistance in helping us plan for the future of our community. Please return to Mr. Billy Farmer, P. 0. Box 145, Holly Ridge, N.C. 28445. If you have questions, please call Mr. Farmer at 329-7081. ISincerely, Billy Farmer Town Administrator 1. How long have you lived in Holly Ridge? ' 21. 4 Two years or less 5%/l Five 210 4 Two to five years to ten years 53%/10 More than ten years 2. Do you live inside Town Limits or in the extraterritorial planning area? 53%/10 Inside Town Limits 47%/9 Extraterritorial Planning Area 3. Do you own or rent the house you live in? 84%/16 Own 16%/3 Rent 4. What age group are you in? 21%/4 18-25 16%/3 26-35 26%/5 36-45 5%/1 46-55 26%/5 56-65 5%/l 66 or over ' 5. At what rate should Holly Ridge grow in the future? 16%/3 No growth 5%/l Slow growth 63%/12 Moderate growth 16%/3*Rapid growth 6. Do you favor growth in the following areas? Industry/Manufacturing 84%/16 Yes 16%/3 No Conventional housing 74%/14 Yes 26%/5 No Mobile Homes 47%/9 Yes 42%/8 No Shopping Center 84%/16 Yes 16%/3 No Grocery Stores 89%/17 Yes ll%/2 No Laundry 63%/12 Yes 32%/6 No Apartments or Duplexes 79%/15 Yes 16%/3 No Others (specify) 7. Please give us your opinion for of the following services. (Check one column each service.) Administrative Services Very Good Good Adequate Poor Very Poor 32%6 1 Police Protection 37y 7 Fire Protection 26%/5 26%5 26%5 1 Rescue Squad 32%/6 21%4 42%8 Recreation Facilities 5%/l ll% 2 2 Trash Collection 26%5 167- 3 Water System 16% 3 32� Sewer System ll% 2 Other 8. Do you support plans for expansion of Camp Lejeune into Holly Ridge? 32%/6 Yes 42 jj No 2 fiZL- Not Sure 9. Would you support the Town working with the Department of Transportation in establishing a recreation trail along the old abandoned railroad right-of-way? 42%/8 Yes 37%/7 No 16%/3 Not Sure 10. Do you think the Town of Holly Ridge should provide more recreational opportunities?63%/12 Yes 21Z 4 No 11112 Not Sure 11. Would you be willing to pay more taxes to support recreation programs and facilities? 16%/3 Yes 37% 7 No 13 Not Sure 12. What recreation facilities would you like to see provided in Holly Ridge? (specify) ' 13. For what facilities or services would you be willing to pay additional taxes if necessary to obtain? (specify) 14. Would you support efforts to encourage industrial and commercial development in Holly Ridge?79! 15 Yes 11Z/2 No Not Sure 15. What other areas of concern to you would you like to see addressed in the planning process? I Holly Ridge Planning Questionnaire April, 1989 12. What recreation facilities would you like to see provided in Holly Ridge? YMCA or YWCA A good ball park, picnic area Community center or multi -purpose room None - I believe the money would not be spent properly but just go in the manager's pockets Tennis court, volleyball, softball A building large enough to have dances, plays, pageants, etc. ' Don't really know, not truly aware of the needs Tennis courts, camping area Good ball field out of the woods, soccer field, volleyball nets ' Bowling alley, movie, a nice restaurant Movie theater, bowling alley, something that senior citizens could enjoy None, if it will cause taxes to go up. Not enough people here to support it. ' 13. For what facilities or services would you be willing to pay additional taxes if necessary to obtain? Better streets and roads More paved roads, town hall Some type community building Fix Bourough Road in Pine Wood Mobile Home Park 1 Tennis court, volleyball, softball Better fire and police support ' Fire, rescue, sewer, streets, water and police More town supported services Bowling alley, movie, a nice restaurant For the size of Holly Ridge, it does not need any new taxes. Just better management of resources 11 1 I 11 11 15. What other areas of concern to you would you like to see addressed in the planning process? Planned economical development, better budget process It is a shame that Holly Ridge doesn't have a decent grocery store Don't believe we will ever be anything more than we are -- if that much A rest area on Hwy. 17, a nice fast food restaurant, a complete service station for car repairs Better roads, get rid of all dumpy stuff I would like to see the town eliminate the town manager position and fire "Andy and Barney" the so—called police department Put Pinewood Mobile Home Park in city limits. We need sewer system and water system. And fix up Bourough Road so school bus can go in and out plus owners can travel road okay. Rest stop areas, paid daytime rescue service An orderly planned growth, working with those who want to improve/ build inside or in the ETJ area and stop trying to slow, halt or reverse the improvements that have been or are being made More services provided by the town such as police, fire, rescue We should pay close attention to our Police Department and some of our town employee activities I do not support Extraterritorial plans. I would rather be annexed with full voting rights. No I do not support the extraterritorial planning. I do support being annexed into city with voting rights! (In response to Question 8) If the water problem here is not corrected my answer is yes. (Marked "Not Sure") (In response to Question 9) I think it is unsafe along side of 17. It can cause trash and garbage. Depending on how it is fixed and what it is used for. (Marked "No") L 1 1 1 1 1 1 1 1 1 1 1 i January 24, 1989 February 7, 1989 April 24, 1989 July 25, 1989 August 22, 1989 September 26, 1989 October 10, 1989 April 10, 1990 June 26, 1990 August 14, 1990 PUBLIC PARTICIPATION OPPORTUNITIES LAND USE PLAN AMENDMENT Public Participation Plan, Planning Questionnaire presented to Planning Board. Discussed Plan Amendment issues with Planning Board. Received Planning Questionnaire and tabulated results. Discussed Plan Amendment with Planning Board. Discussed Plan Amendment with Planning Board Draft Plan presented to Planning Board. Plan reviewed with Town Council. Chairman of Planning Board recommended approval of Plan for submittal to State for review. Meeting with Town Council to discuss State comments. Reviewed Plan with Town Council. Reviewed Plan with Town Council. I IV I 0 1V r13. nKWIWI, kA I 0 o 3 < CD 3 un M fcro50EK 5O Lk �Ml ® cn --., " 1\ N m3 NoWk . ,I S II 31'IIANOrmovr ol ii on 001, 3 E