Loading...
HomeMy WebLinkAbout63386_Replace 240' of exsting bulkhead_20181106ED�GIE-'&-,FILL 3 _.,d RAL PERMIT CNevv '- ❑Modification ❑Complete Reissue ❑Partial Reissue authorized by the State of North Carol ina,.Department of Environmental Quality a and the Coastal Resources Commission in an area of a .�vironmental concern pursuant to I SA NCAC_ i. Applicant Name � r�G�GI `� Project Location: 72 %, Previous ,permit// *. Date previous permit issued, County ' Address �o �' / /'Ci vy'/l �a/j //�/� Street Ad Tess/ SStta-t—e` Road/'L/o #(s) ' City �s�� State A Vzip /631/7 427' eL F; , Phone # E-Mail Subdivision Authorized Agent 1/1 G! �,o,-7r City Ol �GLO << U ���- ZIP El EW �� Affected 17lpPTA s PTS Phone # ( ) ~- River Basin Gil � AEC(s): ❑ OEA ❑ HHF ❑ IH ❑ UBA ❑ N/A ❑ PWS: ORW: yes./ c PNA yes / no Adj. Mr. Bod(Pat Iman unkn Closest Maj. Wtr. Body e FA MEN ■E■MMM■MMM MM■M M■M MM■ME MEMO:,■ M■ - E■EEO■MEOE■E■■M■■MM■M■■■MME■�EEMME■F�■E■■ _ . ... _ O■OMM■MCC.7■M■ME■■■/�'4!�OMMEM■[�. MO■■■■:MEMO MMOO■■M■!�'a■M■MMM�►ISM\�� IEEE■/INAMEME■■`OM■E •• - - ■■MOM■tilt'VM■■MOO■MM■■ME►��MM�iMMMMMMMMCOE■ MEMO■EEORMEE■E■{J■■■■■■■■■!'M■/JEMME■■■■EREM ■MOO■■O.■O■M■■h!�O■M■EEO■■■��E■E■MOM■MMO�■ ■■OM■�.rRIMMMEMENIMMMMEN l�1MO■■MOI�1■■■■■■ ..■■.�► OO■■Err■■■MOO M. MMMMMMMWIAMCWMMMEEEE E; INVAMENOW l Li%i�7%/cam Agents oorA,pplicaht Printed Name Signature Please ead/ �mpliance Went ent on back of permit A (IC ation Fee(s) Check # `Permitpfficersj rinted, me Signs ure ' L /� Q Issuing Date Expiration Date__ B. F. Warren & Sons, Inc. 180 Taylor Farm Road, Belhaven NC 27810 Office (252)964-4628 Fax (252)964-6861 Forrest cell (252)945-2492 Freddy cell (252)945-4240 NC General Contractor License #72600 www.ncniers.com Authorized Agent Consent Agreement To: State of North Carolina Department or Local Government Department from whom this permit is being applied for. -- I, the -undersigned property owner, do hereby authorize B.F. Warren -&-Sons INC. to act on my behalf -in obtaining the necessary permit/s for the below listed projects. I have contracted there services to perform the work permitted. This agreement is limited only to the specific activity of obtaining permits for the below specified projects. Projects: Installation of Two hundred (200) feet of Bulkhead Project location/ address: 135 Terapin Road, Lot #25 Sound Shores Ocracoke, NC Body of Water: Man-made Canal for Sound Shores Subdivision Property Owner Mailing Address: Robert Schafer 726 Tranquility Lane Lansdale, PA 19446 (215)699-0330 -Property Owner's Signature: Authorized Agent Signature: A Ot'a 4:.5V5 MODE '`iv North Carolina Department of Environment and Natural Resources Division of Coastal Management Pat' McCrory Bra -ion C. Da%As Govemor Director BUFFER AUTHORMAWN CERTHMCATE FOR PIER AND DOCKING FACILITIES ACCESSMAY John'E. Skvaria, III Secretary A riparian buffer authorization is required for pier and docking facilities access ways through the Tar Pamlico & Neuse River Riparian buffer per Division of Water Quality (DWQ) regulations 15A NCAC 028.0233 & .0259. The Division of Coastal Management (DCM), through a Memorandum of Understanding with the Division Of Water Quality" (DWQ) has'reAeWed your project proposal and has determined that the project -as proposed complies with the aforementioned regulations. Those activities covered by -your -Coastal Area Management Act (CAMA)- permit -have received Buffer Authorization as_fgng as the project -is constructed in a-mannerthat continues to meet all of the conditions listed below. Failure to comply with this, BufferAuthorization may subject the property owner & the party (contractor) performing the construction 81or"land- clearing- to a civil penalty by DWQ of up to $25,000 per day- per, violation. i. Crossing -is Perpendicular: Pier and docking"facility access way must cross the 50 ft. riparian, buffer- -perpendicularly '(which'is defined as between 75 and 1.05 degrees)" -unless othertirise apptoved -by DO W. The alignment shall minimize the removal of woody vegetation to the'greatest extent piracticable. 