HomeMy WebLinkAbout70621_Boatlift_20171206c':'
-"D
REDGE & FILL
GENERAL._PERMIT
ev0diicion ElComplete Reissue El Partial Reissue
As authorized by the State of •North Carolina, Department of Environmental Quality
and the Coastal Resources Commission inaan arSaof environmental concern pursuant to 15A NCAC_
ZY - -
- e--
V
N2 7062 1
t D
Previous permit # I
Date previous permit issue
/ia�.10
Applicant Name- '-!t
Project Location: County
Address rl 1Z ';7 Street Address/ State Road/
) Lot
City AMX�l State/— ZIP A6- K 46
Phone # E-Mail, Subdivision
Authorized Agent -7,J 111,Wl,�e— Cityu4l
0cw El EW 'YPTA [I ES 0 PTS Phone#
Affected El OEA -[--IHHF E11H El UBA 0 N/A
'AEC(s): •
El PWS:' Adj. Wtr. Body
• ORW: yes //4'o�) FNA yes'/ 34 Closest Maj. Wtr. Body-7
[Rules att
ach:
River
[Rules att
ach:
River
.■......■■........■��M
MMEMMMMMMMMMMMMMMM
MMJJMMMMJMMMMJMmmls"M1K9Ww1rMMMmMMM
ME
M0MM
mmmm
MEN
MMNWWyJffiJMMMMMMMMMUWM
=.MMMM
_J3WM0r,fA%A
MMMM
NONE
M
MMMMMMMMMMVkMMM
MEMMENEffiWaMEMIN
ME
ME
NONE■MEME
mom
M.
MMMMMNMMMMMMMMMMMM
M.
MEN
-MEMO
dirt/ MMMMIro MrAl
NONE
....■.�......■....■■...■NN■NNN
on back Of permit **
Checkif
Perm�itK�Icer's P �in ;ed�Name
Signature
IsVuirigbate 0' Upiration Date.
`TIC Division of Coastal Mgt. Habitat Impact Computer Sheet
, �l
Applicant:.Y���//V��
General Permit #:
Describe below the HABITAT disturbances for the application. All values should match the name, and units of measurement
found in your Habitat code sheet.
Habitat Name
DISTURB TYPE
Choose One
TOTAL Sq. Ft.
(Applied for.
Disturbance total
includes any
anticipated
restoration or
temp impacts)
FINAL Sq. Ft.
(Anticipated final
disturbance.
Excludes any
restoration
and/or temp
impact amount)
TOTAL Feet
(Applied for.
Disturbance
total includes
any anticipated
restoration or
temp impacts)
FINAL Feet
(Anticipated final
disturbance.
Excludes any
restoration and/or
temp impact
amount)
L L�
Dredge ❑ Fill ❑ Both ❑ Other J
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
252-808-2808 :. 1-888-4RC®AST :: www.nccoastaimanapement.net revised: 02/03/10
3
AutkorizedAgent COfisenfAgricgwefit
C&ff-ezlc— ZgEme—lV5 9 herby authorize Tobin Jay Tettertomof -
(prowly
rvUrine &�na�udjj, LLC to act on my beWff In obtaining CAMA perm fug'
the loon Usted below.
T 11
.pRopF,RTy ovINEwS ApkU.ING ADDRESS:
Phone No. ?5-2 -72V-5--7h'?-:Q42
PROPERTY OWNER'S
A, VI AMM M-2 I M -A G E N T
DATE: 2o/7
WlAuthorized Agent Consent Agree.
wart
5 's
;ndAb County)
'Che.:apgo6t has dijj bed,uo=mere{shown'-ba1mv, ate &Vetogmerit pToposwd ai e.above
-
,f l i�ave?nQ:�€�j�cfion-t�•�iia:proposal. .
t have-,objectans-to-#his-proposeL
i understand that a pier, dock, mooring pilings, boat ramp; breskwaler, boaMouse, M or gtr�in
Y =a must be setback a_minimurn distance- of 15` from my area-.ot riperisn actas unless weed by
me. (If you wish to waive the setback you y lM the appropriate blank below-)
l do wish to waive the 16 ,etback requirement.
I do not wish to waive the IV setback requirement.
(Prap -owner li ration) (hvter 1 on)
a
Pifnt cr Type i%if ie - Prim orTyuv- Narrre-
"WhoArddress Mani gAddml--
c►ty�
elyisid�Mp.
