Loading...
HomeMy WebLinkAbout70603B_Pier, platform and boatlift_20171109LWCAMA / 11 DREDGE &FILL GENERAL PERMIT kNew ❑Modification ❑Complete Reissue ❑Partial Reissue As authorized by the State of North Carolina' Department of Environmental Quality and the Coastal Resources Commission in an area of environmental concern pursuant to 15A N( N0 70603 %�A C D Previous permit #� Date previous permit issued Applicant Name K/✓' Project Location: County /?ACiD FT-6 Address`� �(J Street Address/ State Road/ Lot #(s) City StateZlPI 10' Phone #E-MailSubdivision Authorized AgentCity - f��Gi`'� ZIP " Affected. ElCw ❑ EW 'A"PTA El ES &PTS Phone # ( ) River Basin %r ti ❑OEA,•- ❑HHF ❑IH ❑UBA ❑N/A AEC(s): Adj. Wtr. Body �v C���. /(-n—at5lman) /unkn) El Closest Maj. Wtr. Body Pi ORW: yes /Ino� ' ; PNA yes / no �✓ J 1 ■■■■ME. ■ME■■■ E■■■M■■ MEN ■■■..■■■■.■■■■....■■..■■■....■■..■■■... ■■■■■■■■�■■■■■■■■■■■■■■ ■■■■■■■■■■ ■■■■ ■■■■■■■■■fi!■■■/�1)■��■■■■�■■■■■■■■■■■■■■■ ■■■■■■■■■v■■ AFAN■rA■Ill�l�■■�■■■■■■■■■■■■■■■ ■■■■■■■■■■■■ri7■.■■■■■■►�■■■■�■■■■■■■■■■ ■■■C■■■ EMEMENOMMUMENOMMOM: MOEN■■ ■■■...................■■..........�■... ■■ ■............■.....■■...■■■.... -■0■■■■■■........■■..■.■■............■■■ ..■. No MEEMENMEMMEEM Agent orApplicant Printedj>lame Signature Please read compliance` statement on back of permit Application Fee(s) Check # Signature Issuing Date Expiration Date NC Division of Coastal M o Habitat Impact Computer Sheet / c Applicant: Date: General Permit #: 3 Describe below the HABITAT disturbances for the application. All values should match the name, and units of measurement found in your Habitat code sheet. Habitat Name DISTURB TYPE Choose One TOTAL Sq. Ft. (Applied for. Disturbance total includes any anticipated restoration or temp impacts) FINAL Sq. Ft. (Anticipated final disturbance. Excludes any restoration and/or temp impact amount) TOTAL Feet (Applied for. Disturbance total includes any anticipated restoration or temp impacts FINAL Feet (Anticipated final disturbance. Excludes any restoration and/or temp impact amount) Dredge ❑ Fill ❑ Both ❑ Othe Dredge ❑ Fill ❑ Both ❑ Other ❑ �/;'5 Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ 252-808-2808 :: 1-888-4RCOAST :: www.nccoastaimanagement.net revised:02103/10 ,typl" d o poy v �� n f Carolina r}p � f�!��3' t��1�1 �Vtt^�Vi �p?�y r• �j ! � ` fl�+ l tOr`tfi �.arolina DWpartt en—i Vi E-nvironEi�ent and KlIatural. Resources Division of Coastal 10aragernant Pat McCrory Braxton C. Davis John E. Skvaria, III Governor Director Secretary BUFFER AUiil ORMAT90H CERTWICATE FOR PIER AND DOCKING FACILITIES ACCESS WAY A riparian buffer authorization is required for pier and docking facilities access ways through the Tar -Pamlico & Neuse River Riparian buffer per Division of Water Quality (DWQ) regulations 15A NCAC 02B.0233 & .0259. The Division of Coastal Management (DCM), through a Memorandum of Understanding with the Division of Water Quality (DWQ) has reviewed your, project proposal and has determined that the project as proposed complies with the aforementioned regulations. Those activities covered by your Coastal Area Management Act (CAMA) permit have received Buffer Authorization as long as the project is constructed in a manner that continues to meet all of the conditions listed below. Failure to comply with this Buffer Authorization may subject the property owner & the party (contractor) performing the. construction &tor land clearing to a civil penalty by DWQ of up to $25,000 per day per violation. i. Crossing is Perpendicular: Pier and docking facility access way must cross the 50 ft. riparian buffer perpendicularly (which is defined as between 75 and 105 degrees) unless otherwise approved by DCM. The alignment, shall minimize the removal of woody vegetation to the greatest extent practicable. 2. Pervious Materials: All reasonable measures shall be taken to ensure the access way is made of pervious materials like -open -slatted wood or composite, mulch, or grass to meet the intent of the rules to the maximum extent practicable. 