HomeMy WebLinkAbout70624_Bulkhead, RipRap, Boat ramp_20171213/�1,' '�' •���� � �T-•
1V0 7®62� ?��A �; C D
GENERAL PERMIT Previous
CAMA DREDGE &FILL permit
'ONew ❑Modification ❑Complete Reissue ❑ Partial Reissue Date previous permit issued mil"
As authorized by the State of North Carolina, Department of Environmental Quality
and the Coastal Resources Commission in an area of environmental concern pursuant to 15A NCAC ��/' ����G,�� i "•
Rules attached.
Applicant Name
Project Location: County
Addre"ssG
�l%l
Street Add ess/ State' Road/ Lot #(s)
City
State�l�G
ZIP
Phone #�)g)6/ E-Mail
Subdivision \}
Authorized Agent
City / C/ c�
ZIP
Affected ❑ Cw Ew PTA [YES
OEA ❑ HHF IH UBA
El❑ El�
)Ts
❑ N/A
Phone # ( )
River Byas,'n
1,
/�%J�.GA ��fo�
AEC(s):
Adj. Wtr. Body
nat.;
❑ PWS:
ORW: yes /�
PNA �ye/ no
Closest Maj. Wtr. Body
_
■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■
_
ME
- . .. _
.
■�Iiii■■■■■■■■�■■7J■lli�iii■■■■■■■■■■■■liii�i
■I!
■■■■■■■■■■Ali■[J:`■f■■■■■■■■■■■■■■■■■■ii■
■��`'I■■■■■■■i■■■1�■■■■■■■■■■■■■■■■■■■■■■I�ii■
itl�■■■■■■■■■�1■�li■■■ii■■■■i■■■■■■■■fit■■
A.�ii���
v�m�
►"■i■O��IIIiIA
E��1■lE.11�
....
.L.�
,�.!�!�4.
fP�►_
�
�__.
11
� .._.4�
_.•
rlL,��UIII�w■/lI�GE
L�■i
.
■■l��GiV■■■�i■■�i���ii�iirF�r■■■■■■■■I►�a•3�■r�l��■!J
■■�►`�I�r►l[��%l■■■■■■iiT!��J�7■■■■■■■■Itl�9�f�■■Ia■fLl
i
■■�`�i■■[�Vit��/■■■■■■i■V�II/�7/!�/J■■■i■■■ii-!,�&�is■■ICJ■■
■■!!i■■■■G3�i■■■■■■■■■�Ifi7(�■■■■■■■■it�i1■■■■■■
■■�i■■■■■■■■■■■■E'?�■�li■■■■■■■■Iisi'%■■■■■■
■■G111■►\■■■■■■■■■■rfl(�I�Iia�lliii■■■■■■■■�ili�l■■■■i■■
Agent or
f-l� CA i6l, 1,_-2C
statement on back of permit T*
onFee(s) Check#
Lam-
Permit (fie 's P i t"eed &me
Signature
Issuing Date Expiration Date
NC Division of Coastal Mgt. Habitat Impact Computer Sheet
Applicant:
Date: 13
General Permit
Describe below the HABITAT disturbances for the application. All values should match the name, and units of measurement
found imyour Habitat code sheet.
Habitat Name
DISTURB TYPE,
Choose One
TOTAL Sq. Ft.
(Applied for
Disturbance total
includes any
anticipated
restoration or
temp impacW
FINAL Sq. Ft.
(Anticipated final
disturbance.
Excludes any
restoration
and/or temp
impact amount)
TOTAL Feet
(Applied for.
Disturbance
total includes
any anticipated
restoration or
temp impacts)
FINAL Feet
(Anticipated final
disturbance.
Excludes any
restoration and/or
temp impact
amount)
%
A43yow",
Dredge ❑ Fill Both ❑ Other ❑
'�_j07Q
Dredge Fill, Both JX Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ . Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
252-808-2808 :: 1.888-4RCOAST :: wwrw.nccoastalmanagement.net revised: 02/03/10
November 1, 2017
I Laolaa Oaralvai, O b b6 have no objections to Alfred Schmitt and Mark
Carawan bulk heading, repairing and pouring cement for boat ramp located at 45 White Plains Rd,
Engelhard, NC. (Al Gibbs Lot)
Printed Na e: Cf.� k (,
Address: `i�W�'up
4�GS
Date:
0
0
November 1, 2017
have no objections to Alfred Schmitt and Mark
Carawan bulk heading, repairing and pouring cement for boat ramp located at 45 White Plains Rd,
Engelhard, NC. (Al Gibbs Lot)
Printed Name: l I I
'4
Signature: Aldap
Date:
-2, 7�-zy-
i
R.OY COOPER.
Governor.
'MICHAEL S. REGAN
Secretriry
Coastal Management BRAX.TON DAVIS
BUFFER AUTHORIZATION CERTIFICATE FOR SHORELINE STABILIZATION virector
A riparian buffer authorization is required for shoreline stabilization activities within the Neuse and Tar -Pamlico River
basins per Division of Water Resources (DWR) regulations 15A NCAC 02B.0233 and 0259. The Division of Coastal
Management (DCM) through'a Memorandum of Understanding with the Division of Water Resources (DWR) has
reviewed your project proposal and has determined that the project as proposed complies with the aforementioned
regulations.
'Those activities covered by your Coastal Area Management Act (CAMA) permit have received Buffer Authorization
provided the project is constructed in a manner that continues to meet all of the conditions listed below. Failure to
comply with this Buffer Authorization may subject the property owner and the party (contractor) performing the
construction and/or land clearing to a civil penalty by DWR of up to $25,000 per day per violation.