TetepfyotieiVugiberli maiTatldrass TetaphoneNumber/Mill address
47_2j_
Date 13,/11
(Raid Aug 20IR
WaUd for one Wendar year alter signature
STATE —WENT'
I hereby csr* that I own properbi adjacent to <
-(amb omperty Own
properly locaWe-A
-(Addrme,- �A,* Block, Road,- etc)
on A"Y 4ffege ---Jn W,-?t
n andlay- Caurdfi
The applIMI-It tmdescited- to rne, as shown below, the development Proposed at ftm above-
'10ceffon
I have. no9WPCdon: t0IW proposal,
Omer I h.m objections to Ns proposal-
DMCMPTION ANDIOR DRAVANG OF PROPOSED ME., Y.M.Lo
4k'
Z.
WAIVER 8&OM
"l-undembndthat a pier, dock mooring pings, ramp.of riparian access unless waived by
, breakwater. boathou -.1m,040in
ffmt he set back aminimum distdistanceof '16 from my am
. m Of you vulsbtDwaive the"setback. youp-;PCmWmlthe-appropriateblank ,below. )
e.
I do vAsh to waive the.16 setback requirement
I do not Wish to waive ft I& setback iewirenmt
T
M — , , 'i
'ri, m" 1
'Jo. 'e
60
Dior Toe
_&32 r-
I ag Address
lfe- I6, —V ek'-
52 .76-0
-2s-z-g!� 3 66Z
6EW - Imp, 4—To
Tifsphoilq NwiIW/e"
dddrWis
/Z- -,I'-
Dali?tt
(ROWWAU9. 2014).
Valid.foi sine calendar year after signature
r, • « �,4
NCDENR
North Carolina Department of Environment and Natural Resources
Division of Coastal Management
Pat McCrory Braxton C. Davis
Governor Director
BUFFER AUTHORIZATION CERTIFICATE
FOR PIER AND DOCKING FACILITIES ACCESS WAY
John E. Skvarla, III
Secretary
A riparian buffer authorization is required for pier and docking facilities access ways through the Tar -Pamlico &
Neuse River Riparian buffer per Division of Water Quality (DWQ) regulations 15A NCAC 02B.0233 & .0259. The
Division of Coastal Management (DCM), through a Memorandum of Understanding with the Division of Water
Quality (DWQ) has reviewed your project proposal and has determined that the project as proposed complies with
the aforementioned regulations. -
Those activities covered by your Coastal Area Management Act (CAMA) permit have received Buffer Authorization
as long as the. project is constructed in a manner that continues to meet all of the conditions listed below. Failure to
comply with thin Buffer Authorization may -subject -the property owner & the party (contractor) performing the
construction &/or land clearing to a civil penalty by. DWQ of up to $25,000 per day per violation.
i. Crossing is Perpendicular: Pier and docking facilityaccess, way must cross -the 50 ft. riparian buffer . -
perpendicularly (which is defined as,between.75 and 105 degrees) unless otherwise approved by DCM. The -
alignment shall minimize the removal of woody vegetation to the greatest extent practicable.
-2. Pervious Materials: All -reasonable -measures shalt. be taken to ensure the access way is made of pervious
materials like open -slatted wood, or composite, mulch, or gras&to meet the intent of the rules to the
maximum extent practicable.
3. <-Access Width: The width of the pier or docking facility access -way shall be limited to six (5) feet.
4., = Project Drawing: The drawing- on the CAMA General Permit is, considered the project drawing of your
property indicating the -relative location of the pier or docking facility -and any requested access way. This
drawing will be used'to•aid in compliance and monitoring efforts.
® Pre -project site
r signature below u agree to be held responsible for meeting all of thMi- ve andverify- -
in ation pr, vide is comp to an accurate.
r,
Printed Nam
�9
Signature
CAMA GENERAL. PERMIT-#:D� ✓��
Permit Officer's Signature
Issue Date
Washington Office Morehead City Office Wihhington Office
943 Washington Square Mall 400 Commerce Avenue 127 Cardinal Drive Ext.
- Washington, NC 27889 Morehead City, NC 28557 Wahnington, NC 28405-3845
Phone 252-946.6481 Phone 252-808-2808 Phone 910-796-7215