HomeMy WebLinkAbout70613_Riprap_20171108A^ JJCAMA % DREDGE & FILL / J
GINERAL "PERMIT
a
❑New,;"I]Modifcation ❑Complete Reissue ❑Partial Reissue
As authorized by the State of North Carolina, Department of Environmental Quality
.arid the Coastal Resources Commission in an area of envir nmental concern pursuant to 15A NCAC_
lN— 70613
Previous permit "
Date previous permieissued77
9V
Applicant Name Project Location: County
Address) ' .— Stree Address/ State Road/ Lot #(s)
CZIP
ity
' Phone*111E-
ail
Subdivisio,,�2 c,
Authorized gent "
r >G
�f~iJtG
City
Affected ' ewEW
❑ OEA-'
. ❑ HHF
PTAES fPTS
❑ 11H ❑ UBA ❑ N/A
Phone # ( )
AEC(s)::
Adj. Wtr. Body
❑ PWS:
" ORW: yes' % P..
,,_PNA .
yes no
Closest Maj. Wtr. Body—
TYPe of Project/ Activity
s4 le,
■■■■■■■■■■■■■■■■■N
■■■■■■■■■■■■■■■■■�
■■■■■■■■r�■■■■NVAp■■■■1
■■■■■■■■■■■mewl■■■1
mmml
MEMgm
En J1111"UrROPENMR!
■■■■■■■■■■■■■■■■1
■ ■■■■■■■■■■■■■■N
■■■■■■t!■■■■■■■■■■1
■■■■■■[:■■■■■■■■■■1
■■■■■I,ll■■■■■■■■■/�1
.■■■■>�■■■■■■■mil
■■■■■Uri■■■■■■■■■■1
• ■■■■■Ai■■■■■■■■■■1
■■■NEEMENNNEEMENN1
Shoreline Length 1 6
,,SAV:' "`not sure yes no
Moratorium: n/a yes no
.Photos: yes no
Waiver Attached:' . yes no
A, building permit may be'required by:
( Note• Local,Planning Jurisdiction)
Notes/ Pe ial Conditions
"signatur PP�^^ease re d co , pl
AP` lication Fee(s) " v
Permit
on back of permit
f•
./XSee note on back
<<
-,Check# Issuing Date .,
13ules attached.
r
ZIP i
er,B"-assin / I'
ir ma <1,nkn
(Scab )
ntg j me ;
='r, Expiration Date '
NC DiVisian of Coastal Mgt.
Mgt. Habitat impact Computer Sheet
Applicant: �" jy1e/
Date: � yf� '/ / 7
General Permit #: ��/S _13
Describe below the HABITAT disturbances for the application. All values should match the name, and units of measurement
found in your Habitat'code sheet.
Habitat Name
DISTURB TYPE
Choose One
TOTAL Sq. Ft.
(Applied for.
Disturbance total
includes any
anticipated
restoration or
temp impacts)
FINAL Sq. Ft.
(Anticipated final
disturbance.
Excludes any
restoration
and/or temp
impact amount)
TOTAL Feet
(Applied for.
Disturbance
total includes
any anticipated
restoration or
temp impacts)
FINAL Feet
(Anticipated final
disturbance.
Excludes any
restoration and/or
temp impact
amount)
Dredge ❑ Fill 0< Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
252-808-2808 :: 1.888-4RCOAS'T :: www.nccoastalmanauement.net revised:02/03/10
o
"•�.,,�<;.., qua-«.-..
MCDENR
North Carolina Department of Environment and Natural Resources
Division of Coastal Management
Pat McCrory Donald R. van der Vaart
Governor .
BUFFER AUTHORIZATION CERTIFICATE FOR SHORELINE STABILIZATION
A riparian buffer authorization is required for shoreline stabilization activities within the Tar -Pamlico & Neuse River basins
per Division of Water Resources (DWR) regulations 15A NCAC 026.0259 & 0233. The Division of Coastal Management
(DCM) through a Memorandum of Understanding with the Division of Water Resources (DWR) has reviewed your project
proposal and has determined that the project as proposed complies with the aforementioned regulations.
Those activities covered by your Coastal Area Management Act (CAMA) permit have received Buffer Authorization as
long as the project is constructed in a manner that continues to meet all of the conditions listed below. Failure to comply
with this Buffer Authorization may subject the property owner & the party (contractor) performing the construction &/or
land clearing to a civil penalty by DWR of up to $25,000 per day per violation.
1. Impacts: Impacts to woody vegetation from clearing and filling in Zone 1 (begins at the most landward of either
the waters edge or the coastal wetland line and extends 30 feet landward) shall be minimized to what must be
impacted for the sound installation of the shoreline stabilization project. Unnecessary clearing and filling in the
buffer is a violation of the riparian buffer rules.
2. Clearing & Grading: Clearing and grading of Zone 2 (begins at the landward edge of Zone 1 and extends 20 feet
landward) is allowed provided that it is re -vegetated immediately and Zone 1 is not compromised, which includes
maintaining diffused (non-channelized) flow of storm water runoff through the buffer.
3. Construction Corridors: Construction corridors are allowed for shoreline stabilization projects, but they must be
satisfactorily restored as described in condition 5 below.
