HomeMy WebLinkAbout63373_Install 110' of riprap_20181106CAMA / 11 J EDGE & FILL NO. 4 923 -Ag C
G It N E L', PERMIT
Previous permit #
New' ' 1:1 Modification El Complete Reissue ElPartial Reissde Date, prev'ious,pqrm,it'issue'd
As authorized by the State of North Carolina, Department of Environmental Quality
-
and the'Coastal Resources Commission in an area of-dn*vironmental concern pursuant to, I SA NCAC 6-n )-I
2 Rules attached.
Applicant Name;
Project -•,Location: County. rr�N
Address ) 'S 3 0 14�-Y
Street Address/ State Road/ Lot #.(s), 0 -S,z- -,v4:2Zb-
Ci State H L ZIP '.-2--') c3
Phone # /—'9 E - M a i I
Subclivision_;
Authorized Agent 5 <__ 'C"15-
City. 41P
0 Cw pEW W PTA, -%FS ",&PTS.
Phone# River Basin-T70 - PA MAL-i L)
Affected a -�'66
El OEA 0 HHF El lH UBA 0 N/A
AEC(s):
la E-6-L G-31 I m a n,.,,/ u n kn,
Adj. Wte. Bodyt u NA L
•'0 PWS:
ORW: 4_�no PNA yes,,/�no)
yes
Closest Maj. Wt.r. Body
■■■■■■■■■■�■■i�i■■siii■�■■■■■■■■■■■
IMMMM
No
]mom
so
M.
M. M.
MM'_ _''____MMwwMMM No
MET
0 MOM MOR ,12,0010
Y C1.11,
MOMP OW
F41-W.
URNFONVA
n- q P_ 1M.N.W, 1� 6
a MEMO
®R
PREP MOM
MEMO
OMM. 0 1w
wqw BE, Mon EMERENr
■MENNEN OEM
'.ddMMMMOwR%
6"' ?Agent §FAROlic tPaermivqficer's Printed Name
t Printed N7�,
MAJ"
iign.Lre__ Pfgatread compliance statement on back of permit Signature C_
-1-73S_
Application Fee(s), • Che k# Issuing Date Expiration Date
t
Coastal Management
ENVIRONMENTAL QUALITY
ROY COOPER
Governor
MICHAEL S. REGAN
Secretary
BRAXTON DAVIS
- Director
BUFFER AUTHORIZATION CERTIFICATE FOR SHORELINE STABILIZATION
A riparian buffer authorization is required for shoreline stabilization activities within the Neuse and'Tar-Pamlico River
basins per Division of Water Resources (DWR) regulations 15A NCAC 026. 0233 and 0259. The Division of Coastal
Management (DCM) through a Memorandum of Understanding with the Division of Water Resources (DWR) has
reviewed your project proposal and has determined that the project as proposed complies with the aforementioned
regulations.
Those activities covered by your Coastal Area Management Act (CAMA) permit have received Buffer Authorization
provided the project is constructed in a manner that continues to meet all of the conditions listed below. Failure to
comply with this Buffer Authorization may subject the property owner and the party (contractor) performing the
construction and/or land clearing to a civil penalty by DWR of up to $25,000 per day per violation.
1. Impacts: Impacts to woody vegetation from clearing and filling in Zone 1(begins at the most landward of either
normal water line (NWL) or normal high water line (NHWL) and extends 30 feet landward) shall be minirnized-to
what must be impacted for the sound installation of the shoreline stabilization project. Unnecessary clearing and
filling in the buffer is a violation of the riparian buffer rules.
2. Clearing &Grading: Clearing and grading of 2one,2 (begins at the landward edge of Zone'1 and extends 20 feet
landward) is allowed provided that it is re -vegetated immediately and Zone 1 is not compromised, which includes
maintaining diffused (non-channelized) flow of storm water runoff through the buffer.
3. Construction Corridors: Construction corridors are allowed for shoreline stabilization projects, but they must be
satisfactorily restored as described in condition 5 below.
4. Potential Overwash: For vertical shoreline stabilization projects (bulkheads) only; sites where wave overwash is i
expected to be severe, the first ten (10) feet landward (unless -specifically authorized otherwise by DCM) from the
structure may be maintained as a stable lawn in order to provide for structural stability.
s. Temporary Stabilization: Immediately post -construction, bare soils must be stabilized as quickly as possible by
providing a temporary ground cover. Newly seeded areas should be protected with mulch and/or erosion matting.
This ground cover is a temporary measure used to address erosion until site restoration can be accomplished.
