HomeMy WebLinkAboutIndigo Plantation/Bald Head Ltd. -�r-
CERTIFICATION OF EXEMPTION
FROM REQUIRING A CAMA PERMIT
as authorized by the State of North Carolina,
1,.. Department of Environment,Health,and Natural Resources and the Coastal Resources Comm sion
K-- in an area of environmental concern pursuant to 15 NCAC Subchapter 7 .0203. ,jK.
1 /1 j,
Applicant Name , , 4.1 A. '_.i .11 t 'G { /IC-Phone Number 9�a) i;tet t
Address h , et t- ,, ' Zip, � (Q�
City MR� .r(7A.i'li •
P eject L•catio .(Coon y State Road, .ter Body,etc.) Nle /1. et BMWt .
ki V L...r 1 w► -i /if • u. wigliiffriMPUBTAIMMA
Type a • Qi '�!e'ns, ns o Project • / a s it 0 OFIC1M rL"I i��IP
The proposed project to be located and constructed as described This certification of exemption from requiring a CAMA permit is
above is hereby certified as exempt from the CAMA permit re- valid for 90 days from the date of issuance.Following expiration.
quirement pursuant to 15 NCAC 7K .0203. This exemption to a re-examination of the project and project site may be necessary
I CAMA permit requirements does not alleviate the necessity of to continue this certification.
your obtaining any other State,Federal,or Local authorization.
I SKETCH (SCALE: #.47fr )
1
-A-, pdgur Gu o)k 41 604-/to-)tked i- _
�.c, ,hc � _ ' ltii.41t. ' Wiklel
.'
�
',Si X (vv 1:�t. 0 Yet.-/J 1,)-41
'ell? o ; ifil i`Ytc:,( 11: 4011 c_ANII6Q `�(.GC '4L)t otice k.
9
,4 L t t t� 6109 1 lel A, l4 d l 4-fit `Z ji 1
(31)' ilVtAlikivtit e_i euicv.).,--5 .. #74 nvz,itt4/04
11u) ' . 7 C 0" l l� (jL�i'f ittrf•t et.a-tf�
11 Iz, I ' IAL,, ;I.4 ),, i "
Any person who proceeds with a development without the con- /.f2'�.
sent of a CAMA official under the mistaken assumption that the ' ••is s n lure ,-----) / g'I3_Pi. air t9
I development is exempted,will be in violation of the CAMA if there 1
is a subsequent determination that a permit was required for the jMAtIP')
/left
development. A A1' s�gna ur$_
Thea applicant certifies by signing this exemption that(1)the a - �pp g 9 P P Issuing
plicant has road and will abide by the conditions of this oxemp-
lion,and(2)a writteneteiem ined-from adjeeent
iandownef _eertityingJbaL.ihay_have— Exp. ti.n dat•
•pre sed-work_'_'
Attachment: 15 North Carolina Administrative Code 7K.0203
:C „,C'o,rWs�y�pA5wr;��.�,n5.ry4,;Si0-K.^:;.o5e'-.v5,-4i, ;yv'.. ,rr .. ^ami A; :A0 .
CERTIFICATION OF EXEMPTION
FROM REQUIRING A CAMA PERMIT
as authorized by the State of North Carolina,
0 Department of Environment, Health, and Natural Resources and the Coastal Resource.s Commission
in'an area ki
of environmental concern pursuant to 15 NCAC Subchapter 7K.0203. ` ;�;..
