HomeMy WebLinkAbout62648_Propose to Construct 84' of Bulkhead_20180605CAM / DREDGE &,FILL No 72115 N
.. .A B C p
!ew
NERAL PERMIT Previous permit.#��[ N❑Modification ❑Complete Reissue ❑Partial Reissue Date previous permit issued ,/1/%1'- .
As authorized by the State of North Carolina, Department of Environmental Quality %
and the Coastal Resources Commission in an area of environ7nental concern pursuant to 15A NCAC`��
Rules attached. "
Applicant Name (�� �i' Project Location: County�
Address fC Street Address/ State RoaAd4jot#(s)
2/,�Ciae4P ,) � lb7 c AX r '
Phone #9-0—) F-Mail Subdivision �d
Authorized Agent r City /ram ZIP o�
Affected ❑ CW %Ew )PTA �kES A PTS Phone # ( ) River Basin �
AEC(s): ❑ OEA ElHHF ❑ IH ElUBA El N/A Adj. Wtr. Body L �� nit . man/ unkn
❑ PWS:
ORW: yes /�f~io PNA yes/ no Closest Maj. Wtr. Body
Type, of Project/ Activity
Pier (dock) length
Fixed Platform(s)
Floating Platform(s)
Finger pier(s) �
Groin length
number /
gjkhead/.�iprap length
avg distance offshore,;.L
max distance offshore
Basin, channel
cubic yards
Boat ramp
Boathouse/ Boatlift
r
Beach Bulldozing "^—
Other
Shoreline Length
SAV- not sure yes no
Moratorium: n/a yes no
Photos: yes no
Waiver Attached: yes no
A building permit may be required by:
( Note Local Planning Jurisdiction)
Notes/ Special Conditions
Agent o Applicant Printed Name
Sign tur Please read co pliance statement on back of permit
�p ication Fee(s) Check #
See note oq-
�
' : '(Scale: //l , 2 � .. )
I
regarding, River Basin rules.
PermitO ficer's Pri ed Name
Signature
Issuing Date Expiration Date ,
ADJACENT RIPARIAN PROPERTY OWNER STATEMENT
I hereby certify that I own property adjacent to DA V I l C 66cr -"- ) -- dwou AA LU10&a:1s
(Name of Pro erty Owher)
property located at
�P-)S
(Address, Lot, Block, Road, etc.)
on lra t-�t �S�,e , y_ ��� , in , N. C.
(Waterbody) ity/Town and/or County)
The applicant has described to me, as shown below, the development proposed at the above
location.
I have no objection to this proposal.
I have objections to this proposal.
DESCRIPTION AND/OR DRAWING OF PROPOSED DEVELOPMENT
(Individual proposing development must fill in description below or attach a site drawing)
L(
-p ,` r
+6
WAIVER SECTION
I understand that a pier, dock, mooring pilings, breakwater, boathouse, lift, or groin must be set
back a minimum distance of 15' from my area of riparian access unless waived by me. (If you
wish to waive the setback, you must initial the appropriate blank below.) -
C-�l do wish to waive the 15' setback requirement.
I do not wish to waive the 15' setback requirement.
(Property Owner Information)
(Adjacent Property Owne Information)
Signature
f')8(1.� C LA
Signature
3�4/2 Z— Z-, 'e'Ae
Q 4 - &v e r�
Print or Type Name
Print or Type Name
Mailing Address
Mailing Address
lCsk -( Gr r.>
6,VC%'0/lJ�/��
City/st /Zip
1-1,3 6 a'l 9
City/Stat /dip
--)- 7
Telephone Number
Telephone Number
S2 Q
C9S,;2-9/-200
Date �9
Date
(Revised 611812012)
ADJACENT RIPARIAN PROPERTY OWNER STATEMENT
I hereby certify that I own property adjacent to i3AVid C f Ti. ov lu = L.As
(Name of Property Owner)
property located at 1111 -w 6-& PICA' -�s 12 O
(Address, Lot, Block, Road, etc.)
on )2 5=,,J,L x OA mht_ , in 1rI �j�e.(tr.c;rn , N.C.
(Waterbody) -' (City/Town and/or County)
The applicant has described to me, as shown below, the development proposed at the above
location.
I have no objection to this proposal.
I have objections to this proposal.
DESCRIPTION AND/OR DRAWING OF PROPOSED DEVELOPMENT
(individual proposing development must fill in description below or attach a site drawing)
tTc-I CAr 1014 �i K in K%:x. .4LcN� heA Pn'0&.-r--ry
i ri-
�7Gt 4 E—A 4 P-J ci t", J r_�f Air/ �A , (c o
WAIVER SECTION
I understand that a pier, dock, mooring pilings, breakwater, boathouse, lift, or groin must be set
back a minimum distance of 15' from my area of riparian access unless waived by me. (If you
wish to waive the setback, you must initial the appropriate blank below.)
I do wish to waive the 15' setback requirement.
I do. not wish to waive the 15' setback requirement.
Owner Info a,
co
% ,...
or_Type.
