HomeMy WebLinkAbout63376_Replace 205 of Bulkhead 2' waterward of (damaged) existing withing basin, repalce back fill and riprap alon 110' of damaged shoulder_20181017'64MA �13REDGE ILL
No724
C
PERMT,l .4
ERAL', Previous bbrmit* iGEN
W3-7 (.q
e%v UM6difitation, Otp'imphate Reissue.'E] Partial Reissue Dateprevioius,pdrmit issued
As-autH6rizdd.`by1'th6-State of North Carolinia,'Department olLEnvironmental Quality—
and the Coastal
Resources Comm I ission in an area of environmental concern pursuant
rsuant to-ISA NCAC Q-7 ''-
P4Rules attached.
tae>;, PiAA-F�E Project Location: County- T�ry IZ�� A,
Applicant Naiin
Address - I i;:; Street,Addira'ss/ State Road[ Lot'#('s)
'Stated C. ZIP 2'"l R 0 4o I 1p jq
e
-2t t- 'qrl Y q `E-Mail Subdivision-
O�on # bdi'vision
ZIP,
Authorized Agent` V- Ci
��,A-" M71AA , ;-� 11
:L zA
kiver'"Basin i�, 1, e C? D,CW 'Os TS Phone# XEW
A' TA Affe�ted 0 HHF U -1 N/A
DOER 0 IHI El BA
AEC(s):' Adj. Wtr. Body "Rq" � I man /unk6i
Ef Pws:,
Closest Maj. Wtr. Body-
-QRW: yes,',no >-,- FiNA ye,6
A
pall
MENEM
MEN mommommm OEM mm�i mmommm IN■INS
M MENEM■ No
on MEN
u ea �ra■■■■.��r■■r
distAce offshore ' -7
:max , distan'c'e' offshore
�Basin,ch�nnel'
cubic yards',
Pat ramp
136athouse/'Boatiift
Bea7ch Bu`lido*�ing
th e
orelin(i Length 4-Z) Mi
�AV.'(C(�t7jjj�� yes':'rno-
Moratorium: n/a -5—
yes <:n,
to
A building'p ' ermit may be required
Note L cal Planning jurisdon)
Notest Special Conditions, LE5
OEM
—ME
jlfi■■■:�1�■■■■■■■�:�■"1�■i■■■
HEM=
No]
to■13M
NIP
MME0,0131M
I
INS
01
mWeRMIUMC
P
-8
BEN
WEEMMEMMEMEMMEMEMEM
MEMEMENEEMMEME
0
MOMMENOW
ON
wow
IN
INEMEM'".
No
11
EUMMUNIMMMMEMEN
13
MOMMOMMEMEMOMMINSIMMEN
Ems■om■■�■:■®■
IN
■
IO2MMMONIEW.
.M.MMMM
mi■Em's
No,
UUMMIRIMME
6
MEMO
MEN■0
0
ommmommmommmmm■MOM
MEMENEM
■®■C■■■■■..■■■....
■■■■■
NOME■MOMMEM
MEMMOMEME
EMMONS
0
ME
ME
17,11;
M
mom
11111
SOMEONE
IINMEIM
0
ai
ME
,:®:i:
:■�i:■:::i■:■�C:e�i:::■�■:P
1
11
b
T
s
t-�)
ote
on
back
regarding
River
--Basin
rules
1,5
AA
A--),-+-r
Ai
v-4�.
-0
L-A
A./
A p - ript nne-
gent-or,Ap liicantPH --Qd Na.
_8 sighatu4 14JPI alse read compliance statement on ba
Applicatioh Feels)
e—L L
PermitOfficer's Printed Name op
ck of permit" Signdure
-�j D,,6q-D f-2
Cr.
Check # Issuing Date Expiration Date',-
ROY COOPER
Governor
MIICHAEL S. REGAN
CoastalManggMent B RAXTON DAMS
stutiise%riiiE%itai atfi LFri' ' f}+rectQr
BUFFER AUTHORIZATION CERTIFICATE
FOR PIER AND DOCKING FACILITIES ACCESS WAY
A,riparian buffer authorization is required* for pier and docking facilities access ways through the Tar -'Pamlico &
Neuse River Riparian buffer per Division of Water Resources (DWR) regulations 15A NCAC 02B.0233.& .0259: The
Division of Coastal Management (DCM), through a Memorandum of Understanding with the Division of Water
Resources (DWR) has reviewed your project proposal and has determined that the project as proposed complies
with the aforementioned regulations.
Those activities covered by your Coastal Area Management Act (CAMA) permit have received Buffer Authorization
provided the project is constructed in a manner that.continues to meet'all of the conditions listed below. Failure to
comply with this Buffer Authorization- may subject the property owner and the party (contractor) performing the
construction and/or land -clearing to a civil penalty. by DWR of up to $25,000 per day per violation.
1. Crossing is Perpendicular: Pier and docking facility access way must cross the 50 ft. riparian -buffer
perpendicularly (which is defined as between 75 and 105 degrees) unless otherwise approved by DCM. The
alignment shall minirnize'the removal of woody vegetation to the greatest extent practicable.
2. Pervious Materials: All reasonable measures shall betaken to ensure the access way is made of pervious
materials like open -slatted wood or composite, mulch, or grass to meet the intent of the rules to the
maximum extent practicable.
3. Access Width: The width of the pier or docking facility access way shall be limited to six (6) feet.
4. Project Drawing: The drawing on the CAMA General Permit is considered the project drawing of your
property indicating the relative location of the pier or docking facility and any requested access way. This
drawing will be used to aid in compliance and monitoring efforts.
