Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Capital Facilities Plan Water and Wastwater Systems-1988
A rt l 83 DCM COPY DCM COPY lease do not remove!!!!! Division of Coastal Management - _ CONSULTING ENGINEERS; INC. 202 NORTH FIFTN AVENUE. �_ IM099 910 949-9069 WIWINOTON. N.C. A 4 CAPITAL FACILITIES PLAN WATER AND WASTEWATER SYSTEMS TOWN OF HOLLY RIDGE NORTH CAROLINA The preparation of this report was financed, in part, through a grant provided by the North Carolina Coastal Management Program, through funds provided by the Coastal Zone Management Act of 1972, as amended, which is administrated by the Office of Ocean and Coastal Resource Management, National Oceanic and Atmospheric Administration. ANDREW & KUSKE CONSULTING ENGINEERS, INC. 202 North Fifth Avenue Wilmington, NC 28401 (919) 343-9653 A&K Project No. 88036 f 4 MAPS 3 TABLE OF CONTENTS PAGE (S ) INTRODUCTION 1 EXISTING SYSTEM ANALYSIS 2-7 FUTURE DEMANDS 7 - 10 PROJECT IDENTIFICATION 10 - 12 IMPROVEMENTS ANALYSIS/CARRYING CAPACITY/ 12 - 14 IMPACTS PROJECT PRIORITIES 14 - 15 TOWN POLICY 15 - 18 RECOMMENDATIONS 18 - 19 ATTACHMENT A: ENVIRONMENTAL IMPACT STATEMENT 20 - 22 ATTACHMENT B: PRELIMINARY CONSTRUCTION COST ESTIMATE - WATER DISTRIBUTION SYSTEM 23 ATTACHMENT C: PROJECT COST ESTIMATE AND FINANCING PLAN - WATER DISTRIBUTION SYSTEM 24 ATTACHMENT D: RATE SCHEDULE/USE AND INCOME ESTIMATES - WATER DISTRIBUTION SYSTEM 25 ATTACHMENT E: BUDGET FOR COMPLETED FACILITY - WATER DISTRIBUTION SYSTEM 26 ATTACHMENT F: PRELIMINARY CONSTRUCTION COST ESTIMATE - WATER TREATMENT FACILITY 27 ATTACHMENT G: PROJECT COST ESTIMATE - WATER FACILITY 28 ATTACHMENT H: RATE SCHEDULE/USE AND INCOME ESTIMATES - WATER TREATMENT FACILITY 29 ATTACHMENT I: BUDGET FOR COMPLETED FACILITY - WATER TREATMENT FACILITY 30 s CAPITAL FACILITIES PLAN TOWN OF HOLLY RIDGE, NORTH CAROLINA I. Introduction A. Authority. This capital facilities plan and study for the Town of Holly Ridge was authorized by the Board of Commissioners of the Town of Holly Ridge in conjunction with approval from the Coastal Area Management Act pursuant to North Carolina General Statute 113A-112; 113A-124 effective September 1, 1978. B. Purpose. The purposes of this study is to develope a Community Facilities Plan which will include an analysis of the existing water and sewer systems for the Town of Holly Ridge, North Carolina. The plan will study the future demands on the water and sewer systems and will include an analysis of the carrying capacity of the systems. Based on the analysis, system needs will be identified and programmed for future improvement. The system needs identified will be analyzed to determine priorities for funding and scheduling based on estimates of revenues and expenditures. The environmental impacts of the projects identified will be discussed, particularly as they relate to wastewater treatment and disposal. Maps will be created showing the -existing water and sewer systems and identified future projects. The completed plan, as required by the Coastal Area Management Act, will be sumbmitted to the Board of Commissioners for adoption. Being sensitive to the particular needs of the Town of Holly Ridge, major emphasis will be put on the water system. In particular, the possibility of reactivating the Town's water production system will be studied. f ti II. Existing System Analysis A. Water System. The existing water system consists of a distribution network of various sized pipes, an elevated water storage tank and the Onslow County Water System as a water supply. 1. Supply. The Town of Holly Ridge is currently supplied with water by the Onslow County Water System. The Town's water distribution system is connected to an 8 inch main owned by Onslow County in a vault near the base of the existing elevated water storage tank. The Town has an existing water treatment facility which was constructed in the early r 1970's. It has not been used in nearly 6 years and is in a state of general disrepair. When the treatment facility was in service the water supply was a single well, Well No. 1, reported to yield 250 gallons per minute. The Town has access' to another well , Well No. 2, near the Housing Authority. It is not in use at this time and its yield is unknown. Though the Town is not getting any benefit from it's water treatment. facility, it is still paying for its construction and will not pay off the debt until the year 2010. 2. Storage: The Town has one elevated water storage tank. It is a 75,000 gallon elevated tank located adjacent to the Town Hall on Sound Road. The tank was constructed .in the early 1970's. The interior condition is unknown. 3. Distribution System. The main distribution system t consists of 8 inch and 6 inch mains with some areas served by 2 inch lines. Portions of the system were constructed in the early 1940's during World War II. The remaining system was installed in the early 1970's. 4. Treatment: The water supply is treated by the Onslow County Water System before it enters the Town's distribution system. Treatment is conducted at each well location. 5. Auxiliary Power System: The Town does not have any means for auxiliary power, and does not need any, as any requirement is provided by the Onslow County Water System. 6. Current Demand. A. Customers - The system provides service to 286 customers. Sixty of these are outside of the existing Town limits. PRESENT CUSTOMER BREAKDOWN Customers o 128 44.76 Gallons Per Month < 3 , 0 0 0 141 49.30 3,000 - 10,000 14 4.90 10,000 - 20,000 1 0.34 20,000 - 30,000 2 0.70 >30,000 Approximately 44% of the customers use less than 3,000 gallons of water per month. 49% use between 3,000 and 10,000 gallons per month. Only 1% of the customers use over 20,000 gallons per month. This 1% constitutes the industrial users of water by the Town. • 3 V B. Water Consumption - The town is presently purchasing an average of 2.2 million gallons of water per month from the Onslow County Water System at an average cost of $2,667 per month. The Town is metering and receiving payment for an average of 1.4 million gallons of water per month. This indicates a 360 loss of water metered from Onslow County Water System to the water metered by the Town for its customers. This loss is attributed to a small percentage of leakage and a major error in metering of water consumption by the Town's customers. A study has been conducted for the Town which recommends replacement of defective meters. This should significantly impact the margin of error between water received and water delivered by the Town. Actual impacts will not be known until all defective meters have been replaced. 