HomeMy WebLinkAbout70672_Replace Pier_20180227.AMA / ❑.DREDGE & FILL N2 7®6 l 2 A �B C D
GENERAL PERMIT Previous permit # MIA
New ❑Modification ❑Complete Reissue ❑Partial,Reissue Date previous permit issued to I/A
As authorized by the State of North Carolina, Department of Environmental Quality
and the Coastal Resources Commission in an area of environmental concern pursuant to 15A NCAC (:2)-71-1 )-L do
Applicant Name PJA,6
Address) (Pof � 4Cy i r YiEw LA-O-K
City T-'� State P c... ZIPe►—
Phone # (2�2) -7/ u.-r i49 c� E-Mail
Authorized Agent k?�
Affected' ❑ CW X] EW .® PTA ❑ ES ❑ PTS
AEC(s): " ❑ OEA ❑ HHF ❑ IH ❑ UBA ❑ N/A
❑ PWS:
ORW: yes / no PNA yes / no
Project Location: County
Street Address/ State Road/ Lot #(s)yE.F ep , i •pc) "
F
Subdivision
City r _pk) r4-r5 ZIP�-
Phone # ( ) River Basin-77411--,PAr-L-1 I'Zo
Adj. Wtr. Body" 'PAt,�A�,i (c::) 1 J1 na /man '/unkn�
Closest Maj. Wtr. Bodynr"`'i J 7i
■■■■■■■■■■■■■■■■■i■�1■■■■tl■■■■■■■■■■■■■■■
■9"7eiLr'i�l r7G�t�l-'Lii■■it■'at1■■■■tli6■!�il�l�lElf!�l:�l�■■■■
I�:::: �::■■�■e::®®:E:
ONwA:ENERR::■CMIN
■■■■■till■ii■■■■i■■11■.■■■■■■■■■■■■■■■■■■
..-.
■■■■i■■■■■■■■■■■■■■�1■■i■■■■■■■■■■■■■■■■
.■.■.........■■■■■■Ili.■■■......■.■iii■■'
■..........■■■■■■■■I1�.■■■■■■■■..■.■...■.
ME ■■E■�i'!.!!■■i�i111■E�■■■■■�
1�.■■■■■■■■■■■■■■■■■■
NSA 11I
■■�i■■■■■■■■■iiiiii
iiiiiii■■o■®EeEiii�i
No MENNEN
�C ��(7A041/ eC_ r
Agent or Applicant Printed Name
Signature"Please readcompliancestatement°onback ofpermit"
ApplicationFe� e(s) ,Check#
,,PEfrmit0fficePs Printed Name
2 / f - 0 a A -
Issuing Date
Expiration Date
Permit#: —? D G'7?
Date:
Describe 6efowthe HABITAT disturbances fair the appCca6am. All *values should match the nan•te, and units of measurement
found in your Habitat code sheet_
TOTAL Sq- F'
FINAL Sq_ Ft.
TOTAL Feet
FINAL Feet
(Applied for.
(Anticipated final•
(Applied faro
(Anticipated tidal
Habffat Marne
DISTURH•TYPE
disturbance total
disubanc e.
Dws barrcg
disturbance,
' Cho6se One
includes any
adudes are
total includes '
Excludes any
anticipated
re,farafiafr
any anticipated
resiarafian andfor
restara$on or
andfartemp,
restoralan or
temp impact
tamp inipacts)
impact amount)
tenp impacts)
amaurtf)
Dredge Q FIR [j Bath. Q Other
Dredge Q , F1[ Q Satfr Q Other Q
'
Oredge-0- Fill Q Path Q Other Q
Dredge q Q Bath Q Other [{
Oredde Q Fill Q. Batt[ L7 ether Q
i
—riff f-4 Bath Q after Q'
f
• •• '•i
- -
Dredge !=; T^' Bath t=r ether C! (
- 1.
� �
•
_ _
}
Ored4a Ci ►ff Q Bath t , oilier Q
DMdge•Q Q. - Bath C. - other
(•
xQ=P i Fill C Gaut Q (low-
I• .(.
��� r ;rt r1- �a�r Q- ��ttter Q� .{. � f
I
�
-
! ..
-
I
• •- ��iqa
�1•' � Pazn •:,cuter I'
1.
•
�
wLijal
Oredge Q F1•t i Q- flatfr'Q' ether. Q I I
[hedge Q . Fill 0 SM. [[ ' Ofher"Q
I hereby certify that I own property adjacent to
I
/ (Name of Property Owner)
property located at l �f E�'S'�� C1,' e,e) Zae. e_
(Address, I ot. Block, Road, etc.)
on fA� Cyr /,cd , in Zt, cc /S' C -d2%C N.C.
(Waterbody) (City/Town and/or County)
The applicant has described to me, as shown below, the development proposed at the above
location.
I have no objection to this proposal.
I have objections to this proposal.
