HomeMy WebLinkAbout70614_Pier, Platform repair, riprap, and wetslip_20180216�CAMA /'❑ DREDGE & FILL 706I4 -
K:, GNEI3AL PERMIT Previous permit# A A C D
'..
`lew ❑Modification ❑Com lete Reissue ❑Partial Reissue Date,previous permit is ued
A) -'authorized by the State of North Carolina, Department of Environmental Quality
s' an 'the Coastal Resources Commission in an area of environmental concern pursuant to 15A NCAC ► i . j Za C
=-t = I t.Rules attached.
Applicant Name LiAl p n 011 Y F-)2 S cl Project Location: County
Address 1P- 14 � G O s j' 2 ' $ Street Address/ State Road/ Lot #(s) ��, �W A)( p
City F L i I AA ^J State /J (- ZIP 991C7
Phone # () E-Mail
Authorized,Agent 'r OjZCS j - jJA Z I`7 -,") .96 cf - LI F L1 O
' 0 Cw. '
.`^
;*TA El ES ElPTS
Affected
❑ OEA
AEC(s):'
❑ HHF
❑ IH ❑ UBA ❑ N/A
❑ PWS.
ORW: yes :/-p7o
PNA
yes
<fJORC
Subdivision Pw Ij G p $ Po f--f
City t: LHAVC ZIP., ��y^
Phone # ( ) River Basin T' • 2 P /`?
Adj. Wtr. Body �( n 12 1 Vr)L Oat Iman /unkn)
Closest Maj. Wtr. Body F(/AV�:- 0 e I V On_
..■
.........................■......■�■■■
■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■
■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■
■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■
■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■
■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■
■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■
■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■
Agent or Applicant Printed Name...—r
'Si naturre�e Pleaseceadcompliance statement onback ofpermit
Application Fee(s) Check #
• ark "•
i/t v ) /J f-IAP—r
PermitOfficer's Printed Name
Signature
Issuing Date Expiration Date
INC Division of Coastal Mgt. Habitat Impact Computer Sheet
Applicant:
Date:
General Permit #:
Describe below the HABITAT disturbances for the application. All values should match the name, and units of measurement
found in your Habitat code sheet.
Habitat Name
DISTURB TYPE
Choose One
TOTAL Sq. Ft.
(Applied for.
Disturbance total
includes any
anticipated
restoration or
temp impacts)
FINAL Sq. Ft.
(Anticipated final
disturbance.
Excludes any
restoration
and/or temp
impact amount)
TOTAL Feet
(Applied for.
Disturbance
total includes
any anticipated
restoration or
temp impacts
FINAL Feet
(Anticipated final
disturbance.
Excludes any
restoration and/or
temp impact
amount
Wh ('
Dredge ElFill El Both ❑ Other XL
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
252-808-2808 :: 1-888-4RCOAST :: www.nccoastaimanagement.net revised:02/03/10
Linda Wilkerson
Pier Project
767 Pungo Shores
4 Post Lift Belhaven NC
BFW2017-00217-1
NOT TO SCALE
v
This drawing and design are the property of
B. F. Warren & Sons. Inc, Reproduction or
use of this drawing without a=mpanying o f
written permission is strictly prohibited.
�s NN
4
Pungo River
10, 0"
39 0"
Harrell Prop
N
c Wet Slip c
N -
ISO" 1 11 I 11 12' 0" 1 12- 0"
0
0
c
+1 \jFA
Riparian Arch Ripartan Access
IF 0" .cn_ _i 1510"
- 50' 0"
NoL
Wilkerson Prop
0
0
N
Cutler Prop
w u
Adjacent Riparian Property Owner Statement
Prepared by
B. Fa Warren & Song, Inc.
180 Taylor Farm Road, Belhaven NC 27810
Office (252)964-4628 Fax (252)964-6861
Mobile (252)945-4240 Home (252)964-2386
www.ncpiers.com
June 29, 2007
I, the undersigned property owner, do hereby certify that I own property adjacent to `„���r'�5�1
's property located at PjA50 6horeS on 6 _(body
of water), in
NC.
The applicant has described to me, as shown below, the development proposed at the above
location. I understand that any construction, excluding bulkheads, must be set back a minimum
distance of fifteen feet (15') from my area of riparian access unless waived by me.
Please initial the appropriate blank sign and date below.
I have no objection to the project as proposed but do not wish to waive the fifteen foot
(15') set back.