4. Potential Overwash: For vertical shoreline stabilization projects (bulkheads) only; sites where wave overwash is
expected to be severe, the first ten (10) feet landward (unless specifically authorized otherwise by DCM) from the
structure may be maintained as a stable lawn in order to provide for structural stability.
5. Temporary Stabilization: Immediately post- construction, bare soils must be stabilized as quickly as possible by
providing a temporary ground cover. Newly seeded areas should be protected with mulch and/or erosion matting.
This ground cover is a temporary measure used to address erosion until site restoration can be accomplished.
5. Site Restoration: At minimum, pre -project site conditions must be re-established. A site that was wooded prior to
this shoreline stabilization project must be restored with woody vegetation at a stem density of 320 stems per
acre. Non wooded sites may be re -vegetated with woody vegetation. Restoration must be completed by the first
subsequent planting season (November 1 throug� March 30) after cvry D,fretion of the bulkhead-
0 Pre -project -site conditions:
T. Project Drawing: The drawing on the CAMA General Permit is considered the project drawing of your property
indicating the location of the shoreline stabilization structure and any associated clearing, grading, and
construction corridors. This drawing will be used to aid in compliance and monitoring efforts.
By your signature below y gree to be held responsible for meeting all of the above listed conditio a verify that all
information is complete d cc t .
Agent r Applicant P inted Name Permit Offi er's Sign tur
G
Ag nt or plicant Signature ue Date
CAMA GENERAL PERMIT #::Z2 ��7/_3 -4
Washington Office Morehead City Office Wilmington Office
943 Washington Square Mall 400 Commerce Avenue 127 Cardinal Drive Ext.
Washington, NC 27889 Morehead City, NC 28557 Wilmington, NC 28405-3845
,Phone 252-946-6481 Phone 252-808-2808 910-796-7215
An Equal Opportunity/Affirmative Action Employer— 50% Recycled/10% Post Consumer Paper
RECEIVED 10/20/2017 05:08PM 2529646775 SELBY LAND CONCEPTS
10/.20/2017 16:55 2527475916 RHONDA MOREEN PAGE 01/03
Authorized Agent Consent Agreement
I Y' � hereby authoriz (240 act o-.
(Property Owner) (Authorized Agent)
my behalf in obtairuug CAMA perszzits for the location listed below. This agency
authorization is limited to the specific activities described above.
r j Is IP
- I
r r 5 ' I►
��?1-7- ;V�l
Property -Owner's Mailing. 4ddress and Phone Number:
o
Property Owner's. Signature: 1 � � —" •`� r ` �-�' `���
Authorized Agent Signature:
Date: JQ 1-7 -
Form; Authorized Agent Agreement as deveianed by NCDCM revised t129/09
RECEIVED 10/20/2017 05:08PM 2529646775 SELSY LAND CONCEPTS
10/�0/2017 16:55 2527475916 RHONDA MOREEN PAGE 02/03
I hereby certify that I own property adjacent to _Fr-r_a (wame d Propu IS
property located at
�,Q►ddresZ, io8, i390ck, Ro$tl, Ott.) N.C.
on - r`b®dy) I In {Gibown andlor county)
• �ihda�
The applicant has described to me, as shown below, the development proposed at the above
location. -
�N4_ I have no objection to this proposal.
1 have. objections to this proposal.
WSCFtllp'il'90N W401OR ]DRAINING OF PROPQSIED DEVELOPMENT
padivldaua, proposing development maast fldl 16 dwerdptfon golow or elm a sits drdwing)
I understand that a pier, dock, mooring pilings, boat ramp, breakw0ter, boathouse, lift, or groin
me. if you wist be set sh t waive the setback, you � st nitnce of 16 from ill the apprarea Of opriate blank beloW )s waroed by
I do wish to waive the 9 V setback requirement.
I do not wish to waive the 15' setback requirement.
(Proloarty owner lnfor Mgtiarr) (Adjacaet p rapedy Owner nforrrmatlan)
Cia ist�lrv. r atwe*
Telephone Numberlemerl eddress
Date
"valid for one calendar year after signature"
, ,el ,r Sr I2r1 -%%
FWnt or Type name it (dam e d enmi '
MaAing address
" % NG .
CRrefs
Telephone Number/email address
Date*
(Revised Aug. 2014)
RECEIVED 10/20/2017
05:08PM 2529646775
SELBY LAND CONCEPTS
10/20/2017 16:55
2527475916
RHONDA MOREEN
PAGE 03/03
10/20/2017 14:56
2522431733
NARRON & HOLDFORD
PAGE 01/01
JIB/20/2017 10' 95
2527475916
RHONDA MORMN
PAGE 02/82
10/20/2017
THOMAS.I RHODES
PAS{# 252-243-1.733
TQ WHOM IT MAY CONCERN:
I GIVE PERMISSION TO RHONDA, E MOREEN AND FRED C NEWCOMB TO DO WHAT
IS NECESSARYTO SAVE THEIR LAND ,AT:1722 OLD PAMUCO BEACH ROAD EAST,
BELHAVEN, NC 27810, THIS INCLUDES ROCK, DkRT ETCTO PREVENT EROSION OF
THEIR PROPERTY.
7OM
Y'OU,AS 1 R ODES