3. Access Width: The width of the pier or docking facility access way shall be limited to six (6) feet. 4. Project Drawing: The drawing on the CAMA General Permit is considered the project drawing of your property indicating the relative location of the pier or docking facility and any requested access way. This drawing will be used to aid in compliance and moniJAring efforts. /� i / o Pre -project site By your signature below you agree to be held responsible for meeting all of the co _ itions ' to ve and verify that all information provided is complete and accurate. Agent or Applica 'rued Name Permit Officer's Signature Ages ®r A pflcanl Signature Issue Date CAMA GENERAL. PERMIT #:ye��3 —/—? Washington Office Morehead City O!&ce Wilmington Office 943 Washington Square Mall 400 Commerce Avenue 127 Cardinal Drive Ext. Washington, NC 27889 Morehead City, NC 28557 Wilmington, NC 28405-3845 Phone 252-946-6481 Phone 252-808-2808 Phone 910-796-7215 CDEN North Carolina Department of Environment and Natural Resources Division of Coastal Management Pat McCrory Braxton C. Davis John E. Skvarla, III Governor Director Secretary BUFFER AUTHORIZATION CERTIFICATE FOR SHORELINE STABILIZATION A riparian buffer authorization is required for shoreline stabilization activities within the Tar -Pamlico & Neuse River basins per Division of Water Quality (DWQ) regulations 15A NCAC 0213.0259 & 0233- The Division of Coastal Management (DCM) through a Memorandum of Understanding with the Division of Water Quality (DWQ) has reviewed your project proposal and has determined that the project as proposed complies with the aforementioned regulations. Those activities covered by your Coastal Area Management Act (CAMA) permit have received Buffer Authorization as long as the project is constructed in a manner that continues to meet all of the conditions listed below. Failure to comply with this Buffer Authorization may subject the property owner & the party (contractor) performing the construction &/or land clearing to a civil penalty by DWQ of up to $25,000 per day per violation. 1. Impacts: impacts to woody vegetation from clearing and filling in Zone 1 (begins at the most landward of either the waters edge or the coastal wetland line and extends 30 feet landward) shall. be minimized to what must be impacted for the sound installation of the shoreline stabilization project. Unnecessary clearing and'filling in the buffer is a violation of the riparian buffer rules. 2. Clearing & Grading: Clearing and grading of Zone 2 (begins at the landward edge of Zone 1 and extends 20 feet landward) is allowed provided that it is re -vegetated immediately and Zone 1 is not compromised, which includes maintaining diffused (non-channelized) flow of storm water runoff through the buffer. 3. Construction Corridors: Construction corridors are allowed for shoreline stabilization projects, but they must be satisfactorily restored as described in condition 5 below. 4. Potential Overwash: For vertical shoreline stabilization projects (bulkheads) only; sites where wave overwash is expected to be severe, the first ten (10) feet landward (unless specifically authorized otherwise by DCM) from the structure may be maintained as a stable lawn in order to provide for structural stability. 5. Temporary Stabilization: Immediately post- construction, bare soils must be stabilized as quickly as possible by providing a temporary ground cover. Newly seeded areas should be protected with mulch and/or erosion matting_ This ground cover is a temporary measure used to address erosion until site restoration can be accomplished. 6. Site Restoration: At minimum, pre -project site conditions must be re-established: A site that was wooded prior to this shoreline stabilization project must be restored with woody vegetation at a stem density of 320 stems per acre. Non wooded sites may be re -vegetated with woody vegetation. storation must be completed by the first subsequent planting season (November 1 through M�fch30)�after co repletion of the bulkhead. O Pre -project site 7. Project Drawing: The drawing on the CAMA General Permit is considered the project drawing of your property indicating the location of the shoreline stabilization structure and any associated clearing, grading, and construction corridors_ This drawing will be used to aid in compliance and monitoring efforts. By your signature below you agree to be held responsible for meeting all of the above listed conditions and verify that all information is complete and accurate. M`rckci L_I ?COCTOlc Agent or Applft ri ica Printed Name Permit Officer's Signature 171(1 / Agen or