HomeMy WebLinkAbout62238_Replace Pier and T-Head platform_20171023` CAMA / ElDREDGE & FILL �G(G 2z� 8' N2706101 A 0 C - D
GENERAL- PERMIT Previous permit #4
Alew . ❑Modification ' ❑Complete Reissue ❑Partial Reissue Date previous permi( issued A. 44_
As authorized by the State of North Carolina, Department of Environmental Quality
and the Coastal Resources,Cd mmission in an ar a of environmental concern pursuant to 15A NCAC
JSRles ttached.
Applicant Name �(` V Gfn ✓iG /'°�!l%1 CLt�O Project Location: County f/A
Address /J C Stree ]dress/ State Road/ Lot #(s)
.City State ZIP
Phone # SubdivisiQrv�%%•-� 4��C
Authorized Agent Rzl_ 414104 CiZIP
Affected, ❑ CW p EW PTA s ❑ PTS Phone # ( ) River'Basin %� h
AEC(s): ElOEA � HHF ❑ IH ❑ UBA El N/A Adj. Wtr. Body //S (_ - _� na man unkn
❑ PW&
-ORW: yes / PNA yes 10 Closest Maj. Wtr. Body /_&k2
Type of Project/ Activity
AAllv --2, 7-� (Scale: /=�d
Pier L
Fixe
Float
Fing
Groi
i Bulk
Basil
Boat
Boat
Beac
Othi
Shor
SAV
Mo'
Phot
Waiv
■■■■■■■■■■■■■■■■■■■■■■■
■■■■■■■■■■■■■■■
■■■■■■■n■■■■■■■■■■■■■■■�i�■■■■■■■■■■■■■■■
r pier(s)
length
■■■
■■��n.���ia■■i�■■■■■■■�
MENNEEMEMENEEN
■■■■■�r�■r�r�■■■■■■■■it■■r�®i'i■■■■■■■■■■■■■■
number-
■■■■■■1�1L�L'J■■■■■■■■■�■■1■■i■■■■■■■■■■■■■■
avg
distance offshore
■■■■■■■■■■■■■■■■■■■1■■■:■■■■■■■■■■■■■■■■■
■
:■■■■■■■
■■■■■■■:�■■■max
■■■■■■■■■■■NNE
cubic yards
■■■■■ri■■■■■■■■■■■■
.■■■■r■■■■■■■■■■■■■■■
ramp
e■r�u■■■■■■■■■■■■■■■■t■■■■■■■■■■■■■■■■■■■■
■�I�A■■■1■■■riiililei■■■<J■■■[I■■■■■■■■■■■■■■■
�Mni�l�/■■�"������illltiik��L�ll�l�.■■����r�l�lli��■��■■■■
ww
i .
r
i
P'
c
G
•vfr
lineLe6_ 3r
■�iiii■�■■■■■■■■■�
■■■■®■■■■■■■■M�■■■
not sure
■■■■■■tl;�l■■■■N■■■■■■■■■■■■■■■■■�1■■l!�i■■■
yes
»o:■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■N■■O9■■
d.■■■■■■■■■■■■■■■■■■■■■■■■■■■■■`�■■A■■■■
A building permit may be required by:
(Note Local Planning Jurisdiction)
Notes�SPcial,C�ditions G
See note on Hack regarding.River Basin rules.
Name
Signature
App ication 1-ee(s) " I • , ' ."
Check #
Lul 3 c r' S / r< <
ig Date Expiration Vate
NC ®ivision of Coastal Mgt. Habitat Impact Computer Sheet
Applicant: GL/1� L/��lG,�J A/1 faso
Date: o13a13�7�
General Permit #: ?,f:6[ 0 —/8
'Describe below the HABITAT disturbances for the application. All values should match the name, and units of measurement
found in your Habitat code sheet.
Habitat Name
DISTURB TYPE
Choose One
TOTAL Sq. Ft.
(Applied for.
Disturbance total
includes any
anticipated
restoration or
temp impacts)
FINAL Sq. Ft.
(Anticipated final
disturbance.
Excludes any
restoration
and/or temp
impact amount)
TOTAL Feet
(Applied for.
Disturbance
total includes
any -anticipated
restoration or
temp impacts)
FINAL Feet
(Anticipated final
disturbance.
Excludes any
restoration and/or
temp impact
amount)
-
Dredge ❑ Fill ❑ Both ❑ Other,'
Ic-20'
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
252-808-2808 :: 1-888-4RCOAST :: www.nccoastaimanagement.net revised:02/03/10
Pat McCrory
Governor
A WJ
NCDNR
North Carolina Department of Environment and Natural Resources
Division of Coastal (Management
Donald R. van der Vaart
Secretary
BUFFER AUTHORIZATION CERTIFICATE
FOR PIER AND DOCKING FACILITIES ACCESS WAY
A riparian buffer authorization is required for pier and docking facilities access ways through the Tar -Pamlico &
Neuse River Riparian buffer per Division of Water Resourcesf(DWR) regulations 15A NCAC 02B.0233 & .0259. The
Division of Coastal Management (DCM), through a Memorandum of Understanding with the Division of Water
Resources (DWR) has -reviewed your project proposal and has determined that the project as proposed complies
with the aforementioned regulations.