7. Existing System Carrying Capacity. a) Design Criteria - According to the Rules Governing Public Water Supplies, the Department of Human Resources of the State of North Carolina requires that the combined yield of all wells of a water system shall be sufficient to provide the average daily demand in not more than 12 hours pumping time and that the minimum capacity of elevated storage in�a small municipality should be 75,000 gallons or a one -day supply, whichever is greater. It is a State policy that system capacities be computed using 400 gallons per day for each customer. b) Supply - According to State requirements the Town needs 114,400 gallons per day for 286 customers at 400 gallons per day'per customer. Onslow County Water System has r' the capacity to supply the required demand, therefore the supply demand is met. c) Storage - The storage requirement is a one day supply of 114,400 gallons. Again, with the 75,000 gallon elevated storage tank at Holly Ridge and the elevated storage in the Onslow County Water System, the storage requirement is met. The Onslow County storage is based on total customers, not by isolating system segments. d) Distribution System - Some of the existing distribution mains were constructed in the early 1940s. After some 45 years of service, the joints are beginning to fail. The lines are a constant maintenance problem for the Town personnel. The a existing system has several lines which are not interconnected to provide better pressure and serviciability. e) Treatment - The Town does not treat at the present because all water is treated before entering the Towns distribution system by the Onslow County Water System. f) Auxiliary Power System - All auxiliary power system requirements are provided by the Onslow County Water System. The requirements are that standby generation is required when the elevated storage requirement is not met. B. Wastewater System. 1. Collection System - The existing Town wastewater collection system is comprised of approximately 25,800 linear feet of 8, 10, and 12 inch gravity sewer mains with approximately 100 manholes and 2 pump stations with 6 inch forcemains. A'. portion of the system was constructed in the early 1940's during World War II. The remainder of the system was constructed 5 14 in 1986 during a major sewer upgrade and rehabilitation project. 2. Treatment Facility - The Town has a new .1 million gallon per day wastewater treatment facility which was constructed in 1986. The facility includes a bar screen, 4 cell aerated lagoon pump station, sand filters, chlorine contact tank with post aeration, blower building with office space and chlorine room, and discharge to King's Creek. 3. Current Demand - The wastewater collection and treatment facility currently serves about 226 customers, all within the existing Town limits. During normal operating conditions the treatment facility is treating approximately 45% of its design load or 50,000 gallons per day. However, the facility has experienced frequent episodes of higher than normal flows. during prolonged rain events and during short duration rain events of high intensity. At times the flow through the facility has exceeded the facilities ability to treat the effluent to acceptable limits. The collection system has not been reported to capacity during these high flow conditions. A study has been conducted for the Town which has identified numerous areas of infiltration and inflow which accounts for a portion of the high flows experienced. The Town has corrected approximately 65% of the identified problem areas and has seen a significant reduction in extereraneous flows. The wastewater treatment facility has been operating within the limits set by the North Carolina Division of Environmental Management and the Environmental Protection Agency with the corrections 0 made to this point. The success of the corrections cannot be fully seen until 100% of the problem areas have been rehabilitated. 4. Existing Demand Carrying Capacity a) Design Criteria - The existing Town wastewater collection and treatment facilities have been designed in accordance with the current 201 Facilities Plan and applicable State requirements. b) Collection System - Portions of the wastewater collection system were constructed in the early 1940s. Infiltration and inflow are a problem in the old sections of the system. The Town is currently working on correcting problem areas itemized in a recent study conducted for the Town. This system rehabilitation appears to be helping the situation, however conclusive results cannot be seen until all identified areas are corrected. Problems with the collection system exceeding its capacity has not been reported, per Town of Holly Ridge records and employees. c) Treatment Facility - The Town's wastewater treatment facility was constructed in 1986. It has experienced problems with unreasonbly high infiltration and inflow rates, poor performance of its lagoon aeration system and failure of its post -chlorination system. All of the problems have either been corrected or are being corrected by the Town at this time. Currently,.repair to infiltration areas are being conducted. The facility is operating within its required limits. III. Future Demands A. Population Projections. 7 I 1. Annexation: The Town of Holly Ridge is currently going through an annexation study with the North -Carolina Department of Natural Resources and Community Development, Division of Community Assistance. The purpose of the study is to determine the feasibility of annexation of nearly developed residential and commercial property. These properties are located adjacent to the existing Town limits of Holly Ridge in three general areas. The areas include property south of Holly Ridge along U.S. Highway 17, southeast of town along N.C. Highway 50 and northeast of town along State Road 1538 or Sound Road. Should the study indicate that annexation is feasible, the water and sewer customers served by Holly Ridge could increase by approximately 300 upon annexation. This would more than double the number of current water and sewer customers. This increase can.be served by the existing system. 