HomeMy WebLinkAbout70678_Excavate_20180308� \CAMA"% ❑DREDGE &FILL G a`Y & N2 7067 A B D:'
GENERAL -PERMIT Previouspermit# �:
flew ❑Modification ❑Complete Reissue ❑Partial Reissue Date previous permit issued
As authorized by the State of North Carolina, Department of Environmental Quality
and the Coastal Resources Commission in an area of environmental concern pursuant to I SA NCAC 0-7 >-1
ORules attached.
'-Applicant-Name A 1" --�J�' Project Location: County
Address TZ-D
CiState- i C- ZIP
Phone'# I I bq E-Mail'
Authorized'Agent 0
Affected cw ❑ EW, UA ❑ ES �[?TS
AEC(s): ElOEA ElHHF ❑ IH ElUBA El NIA,
❑ PWS:
ORW: yes / no _ PNA yes(/no
Street Address/ State Road/ Lot #(s)
Subdivision
City `��-1 ZIP
Phone # ( ) River Basin-RW-- P/\MLt O.
Adj. Wtr. Body 10 '-VD O—ab /man /unkn) .
Closest Maj. Wtr. Body
Type of Project/ Activity lr t' i /
. -'(Scale:
Pier ( -
Fixes
Float
Fingi
Groi
Bulk
Basil
Boat
Boat
Beac
Othi
Shor
SAV
Mon
Phot
Wain
■■■■■■■■■■■■■■■■■■■■®■■■■■■■■■■■■■■■■■■
Platform- I
ng Platform(s)
■■■■■■■■a■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■
i length
■■■■�■I�i�■■■■
■■■■■®■■■
■■■■■
■®■■■■■■■
■■■■■■■■■■■■■■■■■■■■■■■e■■■■■■■■■■■■■■
number
■■■■■■■■■■■■■■■■■■■■N■■■■■■■■■®■■■■■■■■
avg distance offshore -
max distance offshore
■■■■r�■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■
■■sir■■■■�■■■■����:■��■■■■i�■■■■■■■■■■■■■■
cubic yards
ramp
■■�l■fit!■■■■■1�■!jam■■��■■�!�■fa■i1v]��lT�l■■d
�■
■■NEE,®RMEMMIMMEMEMEMEMMENIVE
MAMMENIZIMIRMEMMEM
■■...■■.MUNEWOR■■...■..■■■.
■■.R.■■■■■■■■■
dine Len - • •
■■■■■■■■■■_■_■_���■■■■■■■■■_■_■_■_■■■■■■■■■I
no
`�i�■■■■■■■i■�rrr������.�.ri..r���■■■■■■■■■
Ir-s: yes •
■■■�■■■■■®■■■■■■■1�■■�l,7■■■■■■■■mil
L•�G°:!�i�Ti■■■
A building permit may be required by: j j-� /; " ! �� • L�J' See note on back.regarding River Basin rules.,
( Note Local Planning jurisdiction) • 1 .
Notes/ Special Conditions LvT- Ji �-� r/hrj�.� ( J )� . / 2L SPOIL � �
e)"_l t„ )0 IDr-7-,�T7� ?z� f3t INb D Q�!FP 1,a1
-. , ) - -- 2,,
Agent o Applic n Print Na e
' A
Signature' " leas read compliance statement on back of permit
5
U. 0nn L
Appli ationFee(s) Check#
V _ .
� MA?,Ci+ 7,31 �ulQ7
Issuing Date - Expiration Date
. L•�i 8 u t�`` 0` 'te aaslee, a.
-
ApP[!=t'rTa,•^ A"iY,.�jr
Date:
Permit:
U1
-
M Aw—Lt-� r2-01
Oesct7be laefo vthe HABITAT disturbances fair the Wrfcatior>_. All *values should the nee, and units of measurement
feurid in your Hahitrh.code sheet_
match
TOT -AI, 5q_ Ft
FIIqAL 9q_ Ft
TOTAL Feet
FINAL Feet
(Applied far.
(Anticipated final
(Appuad fcce
(Anticipated 6cral
Habitat Marne C}ISTURS-TYPE
Disturbance total
disubance,
Ristdr'bancg
o"rsturbance,
Cha(jss One
includes any
Excludes arty
total includes
Excludes any
anticipated ,
reitarafiorr
any anticipated
restafRtfon andfor
restoration or
aAdlor temp
reistoraifan or
temp impact
temp hr pacts)
fm -act amount)
tenp impacts)
amount)
moo;-ror✓�
Dredge Fill Q Both. Q- Qtfter
Qrarfge Q , Fill Q ElotfT Q Other Q
;
Oredge-Q- FII Q Bath Q Other ❑
Oredae Q ni Q Bath Q Other Q
Oredge Q Fig Q. Goat C_1 other Q
i f ❑cadge Q -rillQ' Bath Q Other Q' I
�tedga 1::;-3 r BaTii Other Q �. .
