Loading...
HomeMy WebLinkAbout70613_Riprap_20171108A^ JJCAMA % DREDGE & FILL / J GINERAL "PERMIT a ❑New,;"I]Modifcation ❑Complete Reissue ❑Partial Reissue As authorized by the State of North Carolina, Department of Environmental Quality .arid the Coastal Resources Commission in an area of envir nmental concern pursuant to 15A NCAC_ lN— 70613 Previous permit " Date previous permieissued77 9V Applicant Name Project Location: County Address) ' .— Stree Address/ State Road/ Lot #(s) CZIP ity ' Phone*111E- ail Subdivisio,,�2 c, Authorized gent " r >G �f~iJtG City Affected ' ewEW ❑ OEA-' . ❑ HHF PTAES fPTS ❑ 11H ❑ UBA ❑ N/A Phone # ( ) AEC(s):: Adj. Wtr. Body ❑ PWS: " ORW: yes' % P.. ,,_PNA . yes no Closest Maj. Wtr. Body— TYPe of Project/ Activity s4 le, ■■■■■■■■■■■■■■■■■N ■■■■■■■■■■■■■■■■■� ■■■■■■■■r�■■■■NVAp■■■■1 ■■■■■■■■■■■mewl■■■1 mmml MEMgm En J1111"UrROPENMR! ■■■■■■■■■■■■■■■■1 ■ ■■■■■■■■■■■■■■N ■■■■■■t!■■■■■■■■■■1 ■■■■■■[:■■■■■■■■■■1 ■■■■■I,ll■■■■■■■■■/�1 .■■■■>�■■■■■■■mil ■■■■■Uri■■■■■■■■■■1 • ■■■■■Ai■■■■■■■■■■1 ■■■NEEMENNNEEMENN1 Shoreline Length 1 6 ,,SAV:' "`not sure yes no Moratorium: n/a yes no .Photos: yes no Waiver Attached:' . yes no A, building permit may be'required by: ( Note• Local,Planning Jurisdiction) Notes/ Pe ial Conditions "signatur PP�^^ease re d co , pl AP` lication Fee(s) " v Permit on back of permit f• ./XSee note on back << -,Check# Issuing Date ., 13ules attached. r ZIP i er,B"-assin / I' ir ma <1,nkn (Scab ) ntg j me ; ='r, Expiration Date ' NC DiVisian of Coastal Mgt. Mgt. Habitat impact Computer Sheet Applicant: �" jy1e/ Date: � yf� '/ / 7 General Permit #: ��/S _13 Describe below the HABITAT disturbances for the application. All values should match the name, and units of measurement found in your Habitat'code sheet. Habitat Name DISTURB TYPE Choose One TOTAL Sq. Ft. (Applied for. Disturbance total includes any anticipated restoration or temp impacts) FINAL Sq. Ft. (Anticipated final disturbance. Excludes any restoration and/or temp impact amount) TOTAL Feet (Applied for. Disturbance total includes any anticipated restoration or temp impacts) FINAL Feet (Anticipated final disturbance. Excludes any restoration and/or temp impact amount) Dredge ❑ Fill 0< Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ 252-808-2808 :: 1.888-4RCOAS'T :: www.nccoastalmanauement.net revised:02/03/10 o "•�.,,�<;.., qua-«.-.. MCDENR North Carolina Department of Environment and Natural Resources Division of Coastal Management Pat McCrory Donald R. van der Vaart Governor . BUFFER AUTHORIZATION CERTIFICATE FOR SHORELINE STABILIZATION A riparian buffer authorization is required for shoreline stabilization activities within the Tar -Pamlico & Neuse River basins per Division of Water Resources (DWR) regulations 15A NCAC 026.0259 & 0233. The Division of Coastal Management (DCM) through a Memorandum of Understanding with the Division of Water Resources (DWR) has reviewed your project proposal and has determined that the project as proposed complies with the aforementioned regulations. Those activities covered by your Coastal Area Management Act (CAMA) permit have received Buffer Authorization as long as the project is constructed in a manner that continues to meet all of the conditions listed below. Failure to comply with this Buffer Authorization may subject the property owner & the party (contractor) performing the construction &/or land clearing to a civil penalty by DWR of up to $25,000 per day per violation. 1. Impacts: Impacts to woody vegetation from clearing and filling in Zone 1 (begins at the most landward of either the waters edge or the coastal wetland line and extends 30 feet landward) shall be minimized to what must be impacted for the sound installation of the shoreline stabilization project. Unnecessary clearing and filling in the buffer is a violation of the riparian buffer rules. 2. Clearing & Grading: Clearing and grading of Zone 2 (begins at the landward edge of Zone 1 and extends 20 feet landward) is allowed provided that it is re -vegetated immediately and Zone 1 is not compromised, which includes maintaining diffused (non-channelized) flow of storm water runoff through the buffer. 3. Construction Corridors: Construction corridors are allowed for shoreline stabilization projects, but they must be satisfactorily restored as described in condition 5 below. 