HomeMy WebLinkAbout70612_Pier with platform and boatlift_20171108XC PAA' A'PREDGE &-FILL ICI -7, Z_ �
GENERAL PERMIT
New ElModification E]Com'plete Reissue ElPartial Reissue
As authorized by the, State of North Carolina, Department of Environmental Quality
and the Coastal- Resources Commission in arf area f environmental concern pursuant to 15A N
Na 70612 C -D
Previous permit #
Date previous permit issued
WA_
Applicant Name, Project Location: County
Address Street Address/ State Road/ Lot #(s)
City 4/�';`//__ "State /4�ZIP
Phone # -Mail" Subdivisi
6AI
Authorized4ent City Z
ZIP
,P.cw 'KEW 4TA' <Es E�PTS_ Phone # River Basin f";; AIA
Affected..
E❑. -1 OEA .0 HHF 01 . H El UIBA 0 N/A
AEC(s): Adj. Wtr. Body 4!f n /m
❑ PWS:
Closest Maj. Wtr. Body— A
1 13 A '441?
ye no
'Type o f)Re6ject/ Activity
� 1z er`'c4
Pier--(dock) length, ;,r16a?O
Fixed . Platforms) Platfo�sl 7/1 IT J 7V
Floating, Platform (s)
Finger pier(s)
Groin lengtl
number
julkhea&' F9prap length -/00/,
avk distance offshore'
-max distance offsh6re-
-Basin, channel
cubic yards
Boat, ramp
Boathouse/ Boatlift
Beach Bulldozing
Other'
Shoreline, Length-
_SAV: not su'rd',, yes, no
'Mo ratorium: n/a yes
Photos: yes
_,WaiverAi ached: yes•
building, permit may be required by.
Note-Local-Planning jurisdiction)
."Notes/ S.pecial Conditions IJ
Agent or ApplicAnt Prie
h
116064read.pompliahce statement on back of permit"
Check #
(Scale-;
NEWN
IIIIIIIIII111=0
I , I_1kJ
See note on back regarding River
Permit dr's Prpte-ejlName
Signature
Issuing Date Expi ration Date
NC Division of Coastal Mgt. Habitat Impact Computer Sheet
Applicant: !/lh jt J,—y
Date: 1?110W14V- r /
General Permit#:
Describe below the HABITAT disturbances for the application. All values should match the name, and units of measurement
found in your Habitat code sheet.
Habitat Name
DISTURB TYPE
Choose One
TOTAL Sq._Ft.
(Applied for.
Disturbance total
includes any
anticipated
restoration or
temp impacts)
FINAL Sq. Ft.
(Anticipated final
disturbance.
Excludes any
restoration
and/or temp
impact amount)
TOTAL Feet
(Applied for.
Disturbance
total includes
any anticipated
restoration or
temp impacts)
FINAL Feet
(Anticipated final
disturbance.
Excludes any
restoration and/or
temp impact
amount)
P-
Dredge ElFill ElBoth [IOther/fi
�1
r
Dredge ❑ Fill ❑ Both ❑ Otherj
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
252-808-2808 :: 1-888-4RCOAST :: www.nccoastaimanagement.net revised:02/03/10
112
I
4
m
1
Recelpie fbr
Cermd mg
(St" Here)
Atyaoent Properly punier.
Mftg Address
Ckr. SbIt% Ap We
DW
This saderis to mnn youffI, �`i'►M�. 'iz STAt1 i s hau� app9ed for a CAMA fifinor
Properly Owner
Pam d an my properly at _I a't 1 �� gi�e,Ry+n� nrS �od� $Q:l�ul.4 In COUNTY
Property Addrm
County. As mgL*W by CAMIA nspVm I have enclosed a copy of my Pema gocdOn and Fgect
draAI(s) ae nettstion of my proposed ima No adm Is required from you or you may atgn and return
the encWed no o*Cbn fom ff you have any questions or eornmenls about my primed proler t, pfem
oa W me at A 5'7--531—%q a►—1 ,or by =9 at the address BW below. ff you wish to
Applicant's telephone
ft wren commis or objections with #m LOCAL C3OM MENT CAMA Minor Permit Prop n, you may sut M
them Ira
•.
t71-71
fib. fth, ZP Cade
LPO NAME
Loral Pendt Officer for LOCAL GOVERNMENT
LOCAL GOVERNMENT ADDRESS
CITY, STATE, ZIP CODE
6aA tdc
RNs1.
North Carolina Department of Environment and Natural Resources
Division of Coastal Management
Pat IVIcCrorf
Governor
Donald R. van der Vaart
Secretary
A riparian buffer authorization is required for pier and docking facilities access ways through the Tar -Pamlico &
Neuse River Riparian buffer -per Division of Water Resources (DWR) regulations 15A NCAC 02B.0233 & .0259. The
Division of Coastal Management (DCM), through a Memorandum of Understanding with the Division of Water
Resources (DWR) has reviewed your project proposal and has determined that the project as proposed complies
.with the aforementioned regulations.