❑rgdge iJ Ctm OlnEc OT
!. ofedg4-' ' 3,17.M. cant •.r'. Other (i_' I .._ _Iff
[- Q=ge i F111 i? Elath Q Other. U
Oredae t( iff C r -Bach Q Other Q'
firia =^I ' 'artt • ,u"ter �' l
Oreage i 'C. • Aath' _ Other .
Otedg' a Q Fill Q&t# Q' Othec- Q
I
Oredgf: Q . !riff Q 86M Q Oilier'[(
-ADJACENT RIPARIAN PROPERTY OWNER STATEMENT
hereby certify that I own property adjacent to Tom Atkins
(Name of Property Owner)
on Mixon Creek
(Waterbody)
property located at 301 Ormond Ave., Bath, NC 27808
(Address, Lot, Block, Road', etc.)
in Bath, NC 27809 , N.C.
(City/Town andior County).
I
The applicant has described to me, as shown below, the development proposed at the above
location.
x I have no objection to this proposal.
1 have objections to this proposal. = _
DESCRIPTION AND/OR DRAWING OF -PROPOSED DEVELOPMENT _
(Individual proposing devefop ri*6t mftsf #I/ in descrfption below:be4Hach a§He::dv wing )
This request is for the purpose of cleaning out my boat canal, picture attached, to allow my boat to have proper engress and egress. Overtime, the mouth of the canal has, become filled with sand*-: -___ _ __ __,. .•
to the point that the boat cannot pass through.
The clearing will be done by small -excavator, shovel, or both. The sand removed will -be stored on
my property and used for general maintenance. The sand will be removed only.to the same -depth of
the creek, about 2.5'.
WAIVER SECTION
1 understand that a pier, dock, mooring pilings, boat ramp, breakwater, boathouse, lift, or groin
must be set back a minimum distance of IV from my area of riparian access unless waived by
me. (if you wish to waive -the setback, you must initial the appropriate_ blank below.)
x I do wish to waive the 15' setback requirement.
1 do not wish to waive the 16 setback requirement..
(Property Owner Information) (Adjacent Property Owner -information)
Signature Signature*
Tom Atkins YAichael G. McVearry
Print or Type Name Print or Type Name -
509 Northwood Rd 2508 Virginia Dare Trail
Mailing Address Mailing Address
Washington, NC 27889 Nags Head, NC 27969
City/S€ataZp City/S€atevZip
262-943-1169
Telephone Number/email address Telephone Number/email address ,
2/7/2018 5-2- S-7 3 �,' qe/
Date Date
(Revised Aug. 2014)
*Valid for one calendar year after signature*
PDF processed with CutePDF evaluation edition www.CutePDF.com
-_ADJACENT RIPARIAN PROPERTY OWNER STATEMENT
I hereby cer* that Down property adjacent to Tom Atkins
(Naae�e of Pr®pert90 Owner)
property located at 301 Ormond Ave., Bath, NC 27808
(Address, Lot, Block.- Road; etc.)
,on Mixon Creek in Bath, NC 27809 , N.C.
(Waterbody) (CityiTown andfor County)
The applicant has described to me, as shown below, the development proposed at the -above
-location.
x I have no objection to this proposal.
's
have objections to this, proposal.
DESCRIPTION ANDIOR DRAMNQ OF PROPOSED DEVELOPMENT
(f dnrfduaf',proposfn4�d&elopmerit must Ifll'in description, beidw or attach.a site' rainy€ng)
This request is for the purpose of cleaning out my boat canal, picture attached, to allow my boat
to havwproper engress and egress. Over time, the mouth of the canal has become filled with sand -
to the point that the boat cannot pass through.
The clearing will be done by small excavator, shovel, or both. The sand removed will be stored on___:
my property and used for general maintenance. The sand will be removed -only to -the same depth of the creek, about 2.5'.
WAIVER SECTION -
I understand that a pier, dock, mooring pilings, boat ramp, breakwater, boathouse, lift, or groin
must be set back a minimum distance of 15' from my area of riparian access unless waived by
_me. (if you wish to waive the setback, you must initial the appropriate blank below.)
x 1 do wish to waive the 1-5' setback requirement.
