HomeMy WebLinkAbout70609_Pier, L-Head Platform and uncovered boatlift_20171114;7 aa
AIVIIA, _E' G N270609
I DREDGE &,FILL A D
PERMIT Previous permit#
GENERAL
New
EiModificat'ion F-1 Complete Reissue El Partial Reissue Date previous permit issued �q
As authorized by the State -of. North Carolina, Department of Environmental Quality
and the Coastal Resources Commission in an area of environmental concern pursuant to I SA NCAC
X Rules attached.
,Appfican't'Name 1A__1L)1_14_97_21;1N)
Address
City_,_ Stated6 ZIP -;��,21-1�-
--Phone E-Mail
.-Adthorized Agent
EJ CW' 0 EW PTA .[I ES ;RrTS
(s
�Jfectecl, . _s
AEC '� -, El OEA El HHF D [H El UBA [I N/A
)_
10 Pws:
ORW:- yes (� �no ONA yes /, �no
Project Location: County, --'-?-),FA f' -FXzzT- fz> -/-7-
Street Address/ State Road/ Lot #(s) oFi s-la 13 y
42-
Subdivision
City ZIP -K-
Phone # River Basin I �-Pw� �i_l e
Adj. Wtr. Body/:5,Z &�3 F '<f-_na_t_J,'man /unkn)
Closest Maj. Wtr. Body
Type of Prc!ject/ Activity , ,9 Y 6:, P /G 2 r X
3 b,:) (Scale:
Pier
Fixer
Flow
Fing(
Groi
Bulk
Basir
Boat
Boat
'Othf
S I I
SAV
Mor
PhC;1
Wan
ng Pli■
,itform�(s)
r pie'r
NEED■■■■■
i,.le6g th'
■:�
■
'
�==WE
SEEN
MEMO
number
�ead/, R ipraP length
ayg d istance offshore
loom
I
max distance offshore
SEEN■
ME
I
_?
INIM
E
,,channel
_1ENOWENNE
NONNNEEMEA"Emm
M
U
NNNN
I
NEON
muMENU
g
OWEENEEffi—
NW
WENSEENNE■NOON
eub.ic,yards
ram V
�ous 6oatlift
MOSES■
i Bulldozing
E
SUN
r
fline,Le h -
S e
yes
torium: n/a yes Cr-
SI■■■■■MEN
ENE
s
■NMMONE
NEE
NEMENIN
_15,
EMMUN
EW
A building p6rmit may be required by-r-1-0 —I �� f'A' XLSee note on back regarding River Basin rules.
Note LocalTlanning-JUriscliction)
Sped I allConditi6.fi.s'
Az 12- 0,5 EOL )--S 4/4,-
1/ IIC) Z:7( j 71=>R '-Y
Agent
i orApplicant Printed Name.
-'Signature flease read compliance statement on back of permit
Application Fee(s) Check#
Name 7:
Issuing Date Expiration Date
• . ^ �- JaMy#—'�5:1 .f'•c�'•1S i^—.C`s�7G �Kv V :lvl -yin f� 4�iLW'$ L �y.�� {jtl f yam..}
Applicartt La1at S�Lvrt-c��
Psrmtt`
Date: s ^7 0 0 9
�0v. Zd]�
Describe 6efowthe HABfTAT disturbances far the appCcaiiart_. Ail•value-s shauld match the name, and urufts-of measurement
found in your Habffat code sheet
TOTAL 5q_ Ft
PjNAL 9qr Ft
TOTAL Feet
FINAL Feet
(Applied for
(Anadpated final
(Appliad foa
(Anticipated bW
Habifaf 1<tarrte
DISTURS YPE
Ofsturbance total
disturbance
Distd�bance
disturbance,
.'
Chaase One
includes any
Excludes arnf
total includes
Wudes any
anticipated
re�tj-4fiorr
any anticipated
restorafion andfor
restoration or
andlar femp
restoration ar
temp impact
temp inipacfs)
impact amount)
tenp impacts)
amaud)
Dredge Q Fill [j Bath. Q Other
,-2
Gmdge Q . Fill Q Bath Cf other Q
„Oredge-El• Fill Q Bath Q Other Q
Dredge Q Fill [[ Both Q other Q
Uredde Q Fill C1 Boat Q other Q
I
' I
❑redge'Q . ri Q Seib F�) Other Q
,
Uredg✓ ! FF"Iit r Baft !_I Other
I•
I.