2. -Pervious Materials: All reasonable measures shall be, taken to ensure the access -way ismade of.pervious materials like open -slatted wood or composite, mulch, or grass to meet the intent,of"the-rules to the maximum extent practicable. 3. Access Width: The width of the pier or docking facility access way shall be limited to six (6) feet. 4. Project Drawing: The drawing on the CAMA General Permit is considered the project drawing of your property indicating the- relative location of the pier or docking facility and any requested access way. This drawing-wih be used to aid in compliance and monitoring efforts. a Pre -project site conditions: By your signature below you agree -to be held responsible for meeting all of th&conditions listed.above and verify that.all information provided is, complete and'accurate. Agent.or Applicant Printed-Nanne Permit t3fficer's,Signature r Agent or Appii t Signature LAMA GENERAL PERMIT;#: . 6 /f"/y1dk ..��(� Issue Date Washington Office Morehead City Office Wilmington Office 943_Washington Square Mall 400 Commerce Avenue 127 Cardinal Drive Ext. Washington, NC. 27889 Morehead City, NC 28557 Wilmington, NC 28405-3845 Phone 252-946.6481 Phone 252-808-2808 Phone 910-796-7215 NCDENR North Carolina Department of Environment and Natural Resources Division of coastal Management Pat McCrory Braxton C. Davis John E. Skvarla, III Governor Director Secretary BUFFER AUTHORIZATION CERTIFICATE FOR SHORELINE STABILIZATION A riparian buffer authorization is -required for shoreline stabilization activities within the Tar -Pamlico & Neuse River basins per Division of Water Quality (DWQ) regulations 15A NCAC 0213.0259 & 0233. The Division of Coastal - Management (DCM) through a Memorandum of Understanding with the Division of Water Quality (DWQ) has reviewed your project proposal and has determined that the project as proposed complies with the aforementioned regulations. Those activities covered'.by your Coastal Area Management Act (CAMA) permit have received Buffer Authorization as long -as the project is constructed in a manner -that continues to meet all of the conditions listed below. Failure to comply with this Buffer Authorization may subject the property'owner & the party (contractor) performing the construction ,&/or land clearing to a civil penalty'by,DWQ of up to $25,000 per day per violation. i. Impacts: Impacts to woody vegetation from clearing and filling in Zone 1 (begins at the most landward of -either the -waters edge or the -coastal wetland line and extends 30 •feet -landward) -shall be minimized to what must be impacted for the sound installation of the shoreline stabilization project. Unnecessary clearing and filling in the 'buffer is a violation of the riparian buffer rules. 2. Clearing. & Grading: --Clearing and grading of Zone 2 (begins at the landward -edge of•Zone 1 and extends 20 feet landward) is allowed, provided that -it is re -vegetated immediately -and Zone 1- is- not compromised, which includes maintaining diffused (non-charinelized) flow -of storm water runoff through the buffer. 3: Construction -Corridors: Construction corridors are_ allowed for shoreline stabilization projects, but they must be satisfactorily restored as described in -condition 5 below. 4. Potential -Overwash:-For vertical shoreline stabilization projects (bulkheads) only; sites where Wave overwash is expected to be severe, the first ten (10) feet landward (unless specifically authorized otherwise by DCM) from the structure may be maintained as a stable lawn in order to provide for structural stability. -5. Temporary Stabilization: Immediately post- construction, bare soils must be stabilized -as quickly as possible by providing a temporary ground cover. Newly seeded areas should be protected with mulch and/or erosion matting. This ground cover is a temporary measure used to address erosion until site -restoration can be -accomplished. 