4. Potential Overwash: For vertical shoreline stabilization projects (bulkheads) only; sites where wave overwash is expected to be severe, the first ten (10) feet landward (unless specifically authorized otherwise by DCM) from the structure may be maintained as a stable lawn in order to provide for structural stability. 5. Temporary Stabilization: Immediately post- construction, bare soils must be stabilized as quickly as possible by providing a temporary ground cover. Newly seeded areas should be protected with mulch and/or erosion matting. This ground cover is a temporary measure used to address erosion until site restoration can be accomplished. 5. Site Restoration: At minimum, pre -project site conditions must be re-established. A site that was wooded prior to this shoreline stabilization project must be restored with woody vegetation at a stem density of 320 stems per acre. Non wooded sites may be re -vegetated with woody vegetation. Restoration must be completed by the first subsequent planting season (November 1 throug� March 30) after cvry D,fretion of the bulkhead- 0 Pre -project -site conditions: T. Project Drawing: The drawing on the CAMA General Permit is considered the project drawing of your property indicating the location of the shoreline stabilization structure and any associated clearing, grading, and construction corridors. This drawing will be used to aid in compliance and monitoring efforts. By your signature below y gree to be held responsible for meeting all of the above listed conditio a verify that all information is complete d cc t . Agent r Applicant P inted Name Permit Offi er's Sign tur G Ag nt or plicant Signature ue Date CAMA GENERAL PERMIT #::Z2 ��7/_3 -4 Washington Office Morehead City Office Wilmington Office 943 Washington Square Mall 400 Commerce Avenue 127 Cardinal Drive Ext. Washington, NC 27889 Morehead City, NC 28557 Wilmington, NC 28405-3845 ,Phone 252-946-6481 Phone 252-808-2808 910-796-7215 An Equal Opportunity/Affirmative Action Employer— 50% Recycled/10% Post Consumer Paper RECEIVED 10/20/2017 05:08PM 2529646775 SELBY LAND CONCEPTS 10/.20/2017 16:55 2527475916 RHONDA MOREEN PAGE 01/03 Authorized Agent Consent Agreement I Y' � hereby authoriz (240 act o-. (Property Owner) (Authorized Agent) my behalf in obtairuug CAMA perszzits for the location listed below. This agency authorization is limited to the specific activities described above. r j Is IP - I r r 5 ' I► ��?1-7- ;V�l Property -Owner's Mailing. 4ddress and Phone Number: o Property Owner's. Signature: 1 � � —" •`� r ` �-�' `��� Authorized Agent Signature: Date: JQ 1-7 - Form; Authorized Agent Agreement as deveianed by NCDCM revised t129/09 RECEIVED 10/20/2017 05:08PM 2529646775 SELSY LAND CONCEPTS 10/�0/2017 16:55 2527475916 RHONDA MOREEN PAGE 02/03 I hereby certify that I own property adjacent to _Fr-r_a (wame d Propu IS property located at �,Q►ddresZ, io8, i390ck, Ro$tl, Ott.) N.C. on - r`b®dy) I In {Gibown andlor county) • �ihda� The applicant has described to me, as shown below, the development proposed at the above location. - �N4_ I have no objection to this proposal. 1 have. objections to this proposal. WSCFtllp'il'90N W401OR ]DRAINING OF PROPQSIED DEVELOPMENT padivldaua, proposing development maast fldl 16 dwerdptfon golow or elm a sits drdwing) I understand that a pier, dock, mooring pilings, boat ramp, breakw0ter, boathouse, lift, or groin me. if you wist be set sh t waive the setback, you � st nitnce of 16 from ill the apprarea Of opriate blank beloW )s waroed by I do wish to waive the 9 V setback requirement. I do not wish to waive the 15' setback requirement. (Proloarty owner lnfor Mgtiarr) (Adjacaet p rapedy Owner nforrrmatlan) Cia ist�lrv. r atwe* Telephone Numberlemerl eddress Date "valid for one calendar year after signature" , ,el ,r Sr I2r1 -%% FWnt or Type name it (dam e d enmi ' MaAing address " % NG . CRrefs Telephone Number/email address Date* (Revised Aug. 2014) RECEIVED 10/20/2017 05:08PM 2529646775 SELBY LAND CONCEPTS 10/20/2017 16:55 2527475916 RHONDA MOREEN PAGE 03/03 10/20/2017 14:56 2522431733 NARRON & HOLDFORD PAGE 01/01 JIB/20/2017 10' 95 2527475916 RHONDA MORMN PAGE 02/82 10/20/2017 THOMAS.I RHODES PAS{# 252-243-1.733 TQ WHOM IT MAY CONCERN: I GIVE PERMISSION TO RHONDA, E MOREEN AND FRED C NEWCOMB TO DO WHAT IS NECESSARYTO SAVE THEIR LAND ,AT:1722 OLD PAMUCO BEACH ROAD EAST, BELHAVEN, NC 27810, THIS INCLUDES ROCK, DkRT ETCTO PREVENT EROSION OF THEIR PROPERTY. 7OM Y'OU,AS 1 R ODES