Dredge Q- riff Q Path t! Other
1 I
Dredge-Q ;sir ['. Bata Q - Other CI
(-
C '$Rift Other.
I 4'
I
Oreage rut Q Q Q(
t
�
f•
f
I
(Dl�sige
[ FillQ: Hat
• '
Oreeiga :_ ; =pit '•_ ; Bata � •:,�c"ter '
.
Dredge t-; =.tf'Q• 3X th' � :,then Q i
Q' c�,ther' Q'
--
dredge Q F~•-III Q ' 8ath�Q' Otttec Q �
I
•• .
I .
Qredge Q , 1=zii Q Hatft Q "Other*
f
TOWN OF BATH
BOOKNO." 77
APPLICATION-FOR:'-BUILDINd-PEMIT- -,--ZONING,.C-OhgLMNM�CMRTRICATB--."-
OWNE
R
CONTRACTOR, ..
DESIGNER
N
SURVEYOR
ELECTRICAL -- ----- -
PLUMBING
LIMA QE IMBOAMN-am
NEW ADDITION ALTERATION: INSIDE REPAM INSIDE - MOVE.()
OUTSIDE O OUTSIDE -LOCATE (-)
Lot No. Block No. Building located at
between and Strew. Building to be used as
,Type contraction"
Number of off street parking spacesContains ~ rooms and
Total square feet of building Electric sa i
tW,plumbta &. 10*CW
01L
Walls. Ceiling Windows: Storm Thermal How many exterior
doors Water heater. Gas Electric Other
Roof ventilation: Gable( ) Eaves() Louvers() Other Ventilation,
crawlspace, number feet apart . Height of crawlspace under house: 18" ( ) 24?'( ) outer
Zone Water and Sower Tap: Paid( ) N/A( ) Stw_water tap
_____,
Size sewer tap Total Estimated Cost Flood elevation__`__,;
(over)
George,
You may have already received the Riparian statements from our neighbors for our bulkhead/dock
work. The lot owned by Lori Weatherington has been sold and the transaction was completed on
Monday, Sept filth. This owner statement should be replaced with the this one from Daryl Morris, the
new owner.
Let me know if you have any questions
Lewis
AGENT AUTHORIZATION FOR CAMA PERMIT APPLICATION
Name of Property Owner Requesting Permit:
Mailing Address:
Phone Number:
Email Address:
4045 9st St
Farmville, HC 27828
252.228.0222
Jack Lewis Yelverton Jr. l Letecia Strickland Yelverton
jacklyelverton@gmail.com
I certify that I have authorized George Linton (Linton Marine Construction)
Agent / Contractor
to act on my behalf, for the purpose of applying for and obtaining all CAMA permits
necessary for the following proposed development:
at my property located at Lot #3 Glebe Creek Landing
in Beaurort , County.
Bulkhead / Dock / Boat Lift
I furthermore certify that I am authorized to grant, and do in fact grant permission to
Division of Coastal Management staff, the Local Permit Officer and their agents to enter
on the aforementioned lands in connection with evaluating information related to this
permit application.
Property Owner Information:
Sign re
Jack Lewis Yelverton Jr. f Letecia Strickland Yelverton
Print or Type Name
Title
08 / 25 / 2017
Date
This certification is valid through I I
1 i...l,711 1.Kidl _ • .110---
I hereby certify that I own property adjacent to .lack Lewis Yelveiton Jr. / Letecia Strickland Yelverton 'S
(Name of Property Owner)
property located at Lot #3 Glebe Creek Landing
(Address, Lot, Block, Road, etc.)
on- Glebe Creek , in Bath , N.C.
(Waterbody) (City/Town and/or County)
The applicant has described to me, as shown below, the development proposed at the above
locatio .
o1 DL I have no objection to this proposal.
I have objections to this proposal.
DESCRIPTION AND/OR DRAWING OF PROPOSED DEVELOPMENT
- Approximately 150' of Vinyl Bulkhead
- 40' Dock with I Vx20' Platform to Right
- Boat Lift to Left of Dock
WAIVER SECTION
I understand that a pier, dock, mooring pilings, boat ramp, breakwater, boathouse, lift, or groin
must be set back a minimum distance of 15' from my area of riparian access unless waived by
me. (If you wish to waive the setback, you must initial the appropriate blank below_)
" I do wish to waive the '15' setback requirement.
U� I do not wish to waive the '15' setback requirement.
