Loading...
HomeMy WebLinkAboutLand Use Plan Update-1991 � Town of Hertford d 1991 Land Use Plan Update d 1] I The preparation of this document was financed in n part through a grant provided by the North Carolina Coastal Management Program, through finds provided by the Coastal Zone . Management Act of 1972, as amended, which is administered by the Office of Ocean and Coastal Resource Management, National ^ Oceanic and Atmospheric Administration. Pgpara Its, Howard T. Capps 0 Associates �j Landscape architect • Land Planner 321 North Front Street Wilmington, North Carolina Ul 0 a 0 0 0 0 0 0 0 0 0 a 0 0 0 0 0 0 1991 Hertford Land Use Plan Update Table of Contents Page I. Introduction 1 II. Data Collection and Analysis (Present Conditions) 2 A. Present Population and Economy Including Seasonal Population 3 B. Existing Land Use 10 1. Existing Land Use Map Discussion Including Stream Classification, ORW Waters and Nursery Areas 10 2. Significant Land and Water Use Compatibility Problems 12 3. Major Problems Resulting from Unplanned Development with Implications for Future Land and Water Use 12 4. Areas Experiencing or Likely to Experience Changes in Predominant Land Use 12 C. Current Plans, Policies and Regulations 12 1. Transportation Plan 12 2. Community Facilities Plan 13 3. Utility Extension Policy 13 4. Open Space and Recreation Policy 13 5. Prior Land Use Plan and Policies 13 6. National Flood Insurance Program 13 7. Zoning 14 8. Subdivision Regulations 14 9. Floodway 14 10. Building Code 14 11. Septic Tanks 14 12. Historic District 14 13. Nuisance Ordinance 15 14. Dune Protection 15 15. Sedimentation Ordinance 15 16. Environmental Impact Ordinances 15 17. Codes or Regulations 15 18. Storm Water Management Plans 15 19. Mobile Home Park Ordinance 15 20. Group Housing or PUD Ordinance 15 D. Constraints: Land Suitability 16 1. Physical Limitations for Development 16 a. Man-made Hazard Areas Including Airports, Tank Farms, Nuclear Power Plants or Explosive Storage Areas 16 b. Natural Hazard Areas Including Ocean Erodible Areas, Flood Hazard Areas 16 c. Areas with Soil Limitations Including Non -Compacting Soils, Shallow Soils, Poorly Drained Soils and Soils Not Suitable for Septic Tanks 16 d. Slopes Exceeding 12% 16 e. Water Supply Including Groundwater Recharge Areas, Public Water Supply Watershed and Wellfields 17 2. Fragile Areas 17 a. Coastal Wetlands 17 b. Sand Dunes Along the Outer Banks 17 c. Ocean -Beach and Shorelines 17 d. Estuarine Waters and Estuarine Shorelines 17 e. Public Trust Waters .17 f. Complex Natural Areas 18 g. Areas that Sustain Remnant Species 18 h. Areas Containing Unique Geologic Formations 18 i. Registered Natural Landmarks 18 j. Wooded Swamps 18 0 0 0 0 0 0 0 0 0 13 0 k. Prime Wildlife Habitats 18 1. Scenic and Prominent High Points 18 m. Archeologic and Historic Sites 18 n. Maritime Forests and 404 Wetlands 18 o. Lands Identified Through the U.S. Fish and Wildlife National Wetlands Inventory 19 p. Areas Identified Through NRCD's Natural Heritage Program 19 3. Areas with Resource Potential 19 a. Productive and Unique Agricultural Lands 19 b. Potentially Valuable Mineral Sites 19 c. Publicly Owned Forests 20 d. Parks 20 e. Fish and Game Lands 20 f. Non -Intensive Outdoor Recreation Lands 20 g. Privately Owned Wildlife Sanctuaries 20 h. Prime Farm Land (Consistent with Governor's Executive Order Number 96) 20 E. Constraints: Carrying Capacity Analysis 21 1. Existing Water and Sewer Service Areas, Including Private Systems 21 2. Design Capacity of Existing Water Treatment Plant 21 3. Design Capacity of Existing Sewage Treatment Plant 21 4. Schools 21 S. Landfill 22 6. Police 22 7. Fire 23 8. Public Administration 23 9. Primary Roads and Bridges 23 10. Utilization Level of Water Plant, Sewage Plant, Schools., - Primary Roads 23 11. Capacity of Community Facilities to Supply Existing and Future Needs Including Seasonal Population 24 F. Estimated Demand 24 1. Population and Economic Estimate for 10-Year Period Based on Department of Administration Projections 24 2. Seasonal Population 25 3. Local Objectives Concerning Growth 25 4. Foreseeable Social and Economic Change 26 5. Future Land Needs 26 6. Community Facilities Demand Including Landfill, Roads and Bridges, Water, Sewer, Schools 26 III. Policy Statements 27 A. Resource Protection 30 1. Areas of Environmental Concern and Appropriate Land Use in AEC's 30 2. Constraints to Development Including Flood Prone Areas, Soil Suitability and Septic Tank Use 31 3. Development Density in Proximity to Designated ORW's 33 4. Other Hazard or Fragile Land Areas 33 5. Hurricane and Flood Evacuation Needs 33 6. Protection of Potable Water Supply 34 7. Use of Package Treatment Plants 34 8. Stormwater Runoff 34 9. Marina and Floating Home Development and Dry Stack Facilities 35 10. Industrial Impact on Fragile Areas 35 11. Development of Sound and Estuarine System Islands 36 12. Restriction of Development in Areas up to Five Feet Above Mean High Water 36 13. Upland Excavation for Marina Basins 36 14. Damaging of Existing Marshes by Bulkhead Installation 36 B. Resource Production and Management 36 1. Productive Agriculture Lands 36 2. Commercial Forest Lands 37 3. Potential Mineral Production Areas 37 4. Commercial and Recreational Fisheries 37 5. Off -Road Vehicles 37 6. Residential, Commercial and Industrial Development 38 7. Peat and Phosphate Mining 38 C. Economic and Community Development 39 1. Community Attitude Toward Growth 39 2. Types and Location of Industries Desired 39 3. Local Commitment to Providing Services 40 4. Urban Growth Patterns Desired 40 5. Redevelopment of Developed Areas Including Relocation of Structures Due to Erosion 42 6. Commitment to State and Federal Programs Including Erosion Control, Public Access, Highway Improvements, Port Facili- ties, Dredging and Military Facilities 42 7. Channel Maintenance and Beach Nourishment Projects Including Financial Aid, Providing Spoil Areas or Providing Easements 42 8. Energy Facility Siting 42 9. Inshore and Offshore Exploration or Development Including Refineries, Storage 44 10. Tourism 44 11. Coastal and Estuarine Water Access 45 12. Type, Densities, Location, Units per Acre of Anticipated Residential Development 45 D. Storm Hazard Mitigation and Post Disaster Reconstruction Policies with Composite Hazard Map 47 0 0 0 0 0 a 0 0 0 0 0 Q IV. Land Classification 54 A. Land Classification Definitions 54 B. Land Classification Map 58 V. Relationship of Policies and Land Classification 60 VI. Intergovernmental Coordination and Implementation 60 VII. Public Participation 60 Appendix Slosh Map Public Participation Plan Typical Public Meeting Notice Results of Public Information Workshop Land Use Map Land Classification Map I I. INTRODUCTION In 1974, the North Carolina General Assembly enacted the Coastal Area Management Act (CAMA) for the purpose of establishing a state and local program for managing coastal resources. This a management program allows municipal local governments in twenty coastal communities to prepare land use plans which establish policies to guide growth and development. The land use plans prepared under the Coastal Area Management Act form the basis for a comprehensive plan for protection, preservation, orderly development and management of the coastal area. n CAMA regulations require an update of land use plans every U five years. The Town of Hertford's last update was in 1986. Land use plan updates are needed to insure that all current issues n related to economic and physical development are reviewed and that ►iJ1 plans for future growth in the community adequately reflect these current issues. The preparation of the Plan will help Town officials and citizens guide growth and development in a manner D which will maximize benefits to all the citizens of Hertford, and at the same time protect this part of North Carolina's fragile ncoastal environment. L1 I F1 0 0 1 II. DATA COLLECTION AND ANALYSIS (PRESENT CONDITIONS) The 1991 Land Use Plan is an update of the previously adopted plan now in effect since its adoption in 1986. To adopt effective policies concerning future growth and development, a data base outlining the Town's existing conditions and adequacy of current policies and changes that have occurred since the last Plan was adopted must be established and analyzed. In preparing this section of the Plan, the first step taken was to review policy statements from the 1986 Plan with local officials and determine which policies are still applicable and desirable for Hertford, and which policy statements may need changing. Also, an analysis has been made as to which policies have been implemented and which (u' remain to be accomplished. To accomplish this, a meeting was held on November 29, 1990, with the Hertford Town Council to review and discuss current policy. The result of that meeting follows: The following major issues were discussed as needing more n attention in this Plan update: jj 1. Revise Subdivision Ordinance to require maintenance of vegetative buffer between future development and AEC's. (� 2. Hertford needs policy on protection of freshwater swamps and U marshes. o 3. Hertford wants to establish a stronger policy on protecting cultural and historic resources. 4. Hertford wants to establish an historic district and work to nhave it placed on the National Register of Historic Places. lJ S. Hertford wants to establish an Historic Properties Commission with review powers. 6. Town officials would like to identify sites suitable for hazardous material use, such as oil storage, propane gas tanks, etc., and zone accordingly. 7. Change policy in this Plan to not permit floating home ndevelopment. Also revise Zoning Ordinance if necessary to not permit floating homes. 8. Adopt a nuisance ordinance and include section on off -road vehicles if not already addressed. 9. Revise waterfront development policy based on 1989 Waterfront QAccess Plan. 10. Amend Downtown Development Plan to include needed public and aprivate improvements. 11. The community will take a stronger position and place more emphasis on the promotion of tourism. 12. Review and revise as necessary the Hurricane and Storm Mitigation Policy based on current County policy and plans. 0 R M I 0 Ul 0 Ul 0 3,000 2,500 2,000 1,500 1,000 A. Present Population and Economy Including Seasonal Population Exhibit 1 1970 - 1990 Hertford Population 2,244 2,023 1,941 1970 1980 Source: Census for 1970, 1980 and 1990 1990 Hertford experienced a slight drop in population between the 1970 and 1980 census. In the mid -nineteen eighty's Hertford annexed an area which increased the Town's population. The 1990 census of population shows Hertford with a population of 2,244 people which represents an increase of 303 people over the 1980 census or a 15.6% increase. Since Hertford serves as the primary retail and business center for the County, the growth in population of Perquimans County has a direct impact on Hertford's growth. For that reason, we have reflected the current population of Perquimans County and past growth trends. Using the 1980 and 1990 census information, Perquimans County has grown by over 18.8% in ten years as shown in Exhibit 2. Exhibit lA on the following page reflects the racial make-up and age of the Perquimans County population. I 0 0 0 0 0 0 0 0 a 0 0 a 0 0 0 Exhibit lA Age and Racial Make-up of Perquimans County Population TOTAL PERQUIMANS COUNTY POPULATION SEX: Male Female :L0OF Under 5 years 5 to 17 years 18 to 20 years 21 to 24 years 25 to 44 years 45 to 54 years 55 to 59 years 60 to 64 years 65 to 74 years 75 to 84 years 85 years and over Median age Under.18 years Percent of total population 65 years and over Percent of total population RACE AND HISPANIC ORIGIN: White Black Percent of total population American Indian, Eskimo, or Aleut Percent of total population Asian or Pacific Islander Percent of total population Other race Hispanic origin (of any race) Percent of total population 10,447 5,000 5,447 690 1,882 374 448 2,799 1,119 607 620 1,142 606 160 37.6 2,572 24.6 1,908 18.3 6,979 3,426 32.8 18 0.2 20 0.2 4 28 0.3 Source: 1990 Census, Population Characteristics for Perquimans County 4 Exhibit 2 1970 - 1990 Perquimans County Population 11,000 10,447 10,000 9,489 9,000 8,351 8,000 7,000 6,000 5,000 1970 1980 1990 Source: 1970, 1980 and 1990 Census As developments like Albemarle Plantation, which is located within eight miles of Hertford, begin to develop and add population, many of these new residents will likely look to Hertford to meet some if not all of their retail and other business needs. As discussed in earlier land use plans, Hertford currently does not have any significant seasonal population having any major impact on the community. However, this could change depending on the make-up of future residents at Albemarle Plantation and the success the community has during the next five to ten years in encouraging more visitors to stop and enjoy Hertford's historic area and waterfront. The economy of Hertford is tied primarily to serving the local and surrounding residents with retail and other business services. Exhibit 3 shows the Civilian Labor Force for Perquimans County between 1978 and 1988. Since the last land use plan was prepared, there has been an increase of 170 new jobs and a decrease in the unemployment rate from 4.8% in 1986 to 3.1% in 1988. Between 1987 and 1988 there has been a substantial increase in.the number of non -manufacturing service jobs from 230 in 1987 to 290 in 1988. This represents 60 new jobs in the service industry, while construction and trades have dropped by ten jobs each. Government employment in 1987 and 1988 has increased by 30 jobs. Agriculture has grown from 280 jobs in 1987 to 320 jobs in 1988, which represents a 12.5% increase in that one-year period. y� 5 EXHIBIT 3 PERQUIMANS COUNTY CIVILIAN LABOR FORCE ESTIMATES BY PLACE OF RESIDENCE Annual Averages 1988 1987 1986 1985 1984 1983 1982 1981 1980 1979 1978 CIVILIAN LABOR FORCE 3.940 3,900 3,730 3.510 3.410 2,790 2.980 2,990 3,140 3.540 3.520 EMPLOYMENT, TOTAL 3,720 3,750 3,550 3,360 3,220 2,560 2,720 2,780 2,920 3.410 3,390 UNEMPLOYMENT, TOTAL 120 150 180 150 190 230 260 210 220 130 140 Rate of Unemployment 3.1 3.8 4.8 4.3 5.6 8.2 8.7 7.0 7.0 3.7 4.0 INDUSTRY EMPLOYMENT BY PLACE. OF WORK Nonag. Wage A Salary 1,770 1,770 1,610 1,430 1,410 1,360 1,390 1.400 1,490 1,630 1,600 Manufacturing 430 520 530 410 380 340 330 340 380 440 450 Lumber A Wood 20 30 30 20 30 30 30 40 50 40 60 rn Other Manufacturing1/ 410 490 500 390 350 310 300 300 330 400 390 Nonmanufactu ing 1,340 1,250 1,080 1,020 1,030 1,020 1.060 1,060 1,110 11190 11150 Construction 40 50 40 30 30 30 30 40 80 160 120 Trans., Comm., dr P. Util. 40 40 40 30 40 40 40 40 40 40 30 Thde 370 360 310 300 300 310 350 350 380 420 410 Fin, Ins., do Real Estate 40 40 40 40 40 40 40 40 40 30 50 Service 290 230 180 170 160 160 160. 140 130 140 90 Government 560 530 470 450 460 440 440 450 440 400 450 All Other Nonsg. 2/ 260 280 260 230 240 260 260 250 270 310 300 Agricuhute 320 280 370 400 430 290 320 340 370 400 430 1/ Includes Apparel; Furniture; Stone, Clay, dr Glass; Nonelec. Machinery; and Trans. Equipment. 