Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
62213_Drive 4 tie pilings for one slip_20170911
per Ada V� 'C-A-MATEIDREDGE&F C�jENiERAL PERMIT -Previd'uspermit * 11.-6111` OM6dification E]Complete,Reissu,6 IbPirtial Reissue Dke p�gvious pp�mi issued ailthdriied by the State of'North Carcilina, Department of Environment and Natural Resources andrktlie'Coastal Reiourcds Cornmiision in,a6 area of environmeht6l-concSA NCAC /4�)C).- concern pursuant to I JgRules attached.,' Project Location: Count -Applicant ,Name' 6-!f, y ;—J -P V Street'Addr6ss/, State Road/ Lot Address'. #(s) 4, City Z P k�--1 4 E-Mail SubdivisioState zip n Phone '�� Authorized Agent' City Te- e9 ZIP El CW A EW PTA El 0 ES, PTS Phone# River Basin Affected '. El OEA El HHF D 1H El UBA 0 N/A AEC(s): El P&� �-73L PNA yes 160) Adj. Wtr. Body441, _Znat unkn yes,/, ) T Closest Maj. Wtr. Body 1:■■NI■:::NNE■■ .�■..:.■N..�N:■:■N■■: MMNMMMMMMMMMMM MEMMINNIMMEMENNE It■00 ONN 00 ME NEE::■..:ME CNIUMEME F ■■■: M. M. mmmmm=mmmmmmm 1101111IMEMMEEMMEN■, M EMEMMEMEMEM MEMEMEMEMMEM■na", Mr.- HE MOMMEMEME MMMIINMMMMMMMMMMMMMM MMEME MEN • w MINNIMMINIMMIUME111 No IMUNIM MOM 9 NN101IMMEMEMME■im,■MENNEEMMENNE 0 mommommmmoommEgi.m EVANS [Sam NONE■:■:M:::::M■■■■:■■■■:■: w NMI 0 V C-A Agent orAp'plicant Printed' Name e P �i Officer's Pri6te ermtd�fj r Name , e,� -C • V Sigcompliance staterhe '6t on back of perm'l-i"SignaturePeaserq4'd Signature �96 s), theck dAppicatiopFeh'j q�su!qg Date :xoira!or. 4 , ,4 T V r A ® MC® NR North Carolina Department of Environment and natural Resources Division of Coastal Management Pat �ilcCrory 1 Donald R: van der Vaart Governor Secretary BUFFER AUTHORIZATION CERTIFICATE FOR PIER AND DOCKING FACILITIES ACCESS WAY A riparian buffer authorization is required for pier and docking facilities access ways through the Tar -Pamlico & Neuse River -Riparian buffer per Division of Water Resources (DWR) regulations 15A NCAC 02B.0233 & .0259. The Division of Coastal Management (DCM), through a Memorandum of Understanding with the Division of Water Resources (DWR) has reviewed your project proposal and has determined that the project as proposed complies with the aforementioned regulations. Those activities covered by your Coastal Area Management Act (CAMA) permit have received Buffer Authorization as long as the project is constructed in a manner that continues to meet all of the conditions listed below. Failure to comply with this Buffer Authorization may subject the property owner & the party (contractor) performing the construction Wor land clearing to a civil penalty by DWR of up to $25,000 per day per violation. 1. Crossing is Perpendicular: Pier and docking facility access way must cross the 50 ft. riparian buffer perpendicularly (which is defined as between 75 and 105 degrees) unless otherwise approved by DCM. The alignment shall minimize the removal of woody vegetation to the greatest extent practicable. 2. Pervious Materials: All reasonable measures shall be taken to ensure the access way is made of pervious materials like open -slatted wood or composite, mulch, or grass to meet the intent of the rules to the maximum extent practicable. 3. Access Width: The width of the pier or docking facility access way shall be limited to six (6) feet. 4. Project Drawing: The drawing on the CAMA General Permit is considered the project drawing of your property indicating the relative location of the pier or docking facility and any requested access way. This drawing will be used to aid in compliance and monitoring effortV • Pre -project site 1 By your signature below you agree to be held responsible for meeting all of the conditions ' e ove and verify that all information provided is complete and accurate. Agent or Applicant Printed Name Agent or Applicant Signature CAMA GENERAL PERMIT #: I/ Permit Officer's Signature Issue to Washington Office Morehead City Office Wilmington Office 943 Washington Square Mall 400 Commerce Avenue 127 Cardinal Drive Ext. Washington, NC 27889 Morehead City, NC 28557 Wilmington, NC 28405 3845 Phone 252-946-6481 Phone 252-808 2808 Phone 910-796-7215 An Equal Opportunity/Affumative Action Employer — 50% Recycled/10% Post Consumer Paper NIC Division off Coastal Mgt. ll Applicant: ' j Date: %/ �/ /77 General Permit #:��© Habitat Impact Computer Sheet Describe below the HABITAT disturbances for the application. All values should match the name, and units of measurement found in your Habitat code sheet. Habitat Name DISTURB,TYPE Choose One TOTAL Sq. Ft. (Applied for. Disturbance total includes any anticipated restoration or temp impacts).impact FINAL Sq. Ft. (Anticipated final disturbance. Excludes any restoration and/or temp amount) TOTAL Feet (Applied for. Disturbance total includes any anticipated restoration or temp impacts) FINAL Feet (Anticipated final disturbance. Excludes any restoration and/or temp impact amount) Dredge ❑ Fill ❑ Both ❑ Other ,[0-0-77 Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ 252-808-2808 :: 1-888-4RC®AST :: www.nccoastalmanagement.net revised:02/03/10