1. Impacts: Impacts to woody vegetation from clearing and filling in Zone 1 (begins at the most landward of either
normal water line (NWL) or normal high water line (NHWL) and extends 30 feet landward) shall' be minimized to
what must be impacted for the sound installation of the shoreline stabilization project. Unnecessary clearing and
filling in the buffer is a violation of the riparian buffer rules.
2. Clearing & Grading: Clearing and grading of Zone 2 (begins at the landward edge of Zone land extends 20 feet
landward) is allowed provided that it is re -vegetated immediately and Zone 1 is not compromised, which includes
maintaining diffused (non-channelized) flow of storm water runoff through the buffer.
3. Construction Corridors: Construction corridors are allowed for shoreline stabilization projects, but they must be
satisfactorily restored as described in condition 5 below.
4. Potential Overwash: For vertical shoreline stabilization projects (bulkheads) only; sites where wave overwash is
expected to be severe, the first ten (10) feet landward (unless specifically authorized otherwise by DCM) from the
structure may be maintained as a stable lawn in order to provide for structural stability.
s. Temporary Stabilization: Immediately post- construction, bare soils must be stabilized as quickly as possible by
providing a temporary ground cover. Newly seeded areas should be protected with mulch and/or erosion matting.
This ground cover is a temporary measure used to address erosion until site restoration can be accomplished.
6. Site Restoration: At minimum, pre -project site conditions must be re-established. A site that was wooded prior to
this shoreline stabilization project must be restored with woody vegetation at a stem density of 260 stems per acre.
Non wooded sites may be re -vegetated with woody vegetation. Restoration must be completed by the first
subsequent planting season (November 1 through arch after completion of the bulkhead.
0)
• Pre -project site conditions: Gi/d/ - `u�, C
7. Project Drawing: The drawing on the CAMA General Permit is considered the project drawing of your property
indicating the location of the shoreline stabilization structure and any associated clearing, grading, and construction
corridors. This drawing will be used to aid in compliance and monitoring efforts.
By your signature elow you agree to be held responsible for meeting all of the above lis oo io s nd verify that all
informati is mplete and accurate.
nt WA Mblicant Pri
Ag''tnf or AI3ptFra—nt Signature Issue Date
CAMA GENERAL PERMIT #: ina I Environmental Quality I Coastal Management
Washington' Office 1943, Washington Square Mail Washington, NC27889 1252=946-6481
Wilmington offices 127CardinaibriveExtWilmington, ,NC28405-38451 910-796-7215
Morehead city Officel 400 Commerce AvenueMoreheadCity; NC Z8557 1 252-808-2808
,4
Beaufort County 10-17
DCM Washington Permit Number
Office
CAMA
MINOR DEVELOPMENT
PERMIT
as authorized by the State of North Carolina,, Department of Environmental
Quality and the Coastal Resources Commission for development
in an area of environment concern pursuant to Section 113A-118 of the
General Statutes, "Coastal Area Management'
Issued to Ms. Linda Coughlin authorizing development in the Estuarine Shoreline (AEC) located off SR 1730 at 1672 Old
Pamlico Beach Road East adjacent the Pamlico River near the Town of Belhaven in Beaufort County, North Carolina as
requested in the permittee's application, dated 28 November 2017. This, permit, issued on 8 December 2017, is subject
to compliance with the application and site drawing (where consistent with the permit), all applicable regulations and
special conditions and notes set forth below. Any violation of these terms may subject permittee to a fine, imprisonment
or civil action, or may cause the permit to be null and void.
This permit authorizes: the filling, sloping, and grading of highground 30' landward of the normal water level.
(1) All proposed filling and grading must be done in accordance with the permitted work plat drawings(s) dated 28 November
2017.
(2) A ground cover sufficient to restrain erosion shall be provided -within the shorter of 15 working or 30 calendar
days of completion of any phase of grading on cut or filled slopes.
(3) Appropriate sedimentation and erosion control devices, measures or structures shall be implemented to ensure that
eroded materials do not enter adjacent wetlands, watercourses and property (e.g. silt fence, diversion swales or berms,
sand fence, etc.).
(4) Impervious surfaces on the lot within 75'-of the normal water level (NWL) shall not exceed 30%.
(5) Any change or changes in the plans for development, construction, or land use activities will require a re-evaluation and
modification of this permit.
(Additional Permit Conditions on Page 2)
This permit action may be appealed by the permittee or other qualified persons
within twenty (20) days of the issuing date. From the date of an appeal, any
work conducted -under this permit must cease until the appeal is resolved. This
permit must be on the project site and accessible to the permit officer when the
project is inspected for compliance. Any maintenance work or project
modification not covered under this permit, require further written permit
approval. All work must cease when this permit expires on: 31 December 2019
In issuing this permit it is agreed that this project is consistent with the local Land
Use Plan and all applicable ordinances. This permit may not be transferred to
another party without the written approval of the Division of Coastal
Management.
Steve J. Trowell
CAMA LOCAL PERMIT OFFICIAL
943 Washington Square Mall
Wallington,, North Carolina 2,7889
U PERMITTEEz /'
(Signature required if conditions above apply to permit)
Name: Ms. Linda Coughlin
Minor Permit # 10-17
Date: 8 December 2017
Page 2
(5) All unconsolidated material resulting from, associated grading and landscaping shall be retained on site by effective
sedimentation and erosion control measures. Prior to any land -disturbing activities, a barrier line of filter cloth must
be installed between the land disturbing activity and the adjacent marsh or water areas, until such time as the area
has been properly stabilized with a vegetative cover.
Note: All development must comply with the Tar/Pamlico River Basin Buffer Rules as stated in 15A NCAC 1 B.0259. Any
questions regarding these rules should be directed to Mr. Anthony Scarbraugh, Division of Water Quality, Washington
Regional Office, 252-946-6481.
SIGNATURE. DATE:
P MITTEE