(Property Owner Information)
Signatilre
5
Print or Type Name
Mailing Address
City/State/Zip
wa_ -C
Telephone Number/email address
Date
(Adjacent
Print or
■rui.rar
`(l`o5
Information)
Mail ng Address '
�-e�d���P W 27,13E
City/Statwip
91g _T6 51-ns-�
Telephone Number / email address
q I V 17 '
Date *
(Revised Ana 2014)
CERTIFIED MAIL - RETURN RECEIPT REQUESTED
DIVISION OF' COASTAL MANAGEMENT
ADJACENT RIPARIAN PROPERTY OWNER NOTIFICATIONMAIVER FORM
Name of Property Owner: Jack Lewis Yelverton Jr. / Letecia Strickland Yelverton
Address of Property: Lot 43 Glebe Creek Landing
(Lot or Street #, Street or Road, City & County)
Agent's Name #: George Linton
Agent's phone #: 252.923.6191 /252.943.7154
Mailing Address: 4229 HWf 92e
Bath, HC 27808
I hereby certify that I own property adjacent to the above referenced property. The individual
applying for this permit has described to me as shown on the attached drawin-g the development
they are proposing. �"descnp`trap ocdrawin�c� vntka dimensions: initst 6! VViddd& t vithiss�etten.
_ I have no objections to this proposal. I have objections to this proposal.
if you have objections to what is being proposed, you must notify the Division of Coastal Management
(DCM) in writing within 10 days of receipt of this notice., Contact information for DCM offices is
available at http://www.nccoastalmanacement.net(web/cm/staff-listing orby calling 1-888-4RCOAST.
'No response is considered the same as no objection if you have been notified by Certified Mail.
WAIVER SECTION
1 understand that a pier, dock, mooring pilings, boat ramp, breakwater, boathouse, or lift must -
be set back a minimum distance of 15' from my area of riparian access unless waived by me_ (If
you wish to waive the setback, you must initial the appropriate blank below.)
b I do wish to waive the 15' setback requirement.
do not wish to,waive the 15' setback requirement.
(Property Owner Information) (Riparian Property Owner Information)
Signature Sign tur•e
Jack Lewis Yelverton Jr. / Letecia Strickland Yelverton
Print or Type Name
40451st St
Mailing Address
Farmville, HC 27828
City/State&ip
252.228.0222
Telephone Numberl Email Address
08/252017
Date
Douglas Harold Cushing / Martha Cushing
Print or Type Name
121 Glebe Creek Landing RD
Mailing Address
Bath, HC 27808
City/StatelZip
252.923.0292
Telephone Number/Email Address
Date
(Revised Aug. 2014)
CERTIFIED MAIL • RETURN RECEIPT REQUESTED
DIVISION OF COASTAL MANAGEMENT
ADJACENT RIPARIAN PROPERTY OWNER NOTIFICATIONIWAIVER FORM
Name of Property Owner: Jack Lewis Yelverton Jr.1 Letecia Strickland Yelverton
Address of Property: Lot Glebe Creek Landing
(Lot or Street #, Street or Road, City & County)
Agent's Name n: George Linton
Agent's phone 4- 252.923.61911252.943.7154
Mailing Address: 4229111NY 92E
Bath, HC 27808
I hereby certify that I own property adjacent to the above referenced property. The individual
applying for this permit has described to me as shown on the attached drag the dement
they are proposing. Arldes`cnppon(oroarawinc) -.-mustrbe^proVtdedtwitil als lettei.
I have no objections to this proposal. I have objections to this proposal.
If you have objections to what is being proposed, you must notify the Division of Coastal Management
(DCM) in writing within 10 days of receipt of this notice. Contact information for DCM offices is
available at http.1/www.nccoastalmanaaement.net/web/cm/staff-listing orby calling 1-888-4RCDAST.
No response is considered the same as no objection if you have been notified by Certified Mail.
WAIVER SECTION
I understand that a pier, dock, mooring pilings, boat ramp, breakwater, boathouse, or lift must
be set back a minimum distance of 15' from my area of riparian access unless waived by me. (If
you wish to waive the setback, you must initial the appropriate blank below.)
I do wish to waive the '15' setback requirement.
I do not wish to waive the 15' setback requirement.