DESCRIPTION AND/OR DRAWING OF PROPOSED DEVELOPMENT
(individual proposing development must fill in description below or attach a site
drawing)
/2V �c c.Q-- 4'10�rAE'5 'Opal e:-
WAIVER SECTION
I understand that a pier, dock, mooring pilings, breakwater, boathouse, lift, or groin must be set
back a minimum distance of 15' from my area of riparian access unless waived by me. (If you
wish to waive the setback, you must initial the appropriate blank below.)
I do wish to waive the 15' setback requirement.
I do not wish to waive the 15' setback requirement.
(Propgrty� I/ nform�ation (Adjacent Property Owner Information)
Signature Vl011 dGLT. G I ks Signature
JE6,0/ct` 0 � /!�-efk'r T) Aook
Print or Type Name Print or Type Name 1
e�PFos % t/, a t/ 6,,rQ _ �1 �I (✓ W �1
Mailing Address
C
City/State2ip
.2 Zffl,
Mailing Address
City/State2ip
Telephone Number
2.c a -- s'9 ,7
Date
Telephone Number
Date
6/18(2012)
(Revised
,CGIGJ 's
I hereby certify that I own property adjacent to
(Name of Property Owner)
property located at � 45 `� C"" e c! L-Q e., 'e—
(Address, Lot, Block, Road, etc.)
on 1,, ,4 s ;z,C-Iey- in ��ie.z��i' C'c•e �,C N.C.
(Waterbody) (City/Town and/or County)
The applicant has described to me, as shown below, the development proposed at the above
location.
I have no objection to this proposal.
I have objections to this proposal.
DESCRIPTION AND/OR DRAWING OF PROPOSED DEVELOPMENT
(Individual proposing development must rill in description below or attach a site
drawing)
V/0 cam p� ► ��o �.c (' `Dr �r
WAIVER SECTION
I understand that a pier, dock, mooring pilings, breakwater, boathouse, lift, or groin must be set
back a minimum distance of 15' from my area of riparian access unless waived by me. (If you
wish to waive the setback, you must initial the appropriate blank below.)
I do wish to waive the 15' setback requirement.
I do not wish to waive the 15' setback requirement.
(Pr perty Owner Inform ion (Adjacent Property Owner Information)
Signature �i T, L 1 k 5 Signature
r /__ \
/ Mao c% �• � L asra /lP, 14 svr
Print or Type Name Print or Type Name
le— %ter✓ zo"'P , /s'.g G�c r % c4 eu.a /—4'C'e -
Mailing Address Mailing Address
City/State&ip City/State/Zip
Telephone Number
,2sa-7/�1-Ds—f
Date
Telephone Number
Date
6/18(2012)
(Revised
1
f�,
1 >~
CoasigCMan-a ent
ENVIRONMENTAL 2ALtTY
BUFFER AUTHORIZATION CERTIFICATE
FOR PIER AND DOCKING FACILITIES ACCESS WAY
ROY COOPER
Governor
MICHAEL S. REGAN
Secretary
BRAXTON DAVIS-
Director
A riparian buffer authorization is required for pier and docking facilities access ways through the Tar -Pamlico &
Neuse River Riparian buffer per Division of Water Resources (DWR) regulations 15A NCAC 02B.0233 & .0259. The
Division of Coastal Management (DCM), through a Memorandum of Understanding with the Division of Water
Resources (DWR) has reviewed your project proposal and has determined that the project as proposed complies
with the aforementioned regulations.
Those activities covered by your Coastal Area Management Act (CAMA) permit have received Buffer Authorization
provided the project is constructed in a manner that continues to meet all of the conditions listed below. Failure to
comply with this Buffer Authorization may subject the property owner and the party (contractor) performing the
construction and/or land clearing to a civil penalty by DWR of up to $25,000 per day per violation.
1. - Crossing is Perpendicular: Pier and docking facility access way must cross the 50 ft. riparian buffer
perpendicularly (which is defined as between 75 and 105 degrees) unless otherwise approved by DCM. The
alignment shall minimize the removal of woody vegetation to the greatest extent practicable.
2. Pervious Materials: All reasonable measures shall be taken to ensure the access way is made of pervious
materials like open -slatted wood or composite, mulch, or grass to meet the intent of the rules to the -
maximum extent practicable.
3. Access Width: The width of the pier or docking facility access way shall be limited to six (6) feet.
4. Project Drawing: The drawing on the CAMA General Permit is considered the project drawing of your
property indicating the relative location of the pier or docking facility and any requested access way. This
drawing will be used to aid in compliance and monitoring efforts.
• Pre -project site conditions: --a,,• x
By your signature below you agree to be held responsible for meeting all of the conditions listed above and verify
that all information provided is complete and accurate. ,
Xel � f
Agent or Applicant Printed Name Permit Officer's Signature
Agent or Applicant Signature Issue Date
CAMA GENERAL PERMIT #: "mod (---1'3-- —:5
State of,North Carolina I Environmental Quality [Coastal Management
Washington. Office, 1943-Washington Square Mail Washington, NG27889 G252-946-6481
Wilmington Office 1 127 Cardinal Drive Ext. Wilmington, NG 28405-384sa' 910-796-7215
Morehead City Office 1400 Commerce Avenue Morehead City, NC 28557 1 282-808 2868