6. Site Restoration: At minimum, pre -project site conditions must.be re-established: A -site that was wooded prior to this shoreline stabilization project must he restored With woody vegetation at a.stem density of 320 stems per acre. Non wooded sites may be re-vegetated.with woody vegetation. Restoration must be completed by the first subsequent- planting,season (November 1 through March 30) after completion. of the -bulkhead. • Pre -project site conditions: 7. Project Drawing: The drawing on the CAMA General Permit is considered the -'project drawing of your property - indicating the location of the shoreline stabilization structure and any associated clearing, grading, and construction corridors. This drawing will be used to aid in compliance and monitoring efforts. By -your signature below you agree to be held responsible for meeting all of the above listed conditions and verify that all information is complete and -accurate. Robe-4- sG 0-s-ur Agent or Applicant Printed Name Permit Officer's Signature Agent or Appli t Signature CAMA GENERAL PERMIT #: Issue -Date Washington Office Morehead City Office Wilmington Office 943 Washington Square Mall 406 Commerce Avenue 127 Cardinal Drive Ext- Washington, NC 27889 Morehead City, NC 28557 Wilmington, NC 28405-3845 Phone 252-946-6481 Phone 252-808-2808 910-796-7215 ra. Adjacent Riparian Property Owner Statement Pmpazrd by �'�� B. F. Warren & Sons, Inc. 180 Taylor Farm Road, Belhaven NC 27810 Office (252)964-4628 Fax (252)964-6861 Freddy Mobile (252)945-4240 Forrest Mobile (252)945-2492 NC General Contractor License# 72600 www.ncpiers.com I, the undersigned property owner, do hereby certify that I own property adjacent to Robert Schafer's property located at 135 Terapin Road, Lot #25 of Sound Shores -on Man -Made Canal for Sound Shores Subdivision (body of water), in Ocracoke, NC. The applicant has described tome, as shown below, the development proposed at -the above location. I understand that any construction, excluding bulkheads, must be set back a minimum distance of fifteen feet (15') from my area of riparian access unless waived by me. Please initial the appropriate blank, sign and date below. I have no objection to the project as proposed but do not wish to waive the fifteen foot (15) set back. I have no objection to the project as proposed but do wish to waive the fifteen foot (15') setback. I object to the project proposed. Property -owner -signature---- Printed name - U 1 L L (k-f'L- '- Address Telephone number Ci - Date ' 9 /)J/ L C I A Description and / or Drawing of Proposed Development Installation of Two hundred (200) feet of Vinyl Bulkhead IT, f-00-0-RA"I In p 6 w TV fm- -, I"" VrWwPm A on, F (2 ,52 -A-6-29, Mp 5�6 '64 49 21 Awdapa, 94 -400 lllf� 25Z - - ebm,(25 9-4 1 '12 - N-0460 ffl I 4-. T, *-Q p A, dt S -IR �gml' ijA katurs -bs, kdbs ow YO-1 At- 0-04, a Ww-V-1, - 7,116-0-6 Vito -A" w7iii TAUMVid Nk wl?&l'qm*wzl, Ap-r- Or: r -MY -Not KV labllh-a '61) M-I i 4tu .6 ail -116WWOO Xfthb ptustbd, I tsm wnsidgmdffi�'proj,' d- m6ri%ppy _OpW�t d'r,, it H-gi --ad v ._pn A ,:vIt dWi hEituo bbfd*-Y.,. atian ow t -A dice Rk 44m 4, MF x. -9 .44 9 W piaq flK, j-dj4g;'C` u w, Cc 6 A� Mpg p "pq ppp -d 411, ttftum�p Owu - P, Z;7 o Pam, IV V, rlf�5 ULM R-l" _u I wt_ &S Ln 111W 17�1 B616 1 -7,- ZZ aV= 2- ivy] M, ',-1-1, Amwea w lk-.- -rOL ,, Ait ddr wo FIC L9p Fptl� IWOM d(i ao 4WOOP" NC Division of Coastal 7/9t. Habitat Impact Computer Sheet Applicant: ka&r Seh G'`� - Date: gcplp General Permit #: ?-, -13 Describe below the HABITAT disturbances for the application. All values should match the name, and units of measurement found in your Habitat code sheet. Habitat Name DISTURB TYPE Choose One TOTAL Sq. Ft. (Applied for. Disturbance total includes any anticipated restoration or temp impacts) FINAL Sq. Ft. (Anticipated final disturbance. Excludes any restoration and/or temp impact amount) TOTAL Feet (Applied for. Disturbance total includes any anticipated restoration or temp impacts) FINAL Feet (Anticipated final disturbance. Excludes any restoration and/or temp impact amount) Cl Dredge ❑ Fillk Both ❑ Other ❑ Dredge Fill,� Both Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ ' Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ 252-808-2808 :: 1-888-4RCOAST :: wwwmccoastalmanagement. net revised:02/03/10