(Property Owner Inform tion) ('paripn P%jro erty Owner Information)
•
S'ignattrr . Signature
Jack Lewis Yelverton Jr. J Letecia Strickland Yelverton
Print or Type Name
40451 st St
Mailing Address
Farmville, HC 27828
City/StateOp
252.228.0222
Telephone Number/Email Address
08125/2017
Date
Lori C. Weatherington
Print or Type Name
100 VAlliamsburg Road
Mailing Address
Washington, HC 27889
City/State/Zip
252.975.2133
Telephone Number/Email Address
Date
(Revised Aug. 2014)
Lot #3 Glebe Creek Landing Proposed Development
-Approximately 150' of Vinyl Bulkhead
- 40' Dock with 11'x20' Platform to Right
- Boat Lift to Left of Dock
N540-55 -30"W
06W 121. 00 ,
ga _ m•
N J
H
o'
N
0
o �
h
150. 00' U
N 670- 42- 5070
ROAD !PRIVATE)
S61° 42,-50°E
N
_� - lAnndl—
(D J.51N
4-j
�5
N90-33-11
. ` 1O1.04
rdFNR
North Carolina Department of Environment and Natural Resources
Pat IblcCror/ Division of Coastal hAanagement
Donald R. van der Vaart
Governor
Secretary
BUFFER AUTHORIZATION CERTIFICATE FOR SHORELINE STABILIZATION
A riparian buffer authorization. is required for shoreline stabilization activities within the Tar -Pamlico & Neuse River basins
per Division of Water Resources (DWR) regulations 15A NCAC 0213.0259 & 0233. The Division of Coastal Management
(DCM) through a Memorandum of Understanding with the Division of Water Resources (DWR) has reviewed your project
proposal and has determined that the project as proposed complies with, the aforementioned regulations.
Those activities covered by your Coastal Area Management Act (CAMA) permit have received Buffer Authorization as
long as the project is constructed in a manner that continues to meet all of the conditions listed below. Failure to comply
with this Buffer Authorization may subject the property owner & the party(contractor) performing the construction &/or
land clearing to a civil penalty by DWR of up to $25,000 per day per violation.
I. - .Impacts: Impacts to woody vegetation from clearing and filling in Zone 1 (begins at the most landward of either
the waters edge or the coastal wetland line and extends 30 feet landward) shall be minimized to what must be
impacted for the sound installation of the shoreline stabilization project. Unnecessary clearing and.filling in the
buffer is a violation of the riparian buffer rules
2. Clearing & Grading: Clearing and grading of Zone 2 (begins at the landward edge of Zone 1 and extends 20 feet
landward) is allowed provided that it is re -vegetated immediately and Zone 1 is not compromised, which includes
maintaining diffused (non-channelized) flow of storm water runoff through the'buffer.
s. Construction Corridors: Construction corridors are allowed for shoreline stabilization projects, but they must be
satisfactorily restored as described in condition 5 below.
4. Potential Overwash: For vertical shoreline stabilization projects (bulkheads) only; sites where wave overwash is
expected to be severe, the first ten (10) feet landward (unless specifically authorized otherwise by DCM) from the
structure may be maintained as a stable lawn in order to provide for structural stability.
5. Temporary Stabilization: Immediately post- construction, bare soils must be stabilized as quickly as possible by
providing a temporary ground cover. Newly seeded areas should be protected with mulch and/or erosion matting.
This ground cover is a temporary measure used to address erosion until site restoration can be accomplished.
6. Site Restoration: At minimum, pre -project site conditions must be re-established. A site that was wooded prior to
this shoreline stabilization project must be restored with woody vegetation at a stem density of 320 stems per
acre. Non wooded sites may be re -vegetated with woody vegetation. Restoration must be completed by the first
subsequent planting season (November 1 through March 30) after completion of the bulkhead.
• Pre -project site conditions: .T�
7. Project Drawing: The drawing on the CAMA General Permit is considered the project drawing of your property
indicating the location of the shoreline stabilization structure and any associated clearing, grading, and
construction corridors. This drawing will be used to aid in compliance and monitoring efforts.
By your signature below, you agree to be held responsible for meeting all of the above listed conditions and verify that all
information is complete and accurate.
Agent or Applicant Printed Name
L
Agent or Applicant Signature
CAMA GENERAL PERMIT #: '72-7&og
Permit Officer's Sign t7
Issue Date
wasnmgton Office Morehead City Office
943 Washington Square Mall 400 Commerce Avenue
Washington, NC 27889 Morehead City, NC 28557
Phone 252-946-6481 Phone 252-808 2808
Wilmington Office
127 Cardinal Drive Ext.
Wilmington, NC 28405-3845
910-796-7215
An Equal Opportunity/Affirmative Action Emolover— 50% RPrvclpdll A% PflQt rnnci imor Panzer