I do not wish to waivei the 1& setback requirement.
(Property Owner Information) (Adjacent Property Owner Information)
• ��
„ gmn re � - Signature
oAtkins _ _ . _D.H. Morgan,.LLC-
Print or Type flame
509 Northwood Rd
Mailing Address
- Washington, NC 27889
city/Statemp
252-943A 169
Telephone number/emmail address
2/7/2018
Date
•Valid for one calendar year after signature's
Print or.Type 1llame-
1867 Bayview Rd
Mailing Address -
Bath, NC 27808
City/Stat1p
a5'P. — 92-3—G z s 1
Telephone number/ email address
15afe-
(Revised Aug. 2014) -
PDF processed with CutePDF evaluation edition www.CutePDF.com
Coastal Management
ENVIRONMENTAL QUALITY
ROY COOPER
Governor
MICHAEL S. REGAN .
Secrerary
BUFFER AUTHORIZATION CERTIFICATE FOR SHORELINE STABILIZATION
BRAXTON DAVIS
Director
A riparian buffer authorization is required for shoreline stabilization activities within the Neuse and Tar -Pamlico River
basins per Division of Water Resources (DWR) regulations 15A NCAC 02B. 0233 and 0259. The Division of Coastal
Management (DCM) through a Memorandum of Understanding with the Division of Water Resources (DWR) has
reviewed your project proposal and has determined that the project as proposed complies with the aforementioned
regulations.
Those activities covered by your Coastal Area Management Act (CAMA) permit have received Buffer Authorization
provided the project is constructed in a manner that continues to meet all of the conditions listed below. Failure to
comply with this Buffer Authorization may subject the property owner and the parry (contractor) performing the
construction and/or land clearing to a civil penalty by DWR of up to $25,000 per day per violation.
i. Impacts: Impacts to woody vegetation from clearing and filling in Zone 1(begins at the most landward of either
normal water line (NWL) or normal high water line (NHWL) and extends 30 feet landward) shall be minimized to
what must be impacted for the sound installation of the shoreline stabilization project. Unnecessary clearing and
filling in the buffer is a violation of the riparian buffer rules.
2. Clearing & Grading: Clearing and grading of Zone 2 (begins at the landward edge of Zone 1 and extends 20 feet
landward) is allowed provided that it is re -vegetated immediately and Zone 1 is not compromised, which includes
maintaining diffused (non-channelized) flow of storm water runoff through the buffer.
3. Construction Corridors: Construction'corridors are allowed for shoreline stabilization projects, but they must be
satisfactorily restored as described in condition 5 below.
4. Potential 0yerwash: For vertical shoreline, stabilization projects (bulkheads)only; sites where wave overwash is
expected to be severe, the first -.ten (10) feet landward (unless specifically authorized otherwise by DCM) from the
structure may be maintained as a stable lawn in order to provide for structural stability.
s. Temporary Stabilization: Immediately post- construction, bare soils must be stabilized as quickly as possible by
providing a temporary ground cover. Newly seeded areas should be protected with mulch and/or erosion matting.
This ground cover is a temporary measure used to address erosion until site -restoration can be accomplished.
6. Site Restoration: At minimum, pre -project site conditions must be re-established. A site that was wooded prior to
this shoreline stabilization project must be restored with woody -vegetation at a stem density of 260 stems per acre.
Non wooded sites maybe re -vegetated with woody vegetation. Restoration must be completed by the first
subsequent planting season (November 1 through March 30) after completion of the bulkhead.
• Pre -project site conditions: G=—�
7. Project Drawing: The drawing on. the CAMA General Permit is considered the project drawing of -your property
indicating the location of the shoreline stabilization structure and any associated clearing, grading, and construction
corridors. This drawing will be used to aid in compliance and monitoring efforts.
By your signature below you agree to be held responsible for meeting all of the above listed conditions and verify that all
information is comple and acqurate.
�
AI nt o p i in , a e milt ' er's Signature
A en p 1ca S! u Issue Date
CAMA GENERAL PERMIT #:
State of North Carolina I Environmental Quality I Coastal Management
Washington Office 1943 Washington Square Mall Washington, NC 278891252-946-6481
Wilmington Office 1 127 Cardinal Drive Ext. Wilmington, NC 28405-38451 910-796-7215
Morehead City Office 1400 Commerce Avenue Morehead City, NC 28557 1 252-808-2808