HomeMy WebLinkAbout63009_Constuct 58 of Bulhea along flaffed alignment_20180813V�..
[5kcAMA /,E] DREDdt,& FILL.0.
T
GENERAL -:,-PER M Previous permit ,I A
-RINew ,E]Modifi'ca't'ioh'-.,.E]C"ofn'plete'-Reissue. -,,U]PArtial'Reissue Date previous. permit issued'
ina,;b;E�art
As a'uthoH7'e'd 6'�yth� State of Nor'tih Carol ment"of.-Enivironmental Quality
and the Coastal Resources Co-mr-hission in an-a'rea of environmental concern pUrsuant to 15A NCAC ro 0'
p,Rules,attached.
Project Lo�ation:. C'unty�
Applican'tName A-
0
.
Address Street Address/,State Road/t6t*(s),
7r 'a i
.-7 ,.q1ty- /A,/A ZIP
Phone* �'-Mail Subdivision
Authorized Agent City. WA�)J UJ ZIP- "2 -7 "s �R,
-Phone #,( �_'-;Rive`r-Basin, A-a--4-
ETCW 0 EW, • EIPTA ,DES PTS�
Affected
El OE,4 0 HHF El lH D'UBA 0 N/A ---T-4 —P- �)Z i L/-g2,L,_ (��at man'/unk'
AEC(s): Adj. Wtr. Body _n)
El - PWS:
yes /(PNA yes no Closest Maj. Wtr Body PA M L- I X o
n-o) /_)
MEMEMEMEMMEMMENEEMEM■EMME■MEMEMMEMMEME
■■■■■■■■■■■■■■■■■■■■■■■■■"■■■■■■■■■■■■■■■■
M
M.-M.
M. :4.
MENEM
M
MEMOMME
MENNEN
MMMOMMEME
'MMM
MEMM■
MEMMMEMMENOMMMM
EMEMEMMM
IN
MEMEMMEN
am-POTE!"T®ROMMEN
WOMMEMOMMias
ININ"MOMENS
M
�Iqml�� 250 46J4
Age
or t Applicant Printed f Name
or
Signature **Please riad compliance statement on back of permit"
Application Fee(s) Check#
/,1,) 1// ',
F-1
3
Issuing Date Expiration Date
I hereby certify that I own property adjacent to
property located at
on
in
and/or County)
's
N.C.
The applicant has described to me, as shown below, the development proposed at the above
location.
I have no objection to ;his proposal.
I have objections to this proposal.
DESCRIPTION AND/OR DRAWING Of PROPOSED DEVELOPMENT
• r
i
J
WAIVER SECTION
I. understand that a pier, dock, moor ng pilings, boat ramp, breakwater, boathouse, lift, or groin
must be set back a minimum distance of 15' from my -area of riparian access unless waived by
me. (If you wish to waive the setback, you must initial the appropriate blank below.)
!/ I do wish to waive the 15' setback requirement.
I do not wish to waive the 15' setback requirement.
(Property Owner Information)
(Adj cent Prope Ow er In
SG�
'a//11i Jgwlu'e
JX
Print of TyR"ame P " t or pe N me -lo_
Taffi?�n/�f7�'J �' G •� �%0� ili g Addre �
C' /3 ate C City/ to i
-`
Telephorke N tuber/�r�ail ddresjs Telep one Number/email address
�Vl.f� 0� C,C jC+ OG� � Gc or _ /
Date Date*
(Revised Aug. 2014)
"Valid for one calendar year after signature"
I hereby certify that I ownj property adjacent
pro pe located at
Address,
in _
(Wa er ody)
Property
etc.)
(City/Town an&or County)
N.C.
The applicant ha described to me, as shown below, the development proposed at the above
location.
I have no objection to this proposal.
I have objections to this proposal.
DESCRIPTION AND/OR DRAWING Of PROPOSED DEVELOPMENT
C J ( TJ / l A) }-7)�r`i
Se,v
LJ-
tE
WAIVER SECTION
I understand that a pier, dock, mooring pilings, boat ramp, breakwater, boathouse, lift, or groin
must be set back a minimum distance of 15' from my -area of riparian access unless waived by
me. (If you ish to waive the setback, you must initial the appropriate blank below.)
I do wish to waive the 15' setback requirement.
I do not wish to waive the 15' setback requirement.