I have no objection to the project as proposed but do wish to waive the fifteen foot (15')
setback.
I object to the project proposed.
Property owner signature�19�0,JAgJ
Printed name
Address '/ 't V f-'Ueqlp) 110Red 1
Telephone number
Date
Description and / or Drawing of Proposed Development
Yq'.tL f �
Page 1 of 2
Forrest Warren
From: "Linda Wilkerson" <lindawilkersonl950@gmail.com>
Date: Tuesday, February 13, 2018 10:46 AM
To: "Forrest Warren" <bfwarrennson@gotricounty.com>; "Linda Wilkerson" <1indawilkersonl950@gmail.com>
Subject: Re: Agent Consent Form
I, Linda Wilkerson, property owner of 767 Pungo Shores of Belhaven, NC., do
hereby authorize B.F. Warren & Sons, Inc., to act on my behalf in obtaining
necessary permit/s for listed projects.
Projects:
Installation of Concrete Dock
Installation of 70 feet of RipRap
Linda Smith Wilkerson
r f
�fN
Nonth G'frollina Depa t�l ent o`if.Fnvil1"O71!rn:eit ,r",a;td iatu!'.all Rpusourcee
UhAsion of Coastal Man_gen, en
Pat hicCroRf 3rwdon C. Da%As
Gdtremor Director
BUFFER AUTHOR0.74` HON CERTOFOCATE
FOR- NEE AND D®C KONG FACLIMES ACCESS WAY
John E. Skwarla, III
Sec etapf
A riparian buffer authorization is required for pier and docking facilities access ways through ft Tar -Pamlico &
Meuse River Riparian buffer per Division of Water Quality (DWQ) regulations 15A hlCAC 02B.0233 & .0259. The
®ivision of Coastal Management (DCM), through a Memorandum of Understanding -with the Division of Water
Quality (DWQ)-has reviewed your project proposal and has determined that the project as proposed complies with
the aforementioned regulations.
i hose activities covered by your Coastal Area Management Act (CAMA) permit have received Buffer Auihoftation
as long as the project is constructed in a mariner that continues to meet -all Of-theconditions listed below. Failure to -
comply with this Buffer Authorization ' may subject the property owner & the party (contractor) performing the
construction Wor land clearing to a civil penalty'by DWQ of up to $25,000 per day per violation.
i _ Crossing is- Perpendicular: Fier and docking facility access way must cross the 50 ft. riparian buffer
perpendicularly (which -is defined as between 75 and 105 degrees) unless otherwise approved by DCM. the
alignment shall minimize the removal of woody vegetation to the greatest extent practicable.
2. Pervious Materlals: All reasonable measures shall be taken to ensure the access -way is made of pervious
- materials like open -slatted wood_ or composite, mulch, or grass to meet the intent of the rules to the
maximum extent practicable.
3. Access Width: The width of the pier or docking facility access way shall. be limited to six (6) feet,
4 Project Drawing: The drawing on the CAMA General Permit is considered the project drawing- of your
property indicating the -relative location of the pier or docking facility and any requested access -way. This
drawing will be used to aid, in compliance and monitoring efforts.
a Pre -project- site conditions: t'_ A W
By your signature below you agree to be responsible -for meeting all of the conditions listed above and verify
that all information provided is complete and accurate.
Agent w Appilicatnt Printed Name
Pe &PPegnatum
CAiI}IiA GENERAL PERMOT fe Z a14 " Q
14:1
Permit Officees 809eiat ure
)`_ rIL3 Zoe
Issue ®ate
Washington Office Morehead City Office Wilmington Office
943 Washington Square Mali 400 Commerce A_ venue I27 Cardinal Drive Ext.-
-Washington; NC 27M Morehead City, NC 28557 Wilmington, NC 28405-3845
Phone 252 94"481 Phone 252-809-2808 Phone 910-796 7215
NCD NR
North Carolina Department of Environment and NaturE
Division of Coastal Management
Pat McCrory Braxton C. Davis
Governor Director
Resources
John E, Skvarla, III
uocretar ry
BUFFER AUTHORIZATION CERTIFICATE FOR SHORELINE STABILIZATION
A riparian buffer authorization is required for shoreline stabilization activities within the Tar -Pamlico & Neuse River basins
per Division of Water Quality (DWQ) regulations 15A NCAC 02B.0259 & 0233. The Division of Coastal Management
(DCM) through a Memorandum of Understanding with the Division of Water Quality (DWO) has reviewed your project
proposal and has determined that the project as proposed complies with the aforementioned regulations.