2/ Includes nonagricultural self-employed workers, unpaid family workers, and domestic workers in private households. Exhibit 4 1986 - 1989 Acres of Harvested Cropland in Perquimans County 65,000 60,000 61,500 55,000 , 52,000 50,000 1986 1987 Source: N. C. State Data Center Income (in 000's) 40,000 35,000 30,000 25,000 26,681,000 1986 1987 Source: N. C. State Data Center 62,800 51,180 1988 ■ 19■89 Exhibit 5 1986 - 1988 Estimated Farm Income in Perquimans County 1988 1989 9,000 Since agriculture plays such an important part in Hertford's economy, we have reflected in Exhibit 4 and 5 additional information on this important part of the local economy. Exhibit 4 shows that there has been a substantial increase in the acres of cropland harvested between 1988 and 1989. The acreage has increased from 51,180 acres in 1988 to 62,800 acres in 1989 for a 21.2% increase during this one-year period. This substantial increase is due to new allowances in the 1988 National Farm Bill and increases in prices being paid for corn, soybeans and wheat in 1989 over 1986, 1987 and 1988. Acreages harvested in 1990 are not currently available. 7 D Retail sales for Perquimans County, Exhibit 6, have dropped between 1988 and 1990. This decrease may have been caused by the overall slowing of the economy nationwide; however, retail business is and will continue to be a major part of Hertford's overall economy and will hopefully only improve as efforts are made to bring more visitors into the community to visit and a shop. However, providing goods and services to local residents and County residents will also continue to be a high priority. Exhibit 6 Gross Collections and Gross Retail Sales a for Perquimans County Year Gross Collections Gross Retail Sales D1989-90 $598,000.00 $31,604,000 1988-89 689,000.00 36,298,000 1987-88 710,000.00 35,335,000 1986-87 590,000.00 30,450,000 1985-86 435,000.00 25,777,000 1984-85 1983-84 468,734.96 469,115.52 29,373,588 29,313,779 1982-83 510,832.50 30,008,304 1981-82 581,896.37 30,254,433 a 1980-81 533,328.93 31,937,391 1979-80 531,374.63 31,453,109 aSource: N. C. Department of Revenue Exhibit 7 shows that per capita income for Perquimans County residents continues to grow. As incomes grow, County residents have more disposable income for local goods and services. In addition, as areas such as Albemarle Plantation develop there should be even more residents wanting to utilize local retail, trade and professional services which will help expand the local economic base. j� K K 12,000 11,500 11,000 10,500 10,000 9,500 9,000 8,500 8,000 L Exhibit 7 Perquimans County Per Capita Income 11,236 11,183� 10,341 1985 1986 1987 1988 1989 Source: N. C. Data Center Perquimans County per capita income increased by 32.6% during the period 1985 - 1989. During the same period, per capita income in Chowan County increased by 29.3% from $9,744 to $12,596; in Pasquotank County by 23.4% from $10,313 to $12,723; and in the State of North Carolina by 31.1% from $11,658 to $15,289. It can be assumed that the greater percentage of increase in Perquimans County, where the per capita income remains below average, represents an effort on the part of business and industry to catch up with adjacent counties. O B. Existing Land Use 1. Existing Land Use Map Discussion Including Stream Classification, ORW Waters and Nursery Areas Da. Existing Land Use Before effective future land use decisions can be developed, an inventory of existing land uses must be made. The following section summarizes present land uses and identifies land use trends within the planning area of Hertford. The Hertford planning area includes the land within D the Town limits and the land within the extraterritorial planning jurisdiction. More than 75% of the total planning area is within the corporate limits. Approximately 16% of the land within the a planning area is devoted to urban purposes. The remainder of the undeveloped land is agriculture, wetlands and forest. 0 There have been no significant changes in land use since the 1986 CAMA Land Use Plan was prepared. As D shown on the 1991 Existing Land Use Map, the predominant urban land use is residential (241 acres). Residential development is concentrated in the downtown area of Grubb, Market, Dobbs and King aStreets. Commercial land use supports retail or personal services. Predominant commercial uses are located a along Grubb and Church Streets, which is the traditional Central Business District area (38.50 acres). Public land uses include primarily the municipal building complex between Grubb Street and the river, a the library and park (40.48 acres), and Perquimans County Courthouse on Church Street. Other public land uses are dispersed throughout the Central Business n District and south of King Street. Almost all of the land within the Town's extraterritorial planning jurisdiction is vacant of urban development (729 acres). These lands are either cleared for agricultural purposes or are forested. 0 0 10 0 b. Stream Classification, ORW Waters and Nursery Areas Hertford's boundary includes a portion of the !� Perquimans River and all of Castleton Creek which u feeds into the Perquimans River. The Stream Classification for the Perquimans River in Hertford's n jurisdiction is SB. Castleton Creek has a stream classification of SB. There are no ORW waters in Hertford's jurisdiction; however, there are nursery areas. Specifically, a based on information from the North Carolina Division of Marine Fisheries, the Perquimans River and its tributaries function as spawning and nursery areas for blueback herring and alewife. Other anadromous species (American shad, hickory shad and striped bass) also utilize the area as a nursery. The Division has Q documented the utilization through various research reports. The above -mentioned species are included in the "Threatened and Endangered Species Profiles of. North Carolina" under category 3 (Vulnerable). This D report was prepared by the North Carolina State Museum. White perch; yellow perch, catfish, spot, croaker, blue crabs, and other commercially and recreationally important species also utilize the Q system as nursery areas. Submerged and floating aquatic vegetation exists in the planning area. These areas are an integral constituent of fisheries productivity and critical habitat. Wetland areas are also located along the river and tributaries of the planning area. Wetlands are of great importance to fisheries resources serving as sources of basic biological productivity, providing food directly and indirectly and serving as nursery areas for various important species. Inundated wetlands have been documented to serve as spawning areas for blueback herring and alewife. Finally, the wetlands perform important roles in modifying acute impacts of hydrologic events, trapping sediments, and providing nutrient buffer zones. The Division of Marine Fisheries doesn't have any designated primary or secondary nursery areas in the planning area as n currently addressed in our regulations. However, this agency is in the process of developing anadromous spawning and nursery areas and critical habitat designations. Descriptions and definitions have been drafted for these areas but have not been adopted. If and when adopted, the Division of Marine Fisheries would have additional review authority over proposed auses in spawning and nursery areas. I C. 2. 3. 4. Significant Land and Water Use Compatibility Problems There are no significant land use compatibility problems within the Town's jurisdiction. Some mixed land uses are found in the older section of Town and are generally residential and neighborhood business type. This area was developed prior to the adoption of land use controls. These incompatible uses are, therefore, unplanned non -conforming land uses. This type of development will not be permitted in the future due to enforcement of the Town's Zoning Ordinance. There are no known water use compatibility problems within Hertford's jurisdiction. As mentioned under the discussion of nursery areas, all of the Perquimans River and tributaries are nursery areas. Any future change in water use must be done with this fact in mind. Major Problems Resulting from Unplanned Development With Implications for Future Land and Water Use There are no major problems development that would have and water use. resulting from unplanned implications for future land Areas Experiencing or Likely to Experience Changes in Predominant Land Use The Albemarle Plantation Development located approximately eight miles outside of Hertford may have some impact on the development of retail and service businesses in the area depending on the pace of development at Albemarle Plantation. The four-laning of U. S. 17 from the Virginia Line to Hertford may increase development along this highway corridor in Hertford. In addition, the Town's desire to redevelop the waterfront at Grubb Street could significantly change the land use in this area, depending on the speed of plan implementation. Also, the Town has recently been designated as a Coastal Initiative Community. Current Plans, Policies and Regulations The following represents Hertford's.current plans, policies and regulations that have direct impact on land use in Hertford: 1. Transportation Hertford officials are currently working with the N. C. Department of Transportation in preparing a Transportation Plan for the community. 12 0 2. Community Facilities Plan Hertford has a Community Facilities and Public Improvements Plan dated 1978. This plan is in need of updating. 3. Utility Extension Policy Hertford's Utility Extension Policy addresses water and sewer extensions within the corporate limits and extraterritorial limits. The policy addresses charges for extension and method of payment. The policy also addresses street improvements within the corporate limits a and extraterritorial limits. The Town of Hertford Utility Extension Policy, which is a 22-page document, is available from the Town Manager's office. 4. Open Space and Recreation Policy A Recreation and Open Space Plan was prepared and adopted in 1977. The plan reviewed recreational needs and made recommendations on providing improved recreational facilities. Based on the plan's recommendation, a waterfront park was developed on Grubb Street and the municipal boat ramp was upgraded. Hertford needs to update the Recreation and Open Space Plan. In 1989 a Waterfront Access Plan was prepared which addresses the need for upgrading Missing Mill Park and adding additional pedestrian access facilities at the waterfront behind the municipal building. This plan also includes other waterfront improvements, both public and private, with a schedule for implementation and a list of potential funding sources. The need for continuing efforts to provide waterfront access is addressed in the policy section of the plan. The Town of Hertford currently has two CAMA Shoreline Access Grant applications pending, the funding of either of which would provide additional waterfront access. Also, the community has recently been designated as a Coastal Initiative Community. A copy of the 1989 Waterfront Access Plan is available from the Town Manager's office. S. Prior Land Use Plan and Policies This 1991 Land Use Plan Update is the fourth plan prepared by Hertford since its initial plan in 1976. Based on initial meetings with Town officials, all feel that the next five- to ten-year planning period will be the most critical time for the community. The desire to revitalize the waterfront, revitalize the downtown business area, establish an historic district and promote tourism in the area and thereby increase economic development is a very high priority. Establishing policies and implementation procedures to carry out these goals, while at the same time being sensitive to the need to protect the environment, will be a major goal of this plan. 6. National Flood Insurance Program 0 13 The Town of Hertford is covered under the National Flood Insurance Program. The community is covered by map #370188-1B and 370188-2B dated July 3, 1985. The base flood elevation for Hertford is 7 feet. 7. Zoning Ordinance The Hertford Zoning Ordinance has been in effect since. 1980. Zoning covers the Hertford land area inside the corporate limits only and not the extraterritorial planning area. Based on a review of the 1986 Land Use Plan policy, Council members indicated an interest in making revisions to the current ordinance. 8. Subdivision Regulations The Hertford Subdivision Regulations have been in place since 1968. A review of this ordinance for adequacy might be in order. 9. Floodway As mentioned earlier, the community is covered under the n Federal Flood Insurance Program which defines and reflects ;L11 on two maps areas subject to flooding. The community does not have a designated floodway or floodway program; however, Council members have discussed their desire to look at protection of existing vegetation along tributaries as floodways. This will be addressed in this Land Use Plan Update. 10. Building Code The Town of Hertford uses the services of the County Building Inspector's office. Construction in Hertford is done in compliance with the State Building Code as administered by the County Inspections Department. 11. Septic Tanks Septic tanks are not permitted inside the corporate limits of Hertford. n ((,}� 12. Historic District Hertford does not presently have an established historic district. However, the community does contain numerous homes and other buildings of historic and architectural significance. Based on a letter dated December 14, 1990, from Mr. David Brook, the N. C. Deputy State Historic Preservation Officer, a Perquimans County Historic Structures Inventory has been prepared which includes structures located in Hertford. There is a Hertford Historic District on the State study list for eventual nomination to the 0 14 National Register of Historic Places, and a proposed historic district boundaries map has been drawn for Hertford. 13. Nuisance Ordinance Hertford does not have a nuisance ordinance that addresses off -road vehicles; however, based on a review of the 1986 Land Use Plan policy section, Council members wish to address this issue by revising the ordinance. The current r rU� nuisance ordinance addresses issues such as barking dogs, other noises, etc. 14. Dune Protection Dune protection policy is not applicable in Hertford. 15. Sedimentation Ordinance Hertford currently does not have a sedimentation ordinance. The County Building Inspector refers all major projects requiring sedimentation and erosion control plans to the Washington Field Office for submittal of erosion control plans. 16. Environmental Impact Ordinances Hertford does not currently have an environmental impact ordinance. 17. Codes or Regulations The Hertford Zoning Ordinance was approved on May 19, 1980. The Hertford Subdivision Regulations have been in effect since 1968. 18. Storm Water Management Plans Hertford does not have a storm water management plan. Again, because of the community's desire to protect adjacent water bodies, this type of plan will be discussed and considered as part of this Land Use Plan Update. 19. Mobile Home Park Ordinance Mobile home park development is addressed in the Town's Zoning Ordinance. 20. Group Housing or PUD Ordinance Hertford does not have a PUD ordinance. Group housing and other types of housing are controlled by the Town's Zoning Ordinance. Hertford does have an active Housing Authority with responsibility for providing and managing housing for low and moderate income families. 