HomeMy WebLinkAbout62237_Replace Jetty_20171012Tli,i, J,!',',"'-,I,
7 M, I ". -,- ,
V.
C,
CAMAJ-0 DREDGE- &'0iLL-,
'.:E-NERAL"P'E,RM
-perrnit'#,'�,�, t IT, ,..':Pr6vious
,',New, E]Modificaiion,' []Corpldte Reistue,E]Partial Reissue -bat6'prevtous 06rffiii:issued
As aLithorized"by,the State of'N'o"rth Car6l'in'A', De"partmi'en't' o'f:En'vironment and Natural Resources.
o envj'ro'nm'enta condern -pursuant to 15A NCAC,
and the Coastal Rdsolurces' 'Commission' in, an . a�k
[N Ru
p �ca'n t pli Name Project Location
:'
.-Address. I A 4_Street'Addrdss/, State, Roa PLot #(s) 1� I
_d
ty P -D
b Stat,e zi 1-7Z
Phone Subdivision
-Authorded -Agent / e 14-g-=7 City:'F ZIP 2."2 43 DIC4
Affected,' -1 PTA 0 Cw ;1�'EIW [:1 ES 0 PTS Phone # River Basin) A P--?AM , 14-0
EJ &A 0 RHF El 1H L1 UBA 0 N/A
Adi. Wtr. Bodyr iA P1 W laCnat /!,an /unkn)
El PWS:
ORW: yes" GO
P yeno
' NA Closest Maj. Wtr. Body
-Type, of, Project/ A,;tiv'i -Z,4
Ila]
■■■■■■■■1■■■■■■■E■■0■■E■■■■■■■■■■■■■
ONE
MINE
IMMOMMEMEMEME
NOME
ON
MENIMMEN
MEN
MMMMMMMMMMMMMMMMMME■M
MMMKIMMMMMMMMMMM
MUM:
M
EMEMMOMME
M■
NONE
■■IUMIMM:IE
■M■M
■■■■■...■■...■
■■■■EMI■M■■■■■e■■■MM■■■■■■�■
..�:�.■...■■■.��.
■■������■■
■■..
N■■■■■MMNo
MMEM
No
MMMMMMMMIMI
ME
Ell
MMEE
MMMEM
ME
RUMMIMEME
e;
A
Yn,
VA plica Aje&lyPrinted Nar'n"'—,'-1-
P
P�i i 'd PerftOfker,i
_4
Signature
atu're
N 12-
w<
"4 "1
'x ppIicatiom ee'(s)'
hd&*
Is'sling Date�pratpn
,
Date,,/_,� Gp permits: �� 3 ct � -�
Date: � �
Describe below the HABrrAT disturbances far the appGcadan_. Ail -values should match the name, and uru'ts of measurement
found in your Habitat code sheet_
TOTAL Sq_ FL
FII�[AL Sq_ Ft
TOTAL Feet
FINAL Feet
(Applied for_
jAnflctpated final
(Applied faro
(Anticipated frW
Habitat Marna
OISTURS•TYPE
tisturbance total
disWrBanca
Oisttiibance
disturbance, ."
Choose One
includes any
Excludes any'
total includes '
Excludes any
anticipated
restaratfary
any anticipated.
restoration andlor
restoration or
andlar temp
restoratlaa or
temp impact
temp impacts)
im •act ainauat)
temp impacts)
amaunt)
SaM., Lu w
Dredge Q Fit Q Bath. Q Other
Dredge Q , Fill Q Haar Q Other Q
'
Dredge-Q- Filt Q Both Q Other ❑
Dredge Q M [[ Bath other [{
Oredde Q Fig Q. Gatti Q Other j]
`Q
I
' [
P?ae Q . ri . 5oih II Outer
_
1
Dredgs t ,-`Tit Bart ether Q
!
}
I(.
❑radde Q- trill C Bath i! Other [r
E
..
Dr>=dga Q itC ['. -atQ - Other t.=.i_-
I
�-
I
�mcge �: ui Eiath Q Other.
