HomeMy WebLinkAbout63022_Replace 50' of Bulkhead_20180808CAINAA DREDGE & FILL N 6.1-989 b,':
Iv -
PERMIT Previous permit # 1A
[�New OModification ' E]Co.mplete Reissue []Partial7keissueDate previous permit issued
As authoriz6d by the State of North Carolina, Department of Environment and Natural Resources
and the Coastal Resources Commission in an area of environmental concern pursuant to 15A NCAC
KI Rules attached.
Applicant Project Location: County r:>e avt-7 T:g�- L3 -
—
Address M
r Street Address/ State Road/ Lot #(s),
#16 07 Phone Subdivision rt-:,
H ��ent
==40MIN A.,
City ZIP
El CW ,;REW )KYTS Ve
Affected PTA )d1ES Phone # River Basin7AF, PrWx
AEC(s): E] OEA El HHF 01H El UBA 0 N/A Adi. Wtr. Body e3 —)2j tCna_t)/man /unkn)
0 PWS: El FQ
ORW: .-yes !� PNA, yes Crit.Hab. yes no Closest Maj. Wtr. Body
A
w pier(s)
NOMENEEMENEMOMMEENNEEME
MEN
EMEMENEEM
ilength
number
Vg aisfance OTTsnore
■■■■■■■■■■■■■■■■■■■■■�
max distance offshore
■�■■EE
■■■
M■■■EEM
,channel
cubic yards
■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■
jouse/ Boatlift
jBulldozing_
NOINEEMMEMEMENEM
ENE
MMENEEMEN
0
� r
■■■■■■■:■
:■ENES
'.
�NMAMM■■:EEM
0
A...
...
MENEEMEME
ADJACENT RIPARIAN PROPERTY OWNER STATEMENT
I hereby certify that 1 own property adjacent to ZAe, P—%L F C 's
l (Name of Property -Or)
property located at i? A�7�f�J�` ,�/l-
(Address, Lot, Block , oad; etc.)
on �G/G/yid , in , N.C.
(Waterbody) (City/Town and/or County). -
The applicant- has described to me, as shown below, the development proposed at the above
location.
I have no objection to this proposal.
I have objections to this proposal.
DESCRIPTION ANDIOR DRAINING OF PROPOSED DEVELOPMENT
pndividual proposing development must fill in description below of 808ch a site drawing)
WAIVER SECTION
I understand -that a pier, dock, mooring pilings, boat ramp, breakwater, boathouse, lift, or groin
must be set back a minimum distance of 15' from my area of riparian access unless waived by
me. (if you wish to waive the setback, you crust initial the appropriate blank below.) .
Ub
` el� I do wish to waive the 15' setback requirement.
I do not' -wish to waive the 15' setback requirement.
(Propert Owmer I fo ation) (Adjacent Properly Owner Information)
- e
S ture /tom Sipature*
Print or Type Name Print or Type Nam
Mailing Address Mai ng Address
City/SW60 OWState/Zi
Telephone ,Number/email address ' elephone Number/email address
'7-��-a�ri' --- 7 - Fr- /�-
Date Date'
(Revised Aug. 2014)
*Valid for one calendar year after signature*
ADJACENT RIPARIAN PROPERTY OWNER STATEMENT
I hereby certify that I own property adjacent to /dLLiyl� S� 's
(Name of Property ®wne�)
property located at�1�� �/.� �a I
(Address, Lot, Block, Road etc )
on ��Fi_ , in ,N.C.
(INaterbody) (CitylTown andior County);
The applicant has described to me, as shown below, the development proposed at the above
location. Y'
I have no objection to this proposal.
I have objections to this proposal.
DESCRIPTION AND/OR DRAWING OF PROPOSED DEVELOPMENT
pndividual proposing developmmept must fill in description below or aNsch a site drawing)
WAIVER SECTION
I understand that a pier, dock, mooring pilings, boat ramp, breakwater, boathouse, lift, or groin
must be set back a minimum distance of 15' from my area of riparian access unless waived by
me. (If ou wish to waive the setback, you must initial the appropriate blank below.)
.5' setback
I do wish to waive the 1 requirement.
Date
I do notWish to waive the 15' setback requirement.