0 15 D. Constraints: Land Suitability All land within Hertford's planning jurisdiction is not n suitable for urban development. Some areas of land contain J certain development limitations. The following section discusses areas with constraints to future development. D1. Physical Limitations for Development This section discusses areas likely to have conditions j� making development costly or causing undesirable (J consequences. a. Man -Made Hazard Areas Including Airports, Tank Farms, UNuclear Power Plants or Explosive Storage Areas Hertford does not have an airport, tank farm or nuclear power plant in its planning jurisdiction. The community does contain an oil storage area on the waterfront at Grubb Street and a small bottled gas storage area on Wynn Fork Road. b. Natural Hazard Areas Including Ocean Erodible Areas �y and Flood Hazard Areas Hertford does not contain any ocean erodible areas; however, it does have flood hazard areas as reflected on the Federal Flood Insurance Maps. c. Areas with Soil Limitations Including Non -Compacting Soils, Shallow Soils, Poorly Drained Soils and Soils Not Suitable for Septic Tanks The 1986 Detailed Soils Report for Perquimans County shows the Hertford area consisting of the Dougue-Augusta-State type soils in the upland areas and Chowan-Dorovan soils in the lower areas primarily along tributaries such as Castleton Creek. The Dougue-Augusta-State soils are nearly level and gently sloping, moderately well drained, somewhat poorly drained, and well drained soils that have a sandy or loamy surface layer and a loamy or clayey rT subsoil. The Chowan-Dorovan soils are nearly level, very poorly drained soils that are loamy and are underlain by muck and soils that are muck throughout. The latter soils are likely candidates for 404 wetland soils; however, this can only be determined by a detailed investigation of the soil in the field by the Corps of Engineers or a private firm with Corps s1 verification. d. Slopes Exceeding 12% None identified; therefore, this will not be a barrier to future development. Q 16 u� e. Water Supply Including Groundwater Recharge Areas, Public Water Supply Watershed and Wellfields The water system's source is from two deep wells. These wells are located north of Wynne Fork Road and west of the Norfolk and Southern Railroad. Average daily use is 250,000 gallons per day. Water treatment capacity is approximately 400,000 gallons per day. This indicates a surplus of 150,000 gallons per day which could be used to accommodate new development. 2. Fragile Areas Fragile areas are water and land environments which are sensitive to development. These fragile areas include Areas of Environmental Concern (AEC's) or other environmentally sensitive areas. a. Coastal Wetlands Coastal Wetlands in Hertford are generally located on both sides of the U. S. 17 Bridge and along Business 17 on the Windfall side of the S-Curve Bridge. The actual location must be determined in the field with assistance from the local or State CAMA Permit Officer. rt 14 11) - b. Sand Dunes Along the Outer Banks This type of fragile area is not applicable in Hertford. c. Ocean Beach and Shoreline This type of fragile area is not applicable in Hertford. d. Estuarine Waters and Estuarine Shorelines Both Estuarine Waters and Estuarine Shorelines are present in Hertford. Estuarine Waters are located downriver from the S-Curve Bridge at Business U. S. 17. Estuarine Shorelines consist of the land area in the n first 75' landward of normal water level along all estuarine IL?! waters. e. Public Trust Waters Public Trust Waters include all navigable waters located within Hertford's corporate limits and extraterritorial planning area. 15 17 f. Complex Natural Areas ttu�� None identified. g. Areas that Sustain Remnant Species None identified. h. Areas Containing Unique Geologic Formations None identified. i. Registered National Landmarks None identified. j. Wooded Swamps Wooded swamps are located along the eastern and western side of Business U. S. 17 at the S-Curve Bridge and along portions of Castleton Creek. (See Existing Land Use Map for general location. Specific location must be determined in field.) k. Prime Wildlife Habitats None identified. 1. Scenic and Prominent High Points The Perquimans River east of Business U. S. 17 and north of the S-Curve Bridge is considered a scenic area of local importance. No known prominent high R points identified. (t1l m. Archaeologic and Historic Sites An inventory of historic sites has been completed for Perquimans County which includes Hertford. (See Appendix for list of sites.) Based on a letter from Mr. David Brook of the N. C. Division of Archives and History, there are "no recorded archaeological sites within Hertford's area; however, a systematic archaeological survey has not been performed and there are areas which have high potential for the presence of National -Register -eligible archaeological resources. Development within the planning area could adversely affect such resources and should be reviewed before any work begins." As staff and finances permit, the State should conduct a survey of archaeological sites. n. Maritime Forests and 404 Wetlands There are no Maritime Forests in the Hertford area; 0 18 N however, because of the wet conditions and level characteristics of some soils in the area 404 Wetlands are present. Specific location must be determined by field investigation by the Corps of Engineers staff or use of a wetlands consultant with Corps staff verification in field. Also, maps prepared by the Department of the Interior show the general location of 404 wetlands. o. Land Identified Through the U. S. Fish and Wildlife National Wetlands Inventory The Hertford area includes several areas identified on the Wetland Inventory Map, generally along both sides of Castleton Creek, along both sides of Business U. S. 17 and north of the S-Curve Bridge and along both �y sides of a small tributary running west of Castleton Creek and behind the senior high school. The Wetland Inventory Maps for Hertford can be obtained from the N.C. Department of Environment, Health and Natural Resources, Division of Soil and Water Conservation in Raleigh. p. Areas Identified Through the NCDCR's Natural Heritage Program Based on a letter from Stephen P. Hall of the N. C. Natural Heritage Program dated November 16, 1990, there are no known sites of regional or greater significance. 3. Areas with Resource Potential Areas with resource potential include productive and unique agricultural lands, potentially valuable mineral sites, publicly owned forests, parks, non -intensive outdoor recreation lands, private wildlife sanctuaries and prime farm land. To obtain information on each of these categories, responsible local, State or federal agencies were contacted with the following results: a. Productive and Unique Agricultural Lands The Perquimans County Soil Survey identifies areas of the County with the highest productivity for specific crops. Although Hertford does have an abundance of agricultural land, none has been identified as having O any unusual or unique qualities and none have been identified as prime farm land. �j b. Potentially Valuable Mineral Sites There are no known sites inside Hertford's jurisdiction which can be identified as potentially 19 valuable mineral sites based on information from the U. S. Geological Survey Service. c. Publicly Owned Forests There are no known publicly owned forests inside the planning jurisdiction of Hertford. d. Parks Hertford does not contain any federal or State parks; however, the Town does have a municipal waterfront park on Grubb Street, Missing Mill Park, and a small boat launching facility behind the Town Hall. The Town has recently been designated as a Coastal Initiative Community and hopes to upgrade existing waterfront parks and add new waterfront facilities. The community also has tennis courts and other open space adjacent to the Town Library and within easy walking distance of Missing Mill Park. Additional open space and active recreational facilities are provided on each of the community's school sites. e. Fish and Game Lands The Perquimans River and Castleton Creek have been identified as spawning and nursery areas for blueback herring and alewife and other commercially and recreationally important species. There are no game lands inside Hertford's planning jurisdiction. f. Non -Intensive Outdoor Recreation Lands There are no non -intensive outdoor recreation lands inside Hertford of either State or national significance. As discussed earlier, Hertford does enjoy the benefit of having a passive recreation facility on the Perquimans River in Missing Mill Park, which is located on Grubb Street. g. Privately Owned Wildlife Sanctuaries There are no privately owned wildlife sanctuaries inside Hertford's jurisdiction. h. Prime Farm Land (Consistent with Governor's Executive Order Number 96) Based on information from the Perquimans County Soil Conservation Office, there is no prime farm land inside Hertford's planning jurisdiction. 019 E. Constraints: Carrying Capacity Analysis To adequately project growth in Hertford during the planning period, identification of existing community facilities and capacity of those facilities to accommodate growth must be made. To accomplish that, the following facilities and their n capacity have been reviewed. (l.jl 1. Existing Water and Sewer Service Areas, Including Private Systems The Hertford water and sewer system serves.the land area inside the Town's corporate limits. The Town's water and sewer system has a capacity of 400,000 gpd following the recent upgrading of the system. 2. Design Capacity of Existing Water Treatment Plant The existing water system has a design capacity of 400,000 gpd with a current utilization of only 250,000 gpd. This excess capacity can be used to fill future demand for industrial, commercial and residential growth. nj 3. Design Capacity of Existing Sewage Treatment Plant I1J1 The Town's sewage treatment facilities have recently been upgraded, giving the Town a treatment capacity of 400,000 gpd with utilization of 290,000 gpd. Like the water system, this excess capacity gives the community adequate additional capacity to accommodate future growth during the five- to ten-year planning period. 4. Schools Hertford's elementary, middle and senior high school students are served by three school facilities. The exhibit below shows the school, classes served, year school was built, number of students in 1990, and design capacity. Exhibit 8 Hertford School Facilities School Classes Year Built 1990 Enrollment Design Capacity Hertford Grammar K - 2 1957 448 unknown Central (Windfall) 3 - 5 1935 438 438 Perquimans Middle 6 - 8 Additions in 1960's 479 500 Perquimans High 9 - 12 unknown 477 500 21 Exhibit 8 shows that all schools have a student enrollment under their design capacity. The Long Range Plan for Perquimans County Schools calls for the replacement of Central Elementary in Windfall when financially feasible. Also, the sewage system at both Central and Perquimans Middle schools must be replaced to meet current EPA standards. All schools should be adequate during the planning period. The Town of Hertford Q has no control in providing school facilities since these are County facilities. S. Landfill The Town of Hertford utilizes the Tri-County Landfill located in Perquimans County. Based on information from the Landfill director, the current landfill has approximately four years remaining with a one-year extension permit giving it a five-year life. The landfill n is using vertical expansion over temporarily -capped jam{ landfill areas, meaning that the landfill is completely filled and capped with 12" of soil and they are now filling on top to create a "Mount Trashmore" like Virginia Beach. Additional one-year extension permits may be granted, which would allow continued vertical expansion over old capped landfill areas. The likelihood of the extension permits being granted depends upon reasonable progress being made toward the establishment of the regional landfill as discussed below. The Albemarle Regional Planning District Commission (ARPCD) is presently working with a Raleigh consultant and the Tri-County Landfill to study the 10-county waste stream to determine the best waste management system to use in the future. Another factor that could have a dramatic affect on waste management for not only Hertford but the entire northeastern region is the listing in the Federal Register on October 9, 1991, of rules governing Subtitle D, Resource, Conservation and Recovery Act. The ^ Subtitle D mandates expensive closure and monitoring re- quirements for any unlined landfill which closes more than 24 months after October 9, 1991. The Tri-County Landfill director is working with a State Waste Management Task Force to select a site in either Perquimans or Pasquotank County to serve the ten -county area. 6. Police The Town of Hertford has five full-time police officers plus the Police Chief. Five patrol cars are available and the department has recently relocated into a new building adjacent to the Town Hall. Town officials feel that current staff and equipment are adequate to serve the needs of Hertford, and the Town will continue to upgrade equipment for the department as financially feasible. 0 22 I 0 0 0 0 W in 7. Fire The Hertford Fire Station is located on Grubb Street and consists of 25 volunteers. Equipment includes a 1963 pumper, one pick-up truck with crew cab, one van with air tanks, one emergency van and one jeep. The department also utilizes a 1968 pumper and 1986 tanker belonging to Perquimans County. The Fire Department serves the Town of Hertford and Perquimans County in the event of a major fire in the County. Staff and equipment are considered adequate to serve the citizens of Hertford. Staff will be added as needed and equipment upgraded as financially feasible. 8. Public Administration The Hertford Town Administration is housed in the Town Hall located at the corner of Grubb Street and Punch Alley on the Perquimans River. The Town is nearing completion of a new Police Department building which will also house the Chamber of Commerce. The addition of the new Police Department building has substantially increased space for other Town departments in the Town Hall building. The facility should be adequate for the planning period. 9. Primary Roads and Bridges The primary roads and bridges serving Hertford include U.S. 17 Bypass and U.S. 17 Business. The U.S. 17 Bypass bridge is a high rise bridge that can accommodate boats, while the "S" bridge on U.S. 17 Business requires opening to accommodate boat traffic. U.S. 17 is scheduled for widening to four lanes possibly during the next five- to 10-year planning period. When the widening is completed, U.S. 17 will provide greatly improved access to Hertford. The "S" bridge located on U.S. 17 Business provides a very attractive entrance to Hertford from the east and should be maintained as part of Hertford's historic character. 10. Utilization Levels of Water Plant, Sewer Plant, Schools and Primary Roads The water plant is'currently operating at 250,000 gpd with a 400,000 gpd capacity. The sewer plant is currently operating at 290,000 gpd with a 400,000 gpd capacity. As shown in Exhibit 8, 1990 enrollment for Perquimans County Schools was at or below the design capacity. 23 a 0 I I 0 0 a I I The Primary road system for Hertford has excess capacity. Plans call for the widening of U.S. 17 Bypass which will improve capacity when completed. 