HomeMy WebLinkAboutPointe Bogue HOAC,WA / ❑ DREDGE & FILL F I /oy P1-1 r-f NO. 73404
A B C D
-I'NERAL PERMIT Previous permit #
f - Partial Reissue Date previous permit issued
New Modification Complete Reissue p
As authorized by the State of North Carolina, Department of Environmental Quality N
and the Coastal Resources Commission in an area of environmental concern pursuant to 15A NCAC �` �•
__ ❑ RNles attached.
I IVApplicant Name t t' , f rt T Project Location: Countyf
Address
: ^( 1,""'
City l=
<o` �r,
ZIP__�Y._
State ZIP
Phone #
E-Mail
Authorized
Agent
Affected
❑ CW
❑ EW ❑ PTA ❑ ES ❑ PTS
AEC(s):
❑ OEA
[IHHF ❑ IH ElUBA ❑ N/A
❑ PWS:
ORW: yes / no PNA yes / no
Type of Project/ Activity
Pier (dock) lend
Fixed Platform(
Floating Platfon
Finger pier(s)
Groin length
number
Bulkhead/ Riprz
avg distan
max distal
Basin, channel
cubic yarc
Boat ramp
Boathouse/ Bo;
Beach Bulldozii
Other
Shoreline Leng
SAV: no
Moratorium:
Photos:
Waiver Attache /
A building permit may b equired by:
( Note Local Planning jurisdiction)
Notes/ Special Conditions
Agent or Applicant Printed Name
Signature ** Please read compliance statement on back of permit **
Application Fee(s)
heck #
Street Address/ State Road/ Lot #(s)
Subdivision
City Z�, , I. 1V J ZIP
Phone # ( ) River Basin
Adj. Wtr. Body C �'�'t' at man unkn
Closest Maj. Wtr.
Signpatur �� //
Issui g Date
See note on back regarding River Basin rules.
/"d'` "f!!{rF
1Name
f �✓
Statement of Compliance and Consistency
This permit is subject to compliance with this application, site drawing and attached general and specific conditions. Any
violation of these terms may subject the permittee to a fine or criminal or civil action; and may cause the permit to become
null and void.
This permit must be on the project site and accessible to the permit officer when the project is inspected for compliance. The
applicant certifies by signing this permit that 1) prior to undertaking any activities authorized by this permit, the applicant will
confer with appropriate local authorities to confirm that this project is consistent with the local land use plan and all local
ordinances, and 2) a written statement or certified mail return receipt has been obtained from the adjacent riparian
landowner(s) .
The State of North Carolina and the Division of Coastal Management, in issuing this permit under the best available
information and belief, certify that this project is consistent with the North Carolina Coastal Management Program.
River Basin Rules Applicable To Your Project:
❑ Tar - Pamlico River Basin Buffer Rules _ Other:
❑ Neuse River Basin Buffer Rules
If indicated on front of permit, your project is subject to the Environmental Management Commission's Buffer Rules for the
River Basin checked above due to its location within that River Basin. These buffer rules are enforced by the NC Division of
Water Resources. Contact the Division of Water Resources at the Washington Regional Office (252-946-6481) or the
Wilmington Regional Office (910-796-7215) for more information on how to comply with these buffer rules.
Division of Coastal Management Offices
Morehead City Headquarters Washington District
400 Commerce Ave 943 Washington Square Mall
Morehead City, NC 28557 Washington, NC 27889
252-808-2808/ 1-888-4RCOAST 252-946-6481
Fax: 252-247-3330 Fax: 252-948-0478
(Serves: Carteret, Craven, Onslow -
North of New River Inlet- and Pamlico
Counties)
Elizabeth City District
401 S. Griffin St.
Ste. 300
Elizabeth City, NC 27909
252-264-3901
Fax: 252-264-3723
(Serves: Camden, Chowan, Currituck,
Dare, Gates, Pasquotank and Perquimans
Counties)
(Serves: Beaufort, Bertie, Hertford, Hyde,
Tyrrell and Washington Counties)
Wilmington District
127 Cardinal Drive Ext.
Wilmington, NC 28405-3845
910-796-7215
Fax: 910-395-3964
(Serves: Brunswick, New Hanover,
Onslow - South of New River Inlet -
and Pender Counties)
http://portal.ncdenr.org/web/cm/dcm-home
Revised 7/06/ 17
Date: January 16, 2019
To: Ryan Davenport
CAMA
From: Pointe Bogue HOA
Re: Reconstruction of community dock
This is letter serves as notice that the Pointe Bogue HOA has contracted with David
Braswell/Dynamic East Construction to reconstruct the community dock located in Pointe
Bogue Subdivision.
J. Vann Parker, President
JAN 16 2019
DCM-MHD CITY
J i
ADJACENT RIPARIAN PROPERTY OWNER STATEMENT
I hereby certify that I ovvn property ad1 rjcent to
property located at Corrc;e Cove Dr
Pointe Bogue HOA 's
(tr'air, of Property Owner)
(Address, Lot lock Ro d, utc.)
on Bogue Sound in Emerald Ise N.C.
(Waterbody) (City/Town and/or County)
The applicant has described to me, as shown below, the development proposed at the above
cation
� �I have no objection to this proposal.
I have objections to this proposal.
DESCRIPTION AND/OR DRAWING OF PROPOSED DEVELOPMENT
(Individual proposing development must fill in description below or attach a site drawing)
rebuild the community dock in the existing location with 9 boat slips
WAIVER SECT!U"'N'
and=rsiand :hat a pier, dock, mooring pilings, 'boat r-,rnp, br-KiKINOter', lift cr
must set hau ,.k a minimum distance of 15' from nay area of riparian a: cst•s un!ess wai'v -;i by
r;-,e. (Ii yuu wish to waive the setback, you must initial the a,.prof>nate blank
1 do wish to waive the 15' setback requirerent.
I do not wish to waive the 15' setback requirement.
(Property Owner Information )i� ��� (Adjacent Property Owner Information)
Signature t D p Signature*
�Curf�C G l'( ley �!• �✓ • T Q /)t y
Print or Type Name / Print or Type Name
C<rr e lf Coot r .
Mailing Address Mailing Address
e r-e, ld t"s /ems AIC 0 Sy
City/State/Zip h //� e City/State/Zip
a5A-3' /-/ v Pe Y
Telephone Number/email address Telephone Number/email address
Date Date*
(Revised Aug. 2014)
*Valid for one calendar year after signature'