HomeMy WebLinkAbout63895_Victor Stephenson_20190228�Y
V DIREDGEATILL f�'10
NO'
-
A .-PERMIT P evi6us p ermit,
Modification pre
vious it'issued /8� New. b "li(tompl*e"t6Reis'-s'u"e"'-"�L]Partial-'Reiss' Date pre ious perm
As authorized by the State of -North CarolinaDepartment of Environmental Quality'
and the Coastal K6sofirces -Co' rmi's's'ion)nan area ofe nvironmerital 'concern pursuant to I SA NCAC
Rules attached.
a Project Location: County 'Applic' nt Name -J, --D
A `7 0 9, Address' Street Address/ State Road/ Lot #(s),c)-rT-: !�;T_ i
City A" State -ZIP, "PEA V 1,
Phone.#(qA) S- 48E-Ma'il Subdivision A �4
Authorized Agent- NA A-p!;ja A� 0 ZIP 9 6�
Affected El CW,, :SEW'. 5�PTA, EFTSPTS 'Phone, River:13asin-7-A-P, LA
[I OEA 0HHF _01H, 0 uBA El N/A
's): Adj.,Wtr. Body Am L L-> 1 AEC(0tf _r(nah/man,/unkn)
0 Pws:
Closest Maj. Wtr. Body
PNA' ye ORW:' yes /rno
........... �EDO
Type of Project/ Activity
L, -, fs�
Pie'r (docL) length
Fixe
Float
Fing
Gro
Bulk
Basi
Boat
Boat
Beac
Othl
Sho
SAV
Morl
r Phot
Wah
(Scale:
-
ing Platform(s)�i■iiii�lil����
�ii�
■■■■■iiii�i
r pier(s)
I length
number
MENNEN■
EMEEKHRIUMEMMM"NIMMIN
MEMO
MIMMEM
Ld/Riprap
EMEMEMMUMEMMEMMEM
MIENEOMM■MEMMEM
length
avg distance offshore
max distan J
,,ge-offshore,
�c�hannel
cubic yards
ramp
REEMEMMEMEME
M
Ouse/'Boatlift
MEMEMENIMMEMEMMEMEM
■■■■■■■,�■■■■�■■■■■■■
.,.Bulldozing
r
==MMMEN
NOMMEMEMMEMEMOMMENNNNNIMINUMM,
'11"311MEM
WNSWINNU
IREMMMEMEW—Noffiffim0wass-0
WIRER
NIMMENNUMN
ORINHE"i
a
mON
E
W1=rMM
01WAXON
Em�m
I
MMMM
MEMME
WON
N
M
l
M
r
wo
wwMw
NNNM
MMEN
line Length _MMENM
nq
EMEMEMENERNIME■
1E,
ENEENNEM
►IMEMMUMMEEMEM■
C7�- ��otsure�� yes
orium: ��:Ia yes K-n.-*-,,MMMMMM
—
"AWMEMMENEEMEM
0111MM141100
is
MENNEWN
I
MMUMNOMMEMENNE
M
0s: yes ,--n.4,MMMNMMMMWUMMMMMa
NOMENEEN
ONEEMMENOMMEMME
■
ier_&v_a6ed:-
A building permit may Se"Fe4bired by: CSee note on back regarding River Basin rules.
,(Note Local Planning jurisdiction)
Notes/ Special Conditions L i_5 LA-,— I -A
L_
Signat6r' ** Ple'Le read compliance statement on back of permit"
.. ? 1.4 , '), -
I -1-) 1,;
�-p i ve
PermitOfficer.'s Printed Name I
cation Fee(s) Check #
Issuing Date
01/
Expiration Date
ROY COOPER
Governor
MiCHAEL S. REGAN
Secretary
Coastal Management BRAXTON DAVIS
ENVIRONMENTAL QUALITY Director
BUFFER AUTHORIZATION CERTIFICATE FOR SHORELINE STABILIZATION
A riparian buffer authorization is required for shoreline stabilization activities within the Neuse and Tar -Pamlico River
basins per Division of Water Resources (DWR) regulations 15A NCAC 02B. 0233 and 0259. The Division of Coastal
Management (DCM) through a Memorandum of Understanding with the Division of Water Resources (DWR) has
reviewed your project proposal and has determined that the project as proposed complies with the aforementioned
regulations.
Those activities covered by your Coastal Area Management Act (CAMA) permit have received Buffer Authorization
provided the project is constructed in a manner that continues to meet all of the conditions listed below. Failure to
comply with this Buffer Authorization may subject the property owner and the party (contractor) performing the
construction and/or land clearing to a civil penalty by DWR of up to $25,000 per day per violation.
1. Impacts: Impacts to woody vegetation from clearing and filling in Zone 1(begins at the most landward of either
normal water line (NWL) or normal high water line (NHWL) and extends 30 feet landward) shall be minimized to
what must be impacted for the sound installation of the shoreline stabilization project. Unnecessary clearing and
filling in the buffer is a violation of the riparian buffer rules.
2. Clearing & Grading: Clearing and grading of Zone 2 (begins at the landward edge of Zone 1 and extends 20 feet
landward) is allowed provided that it is re -vegetated immediately and Zone 1 is not compromised, which includes
maintaining diffused (non-channelized) flow of storm water runoff through the buffer.