11. Capacity of Community Facilities to Supply Existing and Future Needs Including Seasonal Population As noted earlier, Hertford does not have a significant seasonal population. However, Town officials hope to increase visitors to Hertford during the next five to 10 years through promotion of Hertford's historic charm and planned waterfront improvements. Community facilities such as the water system, sewer system and roads should be adequate to serve local needs as well as accommodate any additional seasonal population during the five- to 10-year planning period. F. Estimated Demand 1. Population and Economic Estimate for Ten -Year Period The 1986 Land Use Plan (LUP) population projections called for a 1990 population of 2,269 and 2,317 people by 1996. This represented a 19.4% population growth rate between 1980 and 1996. The 1990 census for Hertford reflects a population of 2,244, which is 25 people below the 1986 LUP projection for 1990. Since the 1990 census information is the only current information on population available, we have used this figure to base the year 2000 projections on. We have elected to use three population projections for the 10-year period between 1990 and the year 2000. As shown in Exhibit 9, we have reflected a 3.0% growth rate showing slow growth, 6.0% for moderate growth and 8.0% for rapid growth. Using this method, the Town can plan on a population increase of from 67 to 180 people during this 10-year period. This number could actually be above or below the projections depending on what action local officials and the business community take in drawing more job opportunities, tourists and related new business to Hertford during this 10-year planning period. If new job opportunities are available or existing manufacturing and service jobs expand, then the population may experience a moderate to rapid growth rate. If new jobs don't come to Hertford, then only slow growth or no growth can be anticipated. I W 0 Exhibit 9 1990 - 2000 Population Projections 2,500 2,424 (8.0% - Rapid) — �2,379 (6.0% - Moderate) n 2,000 2,023 2,244 �� = — 2,311 (3.0% - Slow) {L1� 13,941 1,500 1,000 1970 1980 1990 2000 Source: 1970, 1980, 1990 Census 2000 Howard T. Capps and Associates Projections 2. Seasonal Population Although Hertford is located in the Historic Albemarle area along the U.S. 17 Ocean Highway, the community has experienced a very insignificant increase in seasonal population. Due to the lack of hotel and motel facilities in the area, visitors are primarily tourists or fishermen visiting the area on day trips. However, during the next five- to 10-year planning period local officials and the business community would like to encourage more visitors to the area to enjoy the historic charm of Hertford. 3. Local Objectives Concerning Growth During the initial Public Participation Workshop held on January 15, 1991, 28 citizens attended.and many expressed a strong desire to continue the process of upgrading the downtown area and waterfront of Hertford in an effort to increase visitation and thereby economic opportunities for Hertford. Many wanted to restore existing downtown buildings to maintain an historic motif. There was also strong support to promote shopping in the downtown area. Most citizens in attendance wanted to see the community prosper but were concerned that the small town charm of F� Hertford be maintained. In 1988 the Hertford Horizons Action Plan was prepared with its primary objective being the desire "to create an economic climate which allows Hertford to provide reasonable business growth by capitalizing on its unique charm and historic resources." In 1989 the Hertford Waterfront Development and Access plan was prepared which outlined an 18-year phased redevelopment of portions of the Hertford waterfront. Again the purpose of this activity is to improve access to the waterfront for current G 0 25 !{ and future residents, as well as provide an additional !J incentive to draw visitors to the community by capitalizing on the beauty of the Perquimans River. Both of these plans will require cooperation between the public and private sector to implement. Once accomplished, they should help increase economic opportunities for the existing and future business community. 4. Forseeable Social and Economic Change The Hertford Horizons Plan and 1989 Waterfront Development and Access Plan both included specific recommendations for improving both the downtown area and portions of the waterfront to enhance the community for both industrial recruitment and promotion of tourism. In early 1991, several downtown buildings began the renovation process, and Perquimans County began renovation of a large downtown building for additional County office space. Economic change or improvement during the five- to 10-year planning period will depend on the commitment and support for implementation of the two plans discussed above. 5. Future Land Needs The population projections for Hertford in the year 2000 reflect a range of population increase from 3.0% to a high of 8.0% over the 1990 to 2000 period. Based on 1990 census information, Perquimans County had 2.58 persons per household. Using this figure, Hertford will need to accommodate approximately 26 to 70 new housing units by the year 2000. Using the R-6 zone requirement of approximately one unit per 6,000 square feet, Hertford will need approximately 3.6 to 9.6 acres of land area to accommodate this anticipated growth. If all the development takes place in the RA zone, then a range of from 11.9 to 32.1 acres would be needed for future households. Because of the extensive undeveloped land area in Hertford, either of these possible scenarios can be accommodated during the 10-year planning period. 6. Community Facilities Demand Including Landfill, Roads, Water, Sewer and Schools nBridges, L� The anticipated growth during the next five to ten years will have little if any impact on community facilities {� other than providing for waste management if the Subtitle �tJ( D regulations are approved as discussed in Section E.5 of this plan. As discussed above, the population projections for the year 2000 would only add from 26 to 70 additional housing units. D26 III. POLICY S'TATEKEM The policy section of the plan represents the most important part of the Land Use Plan Update since these.policies help establish the direction in which Hertford will go when dealing with the following four broad issues during the five-year planning period: 1) Resource Protection, 2) Resource Production and Management, 3) Economic and Community Development, and 4) Storm Hazard Mitigation. All of these broad policy issues have been addressed in the 1986 Plan; and, for that reason, the Hertford Town Council and Mayor began the plan update process by reviewing policy and implementation strategy as outlined in the current plan. Based on that review, the following major issues or concerns emerged as the ones that the Council wanted to place emphasis on: Resource Protection l 1) Revision of Subdivision Ordinance to require maintenance of vegetative buffer between future development and AEC's. 2) Establish policy to protect freshwater swamps and marshes. 3) Establish a stronger policy on protecting cultural and historic resources. 4) Establish an historic district and work to have it placed on the National Register of Historic Places. 5) Establish an Historic Properties Commission with review powers. Resource Production and Management 1) Identify sites suitable for hazardous material use and zone accordingly. Economic and Community Development 1) Change policy in this plan update to not permit floating home development. Revise Zoning Ordinance if necessary to not permit floating homes. 2) Adopt a nuisance ordinance and include section on off -road vehicles if not already addressed. 3) Revise waterfront development policy based on 1989 Waterfront Access Plan. 4) Amend Downtown Development Plan to include needed public and private improvements. 5) Take a stronger position and place more emphasis on the npromotion of tourism. �J 0 27 Subsequent to the Town Council's review of current Land Use Plan policy, a workshop was held with Hertford citizens to discuss concerns they would like to see addressed during the five-year planning period. Citizens were asked, "What does Hertford need to do during the next 5- to 10-year period to improve the quality of life in Hertford?" Each citizen was given 15 minutes to write down their thoubhts in response to the question. They were each then asked to share their ideas which were written on a flip chart. After approximately two hours of idea sharing, everyone was given the opportunity to vote for five of the ideas in an effort to establish the priority of importance of the ideas shared. The top 9 issues included the following: Issue Discussed Citizen Votes 1) Establish realistic goals for next 5 years/ review earlier studies and implement. 9 2) Promote shopping/patronize downtown. 8 3) More jobs. 7 4) Restore existing downtown structures as possible. 5 5) Maintain/protect water quality, habitat, and aquatic resources of river and wetlands. 5 6) Stay as we are to maintain quality of life. 5 7) More jobs balanced with quality of life. 5 8) Increase recycling opportunities. 4 9) Invite SPSA (Southeastern Public Service Authority of Virginia) to talk with those responsible for improving trash handling and dump sites. 4 See Appendix for list of all issues discussed. Votes represent the number of votes each issue received from 32 citizens present during the workshop. The following is a list of issues discussed under the appropriate broad policy category: Resource Protection Q 1) Maintain/protect water quality, habitat, and aquatic resources of river and wetlands. 2) Protect river beauty/quality. Resource Production and Management 0 28 1) Recycling (more). Increase recycling opportunities. n2) LJ 3) Involve businesses in recycling. n 4) Invite SPSA to talk with those responsible for improving trash 1'Jt handling and dump sites. 5) Add recreational boating activity on river. 6) Swimming facility on river. 7) Require better quality development (landscaping, style, etc.) in zoning laws. 8) Try an adopt-a-street/river program in town. 9) Make town safe/law enforcement officers more effective. O10) Help establish teen club/activities. 11) Restore existing structures as possible. 12) Public transportation. 13) Pave streets where needed. 14) Study traffic signal system. 15) Add sidewalks where none exist. 16) Slow the traffic on Grubb Street. 17) Evaluate need for noise ordinance. 18) Involve youth in local government and community activities. 19) Protect river shore with control of planned growth. 20) Beautify waterfront. 21) Establish/encourage County on a no -wake zone on downtown river. 22) Repave Courthouse parking lot. 23) More public access to river/educate on protection of river quality. 24) Maintain control of population density. 25) Continue condemnation and demolition of older/inactive nstructures. i.! U 29 (� +� 26) Create more community pride in citizens. 27) Stay as we are to maintain quality of life. Economic and Community Development 1) Establish realistic goals next five years/review earlier studies. 2) More jobs. 3) More jobs balanced with quality of life. 4) Maintain historic motif downtown. 5) Offer financial and other assistance for existing and attracting new businesses. 6) Make downtown more attractive for businesses who might locate here. 7) Encourage establishment of downtown restaurant. 8) Promote shopping/patronize downtown. 9) Better parking downtown. 10) More signage directing to existing parking. 11) Develop/attract marina. 12) More tourist attractions along the river. 13) Increase marketing of community. 14) Good motel in town. 15) Attract new industry to keep young people in Hertford. 16) Rebuild Chamber building with more space. 17) Major chain supermarket needed. Based on the Town Council's review of the 1986 Land Use Plan Policy section and citizen comments and concerns expressed at the January 15 workshop, the following issues, policies and implementation strategies have been established and included in the 1991 Plan Update. Alternatives such as taking no action were not included for each of the policy issues. A. Resource Protection 1. Areas of Environmental Concern and Appropriate Land Use in AEC•s 0 30 ISSUE: During a review of the 1986 Land Use Plan Policy section, Town officials determined that protecting existing marshes, not allowing floating homes in the area's waters and protecting existing vegetative buffers adjacent to AEC's needed to be addressed in the plan update. During the citizens workshop held in January, 1991, Hertford residents in attendance also expressed a desire to maintain and protect water quality, habitat and aquatic resources of the area's river and wetlands. There was also expressed by both Town officials and citizens the need for better utilization of the river as an economic and recreational resource. Local policy reflects the desire to maintain the beauty and quality of the river while, at the same time, utilizing the river for the recreational and economic benefit of the community. POLICY: The Town of Hertford contains four types of AEC's which are Estuarine Waters, Estuarine Shorelines, Public Trust Waters and Coastal Wetlands. Each of these AEC's is currently regulated by either the local CAMA Permit Officer for minor developments or by the State CAMA Officer for major permits. Local officials will continue to have a policy of allowing those developments that meet current zoning regulations and all other applicable local, State or federal regulations affecting the AEC area. IMPLEMENTATION: a. The local CAMA Permit Officer and State CAMA Permit Officer will continue to review all proposed construction activities in the AEC areas for compliance with applicable CAMA regulations. b. Town officials have established a new policy not to permit floating homes on water bodies within the Town jurisdiction. Permit officers shall not approve this type of water use. The Town's Zoning Ordinance shall be reviewed and revised as required to make the Ordinance consistent with this policy. c. The Hertford Subdivision Ordinance shall be revised to create a Conservation district adjacent to AEC's to establish a means to preserve and maintain existing vegetative buffer between existing and future development and AEC's in an effort to provide a vegetative buffer to filter urban runoff and thereby protect the water quality of adjacent estuarine and public trust waters. 