The Bald Head Island Limited, LLC "INDIGO PLANTATION
MARINA.' experienced a failure along appx 90 to 1101f of the
concrete sheeet pile C Dock Bulkhead on Saturday, August 11,
2018. By Sunday Morning August 12, the dock and dock piles
were all that was holding up the failed section of wall. (Boats
have been removed to safer locations, electric has been turned
off to the power pedestals and area has been cordoned off.)
Repairs to be, in multiple steps, not necessarily in below order.
1. Emergency/Safety Repairs, possibly installing more
timber piles north/waterward of C-Dock to help dock hold
wall somewhat up while final plans are determined.
2. Excavator/Back-Hoe will be needed to access
south/landward side ol'wall to remove pressure from
backside. Note the tiebacks to cap are in place, so the
failure appears to be in the tieback to deadman
connection, or the deadmen have slipped.
3. C-Dock, From slip C-10 to End/C-15 and their associated
piles and finger piers to be removed from repair area.
4. Concrete Bulkhead Cap will need to be cut into multiple
handle -able sized pieces and removed.
s RE921a Bt7 5. Temporary Steel Sheet Pile most likely will need to be
installed landward of concrete bulkhead. Assumption is
that deadman restraint is non-existant, and new tiebacks
Mom rorw,,,, and deadmen will be needed.
6. To match existing wall, concrete sheet pile and new rebar
Infrared concrete cap to be installed, utilizing item 45
s B24 822 tic cks and deadmen and any additional per final
820 818 816 814 812 810 BB 96 64 e2 a gin ring.
71 media repair area is appx I of the length of the
.
REPAIR P -Dock Bu head. Entire length of C-Dock bulkhead to
• evaluate by engineer, especially for tiebacks and
ATION d
n 8. eamen, daze part of this exemption request.
lease not that r it land and a area is in wetland
mma — 'natin from the n sid equest the 20' strip
Cu c c9 es c7 c5 ca c3 c2 a
�. adjacen to the bulkhe considered same as the
c6 R e newer trained (19 Deep t Marina which has a
/ 20 tie ark maf nonce buffer. f 1985 Indigo Permit
did n have ch a clause.
ti^9 x2 q _
A 6aa
--------_. N 6 - SEAT-
MEAN HIGH WATER
2.9'
MTOBER. 1964
S
;; INDIGO PLANTATION
SUBDIVISION
MAF CABINET P, PAGE 2re
2 gy.
/ At
D. 8-11-18 Piles/Dock Holding Blkd
APPX LOCATION OF BULKEAD DREAK
Indigo Plantation Marina
CAMA 41-85
Repair Exemption Request Dwg
Bruce Marek, P.E.
5489 Eastwind Rd 11
Wilmington, NC 28403 C
910-799-9245 8-12-18