Loading...
HomeMy WebLinkAbout70624_Bulkhead, RipRap, Boat ramp_20171213/�1,' '�' •���� � �T-• 1V0 7®62� ?��A �; C D GENERAL PERMIT Previous CAMA DREDGE &FILL permit 'ONew ❑Modification ❑Complete Reissue ❑ Partial Reissue Date previous permit issued mil" As authorized by the State of North Carolina, Department of Environmental Quality and the Coastal Resources Commission in an area of environmental concern pursuant to 15A NCAC ��/' ����G,�� i "• Rules attached. Applicant Name Project Location: County Addre"ssG �l%l Street Add ess/ State' Road/ Lot #(s) City State�l�G ZIP Phone #�)g)6/ E-Mail Subdivision \} Authorized Agent City / C/ c� ZIP Affected ❑ Cw Ew PTA [YES OEA ❑ HHF IH UBA El❑ El� )Ts ❑ N/A Phone # ( ) River Byas,'n 1, /�%J�.GA ��fo� AEC(s): Adj. Wtr. Body nat.; ❑ PWS: ORW: yes /� PNA �ye/ no Closest Maj. Wtr. Body _ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ _ ME - . .. _ . ■�Iiii■■■■■■■■�■■7J■lli�iii■■■■■■■■■■■■liii�i ■I! ■■■■■■■■■■Ali■[J:`■f■■■■■■■■■■■■■■■■■■ii■ ■��`'I■■■■■■■i■■■1�■■■■■■■■■■■■■■■■■■■■■■I�ii■ itl�■■■■■■■■■�1■�li■■■ii■■■■i■■■■■■■■fit■■ A.�ii��� v�m� ►"■i■O��IIIiIA E��1■lE.11� .... .L.� ,�.!�!�4. fP�►_ � �__. 11 � .._.4� _.• rlL,��UIII�w■/lI�GE L�■i . ■■l��GiV■■■�i■■�i���ii�iirF�r■■■■■■■■I►�a•3�■r�l��■!J ■■�►`�I�r►l[��%l■■■■■■iiT!��J�7■■■■■■■■Itl�9�f�■■Ia■fLl i ■■�`�i■■[�Vit��/■■■■■■i■V�II/�7/!�/J■■■i■■■ii-!,�&�is■■ICJ■■ ■■!!i■■■■G3�i■■■■■■■■■�Ifi7(�■■■■■■■■it�i1■■■■■■ ■■�i■■■■■■■■■■■■E'?�■�li■■■■■■■■Iisi'%■■■■■■ ■■G111■►\■■■■■■■■■■rfl(�I�Iia�lliii■■■■■■■■�ili�l■■■■i■■ Agent or f-l� CA i6l, 1,_-2C statement on back of permit T* onFee(s) Check# Lam- Permit (fie 's P i t"eed &me Signature Issuing Date Expiration Date NC Division of Coastal Mgt. Habitat Impact Computer Sheet Applicant: Date: 13 General Permit Describe below the HABITAT disturbances for the application. All values should match the name, and units of measurement found imyour Habitat code sheet. Habitat Name DISTURB TYPE, Choose One TOTAL Sq. Ft. (Applied for Disturbance total includes any anticipated restoration or temp impacW FINAL Sq. Ft. (Anticipated final disturbance. Excludes any restoration and/or temp impact amount) TOTAL Feet (Applied for. Disturbance total includes any anticipated restoration or temp impacts) FINAL Feet (Anticipated final disturbance. Excludes any restoration and/or temp impact amount) % A43yow", Dredge ❑ Fill Both ❑ Other ❑ '�_j07Q Dredge Fill, Both JX Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ . Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ 252-808-2808 :: 1.888-4RCOAST :: wwrw.nccoastalmanagement.net revised: 02/03/10 November 1, 2017 I Laolaa Oaralvai, O b b6 have no objections to Alfred Schmitt and Mark Carawan bulk heading, repairing and pouring cement for boat ramp located at 45 White Plains Rd, Engelhard, NC. (Al Gibbs Lot) Printed Na e: Cf.� k (, Address: `i�W�'up 4�GS Date: 0 0 November 1, 2017 have no objections to Alfred Schmitt and Mark Carawan bulk heading, repairing and pouring cement for boat ramp located at 45 White Plains Rd, Engelhard, NC. (Al Gibbs Lot) Printed Name: l I I '4 Signature: Aldap Date: -2, 7�-zy- i R.OY COOPER. Governor. 'MICHAEL S. REGAN Secretriry Coastal Management BRAX.TON DAVIS BUFFER AUTHORIZATION CERTIFICATE FOR SHORELINE STABILIZATION virector A riparian buffer authorization is required for shoreline stabilization activities within the Neuse and Tar -Pamlico River basins per Division of Water Resources (DWR) regulations 15A NCAC 02B.0233 and 0259. The Division of Coastal Management (DCM) through'a Memorandum of Understanding with the Division of Water Resources (DWR) has reviewed your project proposal and has determined that the project as proposed complies with the aforementioned regulations. 'Those activities covered by your Coastal Area Management Act (CAMA) permit have received Buffer Authorization provided the project is constructed in a manner that continues to meet all of the conditions listed below. Failure to comply with this Buffer Authorization may subject the property owner and the party (contractor) performing the construction and/or land clearing to a civil penalty by DWR of up to $25,000 per day per violation. 1. Impacts: Impacts to woody vegetation from clearing and filling in Zone 1 (begins at the most landward of either normal water line (NWL) or normal high water line (NHWL) and extends 30 feet landward) shall' be minimized to what must be impacted for the sound installation of the shoreline stabilization project. Unnecessary clearing and filling in the buffer is a violation of the riparian buffer rules. 2. Clearing & Grading: Clearing and grading of Zone 2 (begins at the landward edge of Zone land extends 20 feet landward) is allowed provided that it is re -vegetated immediately and Zone 1 is not compromised, which includes maintaining diffused (non-channelized) flow of storm water runoff through the buffer. 3. Construction Corridors: Construction corridors are allowed for shoreline stabilization projects, but they must be satisfactorily restored as described in condition 5 below. 