Applicant Name 11 kA ) t{f t.ik Lt Phone Number _ _e__`_✓`�k
Address tU e� ,:
City _ t f 'i � . t . w 1 Zip t- (,L)
j Project Location.(County, State Road, Water Body, etc.) Gr 40-a,-,reYE;V - _, ...;, . Y-D V"\i1, y '''.V fj iia•
— Z•L k. A F
Type and Dimensions of Project ;,� �.c 110 . t.itl, ()t) ?met f,.. ti,ei : t.,"
�' t:, ;-1- 1 t pe is ,c;;. ....k.- ;r r• 1 i t�.1�.. • - 'S�
e< _
The proposed project to be located and constructed as described This certification of exemption from requiring a CAMA permit is
above is hereby certified as exempt from the CAMA permit re- valid for 90 days from the date of issuance. Following expiration,
quirement pursuant to 15 NCAC 7K .0203. This exemption to a re-examination of the project and project site may be necessary
CAMA permit requirements does not alleviate the necessity of to continue this certification.
your obtaining any other State, Federal, or Local authorization.
SKETCH (SCALE: 411 )
1
\l,1 d
44,...,.. / r /Ail))te A a,.4... h.f„-)t),,e.
1 gzi,_
, ,
i,..- ,. 4., ,, ,,,,ri .‘,„ ,-.4-1-i, \-74, t-&<Sit-i:‘4-'
A
/03'4 , frre- if —-Z.1 ,./ i 1 jOtt.r/z) 2.-; ,.
1 [ l
li: (01 1 i 11 e itA in/-\.„lif\A9 IM).11/ 4,A,e''' 46 il' '',›..e
Oth - YliA . A .,41 a. A'..' • •
,A- . t -� 1,..4: .J dpi r
tfltt,Pi
•'X_- '41.__ 1
141 ' 44%414 / ' "fin
f
Any person who proceeds with a development without the con- Y - ,.
sent of a CAMA official under the mistaken assumption that theApplicant's signature
development is exempted,will be in violation of the CAMA if there --V r
i; ., C v"--.°K.,....
is a subsequent determination that a permit was required for the r'
development. CAMA Official's signatur L
C:411';- //''A.). /
The applicant certifies by signing this exemption that (1)the ap- Issuing le
plicant has read and will abide by the conditions of this exemp-
tion,and(2)a written statement has been obtained from adjacent /.2,f
landowners certifying that they have no objections to the Exp' tion date
proposed work.
Attachment: 15 North Carolina Administrative Code 7K.0203
_ _..__._
Bruce Marek, P.E.
P.O. Box 3069
Bald Head Island, NC 28461
marekyd@ec.rr.com
August 12, 2018
Ms. Tara MacPherson
NCDEQ Division of Coastal Management
127 Cardinal Drive Extension
Wilmington, NC 28405
Re: Repair Exemption and/or Letter of Refinement Request, CAMA Permit #41-85 Indigo Plantation
Marina for repair of failed C-Dock concrete marina bulkhead
Dear Ms. MacPherson,
On behalf of Bald Head Island Limited, LLC, I am submitting this request for repair exemption and/or
letter of refinement to repair damage at their Indigo Plantation Marina, Southport, NC. I am including
5 color copies of 11"x17" drawing C-1, seal dated 8-12-18, showing pictures of the failed bulkhead
section, and its approximate length/location.
The harbormaster has already taken safety steps of relocating vessels from the affected area, turning
off of the power to the dock pedestals and cordoning off of the area. The failure occurred on
Saturday, August 11. By Sunday Morning August 12, there was dramatically more bulkead movement.
The C-Dock Docks and Dock Plies seemingly are all that is holding up the bulkhead from catastrophic
collapse. From the pictures, the exposed tiebacks still appear to be intact/in tension. With all of the
recent record rainfall, I believe that the tieback deadmen have been displaced, allowing the
concrete sheet pile wall to rotate and cause breakage/separation of the reinforced concrete cap.
Please note that we may have to take additional emergency measures prior to you processing this
request. As the structural guy, this is ugly. I can see having to temporarily add some timber piles,
quantity unknown, either between the failed bulkhead and the dock, or to the waterside of the dock
to help hold it to hold the bulkhead wall. Fortunately, the damage has/had not involved the marina
chamfer corner. Hopefully that remains the case. Closer inspection may indicate "issues" to the
corner or the entire length along C-Dock.
