HomeMy WebLinkAboutCedar Key HOACAMA DREDGE & FILL
GENERAL PERMIT
-'New DModification -Complete Reissue , -Partial Reissue
As authorized by the State of North Carolina, Department of Environmental Quality
and the Coastal Resources Commission in an area of environmental concern pursuant to 15A NCAC
No. `73171 A
Previous permit #
Date previous permit issued
Applicant [,Jame Project Location: County
• Street Address/ State Road/ Lot #(s)
— Rules
B C D
Address
City-- State ZIP
Phone #( ------ E-Mail Subdivision
City j J ZIP
Authorized Agent (Jo C,�_, V--� L_�_() 1210 - - -
Affected UCW 14EW 'IJ PTA Li ES 0 PTS Phone # River Basin
AEC(s): Ll OEA E HIHIF El IH El UBA El N/A Adj. Wtr. Body _______--Ln-at_1m-an--Zu_fl-knJ
_ PWS: i
ORW: yp� / nn PNA Yes / no Closest Maj. Wtr. Body i .
Type Project/ Activity
of
(Scale: -
t In
length
Pier (dock) length
s
Fixed Platform(s)
rm
Floating Platform(s)
(s)
F-t
— ------
Finger
L
pier(s)
I
Groin length
number
'rap length
Bulkhead/ Riprap length
—
—
—
distance offshore
avg distance offshore
4
—
—
—
distance offshore
max distance offshore
KIA
Basin, channel
;:4
J
yards
cubic yards
Boat ramp
ou
Boathouse/ Boat Boathouse/ Boat
Beach BuIldozin
U, oz,
1
Other
Shoreline Length
SAV: not sure yes no
. ..
. ........
. .
Moratorium: n/a yes mo
_7
- HI
Photos: yes no
Waiver Attached: yes no
El See note on back
regarding River Basin rules.
A building permit may be required by:
( Note Local Planning jurisdiction)
Notes/ Special Conditions
Agent or Ap'p1rcant Printed Name
PermitOfficer's Printed Name
Signature ** Please read compliance statement on back of permit
Application Fee(s) Check #
Si ure
Issuing ' ate Expiration Date
Statement of Compliance and Consistency
This permit is subject to compliance with this application, site drawing and attached general and specific conditions. Any
violation of these terms may subject the permittee to a fine or criminal or civil action; and may cause the permit to become
null and void.
This permit must be on the project site and accessible to the permit officer when the project is inspected for compliance. The
applicant certifies by signing this permit that 1) prior to undertaking any activities authorized by this permit, the applicant will
confer with appropriate local authorities to confirm that this project is consistent with the local land use plan and all local
ordinances, and 2) a written statement or certified mail return receipt has been obtained from the adjacent riparian
landowner(s) .
The State of North Carolina and the Division of Coastal Management, in issuing this permit under the best available
information and belief, certify that this project is consistent with the North Carolina Coastal Management Program.
River Basin Rules Applicable To Your Project:
❑ Tar- Pamlico River Basin Buffer Rules ❑ Other:
n Neuse River Basin Buffer Rules
If indicated on front of permit, your project is subject to the Environmental Management Commission's Buffer Rules for the
River Basin checked above due to its location within that River Basin. These buffer rules are enforced by the NC Division of
Water Resources. Contact the Division of Water Resources at the Washington Regional Office (252-946-6481) or the
Wilmington Regional Office (910-796-7215) for more information on how to comply with these buffer rules.
Division of Coastal Management Offices
Morehead City Headquarters
400 Commerce Ave
Morehead City, NC 28557
252-808-2808/ 1-888ARCOAST
Fax: 252-247-3330
(Serves: Carteret, Craven, Onslow -
North of New River Inlet- and Pamlico
Counties)
Elizabeth City District
401 S. Griffin St.
Ste. 300
Elizabeth City, NC 27909
252-264-3901
Fax: 252-264-3723
(Serves: Camden, Chowan, Currituck,
Dare, Gates, Pasquotank and Perquimans
Counties)
Washington District
943 Washington Square Mall
Washington, NC 27889
252-946-6481
Fax: 252-948-0478
(Serves: Beaufort, Bertie, Hertford, Hyde,
Tyrrell and Washington Counties)
Wilmington District
127 Cardinal Drive Ext.
Wilmington, NC 28405-3845
910-796-7215
Fax: 910-395-3964
(Serves: Brunswick, New Hanover,
Onslow - South of New River Inlet -
and Pender Counties)
http://portal.ncdenr.org/web/cm/dcm-home
Revised 7/06/ 17
Styron, Heather M.
From: Dean Lombreglia <Dean.Lombreglia@carteretcountync.gov>
Sent: Tuesday, November 13, 2018 8:29 AM
To: Styron, Heather M.
Subject: [External] FW: Cama permit for pier.
Attachments: CK HOA Pier Repair Permit Letter -Nov 2018.pdf
From: Bobby Lee[mailto:bobatthebeach@embargmail.com]
Sent: Saturday, November 10, 2018 10:23 PM
To: sheryllombreglia; Dean Lombreglia
Cc: Cedar Key HOA
Subject: Re: Cama permit for pier.
Dean,
Attached is the letter stating you are acting on the HOA's behalf to obtain the permits.
Thanks,
Bobby
On Nov 6, 2018, at 5:17 PM, sheryllombreglia <sheryllombreglia@yahoo.com> wrote:
Dean needs a letter from the hoa stating that he is acting on the hoa's behalf to obtain
the Cama and building permits for pier repairs.
This letter can be emailed to
Dean.lombreglia(a�_carteretcountync.gov
Ps. Dean would like to talk to you the weekend regarding the insurance for the dock.
Sent from my Verizon, Samsun, Galaxy smartphone
Disclaimer: The content of this message and all attachments are subject to NC Public Record Law. According to the law
all information except the property of a private individual is considered public record and subject to disclosure upon
request to third parties without prior notification. If you are not the intended recipient of this message contact the
sender immediately and delete the message from your files. Thank you for your cooperation.
1
CEDAR KEY HOMEOWNER'S ASSOCIATION
119 Tidewater Drive
Newport, NC 28570
November 10, 2018
Dean Lombreglia is authorized to act on behalf of the Cedar Key Homeowners Association in
obtaining the necessary CAMA and Carteret County building permits to repair the Cedar Key
pier.
Bobby L
President, Cedar Key Homeowner's Association
`� rt 00
• f 4a 0 E °
• 4 +�yY [ i ' r Oit
m
04
,
b
,7.4i
IM
�g +e
y ur ll ifs
N N
2oz
N
c
U °
`a
mo
o
o
o o
mE
a�
cl
N N
O
� w
U 15
�g
LD
.sue
o gE
z�l✓N o 0
u oD
3 Q o�
41 V N
^ffi N
Pr is
C m v
N � �
00 F „
ffio
O
O OO ° ,:, O CAy >
++ ++ a� �" y L� o N
�i
0 4 o
� E Zl
Wf� is to 'b Sp E
Cl Z � G� f� A � �oE
p o R: v�
�oL)
Ld O N Lffi�
x00 wQ msa
LO rx
o � x as O w coM N
,It
' N y a
co
a� 4w 'Ly fiog
cC
'v"� o 1-4 z a U a 'v a w H H a as H CIO A a A