2. Constraints to Development Including Flood Prone Areas, Soil Suitability and Septic Tank Use ISSUE: Portions of the land area along both the Perquimans River and Castleton Creek and its tributaries 0 31 have Dorovan muck (Do) or Chowan silt loam (Co) soils which are hydric soils and have severe limitations for development of dwellings, commercial buildings or roads based on the Perquimans County Soils Report. These areas are also subject to flooding as shown on the Hertford Flood Insurance Maps. Because of the very wet conditions in these areas, septic tank use is not permitted. These constraints to development have been discussed in all of the previous land use plans and policy shall remain essentially the same pertaining to this issue. This policy would be consistent with both local officials' and Hertford citizens' desire to protect the area's water quality while, at the same time, allowing economic and recreational development that will benefit the community to take place along the river. POLICY: Town policy shall be to discourage residential, commercial or industrial development in areas containing Dorovan muck soils or Chowan silt loam soils or in areas subject to flooding. However, such development may be permitted if all required permits can be obtained for a proposed development, and if it can be shown that such development will not adversely impact adjacent water quality and is considered to be in the best interest of Hertford to allow such development. The highest priority shall be to establish a vegetative buffer zone in areas adjacent to the Perquimans River, Castleton Creek and its tributaries in those areas containing Dorovan muck and Chowan silt loam soils. IMPLEMENTATION: a. Revise zoning ordinance during 1992-93 budget year to establish vegetative buffers as discussed under previous policy section.on AEC's. b. Continue to enforce the Flood Insurance Program. c. Continue to review proposed developments along the waterfront area to insure compliance with CAMA and the Corps of Engineers 404 Wetland Permit Program. d. Request that the Corps of Engineers establish the 404 Wetland line along the Perquimans River from the Municipal Boat Ramp to Missing Mill Park, with permission of affected land owners, in an effort to establish any constraints to future implementation of the Waterfront Access Plan. Once the 404 Wetland line is established, have the line surveyed and mapped for future use in developing more detailed plans for implementation of the Waterfront Access Plan. If Corps of Engineers staff is not able to conduct survey in a timely manner, the Town will consider using a private consultant to delineate the 404 wetland area. 32 0 3. Development Density in Proximity to Designated Outstanding Resource Waters (ORWs) a There are no designated ORW's within Hertford's jurisdiction; therefore, no policy is required. n 1,U1 4. Other Hazardous or Fragile Land Areas ISSUE: During the review of the 1986 Land Use Plan Policy section, local officials learned that the 1986 plan did not address protection of freshwater swamps and marsh areas. Hertford citizens also expressed the desire to protect the river's beauty and quality, which would (� include freshwater swamp areas and marsh areas. For those �j reasons, a policy to protect these areas has been established. n j{ POLICY: Freshwater swamps and marsh areas provide a uuuu filtering affect between upland areas and major water bodies such as the Perquimans River. They also can serve as water recharge areas. Because of their importance, it shall be Town policy to include marsh areas and freshwater swamps in a Conservation district to provide maximum protection to these important natural resources. Uses o that are allowed in CAMA Coastal Wetlands will be permitted in designated 404 Wetlands under the Corps of Engineers program. Land uses near man-made hazards and cultural/historic resources shall be permitted based on the Hertford Zoning Ordinance. IMPLEMENTATION: a. Hertford officials will have appropriate State or federal agencies identify all freshwater swamps and D marsh areas. Town officials will revise Zoning Ordinance to include these areas in new Conservation district or zone in the Zoning Ordinance. Specific a permitted uses will be included in the Zoning Ordinance. b. Town officials will apply for CAMA grant funds to provide assistance in amending the Zoning Ordinance during the 1992-93 budget year. 5. Hurricane and Flood Evacuation Needs The Town of Hertford is covered by the Perquimans County Hurricane Evacuation Plan. Specific policies pertaining to Hurricane and Flood Evacuation will be discussed under "Storm Hazard Mitigation, Post -Disaster Recovery and Evacuation Plans." K 0 33 6. Protection of Potable Water Supply ili...11l POLICY: Town policy will be to guide development in a manner which minimizes any adverse impact on the Town's U water supply. IMPLEMENTATION: a. Analyze existing land use regulations to determine impact on water supply. Control densities and septic tank utilization adjacent to groundwater supply. Analysis will be completed during the 1993-94 budget year. b. Evaluate any proposals for major groundwater using development (industry - to use Town water or to be served by private wells) to determine impact on Town's capacity to provide water to existing and future development. Q7. Use of Package Treatment Plants Connection to the Town's sewer system is mandatory inside n the Town's corporate limits. Package treatment plants and �J[ septic tanks are permitted in the ETJ area. 8. Stormwater Runoff ISSUE: As discussed in earlier sections, both Town officials and Hertford residents are concerned about maintaining or improving the water quality of the Perquimans River. Controlling stormwater runoff is one means to insure protection of the river's water quality. POLICY: Stormwater runoff occurring outside the Town's planning area can damage use of the Town's major natural and economic resources (Perquimans River) and the Town will take steps to discourage excessive runoff, particularly from agricultural uses, in the surrounding area. IMPLEMENTATION: a. Work closely with Perquimans County in identifying the potential adverse impact associated with uncontrolled agricultural stormwater runoff. b. Encourage the County to participate in the Best Management Practices Program. c. Notify the State Land Quality staff when land disturbing activities of greater than one acre take ft l 34 place and encourage Perquimans County to do the same for activity adjacent to the Perquimans River. d. Establish a vegetated buffer zone along river and creeks to manage stormwater runoff. An amendment to the Zoning Ordinance will be completed during the n 1992-93 budget year. 9. Marina and Floating Home Developsent and Dry Stack Facilities ISSUE: During the 1986 CAMA plan policy review, local officials determined that a change was needed to clearly indicate that Hertford officials did not wish to permit floating homes on waters within the Town jurisdiction. POLICY: Floating homes shall not be permitted inside the Town's area of responsibility. The Town's Zoning Ordinance shall be amended to not permit floating homes on any water bodies in Hertford's planning jurisdiction. Town offi- cials wish to establish a marina along the Perquimans River as part of the Town's Waterfront Access Plan. As in the 1986 Plan, Town officials shall continue to have a policy to allow marinas which are developed in accordance with the Division of Coastal Management standards and guidelines. Dry stack boat storage will be permitted as a conditional use in the Zoning Ordinance. IMPLEMENTATION: a. Town officials shall seek funding sources to develop a public marina. b. Town officials shall work with any entity in the development of a marina with public access. c. Town officials will work with State and federal agencies in locating the most appropriate site for a marina that will have the least adverse impact on water quality and aquatic resources. u d. Amend Town Zoning Ordinance to prohibit floating homes as a permanent use in any water body. e. Amend the Zoning Ordinance to allow dry stack boat storage as a conditional use following review and approval. f. Zoning Ordinance amendments discussed above will be n completed during the 1992-93 budget year. 10. Industrial ILpact on Fragile Areas ft 0 35 POLICY: As discussed in earlier policy sections, Town officials will establish a Conservation district in the Town's Zoning Ordinance which will include fragile areas such as wet soils, flood prone areas, marsh areas and wooded swamps, school sites, water supply wells and town park sites. Having such fragile areas included in a Conservation zone will insure protection of these areas by controlling types of development in the Conservation district. IMPLEMENTATION: a. Town officials will revise the Town's Zoning Ordinance to include a Conservation district to protect fragile areas by limiting uses permitted and setback requirements. b. Town officials will apply for CAMA grant assistance to amend the Zoning Ordinance in the 1992-93 budget year. 11. Development of Sound and Estuarine System Islands None exist within the planning area; therefore, no policy is.needed. DMean 12. Restriction of Development in Areas Up to Five Feet Above High Water Hertford policy shall be to not restrict development in areas up to five feet above mean high water (the potential area of impact from rising sea level) other than as currently regulated by CAMA, zoning or the Flood Insurance Program. 13. Upland Excavation for Marina Basins POLICY: Upland excavation for marina basin development shall be permitted if all required federal, State and local permits are secured prior to excavation. 14. Damaging of misting Marshes by Bulkhead Installation POLICY: Bulkheads will be constucted landward of significant marshland or marsh grass fringes following approval of all applicable State and federal permits. B. Resource Production and Management 1. Productive Agriculture Lands Ul 0 36 Only a small portion of the Town's planning area is in active agricultural production. These lands are located in the area classified as "Rural" in the Town's Land Classification Plan. The Town has determined that adequate controls are in existence to protect this agricultural land; therefore, no specific policy statement D is needed. 2. Comercial Forest Lands D Commercial forest areas do not exist in Hertford. No policy is needed. 3. Potential Mineral Production Areas Hertford contains no known mineral production areas. If such areas do exist, Town policy shall be to allow mining of such resources if such operations are consistent with the Zoning Ordinance and all applicable local, State and afederal permits are secured prior to operations beginning. 4. Comercial and Recreational Fisheries ISSUE: Protection of water quality and aquatic resources to ensure continued use of the river for both commercial a and recreational fishing is a very high priority. POLICY: To protect the river's aesthetic and water quality and fisheries found in the area, Hertford policy shall be to do everything within its power to work with State, federal and local agencies to maintain and improve water quality in the River to insure the river's continued use as a aspawning and nursery area. IMPLEMENTATION: Q a. Town officials will encourage County officials as feasible to take action necessary to reduce non -point pollution (agriculture) of the river. ab. Town officials will work with the Chamber of Commerce to actively promote the Perquimans River as a commercial and recreational fishing area. c. Establish vegetated buffer to control runoff which will in turn protect the water quality of fisheries. 5. Off Road Vehicles POLICY: Town officials will revise existing Town I 0 37 ordinances to include a nuisance ordinance that addresses the use of off -road vehicles inside the Town's area of responsibility. Town officials are concerned about noise. The nuisance ordinance will be prepared which allows the use of off -road vehicles under certain conditions to be determined by the Planning Board and Town Council Ofollowing additional discussion of the issue. IMPLEMENTATION: D a. The Town Manager will review existing ordinances and amend as required to address the use of off -road vehicles. Target date for preparation of the nuisance ordinance will be during the 1992-93 budget year. 6. Residential, Commercial and Industrial Development OISSUE: During meetings to review current policy by local officials and a public workshop, the desire to encourage economic development appears to be a major concern in Hertford. For that reason, local officials wish to encourage residential, commercial and industrial development. POLICY: Local officials will continue to encourage residential, commercial and industrial development that is consistent with the Town's Zoning Ordinance. a 7. Peat and Phosphate dining a There are no known peat or phosphate mining sites inside Hertford's jurisdiction; therefore, no policy is required. 0 El a L'. 0 38 0 I I I 11 C. Economic and Community Development 1. Community Attitude Toward Growth ISSUE: During early discussions about revision of the 1986 Land Use Plan, local officials discussed how Hertford is at a critical point in its history. During the last several years, many plans have been discussed and prepared such as the Hertford Horizons Plan, Downtown Facade Study, and the 1989 Waterfront Access Study. Local officials feel that the next five-year planning period will be very important as the Town continues to work to implement these plans. During the public workshop held in January, 1991, many citizens in attendance expressed the desire to maintain the community's quality of life while, at the same time, providing more job opportunities. They also stressed the need to promote shopping in the community and support of downtown Hertford. During this workshop, the number one priority of those citizens in attendance was to establish realistic goals for the next five years following a review of earlier plans as discussed above, and then work to implement. POLICY: Local officials will continue to support local growth in the form of residential, commercial and industrial development that will provide jobs and expand the existing tax base, and that is consistent with the Zoning Ordinance and the community's character. 2. Types and Locations of Industries Desired ISSUE: Both local officials and citizens would welcome more job opportunities in the community, and one way to accomplish this goal is to expand the industrial job base. POLICY: Town officials will continue to encourage non-polluting industries to locate in or near Hertford. IMPLEMENTATION: a. Local officials will continue to work with the Chamber of Commerce in keeping current information packages available for industrial prospects. b. Local officials will work with State economic O development officials in promoting Hertford as a good location for industrial development with emphasis on the charm and quality of life found in Hertford. c. Officials will encourage enhancement of the education 39 level of the local labor pool to provide a better labor pool for existing and future industry. 3. Local Commitment to Provide Services ISSUE: Providing services such as water and sewer is essential to encourage future economic development. Town officials have recently completed expansion of the sewer treatment capacity to provide the necessary excess capacity for future development. POLICY: Local officials will continue to work to provide the needed infrastructure to accommodate existing and future development. IMPLEMENTATION: a. Local officials will prepare a Community Facilities Plan to address all the funding requirements of future public improvements as soon as financially feasible. b. Town officials will apply for CAMA grant assistance in preparing the Community Facilities Plan during the 1992-93 funding cycle. 