HomeMy WebLinkAbout63386_Replace 240' of exsting bulkhead_20181106ED�GIE-'&-,FILL
3
_.,d RAL PERMIT
CNevv '- ❑Modification ❑Complete Reissue ❑Partial Reissue
authorized by the State of North Carol ina,.Department of Environmental Quality
a and the Coastal Resources Commission in an area of a .�vironmental concern pursuant to I SA NCAC_
i. Applicant Name � r�G�GI `� Project Location:
72 %,
Previous ,permit//
*.
Date previous permit issued,
County
' Address �o �' / /'Ci vy'/l �a/j //�/� Street Ad Tess/ SStta-t—e` Road/'L/o #(s)
' City �s�� State A Vzip /631/7 427' eL
F; ,
Phone # E-Mail
Subdivision
Authorized Agent 1/1 G! �,o,-7r City Ol �GLO << U ���- ZIP
El EW ��
Affected 17lpPTA s PTS Phone # ( ) ~- River Basin Gil �
AEC(s): ❑ OEA ❑ HHF ❑ IH ❑ UBA ❑ N/A
❑ PWS:
ORW: yes./ c PNA yes / no
Adj. Mr. Bod(Pat Iman unkn
Closest Maj. Wtr. Body e
FA
MEN
■E■MMM■MMM MM■M M■M MM■ME
MEMO:,■ M■
-
E■EEO■MEOE■E■■M■■MM■M■■■MME■�EEMME■F�■E■■
_
. ... _
O■OMM■MCC.7■M■ME■■■/�'4!�OMMEM■[�.
MO■■■■:MEMO
MMOO■■M■!�'a■M■MMM�►ISM\��
IEEE■/INAMEME■■`OM■E
••
- -
■■MOM■tilt'VM■■MOO■MM■■ME►��MM�iMMMMMMMMCOE■
MEMO■EEORMEE■E■{J■■■■■■■■■!'M■/JEMME■■■■EREM
■MOO■■O.■O■M■■h!�O■M■EEO■■■��E■E■MOM■MMO�■
■■OM■�.rRIMMMEMENIMMMMEN
l�1MO■■MOI�1■■■■■■
..■■.�►
OO■■Err■■■MOO
M.
MMMMMMMWIAMCWMMMEEEE
E; INVAMENOW
l Li%i�7%/cam
Agents oorA,pplicaht Printed Name
Signature Please ead/ �mpliance Went ent on back of permit
A (IC
ation Fee(s) Check #
`Permitpfficersj rinted, me
Signs ure ' L /� Q
Issuing Date Expiration Date__
B. F. Warren & Sons, Inc.
180 Taylor Farm Road, Belhaven NC 27810
Office (252)964-4628 Fax (252)964-6861
Forrest cell (252)945-2492 Freddy cell (252)945-4240
NC General Contractor License #72600
www.ncniers.com
Authorized Agent Consent Agreement
To: State of North Carolina Department or Local Government Department
from whom this permit is being applied for.
-- I, the -undersigned property owner, do hereby authorize B.F. Warren -&-Sons INC. to act on my behalf -in
obtaining the necessary permit/s for the below listed projects. I have contracted there services to perform
the work permitted. This agreement is limited only to the specific activity of obtaining permits for the
below specified projects.
Projects:
Installation of Two hundred (200) feet of Bulkhead
Project location/ address:
135 Terapin Road, Lot #25 Sound Shores
Ocracoke, NC
Body of Water:
Man-made Canal for Sound Shores Subdivision
Property Owner Mailing Address:
Robert Schafer
726 Tranquility Lane
Lansdale, PA 19446
(215)699-0330
-Property Owner's Signature:
Authorized Agent Signature:
A Ot'a
4:.5V5
MODE '`iv
North Carolina Department of Environment and Natural Resources
Division of Coastal Management
Pat' McCrory Bra -ion C. Da%As
Govemor Director
BUFFER AUTHORMAWN CERTHMCATE
FOR PIER AND DOCKING FACILITIES ACCESSMAY
John'E. Skvaria, III
Secretary
A riparian buffer authorization is required for pier and docking facilities access ways through the Tar Pamlico &
Neuse River Riparian buffer per Division of Water Quality (DWQ) regulations 15A NCAC 028.0233 & .0259. The
Division of Coastal Management (DCM), through a Memorandum of Understanding with the Division Of Water
Quality" (DWQ) has'reAeWed your project proposal and has determined that the project -as proposed complies with
the aforementioned regulations.
