Loading...
HomeMy WebLinkAboutMortens, HenryCAMA / - DREDGE & FILL I�O• 732g2 A B C D GENERAL PERMIT Previous permit # - New -_Modification--1Complete Reissue Partial Reissue Date previous permit issued As authorized by the State of North Carolina, Department of Environmental Quality and the Coastal Resources Commission in an area of environmental concern pursuant to 15A NCAC ' 'Rules attached. Applicant Name _ ___ -___ ___ Project Location: County- -__ - Address Street Address/ State Road/ Lot #(s) - City State ZIP Phone # (_T) E-Mail ___ _ - Subdivision Authorized Agent �; _ - City ZIP ---- Affected CW EJ EW ❑ PTA ❑ ES ❑ PTS Phone # ( _ ) River Basin — -- AEC s : _ OEA ❑ HHF ❑ IH ❑ UBA ❑ N/A Adj. Wtr. Body_ . ; fat /man /unkn) I_- PWS: ORW: yes / no PNA yes / no Closest Maj. Wtr. Body Type of Project/ Activity Pier (dock) length Fixed Platform(s) Floating Platform(s) Finger pier(s) Groin length number Bulkhead/ Riprap length avg distance offshore — max distance offshore Basin, channel _ cubic yards_ Boat ramp Boathouse/ Boatlift Beach Bulldozing Other Shoreline Length _ I SAV: not sure yes no -- Moratorium: n/a yes no Photos: yes no Waiver Attached: yes no I 1 1 A building permit may be required by: ( Note Local Planning jurisdiction) Notes/ Special Conditions Agent or Applicant Printed Name Signature Please read compliance statement on back of permit Application Fee(s) Check # (Scale: f , ) I C See note on back regarding River Basin rules. Permit Officer's Printed Name Signature Issuing Date r �! Expiration Date Statement of Compliance and Consistency This permit is subject to compliance with this application, site drawing and attached general and specific conditions. Any violation of these terms may subject the permittee to a fine or criminal or civil action; and may cause the permit to become null and void. This permit must be on the project site and accessible to the permit officer when the project is inspected for compliance. The applicant certifies by signing this permit that [)prior to undertaking any activities authorized by this permit, the applicant will confer with appropriate local authorities to confirm that this project is consistent with the local land use plan and all local ordinances, and 2) a written statement or certified mail return receipt has been obtained from the adjacent riparian landowner(s) . The State of North Carolina and the Division of Coastal Management, in issuing this permit under the best available information and belief, certify that this project is consistent with the North Carolina Coastal Management Program. River Basin Rules Applicable To Your Project: Tar - Pamlico River Basin Buffer Rules Other: Neuse River Basin Buffer Rules If indicated on front of permit, your project is subject to the Environmental Management Commission's Buffer Rules for the River Basin checked above due to its location within that River Basin. These buffer rules are enforced by the NC Division of Water Resources. Contact the Division of Water Resources at the Washington Regional Office (252-946-6481) or the Wilmington Regional Office (910-796-7215) for more information on how to comply with these buffer rules. Division of Coastal Management Offices Morehead City Headquarters 400 Commerce Ave Morehead City, NC 28557 252-808-2808/ I-888-4RCOAST Fax: 252-247-3330 (Serves: Carteret, Craven, Onslow - North of New River Inlet- and Pamlico Counties) Elizabeth City District 401 S. Griffin St. Ste. 300 Elizabeth City, NC 27909 252-264-3901 Fax:252-264-3723 (Serves: Camden, Chowan, Currituck, Dare, Gates, Pasquotank and Perquimans Counties) Washington District 943 Washington Square Mall Washington, NC 27889 252-946-6481 Fax: 252-948-0478 (Serves: Beaufort, Bertie, Hertford, Hyde, Tyrrell and Washington Counties) Wilmington District 127 Cardinal Drive Ext. Wilmington, NC 28405-3845 910-796-7215 Fax: 9 10-395-3964 (Serves: Brunswick, New Hanover, Onslow - South of New River Inlet - and Pender Counties) http://portal.ncdenr.org/web/cm/dcm-home Revised 7/06/ 17 From: Harry Martens ncm2630@gmail.com Subject: Re: Estimate from B Prescott Marine Construction, LLC Date: November 27, 2018 at 4:42 PM To: Brandi Robertson brandiprobertson@gmaii.com On Tue, Nov 27, 2018 at 4:42 PM Harry Martens <:-- --> wrote: hi Brandy -you have my permission to act as my agent - harry martens On Tue, Nov 27, 2018 at 1:35 PM Brandi Robertson <, _randiorobertson@gmail.com> wrote: Dear Mr Martens, We have been working on our calendar and have you on the schedule for the first two weeks in January. I would like to schedule the site visit with Mr Connell from the Dept. of Environmental Quality to obtain the Emergency Permit. Please respond to this email confirming that I have permission to act as you auuhor¢ed agent. This wig adbw me to obtain the Emergency Permit on your behalf. ------------ I will let you know when I have that site visit scheduled. Brandi Prescott Robertson B Prescott Marine Construction, LLC 252-249-0149 brandiprobertson@omaii.com On Nov 16, 2018, at 7:52 AM, Harry Martens <hcm2630 gmail.com> wrote: thanks -looking forward to my new dock! harry On Thu, Nov 15, 2018 at 6:13 PM Brandi Robertson <brandiorobeirt n@email com> wrote: Great. I have you on our project board. I will need to schedule an appointment with the CAMA Rep. to do a site visit. At this time he will write an Emergency Permit to rebuild the dock with Concrete decking. I will let you know when I have that scheduled. Thank you Brandi Prescott Robertson B Prescott Marine Construction, LLC 252-249-0149 brandiorobertson @gmaii.com On Nov 15, 2018, at 3:47 PM, Harry Martens <hem2630@gmaiLcom> wrote. Hi Brandy -hopefully this works - I accept the revised quote as of 9/18/2018 for estimate #1432 revised to 25,615.00 thanks again- harry On Thu, Nov IS 52 PM B Prescott Marine Construction,LLC<guicktwoks@notification .intuit.com> wrote: Dear Harty Martens, Please review the updated estimate below. I updated the walkway to the 60' and also eliminated the Permitting Fees. CAMA is issuing Emergency Permits to those that are rebuilding after the storm at no charge. Feel free to contact us if you have any questions. We look forward to working with you. Thanks for your business! B Prescott Marine Construction, LLC --- Estimate Summary Estimate # : 1432 Estimate Date: 09/18/2018 Total: $25,615-00 The complete version has been provided as an attachment to this email.