Loading...
HomeMy WebLinkAboutPointe Bogue HOAC,WA / ❑ DREDGE & FILL F I /oy P1-1 r-f NO. 73404 A B C D -I'NERAL PERMIT Previous permit # f - Partial Reissue Date previous permit issued New Modification Complete Reissue p As authorized by the State of North Carolina, Department of Environmental Quality N and the Coastal Resources Commission in an area of environmental concern pursuant to 15A NCAC �` �• __ ❑ RNles attached. I IVApplicant Name t t' , f rt T Project Location: Countyf Address : ^( 1,""' City l= <o` �r, ZIP__�Y._ State ZIP Phone # E-Mail Authorized Agent Affected ❑ CW ❑ EW ❑ PTA ❑ ES ❑ PTS AEC(s): ❑ OEA [IHHF ❑ IH ElUBA ❑ N/A ❑ PWS: ORW: yes / no PNA yes / no Type of Project/ Activity Pier (dock) lend Fixed Platform( Floating Platfon Finger pier(s) Groin length number Bulkhead/ Riprz avg distan max distal Basin, channel cubic yarc Boat ramp Boathouse/ Bo; Beach Bulldozii Other Shoreline Leng SAV: no Moratorium: Photos: Waiver Attache / A building permit may b equired by: ( Note Local Planning jurisdiction) Notes/ Special Conditions Agent or Applicant Printed Name Signature ** Please read compliance statement on back of permit ** Application Fee(s) heck # Street Address/ State Road/ Lot #(s) Subdivision City Z�, , I. 1V J ZIP Phone # ( ) River Basin Adj. Wtr. Body C �'�'t' at man unkn Closest Maj. Wtr. Signpatur �� // Issui g Date See note on back regarding River Basin rules. /"d'` "f!!{rF 1Name f �✓ Statement of Compliance and Consistency This permit is subject to compliance with this application, site drawing and attached general and specific conditions. Any violation of these terms may subject the permittee to a fine or criminal or civil action; and may cause the permit to become null and void. This permit must be on the project site and accessible to the permit officer when the project is inspected for compliance. The applicant certifies by signing this permit that 1) prior to undertaking any activities authorized by this permit, the applicant will confer with appropriate local authorities to confirm that this project is consistent with the local land use plan and all local ordinances, and 2) a written statement or certified mail return receipt has been obtained from the adjacent riparian landowner(s) . The State of North Carolina and the Division of Coastal Management, in issuing this permit under the best available information and belief, certify that this project is consistent with the North Carolina Coastal Management Program. River Basin Rules Applicable To Your Project: ❑ Tar - Pamlico River Basin Buffer Rules _ Other: ❑ Neuse River Basin Buffer Rules If indicated on front of permit, your project is subject to the Environmental Management Commission's Buffer Rules for the River Basin checked above due to its location within that River Basin. These buffer rules are enforced by the NC Division of Water Resources. Contact the Division of Water Resources at the Washington Regional Office (252-946-6481) or the Wilmington Regional Office (910-796-7215) for more information on how to comply with these buffer rules. Division of Coastal Management Offices Morehead City Headquarters Washington District 400 Commerce Ave 943 Washington Square Mall Morehead City, NC 28557 Washington, NC 27889 252-808-2808/ 1-888-4RCOAST 252-946-6481 Fax: 252-247-3330 Fax: 252-948-0478 (Serves: Carteret, Craven, Onslow - North of New River Inlet- and Pamlico Counties) Elizabeth City District 401 S. Griffin St. Ste. 300 Elizabeth City, NC 27909 252-264-3901 Fax: 252-264-3723 (Serves: Camden, Chowan, Currituck, Dare, Gates, Pasquotank and Perquimans Counties) (Serves: Beaufort, Bertie, Hertford, Hyde, Tyrrell and Washington Counties) Wilmington District 127 Cardinal Drive Ext. Wilmington, NC 28405-3845 910-796-7215 Fax: 910-395-3964 (Serves: Brunswick, New Hanover, Onslow - South of New River Inlet - and Pender Counties) http://portal.ncdenr.org/web/cm/dcm-home Revised 7/06/ 17 Date: January 16, 2019 To: Ryan Davenport CAMA From: Pointe Bogue HOA Re: Reconstruction of community dock This is letter serves as notice that the Pointe Bogue HOA has contracted with David Braswell/Dynamic East Construction to reconstruct the community dock located in Pointe Bogue Subdivision. J. Vann Parker, President JAN 16 2019 DCM-MHD CITY J i ADJACENT RIPARIAN PROPERTY OWNER STATEMENT I hereby certify that I ovvn property ad1 rjcent to property located at Corrc;e Cove Dr Pointe Bogue HOA 's (tr'air, of Property Owner) (Address, Lot lock Ro d, utc.) on Bogue Sound in Emerald Ise N.C. (Waterbody) (City/Town and/or County) The applicant has described to me, as shown below, the development proposed at the above cation � �I have no objection to this proposal. I have objections to this proposal. DESCRIPTION AND/OR DRAWING OF PROPOSED DEVELOPMENT (Individual proposing development must fill in description below or attach a site drawing) rebuild the community dock in the existing location with 9 boat slips WAIVER SECT!U"'N' and=rsiand :hat a pier, dock, mooring pilings, 'boat r-,rnp, br-KiKINOter', lift cr must set hau ,.k a minimum distance of 15' from nay area of riparian a: cst•s un!ess wai'v -;i by r;-,e. (Ii yuu wish to waive the setback, you must initial the a,.prof>nate blank 1 do wish to waive the 15' setback requirerent. I do not wish to waive the 15' setback requirement. (Property Owner Information )i� ��� (Adjacent Property Owner Information) Signature t D p Signature* �Curf�C G l'( ley �!• �✓ • T Q /)t y Print or Type Name / Print or Type Name C<rr e lf Coot r . Mailing Address Mailing Address e r-e, ld t"s /ems AIC 0 Sy City/State/Zip h //� e City/State/Zip a5A-3' /-/ v Pe Y Telephone Number/email address Telephone Number/email address Date Date* (Revised Aug. 2014) *Valid for one calendar year after signature'