2. Growth Within Existing Town Limits: The Holly Ridge Land Use Plan indicated that the Town is likely to experience population growth from the present population of 500, to 5.52 by the year 2000. This is a 10.4% population increase. 3. TOTAL GROWTH: Should the 'town annex Lne areas now,being studied and population trends occur as indicated in the Land Use Plan, the total number of water and sewer customers would be approximately 600 by the year 2000. If annexation occurs the expected number of customers could be approximately 586 within 2 to 3 years. B. Water System Demands 1. Supply: Undercurrent regulations the required daily demand for 600 customers is 240,000 gallons of water per day. 8 I 2. Storage: The required storage requirement for 600 customers is 240,000 gallons of water per day. This is the equivalent of a one -day supply. 3.Distribution System: Increased flows due to added system customers will put more stress on the older sections of the water distribution system. These sections of 1940 era water mains are currently failing and any additional stress will only accelerate their deterioration and increase maintenance items for Town employees. New lines will have to be constructed to serve annexed areas currently without service. 4. Treatment: In order to meet minimum State requirements for 600 customers, the Town's distribution system must have the availability of 240,000 gallons of treated potable water, per day. 5. Auxiliary Power System: An auxiliary power system must be provided to assure treatment and pumping of water during power outages. C. Wastewater System Demands. 1. Collection System: :The possible addition of 300 sewer customers could increase current wastewater flows from 72,000 to 108,000 gallons per day depending on the types of dwelling and number of bedrooms per dwelling. Current regulations require design parameters of a minimum of 240 gallons per day for any dwelling with 2 bedrooms or less and an additional 120 gallons per day for every bedroom over 2 per dwelling. 2. Treatment Facility: The .1 million gallon per day treatment facility is currently treating approximately Al 45,000 gallons per day which includes inflow and infiltration loads. This flow represents approximately 45% of the treatment facility's capacity and is the product of approximately 226 sewer customers. The addition of 300 new sewer customers could easily increase the inflow to the treatment facility beyond its .1 million gallon per day design capacity. This would limit the Town's ability to grow until such time that the treatment facility's capacity is increased. This will certainly be a determining factor in the annexation study. IV. Project Identification A. Water System Improvements.It is impossible to predict if and when the Town will annex surrounding developed properties. Therefore specific projects related to annexation growth cannot be identified at this time. However, sufficient information is available to identify projects related to the current situation. A. Water System Improvements. 1. Supply: The Towns existing Well No. 1 could be put back into operation. The well is reported to produce 250 gallons per minute. It has a capacity to serve approximately 450 customers if required. The well must be` test pumped in order to determine its actual yield and drawdown.since it has not been used in 6 years. The Town will not be required to have a back up well if it remains interconnected with the Onslow County Water System, see Section V.B.3. However, it would be prudent to have a second well to maintain system integrity and decrease dependence�on the Onslow County .System. The Town's second existing well should be tested and connected to the 10 supply system if it is suitable. 2. Storage: The Town will have adequate storage capacity if it remains interconnected with the Onslow County Water System. If an agreement to remain interconnected cannot be reached the Town will have a minimum requirement of 39,400 gallons per day storage above the existing 75,000 storage available. 3. Distribution System: Parts of the existing system will be replaced (see map #2 in back of plan) to provide reasonable maintenance costs for the distribution system. Necessary hydrants and valves will be included in the overall work for this project to provide adequate fire protection. 4. Treatment: The Town's water treatment facility will be placed back in operation. The coke tray aeration tower will be rebuilt. Pumps, valves and meters will be refurbished. The post disinfection equipment will be replaced including ventilation equipment, scales and all piping. Proper safety equipment will be provided. The two pressure filters will be refurbished as required. Equipment for chemical feeding to aid in the removal of iron and manganese will be replaced. Suitable test equipment for determining chlorine residual, ph, iron and manganese parameters will be obtained. The building will be restored including any required electrical improvements. The town will be required to hire a properly certified operator to assume responsibility for the operation of the water treatment facility. An operator with a B-Well certificate may be required. the treated water produced at the refurbished facility will equal or exceed the water quality now provided by the Onslow County Water System. 11 5. Automatic Control System: If the existing Well No. 2 proves to be usable, an automatic control system would also allow use of either well if one was experiencing problems. 6. Auxiliary Power System: If the Town remains interconnected with the Onslow County Water System, no auxiliary power system is required. However, a system should be added at a future time to provide the Town with a complete self-sufficient system in emergency situations. B. Wastewater System Improvements 1. Collection System: The Town of Holly Ridge is currently implementing a project recommended by a study, "sewer system investigation, Town of Holly Ridge, NC", conducted for the Town by Henry von Oesen and Associates which will eliminate identified inflow and infiltration problem areas. Upon completion of this project, the results of the work can be evaluated. Until such time, no additional projects have been identified. 