Doge l F ifi Q •3aih QOther fr'
'
Qr iaa Q �rC = dam .:;ther
Oreage t ; ' C. 3attf ; ,ther Q•
Qr>edge Q F•ill Q ' aath•Q' Othec. Q
0redgs Q , trill Q Bdth Q Other'El
-------------
�t ft _
NCD R
North Carolina Department of Environment and Natural Resources
Division of Coastal ManagementPat iVlcCro�/ Donald R. van der Vaar[
Governor
BUFFER AUTHORIZATION CERTIFICATE FOR SHORELINE STABILIZATION
A riparian buffer authorization'is required for shoreline stabilization activities within the Tar -Pamlico & Neuse River basins
per Division of Water Resources (DWR) regulations 15A NCAC 02B.0259 & 0233. The Division of coastal Management
(DCM) through a Memorandum of Understanding with the Division of Water Resources (DWR) has reviewed your project
proposal and has determined that the project as proposed complies with the aforementioned regulations.
Those activities covered by your Coastal Area Management Act (CAMA) permit have received Buffer Authorization as
long as the project is constructed in a manner that continues to meet all of the conditions listed below. Failure to comply
with this Buffer Authorization may subject the property owner & the party (contractor) performing the constructionVor
land clearing to a civil penalty by DWR of up to $25,000 per day per violation.
�. Impacts: Impacts to woody vegetation from clearing and filling in Zone 1 (begins at the most landward of either
the waters edge or the coastal wetland line and extends 30 feet landward) shall be minimized to what must be
impacted for the sound installation of the shoreline stabilization project. Unnecessary clearing and filling in the
buffer is a violation of the riparian buffer rules.
2. Clearing & Grading: Clearing and grading of Zone 2 (begins at the landward edge of Zone 1 and extends 20 feet
landward) is allowed -provided that it is re -vegetated immediately and Zone 1 is not compromised, which includes
maintaining diffused (non-channelized) flow of storm water runoff through the buffer.
3. Construction Corridors: Construction corridors are allowed for shoreline stabilization projects, but they must be
satisfactorily restored as described in condition 5 below.
4. Potential Overwash: For vertical shoreline stabilization projects (bulkheads) only; sites where wave overwash is
expected to be severe, the first ten (10) feet landward (unless specifically authorized otherwise by DCM) from the
structure may be maintained as a stable lawn in order to provide for structural stability.
s. Temporary Stabilization: Immediately post construction, bare soils must be stabilized as quickly as possible by
providing a temporary ground cover. Newly seeded areas should be protected with mulch and/or erosion matting.
This ground cover is a temporary measure used to address erosion until site restoration can be accomplished.
6. Site Restoration: At minimum, pre -project site conditions must be re-established. A site that was wooded prior to
this shoreline stabilization project must be restored with woody vegetation at a stem density of 320 stems per
acre. Non wooded sites may be re -vegetated with woody vegetation. Restoration must be completed by the first
subsequent planting season (November 1 through March 30) after completion of the bulkhead.
• Pre -project site conditions:,, ,
Project Drawing: The drawing on the CAMA General Permit is considered the project drawing of your property
indicating the location of the shoreline stabilization structure and 'any associated clearing, grading, and
construction corridors. This drawing will be used to aid in compliance and monitoring efforts.
By your signature below you agree to be held responsible for meeting all of the above listed conditions and verify that all
14formation is complete and accurate.
ppi ca Prin d N me ermit Office 's Signature
Applicant ignature Issue Date - -
CAMA GENERAL PERMIT #: !o--1 3 9 ec—
Washington Office Morehead City Office Wilmington Office -
943 Washington Square Mall 400 Commerce Avenue 127 Cardinal Drive Ext.
Washington, NC 27889 Morehead City, NC 28557 Wilmington, NC 28405-3845
Phone 252-946-6481 Phone 252-808 2808 910-796-7215
An Fnnal nnnnrhmifv/Affix ofnin Arnnn Fmnlnvcr