3. Construction Corridors: Construction corridors are allowed for shoreline stabilization projects, but they must be
satisfactorily restored as described in condition 5 below. - - -
4. Potential Overwash: For vertical shoreline stabilization projects (bulkheads) only; sites where wave overwash is
expected to be severe, the first ten (10) feet landward (unless specifically authorized otherwise by DCM) from the
structure may be maintained as a stable lawn in order to provide for structural stability.
5. Temporary Stabilization: Immediately post- construction, bare soils must be stabilized as quickly as possible by
providing a temporary ground cover. Newly seeded areas should be protected with mulch and/or erosion matting.
This ground cover is a temporary measure.used to address erosion until site restoration can be accomplished.
6. Site Restoration: At minimum, pre -project site conditions must be re-established. A site that was wooded prior to
this shoreline stabilization project must be restored with woody vegetation at a stem density of 260 stems per acre.
Non wooded sites may be re -vegetated with woody vegetation. Restoration must be completed by the first
subsequent planting season (November 1 through March 30) after completion of the bulkhead.
• Pre -project site conditions:
7. Project Drawing: The drawing on the CAMA General Permit is considered -the project drawing -of your property
indicating the location of the shoreline stabilization structure and any associated clearing, grading, and construction
corridors. This drawing will be used to aid in compliance and monitoring efforts.
By your signature below you agree to be held responsible for meeting all of t ove ist d conditions and verify that all
i mat' �n is compl a and a curate, w
�� ✓
n lican Pri d a e er it 0 icer's Sign ture
Agent Applicant Signature Issu Date
CAMA GENERAL PERMIT #:�� l (�
State of North Carolina I Environmental Quality I Coastal Management
Washington Office 1943 Washington Square Mall Washington. NC 278891252-946-6481
Wilmington Office 1127 Cardinal Drive Ext. Wilmington, NC 28405-38451 910-796-7215
Morehead City Office 1400 Commerce Avenue Morehead City, NC 28557 1 252-808-2908
m
Authorized Agent ConsentAgreement
......................... IMP A
(Pn)pi!irjY0w;I!eRB)f - herby -authorize Tobih� jjY -
TJ's Afarline-coogru Tettertoln of -
LLC t0'act 011 Jny- behalf in 04WW., LAMA pqrndft for
the location fisted below.
PR0ipjZRTy ADDRESS:
PROPERTY OWNER'S MAUJNG ADDRESS:
114
ill w1w
%L >
Phone
PROPERTY OWNER'S SIGNATURE:
A�ORMED AGENT ISIGNA
TURE;
DATE:
L-l- -201
W/Au"Mmd Agm Consen
t
p
P oc _MPedy,
V-1 tD -
C
The
-P P
rop af-OWlibbVi
4VL
b"ft
44Dpr 0
"TOW
pie
f.
4,
I Opi
-1 rn-, g"kniCt,
i Vlaffle the seibact4."yae
b
to waive 46 461.
setback.rot
fdo but
Wth__tD*i!V6ih
561
*Valid for one cMenddrywr ars4
(RWsedA60-26t
`�,:;� }- l�Ya�YYBt�IamP�P�M1yaghantio ��IGi2+'t Sii.ii r.�' .�- r, -
`,of �rSy,.pinrj
n' •�Aw �l�,:.Rilli - illdd[M. LC*. ndGRwl. �Ee.). „ ",_•�`4'�,,
�NidWpa- PJ.0 F t `
to QM. f0 /�IOMR{: OM. UIC
P q),OMd at fie abm j
sse Ihmnoo6jaCllontDUft mpoal 4
lovb
D�fCRiPi1Dl1ANDpRORAYPNOOFPROPOAEDDWELCpMW, Cl...;
b?Y.dOpmhlmadlRlitntlsierlp`8co'bilowmaidicliasf17�3a�jn�,,
..mLlco
Per��R
� uaaraflrna go a
m.t'Ee at Beck o rti� totem mdario. of is Uoa� my me of b001�'Asa 81Od'F
m. Qr ,wnmwatvertb ycna blffid �a,ppto a "�v°al�'•;
balsa.
C6lim; Eov±aivs are l6 eetbe,�C',eq�diement
°{:.-tdoneiti�hroa�elve9e�fi embatlirequtromm � . , '•�;: -, r
(P �gfowferMlhilmtlo�, _ (w�t� • �rint�r�ron)_ ;.,;.< � '
m
Applicant:
Date:
General Permit
Describe below the HABITAT disturbances for the -application. All values should match the name, and units of measurement
found in your Habitat code sheet
Habitat Name
DISTURB TYPE
Choose One
TOTAL Sq. Ft
(Applied for.
Disturbance total
includes any
anticipated
restoration or
temp Un ads)
FINAL Sq. Ft.
(Anticipated final
disturbance.
Excludes any
restoration
and/or temp
impact amount)
TOTAL Feet
(Applied for.
Disturbance
total includes
any anticipated
restoration or
tem O impacts)
FINAL Feet `
(Anticipated final
disturbance.
Excludes any
restoration and/or
temp impact
amount
/ (?,
Dredge ❑ Fill ❑ Both ❑ Other
Dredge ❑ Fill ❑ Both ❑ Other
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ 'Both ❑ Other ❑
Dredge ❑ 'Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge•❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