6. Site Restoration: At minimum, pre -project site conditions must be re-established. A site that was wooded prior to
this shoreline stabilization project must be restored with woody vegetation at a stem density of 260 stems per acre. f
Non wooded sites may be re -vegetated with woody vegetation. Restoration must be completed by the first
subsequent planting season (November 1 through March 30) after completion of the bulkhead.
• Pre -project site conditions _tea ; -1—Li. ��� � a w � „ QCr� 42k _ ,P �= 2 ; � cam}- ��� a �,-•� , .
7. Project Drawing: The drawing on the CAMA General Permit is considered -the project drawing of your property i
indicating the location of the shoreline stabilization structure and an associated clearing, j
y g, grading, and construction [
corridors. This drawing will be used to aid in compliance and monitoring efforts.
By your signature below you agree to be held responsible for meeting all of the above listed conditions and verify that all
information is complete and accurat . h
AM r Apo 'cant Printed Name Permit Offic s 'gnat
Age pplicant Signature Issue Date
CAMA GENERAL PERMIT #: Z-1g— 3
State of North Carolina I Environmental Quality I Coastal Management
Washington Office 1943 Washington Square Mall Washington. NC 278891252-946-6481
Wilmington Office 1 127 Cardinal Drive Ext. Wilmington, NC 284053845 1910-796-7215
Morehead City Office 1400 Commerce Avenue Morehead City, NC 28557 1 252-808-2808
Spivey, Kell
From:
Jeff Furness <Jeff.Furness@nutrien.com>
Sent:
Monday, November 5, 2018 10:53 AM
To:
Spivey, Kelly
Cc:
Tyler Peacock
Subject:
[External] FW: CAMA General Permit Landowner Letters and Documentation: Nutrien
Employee's Center Riprap Repair
Attachments:
Oetter ARLO Letter Signed.pdf; Kieffer Landowner Packet.pdf, Oetter Landowner
Packet.pdf, Reg Mail Rcpt Oetter 1.pdf, Reg Mail Rcpt Oetter 2.pdf, Reg Mail Rcpt Kieffer
1.pdfi Reg Mail Rcpt Kieffer 2.pdf, Employee Center Shoreline.JPG; Employee Center
Shoreline 2.JPG
Kelly
Attached is the documentation fora CAMA General Permit application to rip rap approximately 110 feet of shoreline at
our Nutrien (PCS Phosphate) Employee Center between the small gazebo and the boat launch, that was damaged by
Hurricane Florence. We observed this area during your site visit on October 2. The contractor has a window of
availability and we would like to get this work done as quickly as possible. If you could write out the permit and scan
and email it to me, I can sign it and mail it back to you with the $200 permit fee. We have not received a signed adjacent
landowner letter back from Mr. Kieffer, however he signed for the package on October 23, and so Friday November 2
was 10 days. The Employee Center address is 1629 Hickory Point Road, Aurora, NC 27806.
Let me know if you have any questions.
Sincerely,
Jeff
For more information on Nutrien's email policy or to unsubscribe, click here:
https://www.nutrien.com/iinportant-notice
Pour plus de renseigniements sur la politique de courrier electronique de Nutrien ou pour vous desabonner,
cliquez ici: https://www.nutrien.com/avis-important
Feeding tho Futu e-
Certified Mail
October '18, 2018
Mt. Larry J. Oetter &;Mts. Carolyn E. Oetter
2891J.Vater St.
Aurora`, ANC 27806
Dear`MP. & Nlrs. Oetter:'
PCS Phosphate Company, Inc. (PCS) operates an employee center on the Pamlico River to -the east of our
facilities, This property, include-s a private boat ramp and,adjacent shorelinethat has=recently.
experienced erosion in some areas. As part of our maintenance, of the area, we are repairing these
areas with new rip -rap and backfill.
As-a.landownerofthe next adjacent_property,to=.the proposed work (despite its=distance-from tFie;
project),you are required to=be notified of the,per-mit application so that you may i le any_comments_if
you so wish. A map of the proposed project=location-adjacent=to<your`property is„'encl9seil9
Should,you;have any:objeetions to this proposal, -,please send your written comments to Kelly Spivey, NC
Division of Coastal Management, 943 Washington Square Mall, Washington, NC 2788% within 10 days of
your receipt of this notice. If you have no objections, I would appreciate -you signing the bottom of the=
enclosed form and mailing it backin the envelope provided. If you have any questions on this project,
please call me at 252-322-8249, or email me at jeff.furness@nutrien.com. You may also call Kelly Spivey
at 252-948-3853.