4. Urban Growth Patterns Desired ISSUE: During the review of the 1986 Land Use Plan by the Town Council, it was determined that preserving downtown commercial and residential structures should be a high priority during the 5- to 10-year planning period. They also emphasized the desire to begin a concentrated effort to implement recommendations from the Hertford Horizons Study and 1989 Waterfront Access Plan. During the public participation workshop held in January, 1991, many residents in attendance expressed the desire to maintain the historic motif downtown and work to make the downtown area more attractive in order to attract more new businesses. They also expressed support for revitalization of the Hertford waterfront following the Waterfront Access Plan, while being sensitive to the need to protect the water quality of the river. a POLICY: Town officials will continue to work with downtown property owners, downtown businesses and the Chamber of Commerce to implement the Hertford Horizons Plan recommendations and the 1989 Waterfront Access Plan recommendations. Town officials will continue to use the Zoning Ordinance and Subdivision Regulations to create the urban growth patterns desired. IMPLEMENTATION: To improve the downtown area following the Hertford Horizons recommendations, the following items have been established as high priorities for implementation: 40 a. Improve the appearance of existing store fronts and adjacent grounds. b. Continue to work to provide additional downtown parking. c. Begin the planning and implementation of planting street trees in the downtown area during the five-year planning period. d. Plan for and provide improved street lighting in the downtown area during the five-year planning period. e. Work to improve signage in the downtown area to direct users to existing parking facilities. f. Begin the process of nominating the CBD and adjacent residential area as a National Register Historic District. Town officials will consider the feasibility of including in the 1991 Town Budget funds to prepare the necessary application for nomination. g. Local officials will consider including in the 1991 budget adequate funds to begin making additional improvements to Missing Mill Park and the municipal boat dock. Additional funds will be considered annually until improvements completed. h. Hertford Horizons Steering Committee, Hertford Town officials or Chamber of Commerce will investigate requirements to join Historic Albemarle Tour. Funds will be budgeted, if financially feasible, to join during the next one to three years. i. Waterfront Development Sub -Committee will investigate feasibility of purchasing waterfront property next to municipal Annex building property for expansion of parking area. j. Hertford Horizons or Town of Hertford will investigate joining the N.C. Historic Preservation Foundation and N.C. Downtown Development Association as a means of gaining valuable information on promotion of historic area. The Historic Walking Tour brochure will be re- vised and printed in color if financially feasible. k. -Town officials will review the financial feasibility of placing in reserve funds for the acquisition of waterfront property as it becomes available to make implementation of the Waterfront Access Plan possible. 1. Waterfront Development Sub -Committee and/or Town officials will begin discussions with owners of oil company on relocation of oil company to another site. Town officials and/or sub -committee will work with the 0 41 in Main Street Program staff, League of Municipalities, Institute of Government, N.C. Downtown Development Association and Attorney General's office on feasible a incentives to encourage relocation of the oil company from the waterfront to permit desired redevelopment as called for in the Waterfront Access Plan. m. Town officials will work with the DOT to have erected two attractive highway signs on U.S. 17 encouraging tourists to visit historic area in CBD and waterfront. D n. With recent designation of Hertford as a Coastal Initiative Community, local officials will continue to work with State and other agencies to help implement the goals established in the Initiative Program application. L1 5. Redevelopment of Developed Areas Including Relocation of Structures Due to Erosion QPOLICY: Hertford officials will continue to work to preserve the unique character of the CBD area and adjacent n residential areas. The Town will also pursue both State I�JI and federal funds to redevelop the waterfront, CBD, and identified substandard housing areas. Since Hertford is not a coastal community, developed areas are not subject to erosion. IMPLEMENTATION: a. Town officials and local property owners and businesses will continue to implement recommendations n from the Hertford Horizons Plan and Waterfront Access 4LJ1 Plan. The Perquimans County Historic Sites Inventory will be used to guide redevelopment away from local structures of historic or architectural significance. b. Town officials will continue to apply for financial assistance to improve substandard housing areas. fl6. Commitment to State and Federal Programs Including Erosion Control, Public Access, Highway Improvements, Port Facilities, Dredging and Military Facilities POLICY: Hertford officials have a policy to remain committed to erosion control programs through support of the State Sedimentation Control Act. Estuarine access has been and continues to be of great importance to local officials. Town officials will continue efforts to secure additional public funds to develop and improve access for public use and enjoyment. Hertford currently has two CAMA Shoreline Access Grant n 42 aapplications pending. The recent designation of Hertford as a Coastal Initiative Community will hopefully provide additional technical assistance in implementation of waterfront improvements. Highway improvements are considered a major factor in ensuring the continued economic growth of the area. Local officials will continue to include road improvement requests in -the TIP plan on an as -needed basis. Port facilities do not exist in Hertford and no policy is needed. The Town has and will continue to support efforts to dredge areas along the Perquimans River to provide safe access for commercial and recreational boating. Spoil will be placed in approved spoil areas. Hertford does not have any military facilities within the community and no policy is necessary. Q7. Channel Maintenance and Beach Nourishment Projects Including Financial Aid, Providing Spoil Areas or Providing Easements POLICY: Channel maintenance along the Perquimans River is very important to Hertford because of the positive impact on commercial and recreational boating. Continued maintenance of this waterway is a high priority for Town officials. Town officials will continue to work with the Army Corps of Engineers and any other State and federal agencies to ensure continued dredging and maintenance of the river as needed to keep this facility open to navigation. Providing borrow or spoil areas and provision of easements for work will be determined on a case -by -case basis. Town officials will maintain contact with congressional representatives and federal officials as dredging or other channel maintenance operations are needed, and will continue to assist local users of the river as feasible and as needs and concerns for dredging or maintenance are brought before local officials or officials determine that need for such assistance exists. Beach nourishment is not applicable to Hertford and no policy is necessary. 8. Energy Facility Siting A major energy facility locating in Hertford is considered unlikely during the planning period. Waste and nuclear energy facilities shall not be permitted in Hertford. i 0 43 Electrical generating facilities other than nuclear shall be allowed as permitted by the Town Zoning Ordinance. 9. Inshore and Offshore Exploration or Development Including Refineries, Storage Hertford officials are opposed to the development of refinery and storage facilities inside the Town's jurisdiction. 10. Tourism During the Town Council's review of 1986 Land Use Plan policy, one item they determined needed more emphasis was tourism. The Hertford Horizons Plan and 1989 Waterfront Development Plan both emphasized improvements that would enhance Hertford's ability to draw additional visitors or tourists to Hertford. POLICY: Hertford policy on tourism shall be to'continue efforts to promote Hertford as a small historic waterfront community. IMPLEMENTATION: a. Hertford officials will work with Archives and History to have the historic area placed on the National Register of Historic Places. Hertford officials will request that the State prepare an inventory of archaeological sites. b. Hertford officials will request that the Department of Transportation include street tree plantings when the widening of U.S. 17 takes place. Trees should be planted from the U.S. 17 bridge to the western Town limits and from the U.S. 17 Bypass to the entrance of the Newbold White House Site. c. Hertford officials will request that DOT place brown historic site signs on the U.S. 17 Bypass directing motorists to the Hertford historic area. d. Hertford officials will consider joining the Historic Albemarle Tour. e. Hertford officials will encourage the production of a color brochure of the historic area walking tour to replace the present walking tour brochure. f. Hertford officials will continue to encourage downtown and waterfront improvements. g. Town officials will work through the Coastal 44 Initiative Program to implement waterfront revitalization plans to encourage more tourism in Hertford by way of the Perquimans River. Oh. The Town will continue efforts to establish overnight lodging facilities to serve visitors to the community. 11. Coastal and Estuarine Water Access The coastal and estuarine waters of Hertford are a major natural resource for commercial and recreational activities. The Town has prepared a Waterfront Access Plan and has two CAMA Shoreline Access Grant applications pending at the present time seeking financial assistance to implement a portion of the plan in the immediate future that, when implemented, will provide additional waterfront n !U{ access. Funding is anticipated in FY 91-92. POLICY: Hertford policy shall continue to be to make every effort to improve existing waterfront access and to R provide as much additional waterfront access as (� financially feasible while being sensitive to the impact such access has on the water quality of the Perquimans River and Castleton Creek. IMPLEMENTATION: a. Hertford officials will continue to work on implementation of the 1989 Waterfront Development and Access Plan which includes upgrading Missing Mill Park and providing more and better access to the water. b. Hertford officials will continue to pursue financial assistance from applicable State and federal agencies on the implementation of waterfront access such as CAMA Access funds.or Land and Water Conservation Funds. 12. Type, Densities, Location, Units per Acre of Anticipated Residential Developsent Based on population projections discussed in this Plan for the year 2000, there will be a need to accommodate from 24 to 65 new housing units. As shown on the Existing Land Use Map, nearly all of the land area in or adjacent to the Central Business District is already developed. Future development would most likely take place in the southern or western portion of Hertford. Because of the relatively small number of additional housing units anticipated during the planning period, Hertford officials will continue to use the Zoning Ordinance to determine density and location of future residential development. In 0 45 j' POLICY: Hertford officials will continue to use the LLL111 Hertford Zoning Ordinance to determine location and units per acre of future residential development. Residential development will not be permitted in areas with hydric soils as identified in the County detail soils report. 0 I 0 n I I 11 I 46 D. Storm Hazard Mitigation and Post -Disaster Reconstruction Policies with Composite Hazard Map The CAMA Land Use Plan guidelines require that each coastal community evaluate the risk associated with major storms and to consider policies for mitigating storm hazards, post -disaster recovery and evacuations. The CAMA guidelines require consideration of mitigation, reconstruction and evacuation issues discussed in Before the Storm: Managing Development to Reduce Hurricane Damage (McElyea, Brown, nGodschalk). The planning process utilized by the Town in jj developing the following policies, closely follows Before the Storm. 1. Storm Hazard Mitigation Storm hazard mitigation is defined as taking action to reduce the probability of damages resulting from a major storm. Storm mitigation activities available to local governments in the coastal area include zoning regulations, subdivision regulations, building codes, and special ordinances such as shoreline setback controls, standards for erosion protection and requirements for protecting sensitive environmental areas. n Other mitigation measures may include development moratoria and interim development regulations (usually imposed following a disaster), land acquisition, transfer of development rights, w public facility siting and design, and comprehensive planning. !t Each community has a unique set of development problems and potential and storm mitigation measures selected will vary accordingly. The goal of this section of the Land Use Plan is to establish policies which are consistent with the Town's hurricane vulnerability. This vulnerability is based upon an analysis of a hazard map, level of development in the hazard areas and severity and type of risk. The first step in the storm mitigation planning process is to identify the areas of the Town which are most vulnerable to hurricane damage. For purposes of this Land Use Plan, hazard areas are designated as: 1. Storm Surge Areas (for Sea, Lake and Overland Surge from Hurricane [SLOSH] Model prepared by U.S. Corps of Engineers). 2. Flood -prone areas (HUD Flood Insurance Maps.) 3. Areas of environmental concern (AEC's - designated by CRC). Probably the most appropriate indication of hurricane vulnerability are the storm surge areas as delineated by the Corps of Engineers (COE) SLOSH model. The SLOSH model was developed by the Corps of Engineers to simulate the height of the storm "surge" from hurricanes of varying severity. The SLOSH model uses the five categories of hurricanes identified 0 47 is 0 I by the National Weather Service. Hurricanes are identified as Category 1 through 5, depending upon their wind speeds. A Category 1 storm has winds of 74-95 miles per hour, resulting in a surge of waterways of 4-5 feet. Damage would be expected to be minimal. A Category 2 storm has winds of 96-110 miles per hour, resulting in a surge of 6-8 feet. Damage would be moderate. Category 3 storms have winds of 111-130 miles per hour, a storm surge of 9-12 feet and extremely damaging. Category 4 storms have winds of 131-155 miles per hour, a storm surge of 13-18 feet and extreme damage. Finally, Category 5 storms have winds in excess of 155 miles per hour, storm surge in excess of 18 feet with catastrophic damage. A map delineating the Town's SLOSH areas is provided in the Appendix. Areas of Hertford are expected to be inundated by Category 1 and 2 storms. The areas subject to inundation are adjacent to the Perquimans River and Castleton Creek. (The SLOSH model does not identify any areas subject to Category 3, 4, and 5 storms.) During preparation of the 1991 Plan, a transparent overlay mapping system was used by superimposing the SLOSH areas (as well as AEC's and flood -prone areas) over an existing land use map. This overlay technique revealed that only minor development has occurred in the storm hazard areas. It was estimated that no more than 3 percent of the population of Hertford lies within the hazard area. Approximately 25 homes and six public/semi-public buildings are located within the hazard area. The public/semi-public areas consist of a high school, a governmental office building, the Town wastewater treatment plant and elevated storage tank, and several cemeteries. As with any hurricane, damage may be caused by high winds, flooding, erosion and wave action. The severity of these" risks has been analyzed in Exhibit 10. As this exhibit indicates, the hurricane forces would severely affect the a estuarine shoreline AEC. The shorelines would be exposed to high winds, flooding, wave action and erosion. Next in level of severity would be the SLOSH areas. These areas would be exposed to high winds, flooding, wave action and some moderate erosion. Floodprone areas (as defined by FEMA Flood Insurance Maps) would be subject to high winds and flooding. The rest of the community would be exposed to high winds. 