HomeMy WebLinkAbout70675_Replace boatramp_20180307CAMA / ❑ DREDGE & FILL G'1 �j "1 �� N2 70675
�:. X ENERAL . 'PERMIT Previous permit # V)
`?lew ❑Modification . ; ❑Complete Reissue ❑Partial Reissue Date previous permit issued iV
As authorized by the State of North Carolina, Department of Environmental Quality
and the Coastal Resources Commission in an area of environmental concern pursuant to I SA NCAC in') 14 3 eD
Rules attached.
Applicant Name U
Address • 5 . 'E• 13/-•) -, S 1YJ f Ca.
State �J ZIP 2D 9 /
Phone #( )q S<3 - I Z 4- k E-Mail
Authorized Agent
Affected ❑ OE
AEC(s): ❑ O�
-VEW Q•PTA IDES OPTS
❑ HHF ❑ IH ❑ UBA ❑ N/A
❑ PWS:
ORW: yes _no PNA yes(rn�)
Project Location: County
Street Address/ State Road/ Lot #(s) n S 62: I 1 (o Z
Subdivision
City ��y� Co w I a-hiNj ZIP
i
Phone # ( ) River Basin / /,1M c•� U
Adj. Wtr. Body (V� /-/ IA-D6 (nat•
Closest Maj. Wtr. Body
■■■i■■■■E■■■■■■■■■■■■■i■■®■■■■®■■■■■Noi■
..............■.......��..■■■■■■■■■■■■■■■
M.
■■■■■■■■■■■■■■■■■■■■■■c.■■■■■■■�►■■■■■■■■
■■■■■;■■■■■■■■■■■■■■■■e■■i■■■■■■■■■■■■■■■
■�■■■;■■■■■■■■■■■r�■■■■■ter■■■■■■■■■■■■■■■■
•■■■■■■■■■■■■■■■■■■■■■�■►gin■■■■■■■■■■■■■■■
5�gzx L D ,
4gent or Applicant Printed R me
Signature "Please read compliance statement on(b&ckofpermit"
• ° Application Fee(s) Check#
Permit0fficer's Printed Name ,
Signature
Issuing Date Ezpiratioh Date
e''-�a.t=a .'r��•x,.c-,,�,-7rw nY-:a �fs°i.. u 1u�"'.-�' F "y9 yt ,� i,, ..•, -
Applicant~ A?'S r-� s U • �. /.� .
Date: Penntt*
[Describe belowtite HABITAT disturbances for the applica(ian_; All values should match the narrte, and ru s of measurement
found in your Habitat codd sheet_
TOTAi ,Sq_ rlE
FINAL Sq_ Ft
TOTAL Feet
FINAL Felt
(APPIIed for_
Onticipated final•
(Appliad fora,
(AnMpated final
Hahifat Marne
C)l:STURH•TYPE
Disturbance total
disUbarnce.
Qlstdi bane
disturbance,
.'
Chasse One
includes any
Excludes anf
tatal includes
Excludes any
anticipated
restaratian•.
any anddpatad
restoratianandlor
restoration or
andlar temp
rastaratlan or
temp impac�
temp inipacts)
im act amount}
temp impacts)
amount)
S tian,•t.w ..1.�
-
.