Sincerely,
r, nnL"
t reyr. Furness
Senior Scientist
Enclosures
1 530 NC Hv y 306 SouQi, -Aurori; NC USA 27806
Nutrien Employee's Center
a
k-
1�7
CO
110 ft. of rip rap
ZERTIEIED=MAIL- • RE. RN -RECEIPT REallESTFD,
DIVISION OF COASTAL MANAGEMENT
ADJACENT RIPARIAN PROPERTY OIN(VEk NO'TIFI.CATIONMAIVER!FORM -
Name of Property Owner: RCS Phosphate C-ompany' Inc.
Address of Property:
o Point Rd:, Aurora,
or Street #, Street or k6
27806
& County)
Agent's Name_#:, Jeff_ Furness _- WailingAddress: PCS Phosphate
_ -
Agenft phone #:-, Z5N22_-.8249 1530 IBC Hw 306S,_Aurora,-3`NC 27806 �
I hereby certify that I own,
applying for this-oermit.has
I have no objections to this proposal. I Have objections to this proposal.
If yoWbavebbject/ons'tb whatis being proposR0, you muS007066f-M-e Divisibn or Coastal Management
(DCM) in wrifing' within 10 days or rreceipt of this notice. Contact Information for DCM'. offrces is
_available at.htt6 /litiww nccoastalinanaA� rent net%web/cm/sfaff listirrq orby calling 1=$8B=4RCOAST.
.. .ter_.. _ ...„....
WAVER SECTION
understand that a pier, dock, mooring pilings,boat ramp, breakwater, boathouse, or lift must
beset back a minimum distance of 15' from my area of riparian access unless waivetl by, the. (If'
You wish to wafve.thesethack, you;must-inQtial the_appropriate blank below.)
I do wish to waive the 15' setback requirement.
not wish to waive t4e,1.5' setback requfFement
O4w!i-`,,.hformation)
JefffenLC..Eyrness
1530 NC Hwy 306S
ding Address
Aurora,�NC 27806 ___,�
City/Stafe/Zip`��
252-322=8249; je_ff.furness R trigri
-Telephone NeimbWl Email Address
Date
GP,RaL nl R
(Revised A. ug. 2014)
hush Mve-
,ERTIFIED=MAIL- • RETURN--RECEIPT�REQllESTED;
DIVISION OF COASTAL MANAGEMENT
ADJACENT RIPARIAN PROPERTY OWNER, NOTIFICATIONNUAIVER'FORM
Name of Property Owner: RCS Pho.gi ate Cgmpany,,_Inc.
Address of Property: _4
AuroFd, NC 27806
or Road; City & County)
Agents, Narne-#:, Jeff_ Furness _ _ _ _ -Mailing Address: PCS Phosphate
Agent's, phone #:,.?�322-8249 1530 NC -Hwy 3Q6S, Aurora, `NC 27806
- R - -- - Ll
I hereby certify that I own,
applying for#his-Dermit,has'
I have no objections to this proposal. I have objedtibns to this prop
Cb osal.
If youI have ob]ecdons M what is being proposed, y, ou mustnofify.ft Division` of Coastal Management
(DCM) in -writing-' within, f0 days of nieceipt of this notice. Contact 'information for, DWI offices is
available athttii /lwww.nccoastatmanapement•nef'_web/cm/staff=listing orby caliin"g f�888,4RCOA. ST.
WAIVER SECTION -
I understand that a pier-, dock, mooring pilings,:boat "ramp, bfeal&vater,.boathouse, or lift must
be--set-back a minimum distance of 1'5' from my� area of riparian access unless waived by, the. (If'
you wish to waive thesetback., -you mus,_ t.initiat the appropriate blank'below.)
do wish to waive the 1-V setback requirement
not wish to waive the, 1'5' setback requirement:
ation)
(,- - erty Own nform
,4, c �t 'p .irJ✓V� 1vlM
Jeffrex.G,_Furness
Print or Tpe Name - -
_MO NC Hwy 306S
"Mal !ng Xddress
Aurora', NC 27806,
Cify/StateAZip - — W __
252-322=8249 jeff.furness@nutrien.com
_Telephone Numbe?'/ Email Address
,
Date
orr TypeName
ig'Addre§s
7ate/Zip f---'-
Dd' a=-1 �--
7po
�r'it- eh�tq��s'
'V e r'!
(Revised Aug. 2014)
-T72T�
s'#'�c"
Feeding WO Future
Certified Mail
October 18; 2018
Mr. Donald 11 Kieffer
2448 Snider Rd:
Yadkinvillia, NC 27055
Dear Mr. Kieffer:
'PCS Phosphate Company Inc. (PCS) operatesan employee center on the Pamlico River to the east of ou?
facilities. This�.property includes,a-private'bdat ramp and adjacent shoreline that has recently
Lezperiencederosion in sdn5e;areas, As part of our maintenance of the afea; we are repairing these
areas:with new riprap andibackfill.