Those activities covered by -your -Coastal Area Management Act (CAMA)- permit -have received Buffer Authorization
as_fgng as the project -is constructed in a-mannerthat continues to meet all of the conditions listed below. Failure to
comply with this, BufferAuthorization may subject the property owner & the party (contractor) performing the
construction 81or"land- clearing- to a civil penalty by DWQ of up to $25,000 per day- per, violation.
i. Crossing -is Perpendicular: Pier and docking"facility access way must cross the 50 ft. riparian, buffer-
-perpendicularly '(which'is defined as between 75 and 1.05 degrees)" -unless othertirise apptoved -by DO W. The
alignment shall minimize the removal of woody vegetation to the'greatest extent piracticable.
2. -Pervious Materials: All reasonable measures shall be, taken to ensure the access -way ismade of.pervious
materials like open -slatted wood or composite, mulch, or grass to meet the intent,of"the-rules to the
maximum extent practicable.
3. Access Width: The width of the pier or docking facility access way shall be limited to six (6) feet.
4. Project Drawing: The drawing on the CAMA General Permit is considered the project drawing of your
property indicating the- relative location of the pier or docking facility and any requested access way. This
drawing-wih be used to aid in compliance and monitoring efforts.
a Pre -project site conditions:
By your signature below you agree -to be held responsible for meeting all of th&conditions listed.above and verify
that.all information provided is, complete and'accurate.
Agent.or Applicant Printed-Nanne Permit t3fficer's,Signature
r
Agent or Appii t Signature
LAMA GENERAL PERMIT;#:
. 6 /f"/y1dk ..��(�
Issue Date
Washington Office Morehead City Office Wilmington Office
943_Washington Square Mall 400 Commerce Avenue 127 Cardinal Drive Ext.
Washington, NC. 27889 Morehead City, NC 28557 Wilmington, NC 28405-3845
Phone 252-946.6481 Phone 252-808-2808 Phone 910-796-7215
NCDENR
North Carolina Department of Environment and Natural Resources
Division of coastal Management
Pat McCrory Braxton C. Davis John E. Skvarla, III
Governor Director Secretary
BUFFER AUTHORIZATION CERTIFICATE FOR SHORELINE STABILIZATION
A riparian buffer authorization is -required for shoreline stabilization activities within the Tar -Pamlico & Neuse River basins
per Division of Water Quality (DWQ) regulations 15A NCAC 0213.0259 & 0233. The Division of Coastal - Management
(DCM) through a Memorandum of Understanding with the Division of Water Quality (DWQ) has reviewed your project
proposal and has determined that the project as proposed complies with the aforementioned regulations.
Those activities covered'.by your Coastal Area Management Act (CAMA) permit have received Buffer Authorization as
long -as the project is constructed in a manner -that continues to meet all of the conditions listed below. Failure to comply
with this Buffer Authorization may subject the property'owner & the party (contractor) performing the construction ,&/or
land clearing to a civil penalty'by,DWQ of up to $25,000 per day per violation.
i. Impacts: Impacts to woody vegetation from clearing and filling in Zone 1 (begins at the most landward of -either
the -waters edge or the -coastal wetland line and extends 30 •feet -landward) -shall be minimized to what must be
impacted for the sound installation of the shoreline stabilization project. Unnecessary clearing and filling in the
'buffer is a violation of the riparian buffer rules.
2. Clearing. & Grading: --Clearing and grading of Zone 2 (begins at the landward -edge of•Zone 1 and extends 20 feet
landward) is allowed, provided that -it is re -vegetated immediately -and Zone 1- is- not compromised, which includes
maintaining diffused (non-charinelized) flow -of storm water runoff through the buffer.
3: Construction -Corridors: Construction corridors are_ allowed for shoreline stabilization projects, but they must be
satisfactorily restored as described in -condition 5 below.
4. Potential -Overwash:-For vertical shoreline stabilization projects (bulkheads) only; sites where Wave overwash is
expected to be severe, the first ten (10) feet landward (unless specifically authorized otherwise by DCM) from the
structure may be maintained as a stable lawn in order to provide for structural stability.
-5. Temporary Stabilization: Immediately post- construction, bare soils must be stabilized -as quickly as possible by
providing a temporary ground cover. Newly seeded areas should be protected with mulch and/or erosion matting.
This ground cover is a temporary measure used to address erosion until site -restoration can be -accomplished.
6. Site Restoration: At minimum, pre -project site conditions must.be re-established: A -site that was wooded prior to
this shoreline stabilization project must he restored With woody vegetation at a.stem density of 320 stems per
acre. Non wooded sites may be re-vegetated.with woody vegetation. Restoration must be completed by the first
subsequent- planting,season (November 1 through March 30) after completion. of the -bulkhead.
• Pre -project site conditions:
7. Project Drawing: The drawing on the CAMA General Permit is considered the -'project drawing of your property
- indicating the location of the shoreline stabilization structure and any associated clearing, grading, and
construction corridors. This drawing will be used to aid in compliance and monitoring efforts.