*Valid for one calendar year after signature*
(Adjacent Property Owner Information)
1 t c� .�--
or
Date'
/ email address
(Revised Aug. 2014)
�a
Coastal Management
ENV IRONMENTAL QuALITY
ROY COOPER
. Governor
MICHAEL S. kEGAN
Secretary
BRAXTON DAVIS
Director
BUFFER AUTHORIZATION CERTIFICATE FOR SHORELINE STABILIZATION
A riparian buffer authorization is required for shoreline stabilization activities within the Neuse and Tar -Pamlico River
basins per Division of Water Resources (DWR) regulations 15A NCAC 02B. 0233 and 0259. The Division -of Coastal
Management (DCM) through a Memorandum of Understanding with the Division of Water Resources (DWR)-has
reviewed -your project proposal and has determined that the project as proposed complies with the aforementioned
regulations.
Those activities covered by your Coastal Area Management Act (CAMA) permit have received Buffer Authorization
provided the project is constructed in,a manner -that continues to meet all of the conditions listed below. Failure to
comply with this Buffer Authorization may subject the property owner and the party (contractor) performing the
construction and/or land clearing to a civil penalty by DWR of up to $25,000 per day per violation.
i. Impacts: Impacts to woody vegetation from clearing and filling in Zone.1(begins at the most landward of either
normal water line (NWL) or normal high water line (NHW L) and extends 30 feet landward) shall be minimized to
what must be impacted for the sound installation of the shoreline stabilization project. Unnecessary clearing and
filling in the buffer is a violation of the riparian buffer rules.
• 2. Clearing & Grading: Clearing and grading of Zone 2 (begins at the landward edge of Zone 1 and extends 20 feet
landward) is allowed provided that it is re -vegetated immediately and Zone 1 is not compromised, which includes
maintaining diffused (non-channelized) flow of storm water runoff through the buffer.
3. Construction Corridors:•Construction -co rridors are allowed for shoreline stabilization projects, but they must be
satisfactorily restored as described in condition 5 below.
4. Potential Overwash: For vertical shoreline stabilization projects (bulkheads) only; sites where wave overwash is
expected to be severe,.the first ten (10) feet landward (unless specifically authorized otherwlse by DCM) from the
structure may be maintained as a stable lawn in order to provide for structural -stability.
s. Temporary Stabilization: Immediately post- construction, bare soils must be stabilized as quickly as possible by
providing a temporary ground cover. Newly seeded areas should be protected with mulch and/or erosion matting.
This ground cover'is a temporary measure.used to address erosion until site restoration can be accomplished.
6. Site Restoration: At minimum, pre -project site conditions must be re-established: A site that was wooded prior to
this shoreline stabilization project must be restored with woody vegetation at stem density of 260 stems per acre.
Non wooded sites may be re -vegetated with woody_ vegetation. Restoration must be completed by the first
subsequent planting season (November 1 through March 30) after completion of the bulkhead.
Pre -project site cond
7. Project Drawing: The drawing on the CAMA General Permit is considered -the project drawing of your property
indicating the location of the shoreline stabilization structure and any associated clearing, grading, and construction
corridors. This drawing will be used to aid in compliance and monitoring efforts.
By your signature below you agree to be held responsible for meeting all of the above listed conditions and verify that all'
information is c:Ma
e and accurate. ,
o
4�entor
Applica rinted Name Perm' O ature(Ah to 11T Applicant Signature Issue Date
CAMA GENERAL PERMIT #:
State of North Carolina I Environmental Quality I Coastal Management
Washington Office 1943 Washington Square Mail Washington NC 278891252-946-6481
Wilmington Office 1 127 Cardinal Drive Ext. Wilmington, NC 28405 38451 910-796-7215
Morehead City Office 1400 Commerce Avenue Morehead City, NC 28557 1 252-808-2808
Applicant'`—it;,-,%X S 4::�4T2 1
Date: (-% u 7T- Z t
General Permit #:
` Describe below the HABITAT disturbances for the application. All values should match the name, and units of measurement
found in your Habitat code sheet.
TOTAL Sq. Ft
FINAL Sq. Ft
TOTAL Feet
FINAL Feet -
(Applied for.
(Anticipated final
(Applied for.
(Anticipated final
DISTURB TYPE
Disturbance total
disturbance.
Disturbance
disturbance.
Habitat Name
Choose One
includes any
Excludes any
total includes
Excludes any
anticipated
restoration
any anticipated
restoration and/or
restoration or
and/or temp
restoration or
temp impact
temp impacts)
impact amount)
temp impacts)
amount)
S 0 hue.,
Dredge ❑ Fill 21 Both ❑ Other
CEO k Z
d
LjI* f4�,V q:p
Dredge ❑ Fill ❑ Both ❑ Other
r+S
Dredge ❑ Fill ❑ Both ❑ Other f3
v
Dredge ❑ Fill ❑ Both • ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ 'Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