As a landowner of the:next adjacent property,, to the proposed work. (despite its distance from the
project), you are=required to be notified of the permit application so that y_ou€may file any comments if
you so wish., A ,map of the proposed •project location adjacent to your property.is enclosed.
Should you have any objections to thisyroposal, please send yourrwriiten c6ffiments,to Kelly Spivey, NC
Division of Coastal Management, 943 Washington Square Mall, Washington, NC 27889, within 10 days of
your receipt of this notice. If.you have no objections, I would appreciate you sigriirig the bottom of�the
enclosed form and mailing it back in the envelope provided. If you have any questions on this --project;
please,call me at 252-322-8249 or email me at jeff.furness@nutrien.com. You may also call Kelly Spivey
at 252-94&3853.
J
Sincerely,
J rey .Furness
Senior Scientist
Enclosures
1530 NC Hwy 306-Sotnen.co uth, Avrora, NC USA 27806 P r2um,
- - - — -- -
0
Nutrien Employee's Center
IM
110 ft of rip rap
.CERT-IFIED.'MAIL --RETURICRECEIP.T-`R MUESTED;
DIVISIOU OF COASTAL MANAGEMENT'-
ADA -CENT RIPARIAN PIKOPERTY OWNER, NdTlIhCATIONMAIVER FORM
Name of Property, Owner: PCS, Phosphate Company, Inc.
Addiress, of Property:1629 Rd., Aurora; NC 27806
. (Lot or Street#, Street or Road, -.City& County)
Agent's Name #- Jeff, Furness --- UjilihgAddri-eiss? PC&PhospKq#____
Agent's phofie* 262.n32-2-8249, -y.3V6SjAX-rr--- --27806.
JHW pro a. NC
I h"r by , qeftify.
applying for this
they are proposi
I; have no -objections f6 thispyopol. 1have objections to this W - proposal. -DrOP
-- . - I- -P441.
If -you Wvd]6fij6-cdons to wfi4t it being proposed, you Must noiffly-ft Wid.66n of-Coasial Minagement
(QCM) in-,Wrifffigl WIthih 101 dAYA- of� re-de-lAt of thit notice. Cdfit4dt ififfirm-citidn- for, UCMj dffle6i s is
by cafflng:1=880--4RCOAST.
fiF1ed-'bWC#rdr1ed Mail.
WAIVER SECTION
I understand that a; pier, dock, mooring -pilings, boat ramp, breakwater, boathouse, or lift must
be set back a minimum distance of 15'frorn my, area-ofiriparian access, unless walyedby me. (If
you Wish to _waive the, setback, you,ggst —Jn1ti5l�the appropriate -blank below:)
do wish to waivelthe 15',setback requirement.
I do not wish to waive the 15' setback requirement.
Information)
Sig -4,WW'U""
_Jeffrey_—C.Fumess
print r Name
1530 NC'Hwy :S0-6S
'U@Afig7Addie—ss
ffiftmma g 252-322-8249� jeff.fumess@nutrien.com
Telephone
I I , - -- � - �'- -
Nur�ber / Eifte-ill Addiess
(Riparian Oropertybwrrer Information)
MaflingMdress-
Telephone Numberl EMail Address
(Revised Aug. 2014)
Applicant: !✓ ..�. �t%o5 �t%�+ Go . ,� G
Date:
-General Permit*
Describe below the HABITAT disturbances for the -application. All values should match the name, and units of measurement
found in your Habitat code sheet
Habitat Name
DISTURB TYPE
Choose One
TOTAL Sq. Ft
(Applied for.
Disturbance total
includes any
anticipated
restoration or
temp impacts)
FINAL Sq. Ft
(Anticipated final
disturbance.
Excludes any
restoration
and/or temp
impact amount)
I. TOTAL Feet
(Applied for.
Disturbance
total includes
any anticipated
restoration or
temp impacts)
FINAL Feet
(Anticipated final
disturbance.
Excludes any
restoration and/or
temp impact
amount
0j0„C-Lj 14£
Dredge ❑ Fill ❑ Both ❑ Other
�j�itaLa r..7
O??'fl," r
Dredge ❑ FII Both ❑ Other ❑!'Sp
2
;r�&
z
SSo
de � p 19
Dredge ❑ Fill ❑ Both ❑ OtherA
/� J!p ��2
/O So ;Cltz
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ - Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill-[] Both ❑ Other ❑
Dredge ❑ Fill ❑ .Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill•❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