By -your signature below you agree to be held responsible for meeting all of the above listed conditions and verify that all
information is complete and -accurate.
Robe-4- sG 0-s-ur
Agent or Applicant Printed Name Permit Officer's Signature
Agent or Appli t Signature
CAMA GENERAL PERMIT #:
Issue -Date
Washington Office Morehead City Office Wilmington Office
943 Washington Square Mall 406 Commerce Avenue 127 Cardinal Drive Ext-
Washington, NC 27889 Morehead City, NC 28557 Wilmington, NC 28405-3845
Phone 252-946-6481 Phone 252-808-2808 910-796-7215
ra.
Adjacent Riparian Property Owner Statement
Pmpazrd by
�'�� B. F. Warren & Sons, Inc.
180 Taylor Farm Road, Belhaven NC 27810
Office (252)964-4628 Fax (252)964-6861
Freddy Mobile (252)945-4240 Forrest Mobile (252)945-2492
NC General Contractor License# 72600
www.ncpiers.com
I, the undersigned property owner, do hereby certify that I own property adjacent to Robert
Schafer's property located at 135 Terapin Road, Lot #25 of Sound Shores -on Man -Made Canal
for Sound Shores Subdivision (body of water), in Ocracoke, NC.
The applicant has described tome, as shown below, the development proposed at -the above
location. I understand that any construction, excluding bulkheads, must be set back a minimum
distance of fifteen feet (15') from my area of riparian access unless waived by me.
Please initial the appropriate blank, sign and date below.
I have no objection to the project as proposed but do not wish to waive the fifteen foot
(15) set back.
I have no objection to the project as proposed but do wish to waive the fifteen foot
(15')
setback.
I object to the project proposed.
Property -owner -signature----
Printed name - U 1 L L (k-f'L- '-
Address
Telephone number Ci -
Date ' 9 /)J/ L C I A
Description and / or Drawing of Proposed Development
Installation of Two hundred (200) feet of Vinyl Bulkhead
IT, f-00-0-RA"I
In
p 6
w TV fm- -, I""
VrWwPm
A on,
F (2 ,52 -A-6-29, Mp 5�6
'64 49 21 Awdapa, 94 -400
lllf� 25Z - -
ebm,(25 9-4 1
'12
-
N-0460 ffl I
4-.
T, *-Q
p
A,
dt S
-IR
�gml' ijA
katurs -bs, kdbs
ow YO-1
At-
0-04, a Ww-V-1, - 7,116-0-6
Vito
-A" w7iii
TAUMVid Nk
wl?&l'qm*wzl, Ap-r-
Or: r -MY -Not KV labllh-a '61) M-I i 4tu .6
ail
-116WWOO Xfthb ptustbd,
I
tsm wnsidgmdffi�'proj,' d- m6ri%ppy _OpW�t
d'r,, it H-gi
--ad v ._pn
A ,:vIt
dWi
hEituo bbfd*-Y.,.
atian
ow
t
-A
dice Rk
44m 4, MF
x. -9
.44
9 W
piaq flK, j-dj4g;'C`
u w,
Cc
6 A�
Mpg p
"pq ppp -d
411,
ttftum�p
Owu -
P, Z;7
o
Pam,
IV
V, rlf�5
ULM
R-l" _u I wt_ &S Ln
111W 17�1
B616
1 -7,- ZZ
aV=
2- ivy]
M, ',-1-1,
Amwea w lk-.- -rOL ,,
Ait
ddr
wo
FIC L9p Fptl�
IWOM
d(i ao
4WOOP"
NC Division of Coastal 7/9t. Habitat Impact Computer Sheet
Applicant: ka&r Seh G'`� -
Date: gcplp
General Permit #: ?-, -13
Describe below the HABITAT disturbances for the application. All values should match the name, and units of measurement
found in your Habitat code sheet.
Habitat Name
DISTURB TYPE
Choose One
TOTAL Sq. Ft.
(Applied for.
Disturbance total
includes any
anticipated
restoration or
temp impacts)
FINAL Sq. Ft.
(Anticipated final
disturbance.
Excludes any
restoration
and/or temp
impact amount)
TOTAL Feet
(Applied for.
Disturbance
total includes
any anticipated
restoration or
temp impacts)
FINAL Feet
(Anticipated final
disturbance.
Excludes any
restoration and/or
temp impact
amount)
Cl
Dredge ❑ Fillk Both ❑ Other ❑
Dredge Fill,� Both Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ ' Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
252-808-2808 :: 1-888-4RCOAST :: wwwmccoastalmanagement. net revised:02/03/10