Those activities covered by your Coastal Area Management Act (LAMA) permit have received Buffer Authorization as
long as the project is constructed in a manner that continues to meet all of the conditions listed below Failure to comply
with this Buffer Authorization may subject the property owner & the party (contractor) performing the construction Wor
land clearing to a civil penalty by DWQ of up to $25,D00 per day per violation.
I. Impacts: Impacts to woody vegetation from clearing and filling in Zone 1 (begins at the most landward of either
the waters edge or the coastal wetland line and extends 30 feet landward) shall be minimized to what must be
impacted for the sound installation of the shoreline stabilization project. Unnecessary clearing and filling in the
buffer is a violation of the riparian buffer rules.
2. Clearing & Grading. Clearing and grading of Zone 2 (begins at the landward edge of Zone 1 and extends 20 feet
landward) is allowed provided that it is re -vegetated immediately and Zone 1 is not compromised, which includes
maintaining diffused (non-channelized) flow of storm water runoff through the buffer.
3. Construction Corridors: Construction corridors are allowed for shoreline stabilization projects, but they must be
satisfactorily restored as described in condition 5 below.
4. Potential Overwash: For vertical shoreline stabilization projects (bulkheads) only; sites where wave overwash is
expected -to be severe, the first ten (10) feet landward (unless specifically authorized otherwise by DCM) from the
structure may be maintained as a stable lawn in order to provide for structural stability
s. Temporary Stabilization. Immediately post- construction, bare soils must be stabilized as quickly as possible by
providing a temporary ground cover. Newly seeded areas should be protected with mulch and/or erosion matting.
This ground cover is a temporary measure used to address erosion until site restoration can be accomplished.
s Site Restoration: At minimum, pre -project site -conditions must be re-established. A site that was wooded prior to
this shoreline stabilization project must be restored with woody vegetation at a stem density of 320 stems per
acre. Non wooded sites may be re -vegetated with woody vegetation. Restoration must be completed by the first
subsequent planting season (November 1 through March 30) after completion of the bulkhead.
• Pre -project site conditions'
7. Project Drawing: The drawing on the CAMA General Permit is Considered the project drawing of your property
indicating the location of the shoreline stabilization structure and any associated clearing, grading, and
construction corridors. This drawing will be used to aid in Compliance and monitoring efforts.
By your signature below you agree to be held responsible for meeting all of the above listed conditions and verify that all
information is complete and accurate.
1 14mm- 5n1- l.0kwi Ptr-s ,,
Agent or Applicant Printed Name Permit Officer's Signature
Age t or pplicant Signature Issue Date
CAMA GENERAL PERMIT #:
Washington Office Morehead City Office Wilmington office
943 Washington Square Mail 400 Cninmerce Avenue 127 Cardinal Drive L•xt
Washington. NC 27889 Morehead City, NC M57 Wilmington. NC 28405-3845
Phone 257.-946-6481 Phone 252.908-2808 910-796-7215
Adjacent Rrparzan Properly Owner Statement
Prepared by
. G
B. E Warren & Sons, Inc.
1� 180 Taylor Farm Road, Belhaven NC 27810
Office (252)964-4628 Fax (252)964-6861
Freddy Mobile (252)945-4240 Forrest Mobile (252)945-2492
NC General Contractor License# 72600
www.ncpiers.com
September 19, 2017
I, the undersigned property owner, do hereby certify that I own property adjacent to -Laura
Wilkerson's property located at 767 Pungo Shores on Pamlico River (body of water), in
Belhaven, NC.
The applicant has described to me, as shown below, the development proposed at the above
location. I understand that any construction, excluding bulkheads, must be set back a minimum
distance of fifteen feet (15') from my area of riparian access unless waived by me.
Please initial the appropriate blank, sign and date below.
✓I have no objection to the project as proposed but do not wish to waive the fifteen foot
(15') setback.
I have no objection to the project as proposed but do wish to waive the fifteen foot (15')
setback.
I object to the project proposed.
Property owner signature I'���_ �4_
Printed name 4r , e s
Address % S%- P k !� p
Telephone number ( `�/ ) � / q - %S% S
Date_/ p 2 / o /-9
Description and / or Drawing of Proposed Development
Installation of Concrete Dock
X_ k ,
K
1 i 5