Applic nt Signature Issue bate CAMA GENERAL PERMIT #: Washington Office Morehead City Office Wilmington Office 943 Washington Square Mall 400 Commerce Avenue 127 Cardinal Drive Ext. Washington, NC 27889 Morehead City, NC 28557 Wilmington, NC 28405-3845 Phone 252-946-6481 Phone 252-808-2808 910-796-7215 B. F. Warren & Sons, Inc. 180 Taylor Farm Road, Belhaven NC 27810 Office (252)964-4628 Fax (252)964-6861 Forrest cell (252)945-2492 Freddy cell (252)945-4240 NC General Contractor License #72600 www.ncyiers.com Authorized Agent Consent Agreement To: State of North Carolina Department or Local Government Department from whom this pennit is being applied for. I, the_undersigned property owner, do hereby authorize B.F. Warren & Sons INC. to act on my behalf in obtaining the necessary permit/s for the below listed projects. I have contracted there services to perform the work permitted. This' agreement is limited only to the specific activity of obtaining permits for the below specified projects. Projects: Replace Existing Dock and install boat lift Project location/ address: 4420 HWY 99 S Belhaven, NC 27810 Body of Water: Pungo Creels Property Owner Mailing Address: Mike & Meredith Proctor 4420 HWY 99 South Belhaven, NC 27810 (252)945-3112 ."/Y Property Owner's Signature: Authorized Agent Signature: Adjacent Riparian Property Owner Statement Prepared by A E Warren & Sons, Inc. 180 Taylor Farm Road, Belhaven NC 27810 Office (252)964-4628 Fax (252)964-6861 Freddy Mobile (252)945-4240 Forrest Mobile (252)945-2492 NC General Contractor License# 72600 www.ncpiers.com October 27, 2017 I, the undersigned property owner, do hereby certify that I own property adjacent toMike Proctor's property located at 4420 Hwy 99 S on Pungo Creek (body of water), in Belhaven, NC. The applicant has described to me, as shown below, the development proposed at the above location. I understand that any construction, excluding bulkheads, must be set back a minimum distance of fifteen feet (15') from my area of riparian access unless waived by me. Please initial the appropriate blank, sign and date below. I have no objection to the project as proposed but do not wish to waive the fifteen foot (15') set back. I have no objection to the project as proposed but do wish to waive the fifteen foot (15') setback. I object to the project proposed. Property owner signature A Printed i Address Telephone number �j - _pa �NQ Date Description and / or Drawing of Proposed Development Bulkhead Repair, Pier Replacement and installation of Boat Lift Adjacent Piparian Property Owner Statement Prepared by A F Warren & Sons, Inc 180 Taylor Farm Road, Belhaven NC 27810 Office (252)964-4628 Fax (252)964-5861 Freddy Mobile (252)945-4240 Forrest Mobile (252)945�12492 NC General Contractor License# 72600 www.ncpiers.com August 23, 2017 L the undersigned property owner, do hereby certify that I own property adjacent toMike & Meredith Proctor's property located at 4420 HWY 99 S on Pungo Creek (body of water), in Belhaven, NC. The applicant has described to me, as shown below, the development proposed at the above location. I understand that any construction, excluding bulkheads; must be set back a minimum distance of fifteen feet (15') from my area of riparian access unless waived by me. Please initial the appropriate blank, sign and date below. I have no objection to the project as proposed but do not wish to waive the fifteen foot (15') set back. I have no objection to the project as proposed but do wish to waive the fifteen foot (15') setback. I object to the project prop .. // Property owner signature i /�ze/ Printed name �E%V(� / 7 7-7/�f�� Address ✓70 Telephone number ( C25—a ) 9-X 6 Date 8 / a a O?O%7 Description and / or Drawing of Proposed Development Replacing exisiting dock and installing boat lift p, GJ /�aUcxr- offal cross section Opt Rope Railing Pile Cap 8B x Varying length Round Pile 4 x 10 in Battens —{lWL �i5/8 in Galv Timber Bolts \ Min. 8 ft Ground Penetration Pungo Creek 11 0" \ O C °O O existing boatlift proposed boatlift I� O O°° O O Mike and Meridith Proctor Dock replacement and Boatlift project NC Hwy 998 Belhaven NC 27810 BFW2017-00138 V This drawing and design are the property of B. F. Warren & Sons, Inc. Reproduction or use of this drawing without accompanying written permission is strictly prohibited. -a/