2. Treatment Facility: The wastewater treatment facility is reported to be in compliance with its specified limitations as dictated by the North Carolina Division of Environmental Management. Other than routine operation and maintenance items, no new projects have been identified. V. Improvements Analysis/Carrying Capacity/Impacts A. Water Distribution System. 1. Improvements to the Town's water distribution system, as proposed, appear to represent a project of the'size 12 and type that is feasible and would provide the Town of Holly Ridge with a reliable and manageable water distribution system (see Attachment B-E for project information). 2. The water rates that the Town currently has in effect are adequate to generate enough revenue to meet their obligations. Current Rate Schedule: First 3,000 gallons @ $9.00 minimum Next 7,000 gallons @ $2.25 per 1,000 gallons Next 10,000 gallons @ $2.20 per 1,000 gallons All over 20,000 gallons @ $1.65 per 1,000 gallons These rates are doubled for out of town customers. We do not recommend an increse in rates. The current water rates are inline with the rates of most towns the size of Holly Ridge and increasing them significantly could present undue hardship on the Town's citizens. The Town will need assistance in accomplishing this project either through grants such,,as State Clean Water Grants or low interest loans from FmHA. 3. The proposed improvements will increase thewater distribution system's capacity to serve the Town of Holly, Ridge by increasing the efficiency of distribution of potable water. Direct impacts will be less maintenance required to repair leaking pipe joints and reduction of traffic disruption along U.S. Highway 17 where most repairs are now required. B. Water Treatment'Facility. 1. It appears that the rehabilitation of the existing • abandoned water treatment facility is a project that is feasible 13 and will provide the Town of Holly Ridge with a self-supporting means of managing and maintaining its total water system, (see Attachments F-I for project information). 2. The current water rate schedule for the Town is adequate to generate enough revenue to meet all anticipated obligations. This is possible becuase the Town can offset increased obligations with reduced expenditures fo.r purchased water, (see attachment I) . 3. The proposed improvements will give the Town the ability to produce its own water supply and have more flexibility in setting water rates which are equitable and which produce a self-supporting system. However, this project is not viable without an agreement with the Onslow County Water System which allows the 2 systems to remain interconnected. This would provide the Town with a reliable emergency source of potable water and provide required storage (see Section VI. Project Priorities A. Water Distribution System The problems associated with the existing failing water mains call for immediate attention. The joint failures are a constant maintenance requirement which keeps Town personnel from other important duties. The Town should set the improvements to the water distribution system as a high priority. B. Water Treatment Facility. Reactivation of the Town's water treatment facility represents an important project which based on project costs projected in Attachment G; could prove to be beneficial to ' the Town's becoming self supportive of its total water system. 14 Because this project appears to be cost effective without having to increase current -water rates, it should be the Town's first priority. The Town should set a high priority on this project, however, as soon as the Town is financially able, attention should be placed on improvements to the water distribution system. VII. Town Policy A. Existing Water and Wastewater System Policy. The Town of Holly Ridge has adopted policies and ordinances regulating wastewater discharge, application for individual service, acceptance of new facilities, fire protection and water and sewer extensions, both inside and outside of the existing Town limits. These policies are contained in the following 5 documents: 1) "Water and Sewer Rules and Regulations of the Town of Holly Ridge 2) "Town of Holly Ridge Code of Ordinances". 3) "Town of Holly Ridge Policy and Procedures for Acceptance of Improvements". 4) "Town of Holly Ridge Water and Sewer Extension Policy". 5) "Ordinance Regulating Wastewater Discharge Into the Town of Holly Ridge, NC Wastewater System". 6) "Town of Holly Ridge Land Use Plan update". Review of these documents indicates that the Town has a comprehensive collection of policies that outline equitable procedures for providing water and sewer service to its customers 15 while protecting the Town's interests and the environment. No deletion or revision of existing policy is recommended. B. Proposed Land Use Plan Policy The Town of Holly Ridge Land Use Plan defines several policy additions which are water and sewer system related. They are as follows: 1) "The Town policy is to insure the availability of fresh useable water from the aquifer providing the Town's water supply. No alternatives to this policy were considered. Appropriate uses are those which would not endanger the Town's water supply either from pollution or over use." 2) It is the policy of the Town to improve the function of the sewage treatment system." 3) "The Town's policy will be to provide services to development as needed". These'proposed policies appear to compliment the existing Town policies concerning water and wastewater systems and enhance the findings of this plan. Of course, all improvements will not be at the expense of the Town, but will be the responsibility of the developer. C.' Proposed Capital Facilities Plan Polic Preparation of this plan and review of the existing Town policy, Land Use Plan and revised Land Use Plan policy have exposed several areas of concern in regard to water and wastewater systems. The following policy additions are submitted for consideration and adoption. 