Those activities covered by your Coastal Area Management Act (CAMA) permit have received Buffer Authorization
as long as the project is constructed in a manner that continues to meet all of the. conditions listed below. Failure to
comply with this Buffer Authorization may subject the property owner & the party (contractor) performing the
construction &/or land clearing to a civil penalty by DWR of up to $25,000 per day per violation.
i. Crossing is Perpendicular: Pier and docking facility access way must cross the 50 ft. riparian buffer
perpendicularly (which is defined as between 75 and 105 degrees) unless otherwise approved by DCM. The
alignment shall minimize the removal of woody vegetation to the greatest extent practicable.
2. Pervious Materials: All reasonable measures shall be taken to ensure the access way is made of pervious
materials like open -slatted wood or composite, mulch, or grass to meet the intent of the rules to the
maximum extent practicable.
3. Access Width: The width of the pier or docking facility access way shall be limited to six (6) feet.
4. Project Drawing: The drawing on the CAMA General Permit is considered the project drawing of your
property indicating the relative location of the pier or docking facility and any requested access way. This
drawing will be used to aid in compliance and monitoring�efforts. „/' /1
o Pre -project site
By your signature below yo gee to be held responsible for meeting all of the condition ' ted ve and verify
that all information provi e i plete and accurate.
Age or Appli� P ' $ed ame per
i$ officer's
�iga9a$aaPe
21
�
$ o pplllccant dignature Issue date
CANA GEHERAL PERHT o
Washington Office Morehead City Office Wilmington Office
943 Washington Square Mall 400 Commerce Avenue 127 Cardinal Drive Ext.
Washington, NC 27889 Morehead City, NC 28557 Wilmington, NC 28405-3845
Phone 252-946-6481 Phone 252-808-2808 Phone 910-796-7215
An Equal Opportunity/Affirmative Action Employer — 50% Recycled/10% Post Consumer Paper
RKWA
A p2h
NCDENR
North Carolina Department of Environment and Natural Resources
Division of Coastal Management
Pat McCrory Donald R. van der Vaart
Governor
BUFFER AUTHORIZATION CERTIFICATE FOR SHORELINE STABILIZATION
A riparian buffer authorization is required for shoreline stabilization activities within the Tar -Pamlico & Neuse River basins
per,Division of Water Resources (DWR) regulations 15A NCAC 026.0259 & 0233. The Division of Coastal Management
(DCM) through a Memorandum of Understanding with the Division of Water Resources (DWR) has reviewed your project
proposal and has determined that the project as proposed complies with the aforementioned regulations.
Those activities covered by your Coastal Area Management Act (CAMA) permit have received Buffer Authorization as
long as the project is constructed in a manner that continues to meet all of the conditions listed below. Failure to comply
with this Buffer Authorization may subject the property owner & the party (contractor) performing the construction Vor
land clearing to a civil penalty by DWR of up to $25,000 per day per violation.
1. Impacts: Impacts to woody vegetation from clearing and filling in Zone 1 (begins at the most landward of either
the waters edge or the coastal wetland line and extends 30 feet landward) shall be minimized to what must be
impacted for the sound installation of the shoreline stabilization project. Unnecessary clearing and filling in the
buffer is a violation of the riparian buffer rules.
2. Clearing & Grading: Clearing and grading of Zone 2 (begins at the landward edge of Zone 1 and extends 20 feet
landward) is allowed provided that it is re -vegetated immediately and Zone 1 is not compromised, which includes
maintaining diffused (non-channelized) flow of storm water runoff through the buffer.
3. Construction Corridors: Construction corridors are allowed for shoreline stabilization projects, but they must be
satisfactorily restored as described in condition 5 below.
4. Potential Overwash: For vertical shoreline stabilization'projects (bulkheads) only; sites where wave overwash is
expected to be severe, the first ten (10) feet landward (unless specifically authorized otherwise by DCM) from the
structure may be maintained as a stable lawn in order to provide for structural stability.
5. Temporary Stabilization: Immediately post- construction, bare soils must be stabilized as quickly as possible by
providing a temporary ground cover. Newly seeded areas should be protected with mulch and/or erosion matting.
This ground cover is a temporary measure used to address erosion until site restoration can be accomplished.
6. Site Restoration: At minimum, pre -project site conditions must be re-established. A site that was wooded prior to
this shoreline stabilization project must be restored with woody vegetation at a stem density of 320 stems per
acre. Non wooded sites may be re -vegetated with woody vegetation. Restoration must be completed by the first
subsequent planting season (November 1 through,,Marc)-30) gfter completion of the bulkhead.
• Pre -project site conditions: _ (19le"d Lam/
T Project Drawing: The drawing on the CAMA General Permit is considered the project drawing of your property
indicating the location of the shoreline stabilization structure and any associated clearing, grading, and
construction corridors. This drawing will be used to aid in compliance and monitoring efforts,
By your signature below you agree to be held responsible for meeting all of the above listed conditions and verify that all
information is complete Wd aiia0rate.
<S it
Agent o'T Ap licar�t P�rrhted Nan Permit Officer's SiginaVre
Or Aptllicant Signature
GENERAL PERMIT
Washington Office Morehead City Office Wilmington Office
943 Washington Square Mall 400 Commerce Avenue 127 Cardinal Drive Ext.
Washington, NC 27889 Morehead City, NC 28557 Wilmington, NC 28405-3845
Phone 252-946-6481 Phone 252-808-2808 910-796-7215
An Equal Opportunity/Affirmative Action Employer— 50% Recycled/10% Post Consumer Paper