0 0 48 Exhibit 10 TYPE AND SEVi11ITY OF RISKS ASSOCIATED WITH HURRICANES Exposure to Damaging Forces Severity High Wave Hazard Area Rank Winds Flooding Action Erosion AEC - Estuarine 1 • • • • Shoreline SLOSH Areas 2 • • • 0 Floodprone Areas 3 • • - _ Rest of Community 4 • Exposure Level = High •; Moderate 0; Low - During hurricane weather, experience has shown that Hertford's major problem has been high winds and tree, vegetation and power line damage resulting from these winds. The monetary value of the wind damage has been relatively small. Based on this experience and an analysis of land uses within the hazard area, it is anticipated that monetary damage from Category 1 and 2 hurricanes would be substantially less than the estimated value of the property. Most of the higher value_ development lies on the fringe of identified SLOSH area and not in areas subject to flooding. Also, most of the structures lying within the SLOSH area have been constructed in accordance with the North Carolina Building Codes which require materials and construction standards for 100 mile per hour winds. Based on a review of the current location of development in Hertford and a review of the Zoning Map, there is no high density development located in areas subject to flooding. A review of the County FEMA maps shows that the wastewater treatment plant is located outside the 100-year flood zone. The Hertford FEMA maps show that portions of Edenton Road and Church Street and the Highway 17 by-pass which is the County's major evacuation route are not subject to flooding. No large scale commercial establishments are -anticipated in these areas. At this time, acquisition of land to protect against storm hazards is not considered a cost-effective strategy. The Town is also concerned about the accuracy of land delineation in the Flood 49 Hazard Map and SLOSH Area Map. The Town feels that these maps are not totally accurate and policies relative to these specific areas should be general in nature. POLICY: n The Town of Hertford will continue to control development in 1111 the AEC's and floodprone areas to protect the health, safety and welfare of the citizens of Hertford. DIMPLEMENTATION STRATEGIES: 1. The Zoning Ordinance will be revised to establish a Conservation District along flood plains and other areas subject to flooding, with development limited to water related uses and greenway uses. 2. Continue to regulate development in the floodprone areas by vigorously enforcing the existing zoning and subdivision regulations and the Building Code and by aestablishment of a vegetated buffer area. 3. Review and update zoning and subdivision ordinances to n insure that all land within the Town's jurisdiction will 14t1 continue to be adequately regulated against hurricane/ storm hazards. 2. Post -Disaster Reconstruction Community action pertaining to disasters falls a into four categories: mitigation, preparedness, response and recovery. Whereas preparedness and response normally are handled by the County -Emergency Management Agency, �7 mitigation (discussed above) and recovery may be functions 1LJ1 of local government. CAMA guidelines require all coastal communities to prepare a "post -disaster reconstruction" plan which considers the storm mitigation policies outlined above. (Post disaster reconstruction can be equated to the recovery phase of community action.) Post -disaster reconstruction involves rehabilitation and reconstruction activities necessary to return the community to a normal or pre -disaster n condition. Coastal communities may also consider actions iLJ1 during this phase to insure that the community will be safe from future natural disasters. Typical post -disaster reconstruction activities include immediate clean-up and debris removal,'reconstruction over a longer period of time, establishment of special recovery task force, establishing guidelines and schedules for repairs and reconstruction, designation of an implementing agency, and establishing policies for repair/replacement of public utilities (and possible relocation of these facilities). D K 50 I Immediate cleanup and removal following a natural disaster is a function of the Perquimans County Emergency Management Agency (EMA). According to the EMA coordinator, immediate cleanup and removal within the corporate limits is the responsibility of the Town government with the assistance of private citizens. (The Town owns and operates the water, sewer, streets, drainage and electrical system.) Cleanup outside the corporate limits is the responsibility of the County with assistance D from DOT and utility companies. Damage assessment is conducted by the County EMA. Reports are submitted to State and regional Emergency Management officials. These reports provide the basis for disaster declarations and levels of relief assistance. According to local Emergency Management officials, other than the "common sense" approach, the emergency management agency has no specific plans and policies for long-term reconstruction. However, post -disaster repair and j� reconstruction will be carried out in accordance with the U priority schedule. In the event of a natural disaster, the County EMA plans call for the formation of a Control Group. This Control Group would make all decisions relative to evacuation, Q damage assessment and recovery. The following are members of the Group: . Chairman of County Commissioners . County Emergency Management Coordinator . Mayor, Town of Hertford . Hertford Emergency Management Coordinator Mayor, Town of Winfall Q . Perquimans County Sheriff . Hertford Chief of Police . Fire Marshall . Captain, Rescue Squad . Superintendent of County Schools . Director of Social Services . Administrator of County Health Department . Register of Deeds . Perquimans County Dispatcher . American Red Cross . Hertford Grammar School . EMS Director n The formation and operation of this Control Group is based ll on the assumption that a hurricane would affect.the entire County; therefore, there exists no need for a separate n recovery task force for the Town of Hertford. According to County Emergency.Management officials, guidelines for repair and recovery consist of completion 0 51 LJ Uof damage assessment as soon as possible after a hurricane, notification to State officials of level of damage and coordination of disaster assistance. A temporary development moratorium is not anticipated and all repair and reconstruction will meet local land use regulations and the State-wide Building Code. A schedule or priority system for repair and reconstruction has not been developed. At the present time, all decisions and actions taken in response to hurricanes are implemented by the County Emergency Management Agency. All policy -related decisions are made by the Control Group described above. As mentioned previously, the Town's wastewater treatment plant and an elevated storage tank are located on the fringe of a hurricane hazard area. The high winds and flooding associated with a hurricane would have little affect on operating the treatment plant. With the exception of overhead power lines, no other municipal facilities lie within the hazard areas. POLICY: The Town of Hertford will continue to cooperate and work in conjunction with the County's Emergency Management plans and policies to guide post -disaster repair and reconstruction activities. IMPLEMENTATION: 1. Continue to cooperate with the Perquimans County Emergency Management Agency and encourage the completion of a Disaster Relief and Assistance Plan. 2. Continue to use local wind -vulnerable trees immediate cleanup and following a hurricane. forces to identify and remove and vegetation and conduct debris removal operations 3. Consider the formation of a Recovery Task Force to support the efforts of the County Control Group. The Task Force could include: U . Mayor and Mayor Pro-Tem . Planning Board Chairman and Vice Chairman . Public Works Supervisor . Member of fire and rescue squads . Town engineer and planner The purpose of this Task Force would be to review damage assessment reports following a hurricane and determine if supplemental repair and reconstruction policies and programs are necessary to protect the L health, safety and welfare of the Hertford community. 52 OThe Task Force could consider the need for temporary development moratorium, revised land use regulations and additional construction standards for repair and reconstruction. 4. Consider establishing the following schedule or priority system for post -disaster repair and reconstruction: First Priority: Replacement of essential public a services such as electricity, water, sewer, telephone, streets and bridges. Second Priority: Minor repairs. Third Priority: Major repairs. tttJ��� Fourth Priority: New development. 5. Evaluate the structural integrity of the elevated D storage tank located near the wastewater treatment plant. Assess the potential damage to the wastewater treatment plant as well as the impact of the loss of n water supply should the tank be damaged by high winds. 3. Evacuation Q The Perquimans County Evacuation Plan was developed for evacuation of all County residents. The purpose of the plan is to "provide for an orderly and coordinated evacuation and shelter system to minimize the effects of hurricanes on the residents and visitors in Perquimans County." This plan establishes a control group, support group, warning and alerting systems, shelter locations and evacuation routes. Based on an analysis of the County Hurricane Evacuation Plan, evacuation can be accomplished within anticipated warning times. Evacuation routes include Highway 37 north to highway 32 to Highway 158, which is referred to as Evacuation Route 1. Evacuation Route 2 is Highway 17 West. t�J n In u I 0 53 0 IV. LARD CLASSIFICATION A. Land Classification Definitions aThe Land Classification Map has been prepared based on a comprehensive review of existing land uses and after taking into consideration the location of AEC's and vacant land available for future development. By delineating land classes on a map, Hertford and its citizens can specify those areas where certain policies (local, state and federal) will apply. The land classification system is intended to be supported and complemented by zoning, subdivision and other local growth a management tools and these local tools should be consistent with the classification system as much as possible. Although a specific areas are outlined on a land classification map, it must be remembered that land classification is merely a tool to help implement policies and not, in a strict sense of the term, a regulatory mechanism. The land classification system provides a framework to be used by the Town to identify the future use of all lands. The designation of land classes allows Hertford a to illustrate their policy statements as to where and to what density they want growth to occur, and where they want to conserve natural and cultural resources by guiding growth. The Land Classification Map includes the following classifications: 1. Developed Da. Purpose. The purpose of the developed class is to provide for continued intensive development and redevelopment of existing cities, towns and their aurban environs. b. Description and characteristics. Areas meeting the intent of the developed classification are currently a urban in character where minimal undeveloped land remains and have in place, or are scheduled for the timely provision of, the usual municipal or public services. Urban in character includes mixed land uses such as residential, commercial, industrial, institutional and other uses at high to moderate O densities. Services include water, sewer, recreational facilities, streets and roads, police and fire protection. In some instances an area may not n have all the traditional urban services in place, but if it otherwise has a developed character and is scheduled for the timely provision of these services, it still meets the intent of the developed 54 classification. Areas developed for predominantly residential purposes meet the intent of this classification if they exhibit: (i) a density of three or more dwelling units per acre; or (ii) a majority of lots of 15,000 square feet or less, which are provided or scheduled to be provided with the traditional urban services; and/or (iii) permanent population densities are high and seasonal populations may swell significantly. 2. Urban Transition a. Purpose. The purpose of the urban transition class is to provide for future intensive urban development on lands that are suitable and that will be provided with the necessary urban services to support intense urban development. b. Description and characteristics. Areas meeting the intent of the urban transition classification are presently being developed for urban purposes or will be developed in the next five to ten years to accommodate anticipated population and urban growth. These areas are in, or will be in, an urban "transition" state of development going from lower intensity uses to higher intensity uses and as such will eventually require urban services. Examples of areas meeting the intent of this class are lands included within municipal extraterritorial planning boundaries and areas being considered for annexation. (i) Areas classified urban transition will provide lands for intensive urban growth when lands in the developed class are not available. Urban transition lands must be able to support urban development by being generally free of physical limitations and be served or readily served by urban services. Urban development includes mixed land uses such as residential, commercial, institutional, industrial and other uses at or approaching high to moderate densities. Urban services include water, sewer, streets and roads, police and fire protection that will be made available at the time development occurs or soon thereafter. Permanent population densities in this class will be high and the seasonal population may swell significantly. (ii) In choosing land for the urban transition class, such land should not include: areas with severe 55 I 0 I I [II 0 I 0 11 I I physical limitations which would make the provision of urban services difficult or impossible, lands which meet the definition of conservation, lands of special value (unless no other alternative exists) such as productive and unique agricultural lands, forest lands, potentially valuable mineral deposits, water supply watersheds, scenic and tourist resources including archeological sites, habitat for important wildlife species, areas subject to frequent flooding, areas important for environmental or scientific values, lands where urban development might destroy or damage natural systems or processes of more than local concern, or lands where intense development might result in undue risk to life and property from natural or existing manmade hazards. (iii) Areas that are predominantly residential meet the intent of this class if: a. they are approaching three dwelling units per acre, or b. a majority of the lots are 15,000 square feet or less and will be provided with essential urban services to support this high density development, or c. are contiguous to existing developed municipal areas. 