1) Water and Sewer Rates a) Issue: The Town desires to have water and 16 I sewer systems that are self-supporting, in.order to be financially stable and be able to properly maintain existing systems. b) Policy: It is the Town's policy to establish water and sewer rates which will create self-supporting water and sewer systems. c) Implementation: i) The Town will conduct an annual review of its water and sewer finances to determine the effectiveness of the current water and sewer rates. ii) Within established guidelines in the Holly Ridge Town Code, the. Town will adjust the water and sewer rates as needed, and as the citizens can bear, to provide sufficient revenue to operate the water and sewer systems on a balanced budget. 2) Operation of Water and Sewer Systems a) Issue: The Town is currently lacking the manpower to efficiently operate the wastewater and water systems. b) Policy: It is the Town's policy to recruit and maintain a staff position with primary function of operation of the water and wastewater system. c) Implementation: i) Using funds (see Attachment I) generated by the restored water treatment facility and sewer fee revenue, hire a water and sewer system operator with proper State certifications. ii) Ensure that the operator is kept abreast with procedures for efficient operation of the system. iii) To ensure that the water and wastewater systems are properly maintained to produce acceptable end results and 17 prolong life of systems. 3) Water and Sewer Extensions. a) Issue: The Town is concerned that water and sewer extensions are made in a manner that is in the best interest of both the Town and the customers served by the extension. b) Policy: The Town will retain the services of a Professional Engineer, registered to practice in the. State of North Carolina, to review, along with Town staff, all proposed water and sewer extensions. c) Implementation: i) To protect Town interests. ii) To ensure adequate line size for fire protection and possible future extensions. iii) To ensure adequate design to serve proposed customers. VIII. Recommendations A. Water Distribution Svstem. It is recommended that the Town replace existing water mains which have deteriorated to the point of failure. These improvements will provide better pressure, reduced leakage and less maintenance requirements. B. Water Treatment Facility. It is recommended that the Town reconstruct its existing water treatment facility. The Town should establish an agreement with the Onslow County Water System to remain connected to that system for emergency supply and storage requirements. It should be noted that this project may not M be feasible without an agreement with Onslow County. The. reconstruction of the facility will eventually increase the revenue generated by the water system and will give the Town greater influence over its destiny. C. Town Policy. It is recommended that the policies presented in this plan be adopted by the Board of Commissioners. Proiect Initiation. It is recommended that the Board of Commissioners decide what method of producing revenue is to be used to finance the recommended projects. It is suggested that the Board approach the Local Governments Commission of the State of North Carolina and the Farmers Home Administration for advice as to the availability of grants or low interest monies for these projects. Following financing arrangements, the projects can be pursued in more detail with plans, specifications and construction documents. We recommend that the projects be approved as submitted and the necessary steps be taken to begin their financing. We do caution, however, that for the water treatment plant reconstruction project to be feasible, the Town must commit to proper maintenance of the facility and must initiate an agreement with Onslow County to remain interconnected with its water system. Respectfully submitted ANDREW & KUSKE ,'�4�N, CARO��''r, CONSULT ENGINEERS, ENGINEERS, INC. ��pF ESSjo.�.�y iS EAL 11966 hillip No is, P.E. • /p +•...... N0�1 �% 19 I ENVIRONMENTAL IMPACT STATEMENT ATTACHMENT A N. C. CLEAN WATER BOND ACT WATER SYSTEM IMPROVEMENTS TOWN OF HOLLY RIDGE, NORTH CAROLINA 1. Applicant The applicant is the Town of Holly Ridge, P.O. Box 145, Holly Ridge, North Carolina 28445. The application has been prepared by Andrew & Kuske Consulting Engineers, Inc. 2. Proiect Description and Location The project consists of improvements to the Town's Municipal Waterworks System to provide adequate service, pressure, and fire protection for the residents and the area business establishments. The Town is located in the southeastern part of Onslow County. 3. Public Necessit .A. System and Area Needs. The proposed replacements will provide the waterworks with reliable service. The proposed improvements will increase the emergency fire protection and. provide better pressure and reduce loss of water from leakage. B. Public Health Needs. The water and wastewater systems extensions and improvements will provide the Town with good municipal systems to protect the public. C. Compatibility With Local .and Regional Planning. Prior being submitted in its final form to the concerned State and Federal agencies for approval, the plan will be reviewed by Local, County and regional planning agencies to insure that it is compatible with present and future development objections and the Town of Holly Ridge Land Use Plan update. 20 ATTACHMENT A, CQnt'd 4. Probable Impact of Proposed Project on Environment A. Water Resources Impact. The project will have - no adverse effects on the withdrawal of water water supply. B. Land Use Impact. The acquisition of rights of way if required for the proposed water projects will not alter existing land uses such as recreation, historic areas, or scenic areas. C. Wildlife and Marine Resources Impact. The project will have no effects on wildlife or marine resources. D. Air Pollution and Noise Impacts. The proposed project is a public works project and the noise level will be temporary and normal for that type of construction. No continuing sources of air and noise pollution are included in this project. E. Socio - Economic Impacts. The acquisition.of rights of way for this project will not result in displacement of families, disruption of businesses, recreational areas, or other public facilities. By providing adequate services, this project will improve the standard of living of the community and provide more opportunities for social and economic growth of the Town and its surrounding areas. 