Loading...
HomeMy WebLinkAboutRichard C. Harrell Jr, _ _„_ o-r,•:-Irv-r�rvfrj.tic'7TJ�+is7-g'r.�q, �w*,�•.y.-Rq....c.v...,--4.,q-..-.�aW—..sr7-,r�r-a..-, .. ....,- - - r-..grf�yr,�,.,�-,.x.�w-n,.. _. CERTIR-uATION OF EXEMP-i ION., FROM REQUIRING A CAMA PERMIT as authorized by the State of North Carolina, Department of Environment, Health, and Natural Resources and the Coastal Resources Commission f� in an area of environmental concern pursuant to 15 NCAC Subchapter 7K .0203. Applicant Name 1\) I IAj� C. �Iq�RIrLc TV: Phone Number City GAITESV ILLL State NC, Zip a7439 - Project Location (County State, Road, Water Body, etc.) S 21,4Dt P•nPAL , W)n1TbPJ , un) NAME f) cAAL Tn CA__ C9FF_1C and Dimensions of Project REGAL M), Uo69 1,46 WALL �AICk �_S �I� t$ e G1Al.t MU SIT Bf- KEFti'}cCD. The proposed project to be located and constructed as described above is hereby certified as exempt from the CAMA permit re- quirement pursuant to 15 NCAC 7K '.0203. This exemption to CAMA permit requirements does not alleviate the necessity of your obtaining any other State; Federal, or Local authorization. ibir-AD MP 96' IALYWAY,/Vf 6) AI BAcK5 Aef(I"- PCC f%i7 Tb Br WA11K "I IGN'I Yat`e "16 9X tFfU. This certification of exemption -from requiring a CAMA permit is valid for 90 days from the date of issuance. Following expiration, a re-examination of the project and project site may be'necessary to continue this certification. . SKETCH (SCALE: I� _#- ►I-,,_„�E�,_ti-�)-►-ti — -- �.�_t ii� I II-� _ I ►i' iP_I_hu�I� I" —-- — — -- — —fLJL i _ f CA')14C�(E( Any person who proceeds with a development without the con- sent of a CAMA official under the mistaken- assumption that the development is exempted, will be in violation of the CAMA if there is a subsequent determination that a permit was required for the development. , . . The applicant certifies by signing this exemption that (1) the ap- plicant has read and will abide by the -conditions of thisf exemp- tion, and (2) awritten statement has been obtained from adjacent landowners certifying -that they have no objections to the proposed work: Applican 's signature �f' CAMA Official's signature 3 AUIL Zeff�, Issuing date Expiration date Attachment: 15 North Carolina Administrative Code 7K .0203