3. Rural a. Purpose. The rural class is to provide for agriculture, forestry, mineral extraction and other allied uses traditionally associated with an agrarian region. Other land uses, due to their noxious or hazardous nature and negative impacts on adjacent uses, may also be appropriate here if sited in a manner that minimizes their negative effect on surrounding land uses or natural resources. Examples include energy generating plants, refining plants, airports, sewage treatment facilities, fuel storage tanks and other industrial type uses. Very low density dispersed residential uses on large lots with on -site water and sewer are consistent with the intent of the rural class. Development in this class should be as compatible with resource production as possible. b. Description and characteristics. Areas meeting the intent of this classification are appropriate for or presently used for agriculture, forestry, mineral extraction and other uses, -that due to their hazardous I 56 or noxious nature, should be located in a relatively isolated and undeveloped area. Very low density dispersed, single family residential uses are also appropriate within rural areas where lot sizes are large and where densities do not require the provision of urban type services. Private septic tanks and wells are the primary on -site services available to D support residential development, but fire, rescue squad and sheriff protection may also be available. Population densities will be very low. 4. Conservation a. Purpose. The purpose of the conservation class is to provide for the effective long-term management and protection of significant, limited, or irreplaceable areas. Management is needed due to the natural, cultural, recreational, scenic or natural productive values of both local and more than local concern. D b. Description and Characteristics. Areas meeting the intent of this classification include: (i) AEC's including, but not limited to, public trust waters, estuarine waters, coastal wetlands, etc., as identified in 15A NCAC 7H; Q (ii) other similar lands, environmentally significant because of their natural role in the integrity of the coastal region and include but are not limited to bottom land hardwoods, pocosins, swamp forests, areas that are or have a high probability of providing wildlife habitat, forest lands that are essentially undeveloped and lands which otherwise contain significant productive, natural, scenic, cultural or recreational resources. c. Discussion. The conservation class is designated to illustrate the natural, productive, scenic, cultural and recreational features of the coastal zone which make the region a desirable place in which to live, work and visit. As such, the conservation class should be applied to areas that because of their unique, productive, limited, cultural or natural a features should be either not developed at all (preserved), or if developed, done so in an extremely limited and cautious fashion. At a minimum all AEC's a as defined in 15A NCAC 7H should be included in this class and the land use plan should so state, and the local government is strongly urged to include other similar areas protected by either other state or a federal agencies. Examples include Army Corps of Engineers "404 wetlands." As AEC's should be included in the conservation class, the local government should 0 57 0 Q acknowledge the distinctions among the various uses the Coastal Management Program permits within each AEC group. It should be understood, however, the local government may develop its own more restrictive standards as the State's are considered minimum. At a minimum each plan should include language such as: {� (i) coastal wetlands - These areas are the most L restrictive of all AEC's and very few uses are permitted therein; the highest priority is for a their preservation as they are well documented in their contribution to the natural productivity of the coastal area. (ii) estuarine shoreline AEC's - These areas are located adjacent to estuarine waters AEC's and are known for their contribution to the natural productivity of the waters close by. Many uses may be permitted as long as the 30 percent impervious rule is met and development is well r managed on individual sites to ensure minimal degradation. n (iii) other similar lands that are afforded some II.�! protection by another agency, such as 11404 wetlands" where use and performance standards of that agency will apply. B. Land Classification leap 1. Developed uThe Developed Classification land areas of Hertford include the CBD and all other adjacent residential and commercial areas currently developed and as shown on the 1991 Existing Land Use Map. 2. Urban Transition The Urban Transition Classification for Hertford includes those areas that are suitable for urban type development and are currently adjacent to existing water and sewer lines or are close enough to existing utilities to make extension of utilities to designated Urban Transition areas relatively inexpensive. Land areas included in the Urban Transition classification include all undeveloped land between Castleton Creek and U.S. 17 Business, undeveloped land on both sides of Church Street southeast a of Castleton Creek and undeveloped land on both sides of Grubb Street Extended on the western side of Hertford. 0 3. Rural The Rural Classification includes all land areas not designated as Developed, Urban Transition or Conservation. 0 58 0 4. Conservation The Conservation Land Classification area includes all estuarine waters and public trust waters. The 100-year flood zone and hydric soils along Castleton Creek are also included in the Conservation zone only if not currently developed. For purposes of any State or federal review of future projects in Hertford, any Conservation classification that crosses an existing public road right-of-way, the Conservation zone is considered to start 50 feet from the public road right-of-way as measured along any creek or waterbody. The purpose is to allow extension of public utilities such as water and sewer across a Conservation classification. All other land uses currently allowed by the Hertford Zoning Ordinance, CAMA regulations, 404 wetland regulations and Flood Insurance a Program shall be allowed in the Conservation Classification. I I 7 I 11, 59 V. RELATIONSHIP OF POLICIES AND LAND CLASSIFICATION The 1991 Land Classification Map has included hydric soils and land areas subject to the 100-year flood in the Conservation Classification. The Policy section includes a policy to protect this land area from inappropriate development by also establishing a Conservation Zone in the Hertford Zoning Ordinance. The purpose of such action would be to refine the current Zoning Ordinance to further protect this environmentally sensitive area from inappropriate development. The Policy section also indicates that future residential, commercial and industrial development will be guided through use of the Hertford Zoning Ordinance. The Land Classification Map has been prepared to reflect developed and urban transition in areas where existing and future residential, commercial and industrial adevelopment will most likely take place. VI. IPTERGOVF.R10ORTAL COORDINATION AND 2MATION During the early part of the data collection phase of the planning process and following local adoption of the Public Participation Plan, a copy of the meeting schedule was sent to the Perquimans a County Manager with an invitation to attend all meetings pertaining to the Plan preparation. Prior to final adoption of the Plan, a draft copy will be made available to the County for review and comment. VII. rMLIC PARTICIPATION a The Public Participation Plan was presented and adopted by the Hertford Town Council on December 11, 1990. A Public Information Meeting was held on January 15, 1991, with a total of 34 in attendance. The purpose of the meeting was to discuss the planning process and to obtain input from citizens present. In addition to the meeting dates shown on the Public Participation Schedule, a special meeting of the Town Council was held on June 24 for final review of the Plan prior to submittal to the State for review and comments. Prior to final local adoption, a Public Hearing will be held to discuss the Plan and a copy will be a available at the Courthouse or Library for public review. (See Appendix for copy of Public Participation Plan and results of Public Information Meeting held on January 15, 1991.) I 15 IF 0 60 SLOSH AREA HERTFORD,- NC LEGEND CATEGORY 1 &2 HURRICANES HOWARD T. CAPPS mod? ASSOCIATES r . LMd 321 N. Front Street • Wilmington. N.C. 28401 • 9191763.7708 1990 - 1991 Public Participation Plan for Hertford Land Use Plan Update the Hertford Town Council will serve as the designated principal local board with the lead role in preparing the 1991 Land Use Plan Update. To in- sure adequate public participation in the planning process, the Planning Board has proposed the following schedule of public meetings to give citizens the opportunity to be involved in the planning process. Meetings have been tentatively scheduled for the following dates, times and locations: Hertford 1991 Land Use Plan Update Public Information/Education Schedule Date Time/Location Purpose of Meeting Nov. 29, 1990 7:00 PM/Town Hall Council meeting to review 1986 LUP policy. Planning Board & Town Council Jan. 14, 1991 7:00 PM/Town Hall Review work in progress to date with Planning Board & Council. Town Council Jan. 15, 1991 7:00 PM/Town Hall Open discussion with citizens on purpose of Planning Consultant plan update. Citizens' opportunity to outline Feb. 11, 1991 7:00 PM/Town Hall Planning Board & Town Council. March 11, 1991 7:00 PM/Town Hall Planning Board & Town Council April 8, 1991 7:00 PM/Town Hall Planning Board & Town Council their desires for Hertford's growth including downtown revitalization, economic develop- ment, environmental protection, historic preservation, etc. Review trends in population, land use and economy. Review identified environmental issues. Review results of public information meeting held Jan. 15, 1991. Discuss Land Use Plan policies, land classification map and text. Review draft with Planning Board and Town Council. 0 May 13, 1991 7:00 PM/Town Hall Work session on Land Use Plan draft. Planning Board & Town Council June 10, 1991 7:00 PM/Town Hall Review final draft and obtain approval Planning Board & for submittal to CRC following public aTown Council. meeting. In an effort to obtain as much public input as possible during plan pre- paration, the Town will place notices in local newspapers for each meeting date set to discuss the plan and its preparation. The Town will also work closely with local newspapers to have informational articles in the paper prior to each meeting. Town officials will also notify by direct mail local interest groups and individuals that might have a specific interest in the meeting dates at which the plan will be discussed. During public information meetings, citizens will be given the opportunity to provide input on plan preparation and policy issues. Information on dates, times, locations and numbers of participants at each meeting will be included in the final Land Use Plan Update Public Participation section of the Plan. This was adopted by the Hertford Town Council during a regular meeting held on December 11, 1990. Ul Ul Ul IN Ul ui Ell K I C' V I 7i* Porqulmans W*Aly, N.rtford, N.C., Thursday, January 10, 1"7- 1991 HERTFORD LAND USE PLAN UPDATE WORKSHOP As part of the Public Participation process. in preparing the - 1991 Hertford Land Use Plan Update, a workshop_ will be held on. Tuesday, January 15, 1991, at 7:30 PM in the.. Hertford Town Hall. This is an opportunity, for Hertford citizens to discuss their opinion - on such issues as Economic Development;,` Waterfront Development, Downtown Revita lization, Historic Preservation, Environmen tal Protection and any other land use planning related issues they wish to discuss-.*'-. Opinions expressed will be utilized by local - officials as they prepare policy statements and establish implementation goals that will affect Hertford during the next several - years. Please take this opportunity to be in- volved in the planning for Hertford's future._ If you have any questions contact Mayor Bill: Cox. Mayor W.D. Cox ; [t tt��11 1991 MOMTFORD LARD USE PLAN UPDATE Public Information Workshop The Public Information Workshop was held on Tuesday, January 15, 1991, with 32 citizens in attendance in addition to the Mayor and all Town Council members. After a brief introduction as to the purpose of the meeting, all in attendance were asked to take fifteen minutes to respond to the question, "What needs to be done to improve the quality of life in Hertford over the next 5- to 10-year period?" Citizens were then asked to share their opinions with the group with each one being recorded on a flip chart. After a approximately two hours of sharing thoughts and recording each answer, all present were asked to vote for the top five suggestions or goals discussed. The list below reflects a their responses: 1. 5 Restore existing structures as possible. a2. 4 Increase recycling opportunities. 3. 7 More jobs. 4. 3 Major chain supermarket needed. a5. Develop/attract marina. 6. 3 Better parking downtown. 7. 1 Maintain control of density. population 8. 9 Establish realistic goals next five years/review earlier studies and implement. 9. 3 Make downtown more attractive for businesses who Dmight locate here. 10. 8 Promote shopping/patronize downtown. 11. Rebuild Chamber building with more space. 12. 3 Maintain historic motif downtown. 13. 2 Increase marketing of community. 14. 2, Good motel in town. 15. 1 Attract new industry to keep young people in Hertford. 16. 2 More tourist attractions along the river. 17. Continue condemnation and demolition of older/inactive structures. IN 0 Q18. 1 Make town safe/law enforcement officers more effective. 19. Help establish teen club/activities. O20. Try an adopt-a-street/river program in town. 21. Establish/encourage County on a no -wake zone on downtown river. 22. Create more community pride in citizens. 23. 2 Repave Courthouse parking lot. 24. More signage directing to existing parking. 25. 3 More public access to river/educate on protection of river quality. 26. 5 More jobs balanced with quality of life. 27. 4 Invite SPSA to talk with those responsible for improving trash handling and dump sites. R ILJI 28. Protect river beauty/quality. .29. Add recreational boating activity on river. 30. 3 Offer financial and other assistance for existing and attracting new businesses. 31. 1 Swimming facility on river. 32. 2 Involve businesses in recycling. D33. 2 Involve youth in local government and community activities. 34. Pave streets where needed. Q 35. Slow the traffic on Grubb Street. a36. Evaluate need for noise ordinance. 37. Public transportation. 38. 2 Protect river shore with control of planned growth. 39. Encourage establishment of downtown restaurant. 40. 1 Require better quality development (landscaping, style, etc.) in zoning laws. 41. 5 Stay as we are to maintain quality of life. 42. 5 Maintain/protect water quality, habitat, and aquatic resources of river and wetlands. 0 43. Recycling (more). 44. 1 Beautify waterfront. 45. 2 Add sidewalks where none exist. a46. 3 Study traffic signal system. I I 0 r� M I u EI � M F1, M 1 i Existing Land Use Map Hertford;. North Carolina 09; 800• 16009 HO���W ,ARD���D T CAPPS 32 ASSOQAM Nr er 2 y • r Church treet • _ +}ca o d 3 p t - 6 5..r' • 1 Missing bill Park r• 2 Youa Hall 6.Boat Eaup a 3 County Courthouse 4 ARPDC Regional Planning Office 5 County Offices 6 County School Adzinistration�� lewd 7 High School ® RmkknU ■ C0ffff*fCW 8 Elementary School B bxkm al 9 Health Department ■ Public 10 Fire Department/Ice Plant �• � 0 5«rn Public Churches ■U Town Limit E�J �•J Extraterritorial Planning Limit