Dredge [Q ' Fig [[ Bath. Q Other
z
2
Qredg� Q , Fill Q Both Q other Q
Dredge-0- Fill Q Bath Q Other Q
Dredcde Q (riff Q Bath Q Other Q
Oredde 0 Fig Q. Bath Q Other Q
_ -
Oredge'[j . rJU Q t3attr Q Other Q"
I+�reugs
1 :; r Iii C: EIattf'0 Other C:t
I;
IE•
Dradde 0- � Q gcm l <, Other
1
Oredga Qi �'_ each Q _ Other C.i-
�•
C act Q rJther- Q'J
Dredge IIQ Fill Q 3adt Q Otlrer r--
2reagr_,1 = Il'C• Sat , El Cmer r �• i '
Oredgs Q Flit Q ao 'CI. Other
Clredgs Q - Fill Q Bdt(t Q Other'Q
,& W v -Et
ROY COOPER
Governor
MICHAEL S. REGAN
Secretary
Coastal Management BRAXTON DAVIS
ENVIRaNMENTALQUALITY Dlrectar
-BUFFER AUTHORIZATION CERTIFICATE FOR SHORELINE STABILIZATION
A riparian buffer authorization is required for shoreline -stabilization activities within the Neuse and Tar -Pamlico River
basins per Division of Water Resources (DWR) regulations.l5A NCAC 02B. 0233 and 0259. The Division of Coastal
Management (DCM) through a -Memorandum of Understanding with the Division of Water Resources (DWR) has
reviewed your project proposal and has determined that the project as proposed complies with the aforementioned
regulations.
Those activities covered by your Coastal Area Management Act (CAMA) permit have received Buffer Authorization
provided the project is constructed in a manner that continues to meet all of the conditions listed below. Failure to -
comply with this Buffer Authorization may subject the property owner and.the party (contractor) performing the
construction and/or land clearing to a civil penalty by DWR of up to $25,000 per day per violation.
i. Impacts: Impacts to woody vegetation from clearing and filling in-Zone-1 (begins at the most landward of either
normal water line (NWL) or normal high waterline (NHWL) and extends 30 feet landward) shall be minimized to,
what must be impacted for the sound installation of the shoreline stabilization project. Unnecessary clearing and
filling in the buffer is a violation of the riparian buffer rules.
2. Clearing & Grading: Clearing and grading of Zone 2 (begins at the landward edge of Zone Land extends 20 feet
landward) is allowed provided that -it is �e-vegetated immediately -and Zone 1 is not compromised, which includes
maintaining diffused (non-channelized) flow of storm water runoff through the -buffer. .
a. Construction Corridors: Construction corridors are allowed for shoreline stabilization projects, but they must be
satisfactorily restored as described in condition 5 below.
4. Potential overwash: For vertical shoreline stabilization projects (bulkheads) only; sites where wave overwash is
expected to be severe, the first ten (10) feet landward (unless specifically authorized otherwise by DCM) from the
structure may be maintained as a stable lawn in order to provide for structural stability.
5. Temporary Stabilization: Immediately post- construction, bare soils must be stabilized as quickly as possible by
providing a temporary ground cover. Newly seeded areas should be protected with mulch and/or erosion matting.
This ground cover is a temporary measure used to address erosion until site restoration can be accomplished.
6. Site Restoration: At minimum, pre -project site conditions must be re-established. A site that was wooded, prior to
this shoreline stabilization project must be restored with woody vegetation at a stem density of 260 stems per -acre.
Non wooded sites may be re -vegetated with woody vegetation. Restoration must be completed by the first
subsequent planting season (November 1 through March 30) after completion of the bulkhead.
• Pre -project site conditions: �cr
7. Project Drawing: The drawing on the CAMA General Permit is considered the project drawing of your property
indicating the location of the shoreline stabilization structure and any associated clearing, grading, and construction
corridors. This drawing will be used to aid in compliance and monitoring efforts.
By your signature below you agree to be held responsible for meeting all of the above "sted conditions and verify that all
information is plete and accurate.
rye
A nt or AppI to Pr nted ame ermi ficer's Signal
ILM T ,4_2a7
Agent or Applicant Signatu Issue Date
CAMA GENERAL PERMIT #: , —7 — f
State of North Carolina I Environmental Qualky I CoastalManagement
Washington Office 1943 Washington Square Mall Washington, NC 278891252-946-6481
Wilmington Office 1 127 Cardinal Drive Ext. Wilmington, NC 28405-3845 1 910-796-7215
Morehead City Office 1400 Commerce Avenue Morehead City, NC 28557 1 252-808-2808