Those activities covered by your Coastal Area Management Act (CAMA) permit have received Buffer Authorization
as long as the project is constructed in a manner that continues to meet all of the conditions listed below. Failure to
comply with this Buffer Authorization may subject the property owner & the party (contractor) performing the
construction Wor land clearing to a civil penalty by DWR of up to $25,000 per day per violation.
1. Crossing is Perpendicular: Pier and docking facility access way must cross the 50 ft. riparian buffer
perpendicularly (which is defined as between 75 and 105 degrees) unless otherwise approved by DCM. The
alignment shall minimize the removal of woody vegetation to the greatest extent practicable.
2. Pervious Materials: All reasonable measures shall be taken to ensure the access way is made of pervious
materials like open -slatted wood or composite, mulch, or grass to meet the intent of the rules to the
maximum extent practicable.
3. Access Width: The width of the pier or docking facility access way shall be limited to six (6) feet.
4. Project Drawing: The drawing on the CAMA General Permit is considered the project drawing of your
property indicating the relative location of the pier or docking facility and any requested access way. This
drawing will be used to aid in compliance and monitoring efforts.
• Pre -project site conditio
By your signature below you agree to be held responsible for meeting all of the co st "ov and verify
that all i orm on provided is complete and accurate.
'/0A117 �
Agent dApplicant Printed Name Permit Officer'Agnature
/ \ %4 60
Agent or Applicant Signature
CAMA GENERAL PERMIT #: l
Issue Date
Washington Office - Morehead City Office Wilmington Office
943 Washington Square Mall 400 Commerce Avenue 127 Cardinal Drive Ext.
Washington, NC 27889 Morehead City, NC 28557 Wilmington, NC 28405-3845
Phone 252-946-6481 Phone 252-808-2808 Phone 910-796-7215
An Equal Opportunity/Affirmative Action Employer— 50% Recycled/10% Post Consumer Paper
I hereby certify that I oum property adjacent to 4 JnA0Ve V 's
(Name of Property der)
property located at 21 To)op 144UM61 Ne o2 7F5slt3
(Address, dot, Block, Road, etc.)
on A(>NcFi o 2a-r in�1z.G'U F02? BOUNTY ill. G_
(Waterbody) (City/Town andlor County)
t he applicant has described to me, as shown below, the development proposed at the above
locatio
I have no objection to this proposal.
1 have objections to this proposal.
DE SCROPTIfON ANDIQR DRATIONG OF PROPOSED DEVELOPMENT
(individual proposing development must fill in descdpfion below or affach a site drawing)
fi�RL ACC i cS %�NCr p/rZ-%Z
!VIEW ja/rS�p . NfzuJ
YVA
rQJ.AJVER SECTOOK,
I understand that a pier; dock, mooring pilings, breakwater, boathouse, lift, or groin must -be set
back a minimum distance_ of 15' from my area of riparian access unless waived by me. (if you
wish to waive the setback, you must inifiBal the appropriate blank below.)
I do wish to waive the 15' setback requirement.
I do not wish to waive the 15' setback requirement.
(Property CWner Wormation) (Adjacent Property Owner Information)
Signature SI Cit7li'e
W9-S Yd Y f- c57rp/,/0V nW ANCUSS
Print or Type Name
Ql /n PPr C-7 _(A6 -
Mailing Address
(& C. h-I/u WF.^J /V C. o` 79/ 0
Citylstatemp
nz,5�g 9,64 ,qgi 9r
Telephone Number
ae'ye- W . of AA/
Print or Type Name
Mailing Address
City/State/Zip
z.f2 - 9G N - 'Y b 7
Telephone Number
/O - /3_- / 7
Date
Date
/Ravirnr! (./4R/7n-roe
mir-AXMW PROPERTY OWNER STATEMENT
I hereby certify that 1 ovum property adjacent to��20��1
s
(Mame of Property Owner)
property located at - 9! inpp/�rly .�nd/� rlgl�„r� !�!� o27�slt�
(Address, I oS, Block, Road, etc.)
on in _ Ar7A _Fo27- COUNT y , N.G_
(Waterbody) (City/Town andfor County)
The applicant has described to me, as shown below, the development proposed -at the above
location.
1 have no objection to this proposal:
l have objections to this proposal.
DESCPJPTIOM AND/OR D AMING OF PROPOSED DEVELOPMENT
(%divioluaf proposing development must Nil in descdiadon below or arch a site drawing)
4A//7/f NSW io!! a IVJ�UJ
YY.m L Qc w.®Y,
3€ aECTRO1
I understand that a pier, dock, mooring pilings, breakwater, boathouse, lift, or groin must -be set
back a minimum distance_ of 15' from my area of riparian access unless waived by me- (if you
wish to waive the setback, you must initial the appropriate blank below.)
I- do wish to waive the 15' setback recwirement.
I do not wish to waive the 15' setback requirement -
(Property Owner lnfforM- ation) (Adjacent Property Owner lnformataon) -r-
c
Si tu;-e —
Si lure '�
1XV- 74 Y ¢ 6 /_T_/,/4 - V /W AN CUS0 _ I W1 � � h y A �I J � G M
Print or Type Name Print or Tvoe Name
91 70PPi V&? C.A&C
Mailing Address
(-I(_M ^VrFIV AIC_ 627r410
CitylStatelzip
r9,5.;2 %4 2.91 S
Telephone Number
Date
lRaviccrf /,/4R/7nen,