5. Significant Adverse Effects. There will be no adverse effects upon the environment as a result of -the construction of this project. 6. Measures to Minimize Adverse Effects. Not applicable. 7. Alternatives to the Project. • Not applicable. 21 ATTACHMENT A Cont'd 8.. Short Term Uses and Enhancement of Long Term Productivity. As has been explained in this statement, this project will help to insure the public health and well being of the Town and its surrounding area, and will contribute to opportunities for improved social and economic conditions by providing improved services to developed areas. The short term inconvenience of the construction of the project will be accepted by the residents as a minor inconvenience in the light of the benefits to be derived from the project. 9. Irreversible and Irretrievable Environmental Changes. There will be no irreversible or irretrievable effects on the environment as a result of the construction of this project. 10. Objections to the Project. There are no known objections to the construction of this project. ANDREW & KUSKE CONSULTING ENGINEERS, INC. Wilmington, North Carolina 22 .ATTACHMENT B PRELIMINARY CONSTRUCTION COST ESTIMATE WATER DISTRIBUTION SYSTEM along U.S. 17 (See map #2) Piping 900 if. - 6" PVC @$ 7.00 3,800 if. - 8" PVC @$ 9.00 Valves 6 ea. - 6" valves @$350.00 12 ea. - 8" valves @$500.00 Hydrants _1 ea. - New @$600.00 6 ea. - Reconnect @$250.00 Pavement Repair 500 if. @$ 15.00 Concrete Repair 100 if. @$ 10.00 Reconnect Services 25 ea. @$ 75.00 Total Construction Contingency (10%) Technical Services Legal and Fiscal Interest TOTAL PROJECT COSTS ** Method of funding has not been established. $ 6,300.00 $ 34,200.00 $ 2,100.00 $ 6,000.00 $ 600.00 $ 1,500.00 $ 7,500.00 $ 1,000.00 $ 1,875.00 $ 61,075.00 $ 6,100.00 $ 6,000.00 $ 2,025.00 ** $ 75,200.00 23 r _ x ATTACHMENT C PROJECT COST ESTIHATE WATER DISTRIBUTION SYSTEM Construction $ 61 , 07 5 Land 6 Rights $ - 0 - Legal 6 Administrative $ 2, 02 5 Engineering $ 6 , 0 0 0 Interest $ Equipment $ - 0 - Contingencies $ 6 , 100 TOTAL PROJECT COST $ 7 5, 2 0 0 * UNKNOWN PROJECT FINANCING PLAN Cash Clean FmHA Contrib. Wat. Bond Other Loan GO by Appl. Grant Grant* Bonds Total $75,200 0 ** 0 * $ 75,200 *Do not assume any FmHA Grant ** METHOD OF FUNDING HAS NOT BEEN ESTABLISH Existing Indebtedness: (This facility only) Amortization Amount of _ Purpose Amount Owed Period Installment WATER BOND 65,000 7010 $ 41jOD nn SERER 196,000 _ 2074 FLOOD PLAIN INFORMATION ;s any parr_ of project located in a flood plain area? If project is in flood area, is applicant eligible for National Flood Insurance? NO. 24 . i ATTACHMENT D Y EXISTING RATE SCHEDULE First 3, 00o gallons @ $9.00 Min. .Next 7, 000 gallons @ 2-.-2'5 Per 1,000 gal. 10,000 gallons @ $ 2. 2 0 gallons @ " All Over 2 0, 0 00 gallons @ $1. 6 5 PROPOSED RATE SCHEDULE First NO CHANGE eallons @ Min. Next gallons @ Per 1,000 gal. 1. gallons @ " " gallons @ All Over gallons @ " USE AND INCOME ESTIMATES (According to proposed rate schedule) WATER: Benefited Users (All users with 3/4 x 5/8"meters) Existing New Total Res. 71 0 71 users @ 3,000gal. $ 639.00 Res. 133 0 133 users @ 7,000 gad.. $ 2,064.00 Com. 2 2 users @ 3,000gal. $ 10.00 Com. 6 0 6 users @ 7,000gal. $ 108.00 con. 12 0 12 users @ 1o, as gal. $ 297.00 Con. 2 2 2 users @ >2a,000gal. $ 158.00 Out of Town 30 0 30 users @ 3,000gal. $ 540.00 Out of Town 30 0 30 7,000ga1.$___675.00 TOTAL 2 0 6 n users @ gal. $ 4. 500 Non Benefited Users (All users with larger than 3/4 x 5/8 meters) Existing New Total users @ gal. $ users @ gal. $ users @ gal. $ users @ gal. $ TOTAL users @ gal. $ TOTAL N$ 4, 500 x 12 $ 54,7000 Annually 25 • ' ATTACHMENT E r BUDGET FOR COMPLETED FACILITY WATER DISTRIBUTION SYSTEM Actual Estimated (Fiscal Year (Completed Ending 1989) Facility) Income: Water Sales $ 54,000 $ 54,000 Adv. Tax Other $ 6,400 6,400 TOTAL $ 60,400 $ 60,400 EXPENSES: Salaries Supt. b Clerk $ 8� 115. _ $ -8 .315. Labor _ Soc. Security Tax $ 658. 658. Office Exp. (Supplies, $ 2,800. $ 2, 800. Postage, Heat, Elec- tricity, Telephone, Equipment, etc.) Bond b Insurance Audit Testing -St. Reg. Agy, Chemicals Transportation $ 500. $ 500. " Electricity Supplies $ 300, S 3R Maint. 6 Repairs $ 7501 $ 3DD. Miscellaneous _ 8 3 0 0, t 7 ,.Q Q Q,r Bulk Water Purchase $ 3 , n n n _ $ 31 s n n _ Debt Service Existing $ 4,100. $ 4,100. Proposed Addition $16,000. TOTAL $579723. $71.,473. BALANCE AVAILABLE $ 21 677 . - $1 1 , 0 7 3 . * ESTIMATIONOF DEBT SERVICE, ACTUAL AMOUNT WILL NOT BE KNOWN UNTIL METHOD OF FUNDING IS ESTABLISHED. 26 . ATTACHMENT F PRELIMINARY CONSTRUCTION COST ESTIMATE WATER TREATMENT FACILITY Sitework @ $ 2,000 Well House Rehab. 1 Job L.S. @ $ 1,500 Chlorine System 1 Job L.S. @ $ 5,000 Reservoir with Aerator 1 Job L.S. @ $12,000 Filter System 1 Job L.S. @ $14,500 Interior Piping 1 Job L.S. @ $ 5,000 Backflow Preventer and Vault 1 Job L.S. @ $12,000 Electrical Rehab. 1 Job L.S. @ $ 3,500 Chemical Feed System 1 Job L.S. @ $10,000 TOTAL CONSTRUCTION COSTS CONTINGENCY (10 0 ) TECHNICAL SERVICES LEGAL AND FISCAL INTEREST TOTAL PROJECT COSTS *Method of funding has not been established. 27 $ 2,000 $ 1,500 $ 5,000 $ 121,500 $ 14,500 $ 5,000 $ 12,000 $ 3,500 $ 10,000 $ 65,500 6,550 7,450 2,000 $ 81,500 t ATTACHMENT G PROJECT COST ESTIMATE WATER TREATMENT FACILITY Construction $ 65,500. Land b Rights $ -0- Legal b Administrative $ 2 ; 000 . Engineering $ 7,450. Interest $ Equipment $ -0- Contingencies $ 6.5 5 5 n _ _ TOTAL PROJECT COST $ 81 , 500. UNKNOWN PROJECT FINANCING PLAN Cash Clean FmHA Contrib. Wat. Bond Other Loan GO by Appl. Grant Grant* Bonds Total $81,500. 0 * 0 0 * $81,500. *Do not assume any FmHA Grant * METHOD OF FUNDING HAS NOT BEEN ESTABLISHED. Existing Indebtedness: (This facility only) Amortization Amount of Purpose Amount Owed Period Installment Water Bond 65�Onn 7nt0 $ 4,100.00 Sewer 196,000 2024 $16.134.00 FLOOD PLAIN INFORMATION Is any part of project located in a flood plain area? If project is in flood area, is applicant eligible for National Flood Insurance? NO N-11 f ATTACHMENT H EXISTING RATE SCHEDULE First 3,Goo gallons @ $9.00 Kin. Next 7, 0 0 0 gallons @ $2. 