The NC Building Code in recent years has developed rules/regulations on tieback best practices. Any
new or additional deadmen will probably need to be appx 20' back from the bulkhead (i.e. 20' x 1 1/,"
diameter galvanized steel, sloped tiebacks). A permit condition of 41-85 is for no excavation or fill in a
wetland. The Indigo Marina Permit did not have the 20' maintenance/access buffer that our newer
1996 Deep Point Marina has for its entrance wetlands. I have shown a red hatched area appx 20'
wide from*the backside of the original bulkhead line on C-1. We may need 25'-30'to properly install
new deadmen and not drive over the tiebacks while straightening up the wall. Hopefully some or
most of the wall can be re-used, but being initially cautious, I am semi-preparing for new concrete
sheets, and definitely a new reinforced concrete cap. Steel sheet pile may be an intermediate step,
especially if a tropical storm or hurricane is predicted.
If you have any questions and/or comments, please call or text me at 910-228-2484 or send me an e-
mail. I will sign and pdf the exemption back to you once you have it prepared.
Respectfully, tttCAR04
Bruce Marek, P.E. r Z '•.� j
For Bald Head Island Limited, LLC ).-It SEAL •
� RECEIVED
cc: Bill Mack,BHI Planning&Development Dept. •f 1 4 �= DCM V\It M;NG7r N, NC
Ben Traynham,BHI Harbormaster
Chad Paul, CEO f
411,01
DAMES • ;-
r-. and Limited, LLC "INDIGO PLANTATION
iced a failure along appx 90 to 110 if of the
° ° OMH 'le C Dock Bulkhead on Saturday, August 11,
Morning August 12, the dock and dock piles
DOING BUILDING holding up the failed section of wall. (Boats
d to safer locations, electric has been turned
-dentals and area has been cordoned off.)
)1111:4F1
iultiple steps, not necessarily in below order.
Safety Repairs, possibly installing more
��,, north/waterward of C-Dock to help dock hold
, 41L A1lat up while final plans are determined.
IV!'
Sack-Hoe will be needed to access
iard side of wall to remove pressure from
.�� ote the tiebacks to cap are in place, so the
lrs to be in the tieback to deadman
t or the deadmen have slipped.
' D1 � m slip C-10 to End/C-15 and their associated
D2 ger piers to be removed from repair area.
lkhead Cap will need to be cut into multiple
D3 sized pieces and removed.
' Steel Sheet Pile most likely will need to be
/D4 dward of concrete bulkhead. Assumption is
•MN tn restraint is non-existant, and new tiebacks
05 n will be needed.
li D6 isting wall, concrete sheet pile and new rebar
�` S. ' )ncrete cap to be installed, utilizing item #5
D7 - INDIGO PLANTA1I
MARINA deadmen and any additional per final
`, •�
-�D8
3.4 ACRES apair area is appx i of the length of the
D9 ihead. Entire length of C-Dock bulkhead to
by engineer, especially for tiebacks and
0 30' id are part of this exemption request.
I I I I 1 6 hat pair land nd access area is in wetland
Dm th iver si e. Request the 20' strip
D10 he bulkh o be considered same as the
tted (1996 ep Point Marina which has a
nainten ce bu . The 1985 Indigo Permit
such clause. Si
li
A ..o- I ... (lito 0
' ;. a aye
INLET : ��
i A t-'4 'NO
1
I oo•IeEarth,
�J 111, ` V 'PX LOCATION OF BULKEAD BREr�l�/!iIM NIGTD
. , •N, NC
rtIndigo Plantation Marina
CAMA 41-85
A
z 1 epair Exemption Request Dwg
,,, - _ ce Marek, P.E.
89 Eastwind Rd C 1
' "'' _ w ilmington, NC 28403
g
A. 8-11 -18 3: 30 pm B. 8-12-10-799-9245 8-12-18