• Pre -project site conditions:
By your signature below you agree to be held responsible for meeting all of the conditions listed above and verify
that all information provided is complete and accurate.
OrFaeY C.
(ftent or A77YAAo5
it Printed Name Per leer's Signatur
-T--,3 �-� —z 1 <,< .
Ag'n# 4plibant Signature Issue Date
CAMA GENERAL PERMIT#: -`124 2 1:�-
State of North Carolina I Environmental Quality I coastalManagement
%fashindtor►Office 1943VVashingtonSquare Mall Waslidn9ton,NC278891252-946-6481
Wilmmgton Office 1 127 Cardinal Drive Ext. Wilmington NC 28405-3M 1 910-796-7215
Morehead City Office 1400 Commerce Avenue Morehead City, NC 28557 f 252-808-2808
ROY COOPER
Governor
MICHAEL S, REGAN
Secretary
CoastalManagement BRAXTON DAVIS
ENVIRONMENTAL OUALIiY Director
BUFFER AUTHORIZATION CERTIFICATE FOR SHORELINE STABILIZATION
A riparian buffer authorization is required for shoreline stabilization activities within the Neuse and Tar -Pamlico River
basins per Division of Water Resources (DWR) regulations 15A NCAC 02B: 0233 and 0259. The Division of Coastal
Management (DCM) through a Memorandum of Understanding with the Division of Water Resources (DWR) has
reviewed your project proposal and has determined that the project as proposed complies with, the aforementioned
regulations.
Those activities covered by your Coastal Area Management Act (CAMA) permit have received Buffer Authorization
provided the project is constructed in a manner that continues to meet all of the conditions listed below. Failure to
comply with this Buffer Authorization may subject the property owner and the party (contractor) performing the
construction and/or land clearing to a civil penalty by DWR of up to $25,000 per day per violation.
1. Impacts: Impacts to woody vegetation from clearing and filling in Zone 1(begins at the most'landward of either
normal water line (NWL) or normal high water line (NHWL) and extends 30 feet landward) shall be minimized to
what must be impacted for the,sound installation of the shoreline stabilization project. Unnecessary clearing and
filling in the buffer is a violation of the riparian buffer rules.
2. Clearing & Grading: Clearing and grading of Zone 2 (begins at the landward edge of Zone 1 and extends 20 feet
landward) is allowed provided that it is re -vegetated immediately and Zone 1 is not compromised, which includes
maintaining diffused (non-channelized) flow of storm water runoff through the buffer.
3, Construction Corridors: Construction corridors are allowed for shoreline stabilization projects, but they must be
satisfactorily restored as described in condition 5 below,
4. Potential Overwash: For vertical shoreline stabilization projects (bulkheads) only; sites where wave overwash is
expected to be severe, the first ten (10) feet landward (unless specifically authorized otherwise by DCM) from the
structure may be maintained as a stable lawn in order to provide for structural stability.
s. -Temporary Stabilization: Immediately post -construction, bare soils must be stabilized as quickly as possible by
providing a temporary ground cover. Newly seeded areas should be protected with mulch and/or erosion matting.
This ground cover is a temporary measure used to address erosion until site restoration can be accomplished.
6. Site Restoration: At minimum, pre -project site conditions must be re-established. A site that was wooded prior to
this shoreline stabilization project must be restored with woody vegetation at a stem density of 260 stems per acre.
Non wooded sites may be re -vegetated with woody vegetation. Restoration must be completed by the first
subsequent planting season (November 1 through March 30) after completion of the bulkhead.
• Pre -project site conditions:
7. Project Drawing: The drawing on the CAMA General Permit is considered.the project drawing of your property
indicating the location of the shoreline stabilization structure and any associated clearing, grading, and construction
corridors. This drawing will be used to aid in compliance and monitoring efforts.
By your signature below you agree to be held responsible for meeting all of the above listed conditions and verify that all
information is complete and accurate.
�ermv� C. R4Fss
ent pAliicant
Printed Name Per it gna
-
icant Signature Issue Date �—
CAMA GENERAL PERMIT #: 'L 4 7 S
State of North Carolina I Environmental Quality I Coastal Management
Washington Office 1943 Washington Square Mall Washington, NC 278891252-946-6481
Wilmington Office 1 127 Cardinal Drive Ext. Wilmington, NC 28405 38451 910-796-7215
Morehead City Office 1400 Commerce Avenue Morehead City, NC 28557 1 252-808-2808
Applicant:
Date: ,1 v e--r-- V
General Permit*
Describe below the HABITAT disturbances for the application. All values should match the name, and units of measurement
found in your Habitat code sheet
TOTAL Sq. Ft
FINAL Sq. Ft
TOTAL Feet
FINAL Feet `
(Applied for.
(Anticipated final
(Applied for.
(Anticipated final
DISTURB TYPE
Disturbance total
disturbance.
Disturbance
disturbance.
Habitat Name
Choose One
includes any
Excludes any
total includes
Excludes any
anticipated
restoration
any anticipated
restoration and/or
restoration or
and/or temp
restoration or
temp impact
temp impacts)
impact amount)
temp impacts)
amount
_
Si-t-OZGZ}
Dredge ❑ Fill ❑ Both ❑ Other CO,
(�ryoV
Dredge ❑ Fill ❑ Both ❑ Other ❑
I �z
1 p`.L� Z
y�
Dredge ❑ Fill ❑ Both ❑ Other ❑
g f�Z
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ .Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ F1110 Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