4. Potential Overwash: For vertical shoreline stabilization projects (bulkheads) only; sites where wave overwash is expected to be severe, the first ten (10) feet landward (unless specifically authorized otherwise by DCM) from the structure may be maintained as a stable lawn in order to provide for structural stability. s. Temporary Stabilization: Immediately post- construction, bare soils must be stabilized as quickly as possible by providing a temporary ground cover. Newly seeded areas should be protected with mulch and/or erosion matting. This ground cover is a temporary measure used to address erosion until site restoration can be accomplished. 6. Site Restoration: At minimum, pre -project site conditions must be re-established. A site that was wooded prior to this shoreline stabilization project must be restored with woody vegetation at a stem density of 260 stems per acre. Non wooded sites may be re -vegetated with woody vegetation. Restoration must be completed by the first subsequent planting season (November 1 through arch after completion of the bulkhead. 0) • Pre -project site conditions: Gi/d/ - `u�, C 7. Project Drawing: The drawing on the CAMA General Permit is considered the project drawing of your property indicating the location of the shoreline stabilization structure and any associated clearing, grading, and construction corridors. This drawing will be used to aid in compliance and monitoring efforts. By your signature elow you agree to be held responsible for meeting all of the above lis oo io s nd verify that all informati is mplete and accurate. nt WA Mblicant Pri Ag''tnf or AI3ptFra—nt Signature Issue Date CAMA GENERAL PERMIT #: ina I Environmental Quality I Coastal Management Washington' Office 1943, Washington Square Mail Washington, NC27889 1­252=946-6481 Wilmington offices 127CardinaibriveExtWilmington, ,NC28405-38451 910-796-7215 Morehead city Officel 400 Commerce AvenueMoreheadCity; NC Z8557 1 252-808-2808 ,4 Beaufort County 10-17 DCM Washington Permit Number Office CAMA MINOR DEVELOPMENT PERMIT as authorized by the State of North Carolina,, Department of Environmental Quality and the Coastal Resources Commission for development in an area of environment concern pursuant to Section 113A-118 of the General Statutes, "Coastal Area Management' Issued to Ms. Linda Coughlin authorizing development in the Estuarine Shoreline (AEC) located off SR 1730 at 1672 Old Pamlico Beach Road East adjacent the Pamlico River near the Town of Belhaven in Beaufort County, North Carolina as requested in the permittee's application, dated 28 November 2017. This, permit, issued on 8 December 2017, is subject to compliance with the application and site drawing (where consistent with the permit), all applicable regulations and special conditions and notes set forth below. Any violation of these terms may subject permittee to a fine, imprisonment or civil action, or may cause the permit to be null and void. This permit authorizes: the filling, sloping, and grading of highground 30' landward of the normal water level. (1) All proposed filling and grading must be done in accordance with the permitted work plat drawings(s) dated 28 November 2017. (2) A ground cover sufficient to restrain erosion shall be provided -within the shorter of 15 working or 30 calendar days of completion of any phase of grading on cut or filled slopes. (3) Appropriate sedimentation and erosion control devices, measures or structures shall be implemented to ensure that eroded materials do not enter adjacent wetlands, watercourses and property (e.g. silt fence, diversion swales or berms, sand fence, etc.). (4) Impervious surfaces on the lot within 75'-of the normal water level (NWL) shall not exceed 30%. (5) Any change or changes in the plans for development, construction, or land use activities will require a re-evaluation and modification of this permit. (Additional Permit Conditions on Page 2) This permit action may be appealed by the permittee or other qualified persons within twenty (20) days of the issuing date. From the date of an appeal, any work conducted -under this permit must cease until the appeal is resolved. This permit must be on the project site and accessible to the permit officer when the project is inspected for compliance. Any maintenance work or project modification not covered under this permit, require further written permit approval. All work must cease when this permit expires on: 31 December 2019 In issuing this permit it is agreed that this project is consistent with the local Land Use Plan and all applicable ordinances. This permit may not be transferred to another party without the written approval of the Division of Coastal Management. Steve J. Trowell CAMA LOCAL PERMIT OFFICIAL 943 Washington Square Mall Wallington,, North Carolina 2,7889 U PERMITTEEz /' (Signature required if conditions above apply to permit) Name: Ms. Linda Coughlin Minor Permit # 10-17 Date: 8 December 2017 Page 2 (5) All unconsolidated material resulting from, associated grading and landscaping shall be retained on site by effective sedimentation and erosion control measures. Prior to any land -disturbing activities, a barrier line of filter cloth must be installed between the land disturbing activity and the adjacent marsh or water areas, until such time as the area has been properly stabilized with a vegetative cover. Note: All development must comply with the Tar/Pamlico River Basin Buffer Rules as stated in 15A NCAC 1 B.0259. Any questions regarding these rules should be directed to Mr. Anthony Scarbraugh, Division of Water Quality, Washington Regional Office, 252-946-6481. SIGNATURE. DATE: P MITTEE