(Property Owner Information)
/�"le
SGzJa
/56;- T>r>e a�
Mani g Address
lA/A& �'�J /(l ' C 27ub'i'
Telephone Number/?rrgaiddres�s
h ri `r 1 yGL O C, i CC uv�
Date
(Adjacent Property Owner
I
`�r�zgaLip%'
TelephoJr a N/r ►be/mail address
Date*
e31lilu
��-r�� �r
r
L.Pi V-e—
LC17F 7
(Revised Aug. 2014)
*Valid for one calendar year after signature*
ROY COOPER
Governor
MICHAEL S. REGAN
Secretary
Coastal Management BRAXTON DAVIS
ENVIRONMENTAL QUALITY Director
BUFFER AUTHORIZATION CERTIFICATE FOR SHORELINE STABILIZATION
A riparian buffer authorization is required for shoreline stabilization activities within the Neuse. and Tar -Pamlico River
basins per Division of Water Resources (DWR) regulations 15A NCAC 02B. 0233 and 0259. The Division of Coastal
Management (DCM) through a Memorandum of Understanding with the Division of Water Resources (DWR) has
reviewed your project proposal and has determined that the project as propose_ d complies with the aforementioned
regulations.
Those activities covered by your Coastal Area Management Act (CAMA) permit have received Buffer Authorization
provided.the project is constructed in -a manner that continues to meet all of the conditions listed below. Failure to
comply with this Buffer Authorization may subject the property owner and the party (contractor) performing the
construction and/.or land clearing to a civil penalty by-DWR of up to $25,000 per day per violation.
1. Impacts: Impacts to woody vegetation from clearing and filling in Zone 1(begins at the most landward of either
normal water line (NWL) or normal high water line (NHWL) and extends 30 feet landward) shall be minimized to
what must be impacted for the sound installation of the shoreline stabilization project. Unnecessary clearing and
filling in the buffer is a violation of the riparian buffer rules.
2. Clearing & Grading: Clearing and grading of Zone 2 (begins at the landward edge of Zone 1 and extends 20 feet
landward) is.allowed,provided that it is re -vegetated immediately and Zone 1 is not compromised, which includes
maintaining diffused (non-channelize'd) flow'of storm water runoff.tlirough the buffer.
3. Construction Corridors: Construction corridors are allowed for shoreline stabilization projects, but they must -be
satisfactorily restored as described in condition 5 below.
4. Potential Overwash: For vertical shoreline stabilization projects (bulkheads) only; sites where wave overwash is
expected to be severe, the first ten (10) feet landward (unless specifically authorized otherwise by DCM) from the
structure may be maintained as a stable lawn in order to provide for structural stability.
s. Temporary Stabilization: Immediately post- construction; bare soils must be stabilized as quickly as possible by
providing a temporary ground cover. Newly seeded areas should be protected with mulch and/or erosion matting.
This ground cover is a temporary measure used to address erosion until site restoration can be accomplished.
6. Site Restoration: At minimum, pre -project site conditions must be re-established. A site that was wooded prior to
this shoreline stabilization project must be restored with woody vegetation at a stem density of 260 stems per acre.
Non wooded sites may be re -vegetated with woody vegetation. Restoration must be completed by the first
subsequent planting season (November 1 through March 30) after completion of the bulkhead.
• Pre -project site conditions-
7. Project Drawing: The drawing on the CAMA General Permit is considered -the project drawing of your property
indicating the location of the shoreline stabilization structure and any associated clearing, grading, and construction
corridors. This drawing will be used to aid in compliance and monitoring efforts.
By your signature below you agree to be held responsible for meeting all of the above listed conditions and verify that all'
infor ati n is co ete and accurat .
n or pplicalft r- ed Na Pe �essl—gnatdlr&�)
gent or Applicant Signature Issue Date
CAMA GENERAL PERMIT #:-7 2 `t `
State of North Carolina I Environmental Quality I coastal Management
Washington Office 1943 Washington Square Mall Washington. NC 278891252-946-6481
Wilmington Office 1 127 Cardinal Drive Ext. Wilmington, NC 28405 3845 1910-796-7215
Morehead City Office 1400 Commerce Avenue Morehead City. NC 28557 1 252-808-2808
Applicant: W •Tea ARKS E'C> w U-9 =>�5
Date: 13 A -%A GL "Y '
-General Permit#:
Describe below the HABITAT disturbances for the application. All values should match the name, and units of measurement
found in your Habitat code sheet.
Habitat Name
DISTURB TYPE
Choose One
TOTAL Sq. Ft
(Applied for.
Disturbance total
includes any
anticipated
restoration or
temp impacts)
FINAL Sq. Ft.
(Anticipated final
disturbance.
Excludes any
restoration
and/or temp
impact amount)
TOTAL Feet
(Applied"for.
Disturbance
total includes
any anticipated
restoration or
temp impacts)
FINAL Feet -
(Anticipated final
disturbance.
Excludes any
restoration and/or
temp impact
amount
Dredge ❑ Fill ❑ Both ❑ Other
58 V-V
6.9 f-�t .
j t,10
Dredge ❑ Fill ❑ Both ❑ Other
9 Z.Q jz�,
91A r _
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