15 Per 1,000 gal. " 10 '000 gallons @ $2. 20 " gallons @ "• " All Over 2 0, 000 gallons @ $1. 65 PROPOSED RATE SCHEDULE First NO CHANGE gallons @ Kin. Next gallons @ Per 1,000 gal. " gallons @ " " gallons @ " All Over gallons @ " USE AND INCOME ESTIMATES (According to proposed rate achedule) WATER: Benefited Users (All users with 3/4 xi5/Wma tern) Existing New Total Res . 71 . 0 71 users @ 3, 000 gal.. $ 63?. 00 Res. 133 0 133 users @ 7,000gal. $ 2,064.00. Com . 2 2 users @ 3,00 gal. $ 18.00 Com . 6 0 6 users @ 7, 000 gal. $ 108.00 Com. 12 0 12 users @ 1o,000gal. $ 297.00 Com. 2 2 2 users @ >20,000gal- $ 158.00 Out o P Town 30 0 30 users @ 3, 000 gal- $ 540.00 Out of Town 30 0 30 7,000gaI.S_ 675.00 TOTAL 2 0 6 0 users @ gal. $ 4. 500 Non Benefited Users (A11 users with larger than 3/4 x 5/8 meters) Existing New Total. users @ gal, $ —' useru @ gal. $ users @ gal. $ users @ gala $ TOTAL users @ gal. $ TOTAL e $ 4,500 x 12 .. $ 54,000 Annually 29 Income: Water Sales Adv. Tax Other TOTAL ATTACHMENT I BUDGET FOR COMPLETED FACILITY WATER TREATMENT FACILITY Actual Estimated (Fiscal Year (Completed Ending 1989) Facility) $54,000 $ 6,400 $60,400 $54,000 $ 6,400 $60,400 EXPENSES: Salaries Supt. b Clerk B.315- $16.630 Labor Soc. Security Tax 658. E 987. Office Exp. (Supplies, $ 2, B00. $ 3,000. Postage, Heat, Elec- tricity, Telephone, Equipment, etc.) Bond 6 Insurance Audit Testing -St. Reg. Agy. Chemicals n S 4,000 Transportation t 5 n n_ 5 n n Electricity $ n l Inn Supplies $ -inn $ 5nn Maint. 6 Repairs $ -5n $ i nnn Miscellaneous $ n' n n $ a -inn Bulk Water Purchase $3? na o n Debt Service y 4, 1 0 0 $ 4,100 Existing Proposed Addition $16 , 000 TOTAL $57, 723 $56, 417 BALANCE AVAILABLE $ 2, 677 E. 3, 983 *ESTIMATION OF DEBT SERVICE, ACTUAL AMOUNT WILL NOT BE KNOWN UNTIL METHOD OF FUNDING IS ESTABLISHED. 30 ATTACHMENT D r EXISTING RATE SCHEDULE First 3.009 gallons @ $9. 00 Min. Next 7 , 000 gallons @ $ . 225 Per 1,000 gal. 10, 000 gallons @ $ 2. 2 0 gallons @ " All Over 20,000 gallons @ $1.65 PROPOSED RATE SCHEDULE First NO CHANGE eallons @ Min. Next gallons @ Per 1,000 gal. gallons @ " " It gallons @ " All Over gallons @ it USE AND INCOME ESTIMATES (According to proposed rate schedule) WATER: Benefited Users (All users with 3/4 xz5/8'meters) Existing New Total Res. 71 0 71 users @ 3,000gal., $ 63?.00 Res. 133 0 133 users @ 7,000 gal. $ 2,064.00. C o n . 2 2 users @ 3,000 gal. $ 18.00 Com., 6 0 6 users @ 7,000gal. $— 108.00 Com. 12 0 12 users @ ia,000gal. $ 297.00 CoM. 2 2 2 users @ >20,000gal $ 158.00 Out of Town 30 0_ 30 users @ 3,000gal. $ 540.00 Out of Town 30 0 30 7,000ga1.$ 675.00 TOTAL 266 n users @ gal. $ 4. 500 Non Benefited Users (All users with larger than 3/4 x 5/8 meters) Existing New Total users ,@ gal. $ -- u©era @ gal. $ users @ gal. $ uaera @ gal. $ TOTAL users @ gal. $ TOTAL. A$ 4,500 x 12 a$ ' 5 4, 0 0 0 Annually 25 PROPOSED AWMEYA"TIOW PI,AW NTS 4L 1 \ \ 55 j 701 1 ��RCS` EBORO KINSTON —70—, 55 /I I 258 J LLE — 24 17 'DI 421 / Bl 53 IKE 74/ WII_MINOT ON I � I7 1 . 53 7 5'0 HOLLY RIDGE 17� lI �WRIGHTSVILL E EACH VICINITY MAP IO 5 0 10 20 "m -m— — --- SCALE OF MILES Y O ri Z Wgo oN � 0: W X } H W J Z _ u Q G �a N z � o_ a S ao d ? •r C � U = Z LL tl. Z LL — I Z Z N J . O N V Z_ W W Z 0 o Z. W Z � A O� J o W Z W O ° G U a Ii I I I I I I II I IIIIII) �IIIIII III II II IEI II II >IGTIOI.I 88o S& AKeA Its KFD MTE lo_23-06 ,,�I/I/IttIf1II CARp 1'••, 01, SEAL 11966 r 4111 IIIfIfllltt�t�, THE PREPARATION OF THIS MAP WAS FINANCED, IN PART, THROUGH D 1 PRINTED A GRANT PROVIDED BY THE NORTH CAROLINA COASTAL MANAGEMENT PROGRAM THROUGH FUNDS PROVIDED BY THE COASTAL 'ZONE MANAGEMENT ACT OF �� 19 i4v8� 1972, AS AMENDED, WHICH IS ADMINISTERED BY THE OFFICE OF OCEAN AND COASTAL RESOURCE MANAGEMENT, NATIONAL OCEANIC AND ATMOSPHERIC AUMINISTRATTON. �+ - 1 1 jot s. s� t kim s ST. SR l l u T� - i' LLWD. ST SK IIz7 I 0 6 K r n � ,s ell d 0 I I i �I I i u� I� I I1 HaWl ST SR 1126 . oil IF (oil 1 -t��W�1t�tui�1�Uu■u■ua■au>aU.S. NW1UUlW11UW1W WWWWUUl1Wi�UWi N lu"w LURE t0 kl.MluiOA! • �--------- — — — — — — ------ — -- -- 1 I t I \ C,Amlj ST. One" ST. L — - F. � 2 ST C" ST \\ i O \ T? jI I 1-- —)---------- ------ ;r\----------T z I 1 EUVATED TANK \ 1 d I illlitss �. 1 01 WELL No. Z n STING I ItJom 0 TREATMENT � uwr JgNKINS Sr. � / \ ; SMITI�%/ SMITH ST. \ I (N 1 G1AK ST. WATEK. i SYSTEM 12 SCALE i 0 a 400, rL PLAN \ \ \ \ \ \ U.S. MWY 17 To UACKSNVILLE-� LEG�N D ----- FXISTIWG WATEKLIIDES EA STI M6 FI Kr-, HYDK &W T 1>r Pr 0F05E> WATERLI WE PKOpoSW TKEATMF QT FACI LIW UPGiK.DE 0 2 w Z �... V h w c� a. cl) Z W O J ~ _! _J CO O V Q U. U. Q O .I Q � Z -- W 3 a. in- O Q Q i-- V 39 PM � KFD M� (0-28-88 ��.• ZN Capp '•.,, SEAL f THE PREPARATION OF THIS MAP WAS FINANCED, IN PART, THROUGH A GRANT PROVIDED Y3'1C "TRE NORTH CAROLINA COASTAL MANAGEMENT PROGRAM T$ROti..FUNDS MVIDIM WISTEREDBY RSTAI, 80NE �B�NlEI!i'rACT OF 1972, ,�3 �DE>�, WHICHIS THE OFFICE OF OCW t' AND O"TA13: RESO'CiACSliA4riQN#& OCEAI+IIC AND ATMOSRIC AM11IEI3.►T'T00 . ' , LLWD. ST SK IIz7 I 0 r n � ,s ell d 0 I I i �I I i u� I� I I1 HaWl ST SR 1126 . oil IF (oil 1 -t��W�1t�tui�1�Uu■u■ua■au>aU.S. NW1UUlW11UW1W WWWWUUl1Wi�UWi N lu"w LURE t0 kl.MluiOA! • �--------- — — — — — — ------ — -- -- 1 I t I \ C,Amlj ST. One" ST. L — - F. � 2 ST C" ST \\ i O \ T? jI I 1-- —)---------- ------ ;r\----------T z I 1 EUVATED TANK \ 1 d I illlitss �. 1 01 WELL No. Z n STING I ItJom 0 TREATMENT � uwr JgNKINS Sr. � / \ ; SMITI�%/ SMITH ST. \ I (N 1 G1AK ST. WATEK. i SYSTEM 12 SCALE i 0 a 400, rL PLAN \ \ \ \ \ \ U.S. MWY 17 To UACKSNVILLE-� LEG�N D ----- FXISTIWG WATEKLIIDES EA STI M6 FI Kr-, HYDK &W T 1>r Pr 0F05E> WATERLI WE PKOpoSW TKEATMF QT FACI LIW UPGiK.DE 0 2 w Z �... V h w c� a. cl) Z W O J ~ _! _J CO O V Q U. U. Q O .I Q � Z -- W 3 a. in- O Q Q i-- V 39 PM � KFD M� (0-28-88 ��.• ZN Capp '•.,, SEAL f THE PREPARATION OF THIS MAP WAS FINANCED, IN PART, THROUGH A GRANT PROVIDED Y3'1C "TRE NORTH CAROLINA COASTAL MANAGEMENT PROGRAM T$ROti..FUNDS MVIDIM WISTEREDBY RSTAI, 80NE �B�NlEI!i'rACT OF 1972, ,�3 �DE>�, WHICHIS THE OFFICE OF OCW t' AND O"TA13: RESO'CiACSliA4riQN#& OCEAI+IIC AND ATMOSRIC AM11IEI3.