Mailing Address
Nv ,,- (tn� A( G
City _ ate.
Telephone Number
Date
=WPIN AMA
or
C' y/S at61z*
B.?-
elephone Number
Date
Informationy
(Revised 611812012)
Coastal Management
ENVIRONMENTAL QUALITY
ROY COOPER
Governor
MICHAEL S. REGAN
Secretary
BUFFER AUTHORIZATION CERTIFICATE FOR SHORELINE STABILIZATION
BRAXTON DAVIS
Director
A riparian buffer authorization is required for shoreline stabilization activities within the Neuse and Tar -Pamlico River
basins per Division of Water Resources (DWR) regulations 15A NCAC 02B. 0233 and 0259. The Division of Coastal
Management (DCM) through a Memorandum of Understanding with the Division of Water Resources (DWR) has
reviewed your project proposal and has determined that the project as proposed complies with the aforementioned
regulations.
Those activities covered by your Coastal Area Management Act (CAMA) permit have received Buffer Authorization
provided the project is constructed in a manner that continues to meet all of the conditions listed below. Failure to
comply with.this Buffer Authorization may subject the property owner and the party (contractor) performing the
construction and/or land clearing to a civil penalty by DWR of up to $25,000 per day per violation.
1. Impacts: Impacts to woody vegetation from clearing and filling in Zone 1(begins at the most landward of either
normal water line (NWL) or normal high water line (NHWL) and extends 30 feet landward) shall be minimized to
what must be impacted for the sound installation of the shoreline stabilization project. Unnecessary clearing and
filling in the buffer is a violation of the riparian buffer rules.
2. Clearing & Grading: Clearing and grading of Zone 2 (begins at the landward edge of Zone 1 and extends 20 feet
landward) is allowed provided that it is re -vegetated immediately and Zone 1 is not compromised, which includes
maintaining diffused (non-channelized) flow of storm water runoff through the buffer.,
3. Construction Corridors: Construction corridors are allowed for shoreline stabilization projects, but they must be
satisfactorily restored as described in condition 5 below.
4. Potential Overwash: For vertical shoreline stabilization projects (bulkheads) only; sites where wave overwash is
expected to be severe, the first ten (10) feet landward (unless specifically authorized otherwise by DCM) from the
structure may be maintained as a stable lawn in order to provide for structural stability.
s. Temporary Stabilization: Immediately post- construction, bare soils must be stabilized as quickly as possible by
providing a temporary ground cover. Newly seeded areas should be protected with mulch and/or erosion matting.
This ground cover is a temporary measure.used to address erosion until site restoration can be accomplished.
6. Site Restoration: At minimum, pre -project site conditions must be re-established. A site that was wooded prior to
this shoreline stabilization project must be restored with woody vegetation at a stem density of 260 stems per acre.
Non wooded sites may be re -vegetated with woody vegetation. Restoration must be completed by the first
subsequent planting season (November 1 througf� M Bch 30)-a ter cor�lpletion of the bulkhead.
Pre -project site conditions: �lclllilTG1- ��
7. Project Drawing: The drawing on the CAMA General Permit is considered the project drawing of your property
indicating the location of the shoreline stabilization structure and any associated clearing, grading, and construction
corridors. This drawing will be used to aid in compliance and monitoring efforts.
By your signature bel w you a ee to be held responsible for meeting all of the above listed con9ro9sand verify th
informatn is co p ete and ccurate.
Aggrtit,or Apolicant Pr' t9d Name ��_ Permit Officer's Sienaturea
Signature
GENERAL PERMIT #:
Issue
State of North Carolina I Environmental Quality I Coastal Management
Washington Office 1943 Washington Square Mail Washington, NC 278891252-946-6481
Wilmington Office 1 127 Cardinal Drive Ext. Wilmington, NC 28405-3845 1 910-796-7215
Morehead City Office 1 400 Commerce Avenue Morehead City, NC 28557 1 252-808-2808
NC Division of Coastal Mgt. Habitat Impact Computer Sheet
AppIicantJ5&/"d
Date: J'�T4"4'::-
General Permit #:�%��
Describe below the HABITAT disturbances for the application. All values should match the name, and units of measurement
found in your Habitat code sheet.
Habitat Name
DISTURB TYPE
Choose One
TOTAL Sq. Ft.
(Applied for.
Disturbance total
includes any
anticipated
restoration or
temp impacts)
FINAL Sq. Ft.
(Anticipated final
disturbance.
Excludes any
restoration
and/or temp
impact amount)
TOTAL Feet
(Applied for.
Disturbance
total includes
any anticipated
restoration or
temp impacts)
FINAL Feet
(Anticipated final
disturbance.
Excludes any
restoration and/or
temp "impact
amount)
Dredge ❑ Fill Both ❑ Other ❑
r
Dredge4 Fill,& Both Other ❑
;)4C2g2e0k
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
252-808-2808 :: 1-888-4RCOAS'T :: wwwmccoastalmanagement.net revised: 02/03/10