►T'T00 . ' , d 0 I I i �I I i u� I� I I1 HaWl ST SR 1126 . oil IF (oil 1 -t��W�1t�tui�1�Uu■u■ua■au>aU.S. NW1UUlW11UW1W WWWWUUl1Wi�UWi N lu"w LURE t0 kl.MluiOA! • �--------- — — — — — — ------ — -- -- 1 I t I \ C,Amlj ST. One" ST. L — - F. � 2 ST C" ST \\ i O \ T? jI I 1-- —)---------- ------ ;r\----------T z I 1 EUVATED TANK \ 1 d I illlitss �. 1 01 WELL No. Z n STING I ItJom 0 TREATMENT � uwr JgNKINS Sr. � / \ ; SMITI�%/ SMITH ST. \ I (N 1 G1AK ST. WATEK. i SYSTEM 12 SCALE i 0 a 400, rL PLAN \ \ \ \ \ \ U.S. MWY 17 To UACKSNVILLE-� LEG�N D ----- FXISTIWG WATEKLIIDES EA STI M6 FI Kr-, HYDK &W T 1>r Pr 0F05E> WATERLI WE PKOpoSW TKEATMF QT FACI LIW UPGiK.DE 0 2 w Z �... V h w c� a. cl) Z W O J ~ _! _J CO O V Q U. U. Q O .I Q � Z -- W 3 a. in- O Q Q i-- V 39 PM � KFD M� (0-28-88 ��.• ZN Capp '•.,, SEAL f THE PREPARATION OF THIS MAP WAS FINANCED, IN PART, THROUGH A GRANT PROVIDED Y3'1C "TRE NORTH CAROLINA COASTAL MANAGEMENT PROGRAM T$ROti..FUNDS MVIDIM WISTEREDBY RSTAI, 80NE �B�NlEI!i'rACT OF 1972, ,�3 �DE>�, WHICHIS THE OFFICE OF OCW t' AND O"TA13: RESO'CiACSliA4riQN#& OCEAI+IIC AND ATMOSRIC AM11IEI3.►T'T00 . ' , I I i �I I i u� I� I I1 HaWl ST SR 1126 . oil IF (oil 1 -t��W�1t�tui�1�Uu■u■ua■au>aU.S. NW1UUlW11UW1W WWWWUUl1Wi�UWi N lu"w LURE t0 kl.MluiOA! • �--------- — — — — — — ------ — -- -- 1 I t I \ C,Amlj ST. One" ST. L — - F. � 2 ST C" ST \\ i O \ T? jI I 1-- —)---------- ------ ;r\----------T z I 1 EUVATED TANK \ 1 d I illlitss �. 1 01 WELL No. Z n STING I ItJom 0 TREATMENT � uwr JgNKINS Sr. � / \ ; SMITI�%/ SMITH ST. \ I (N 1 G1AK ST. WATEK. i SYSTEM 12 SCALE i 0 a 400, rL PLAN \ \ \ \ \ \ U.S. MWY 17 To UACKSNVILLE-� LEG�N D ----- FXISTIWG WATEKLIIDES EA STI M6 FI Kr-, HYDK &W T 1>r Pr 0F05E> WATERLI WE PKOpoSW TKEATMF QT FACI LIW UPGiK.DE 0 2 w Z �... V h w c� a. cl) Z W O J ~ _! _J CO O V Q U. U. Q O .I Q � Z -- W 3 a. in- O Q Q i-- V 39 PM � KFD M� (0-28-88 ��.• ZN Capp '•.,, SEAL f THE PREPARATION OF THIS MAP WAS FINANCED, IN PART, THROUGH A GRANT PROVIDED Y3'1C "TRE NORTH CAROLINA COASTAL MANAGEMENT PROGRAM T$ROti..FUNDS MVIDIM WISTEREDBY RSTAI, 80NE �B�NlEI!i'rACT OF 1972, ,�3 �DE>�, WHICHIS THE OFFICE OF OCW t' AND O"TA13: RESO'CiACSliA4riQN#& OCEAI+IIC AND ATMOSRIC AM11IEI3.►T'T00 . ' , u� I� I I1 HaWl ST SR 1126 . oil IF (oil 1 -t��W�1t�tui�1�Uu■u■ua■au>aU.S. NW1UUlW11UW1W WWWWUUl1Wi�UWi N lu"w LURE t0 kl.MluiOA! • �--------- — — — — — — ------ — -- -- 1 I t I \ C,Amlj ST. One" ST. L — - F. � 2 ST C" ST \\ i O \ T? jI I 1-- —)---------- ------ ;r\----------T z I 1 EUVATED TANK \ 1 d I illlitss �. 1 01 WELL No. Z n STING I ItJom 0 TREATMENT � uwr JgNKINS Sr. � / \ ; SMITI�%/ SMITH ST. \ I (N 1 G1AK ST. WATEK. i SYSTEM 12 SCALE i 0 a 400, rL PLAN \ \ \ \ \ \ U.S. MWY 17 To UACKSNVILLE-� LEG�N D ----- FXISTIWG WATEKLIIDES EA STI M6 FI Kr-, HYDK &W T 1>r Pr 0F05E> WATERLI WE PKOpoSW TKEATMF QT FACI LIW UPGiK.DE 0 2 w Z �... V h w c� a. cl) Z W O J ~ _! _J CO O V Q U. U. Q O .I Q � Z -- W 3 a. in- O Q Q i-- V 39 PM � KFD M� (0-28-88 ��.• ZN Capp '•.,, SEAL f THE PREPARATION OF THIS MAP WAS FINANCED, IN PART, THROUGH A GRANT PROVIDED Y3'1C "TRE NORTH CAROLINA COASTAL MANAGEMENT PROGRAM T$ROti..FUNDS MVIDIM WISTEREDBY RSTAI, 80NE �B�NlEI!i'rACT OF 1972, ,�3 �DE>�, WHICHIS THE OFFICE OF OCW t' AND O"TA13: RESO'CiACSliA4riQN#& OCEAI+IIC AND ATMOSRIC AM11IEI3.►T'T00 . ' , i SYSTEM 12 SCALE i 0 a 400, rL PLAN \ \ \ \ \ \ U.S. MWY 17 To UACKSNVILLE-� LEG�N D ----- FXISTIWG WATEKLIIDES EA STI M6 FI Kr-, HYDK &W T 1>r Pr 0F05E> WATERLI WE PKOpoSW TKEATMF QT FACI LIW UPGiK.DE 0 2 w Z �... V h w c� a. cl) Z W O J ~ _! _J CO O V Q U. U. Q O .I Q � Z -- W 3 a. in- O Q Q i-- V 39 PM � KFD M� (0-28-88 ��.• ZN Capp '•.,, SEAL f THE PREPARATION OF THIS MAP WAS FINANCED, IN PART, THROUGH A GRANT PROVIDED Y3'1C "TRE NORTH CAROLINA COASTAL MANAGEMENT PROGRAM T$ROti..FUNDS MVIDIM WISTEREDBY RSTAI, 80NE �B�NlEI!i'rACT OF 1972, ,�3 �DE>�, WHICHIS THE OFFICE OF OCW t' AND O"TA13: RESO'CiACSliA4riQN#& OCEAI+IIC AND ATMOSRIC AM11IEI3.►T'T00 . ' , U.S. MWY 17 To UACKSNVILLE-� LEG�N D ----- FXISTIWG WATEKLIIDES EA STI M6 FI Kr-, HYDK &W T 1>r Pr 0F05E> WATERLI WE PKOpoSW TKEATMF QT FACI LIW UPGiK.DE 0 2 w Z �... V h w c� a. cl) Z W O J ~ _! _J CO O V Q U. U. Q O .I Q � Z -- W 3 a. in- O Q Q i-- V 39 PM � KFD M� (0-28-88 ��.• ZN Capp '•.,, SEAL f THE PREPARATION OF THIS MAP WAS FINANCED, IN PART, THROUGH A GRANT PROVIDED Y3'1C "TRE NORTH CAROLINA COASTAL MANAGEMENT PROGRAM T$ROti..FUNDS MVIDIM WISTEREDBY RSTAI, 80NE �B�NlEI!i'rACT OF 1972, ,�3 �DE>�, WHICHIS THE OFFICE OF OCW t' AND O"TA13: RESO'CiACSliA4riQN#& OCEAI+IIC AND ATMOSRIC AM11IEI3.►T'T00 . ' , 0 2 w Z �... V h w c� a. cl) Z W O J ~ _! _J CO O V Q U. U. Q O .I Q � Z -- W 3 a. in- O Q Q i-- V 39 PM � KFD M� (0-28-88 ��.• ZN Capp '•.,, SEAL f THE PREPARATION OF THIS MAP WAS FINANCED, IN PART, THROUGH A GRANT PROVIDED Y3'1C "TRE NORTH CAROLINA COASTAL MANAGEMENT PROGRAM T$ROti..FUNDS MVIDIM WISTEREDBY RSTAI, 80NE �B�NlEI!i'rACT OF 1972, ,�3 �DE>�, WHICHIS THE OFFICE OF OCW t' AND O"TA13: RESO'CiACSliA4riQN#& OCEAI+IIC AND ATMOSRIC AM11IEI3.►T'T00 . ' , PM � KFD M� (0-28-88 ��.• ZN Capp '•.,, SEAL f THE PREPARATION OF THIS MAP WAS FINANCED, IN PART, THROUGH A GRANT PROVIDED Y3'1C "TRE NORTH CAROLINA COASTAL MANAGEMENT PROGRAM T$ROti..FUNDS MVIDIM WISTEREDBY RSTAI, 80NE �B�NlEI!i'rACT OF 1972, ,�3 �DE>�, WHICHIS THE OFFICE OF OCW t' AND O"TA13: RESO'CiACSliA4riQN#& OCEAI+IIC AND ATMOSRIC AM11IEI3.►T'T00 . ' , 9 m 9 v- 2 W F— 9 Iuuu1 1uI -]Il 0 JOWES ST. SR IIZ/o LLOYD. ST SR I127 a Lp 0 IL i I I I , �i I , u� U.S. HWY Il •=—y—•—•� •—. r •— „ — I�0—•-0 �.— �— TO W I LM lmc7T0" I jib 4MTErc I OAK ST. 10' D`rSoW ST. I d 1 FIINEs ST. \ I I FOAM I JUAINS ST. I_ MAIN L's' — ----- — .N I UENKINS ST SANITARY 56WEK PLAW SCALE I" z 100' U.S. HWY 17 TO UAGK5014VILLE.—� —•—•a-•—� —. S4JJITe.�{`� SEI•c.IEF� � MAIJNOLES tJAST6 WA T ER TREATMENT PAC1 LI T`i 15.51 '- ACRES Z W. I-- Z Z.. Q Q W a (D ~ 0 cl) W W 0 0 V _ LL W I— U. Q 0 3 W Z 3 a. 0 Q Q 0 3 oa:. v Pm sm. IKFD UTE !O- 27-$ ���M�rEJf'Hrt pe f, �.•� CARP -:vESSI r SEAL 11966 �''•.�,?HI LLtP THE PREPARATION OF THIS MAP WAS FINANCED, IN PART, THROUGH A GRANT PROVIDED BY THE NORTH CAROLINA COASTAL PROGRAM THROUGH FUNDS PROVIDED BY THE COASTAL ZONE'MANAGEN=T ACT OF 1972, AS AMENDED, WHICH IS ADMINISTSRM BY THE OFFICE OF OCFM AND COASTAL RESOURCE MANAGEMENT, NATIONAL OCEANIC AND ATMOSPNEttIC ADMINISTRATION. •