HomeMy WebLinkAbout72121_Pier and Boatlift_20180416�CAMA / ❑ DREDGE & FILL ( (.t✓ % b N2 `J2121
GENERAL PERMIT �\� � � Previous permit# ",tl - (B c" °
d _ ew ❑Modification ❑Complete Reissue El Partial Reissue Date previous permit'issued /,Vll
As authorized by the State of North Carolina, -Department of Environmental Quality
and the Coastal Resources Commission in an area of environmental concern pursuant to 15A NCAC {'
['Rules attached. "
Applicant Named / Project Location: County_
Address— /70N ® // � /! S �?�=e/ . " Street Address/ State Road/ Lot #(s) O _Z� /�
City (��'��yi,/�— State �LZIP /I O nC '�AO
Phone # (a � J��" a�E--Mail Subdivision / V �J vres
Authorized Agent �!/li(7% �U�d'l City.
❑ CW XEW /)ePTA ❑ ES ❑ PTS Phone # ( ) River Basin
ElElEli
' Affected OEA ❑ HHF IH UBA ❑ N/A -�
AEC(s): Adj. Wtr. Body �� %</U/—�_. .(n�/man'/unkn)
❑ PWS:
ORW: yes /�n� PNA yes / Closest Maj. Wtr. Body
Type of Project/ Activity
���■�ee�e��■■���y1i�l��v�ee�
et■�■e�e0
�n�
-
C■■■■■■■■■el/■II■IA■■■■■■e■■C■®■■■■e■e■■
MEN
■■■■■■.■■■■■■■■■�I%7�■■■III■■■■■■■...■■■■■■
■■■■■■■■■■■■■1!■■■■Il■■■■■r■N■
■!■■■■O■■■
■■■■■■■■■■■■■li■■■■t�yL�■■■■■■■■■■■■■■■■■■■■
MEMEMEMEMEMEMN
eeiiieieee■■i
Ne
iie�°■■iii�■ie����ieiiU���iie�siv■■�
■■■ee■■■■■■■■■R■■e■■■■■■■gene■■■■■■■■■■
M." ■■■a■■■■■■■■■■a■�■■■■■e■■■■■■■■■.■■■■
■■■■■■■■■■■■■■■■■■■■■■
■■■■■■■■■■■■■■■■■■■■
■■■■■ ■■e■■■■■■■■.■■
MEN
�b����i�r�■■
■■■■■■■■■■
.- - ■■■■■r■■r■■■■■r■■■■■ram■■■■■■iii■il�ii(inr�■■■
■■ee��e■ne■■■■■■■■■■■■■■■■■■■■■■■■`gee■■■
Signature. -
Issuing Date Expiration Date
NC Division
/of�Coastal Mgt.
Applicant:70�(e
Date: l . 411
General Permit #: 2AI,), {! — 13
Habitat Impact Computer Sheet
Describe below the HABITAT disturbances for the application. All values should match the name, and units of measurement
found in your Habitat code sheet.
Habitat Name
DISTURB TYPE
Choose One
TOTAL Sq. Ft.
(Applied for.
Disturbance total
includes any
anticipated
restoration or
temp impacts)
FINAL Sq. Ft.
(Anticipated final
disturbance.
Excludes any
restoration
and/or temp
impact amount)
TOTAL Feet
(Applied for.
Disturbance
total includes
any anticipated
restoration or
temp impacts
FINAL Feet
(Anticipated final
disturbance.
Excludes any
restoration and/or
temp impact
amount)
Dredge ❑ Fill ❑ Both ❑ Other
Dredge ❑ Fill ❑ Both ❑ Othe-'�
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both .❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
252-808-2808 :: 1-888-4RCOAST :: www.nccoastaimanagement.net revised:02/03/10
3/23/2018
Preview
Date: Friday, March 23, 2018 11:03 AM
From: connectgis@dudesolutions.com
To: cathypat@suddenlink.net
Subject: Someone has sent you a map from ConnectGIS
@1997-2011 Openwave Systems Inc. All rights reserved.
https://webmail.suddenlink.net/do/maii/message/preview?msgld=[NBOXDELIM14359 1/1
Coastal Management
ENVIRONMENTAL QUALITY
BUFFER AUTHORIZATION CERTIFICATE
FOR PIER AND DOCKING FACILITIES ACCESS WAY
ROY COOPER
Governor
MICHAEL S. REGAN
Secretary
BRAX,TON DAVIS
Director
A riparian buffer authorization is required for pier and docking facilities access ways through the Tar -Pamlico&
Neuse River Riparian buffer per Division of Water Resources (DWR) regulations 15A NCAC 0213.0233 & .0259. The
Division of Coastal Management (DCM); through a Memorandum of Understanding with the Division of Water
Resources (DWR) has reviewed your project proposal and has determined that the project as proposed complies
with the aforementioned regulations.
Those activities covered by your Coastal Area Management Act (CAMA) permit have received Buffer Authorization
provided.the project is constructed in a manner that continues to meet all of the conditions listed below. Failure to
comply with this Buffer Authorization may subject the property owner and the party (contractor) performing the
construction and/or land clearing to a civil penalty by DWR of up to $25,000 per day per violation.
i. - Crossing is Perpendicular: Pier and docking facility access way must cross the 50 ft. riparian buffer
perpendicularly (which is defined as between 75 and 105 degrees) unless otherwise approved,by DCM. The
alignmerit'shall minimize the removal of woody vegetation to the greatest extent practicable.
2. Pervious Materials: All reasonable measures shall be taken to ensure the access way is made of pervious
materials like open -slatted wood or composite, mulch, or grass to meet the intent of the rules to the
maximum, extent practicable.
3. Access Width: The width of the pier or docking facility access way shall be limited to six (6) feet.
4. Project Drawing: The drawing on the CAMA General Permit is considered the project drawing of your
property indicating the relative location of the pier or docking facility and any requested access way. This
drawing will be used to aid in compliance and monitoring eff
• Pre -project site conditions:
By your signature below you agree to be held responsible for meeting all of the con io iste
that all in ormation ovided is complete and accurate.
Age9fidr Appl' ardt Prince Name Permit Officer's S
or Applicaryt Signature Issue Date
GENERAL PERMIT M
State of North Carolina I Environmental Quality I CoastalManagement
Washington Office 1943 Washington Square Mall Washington, NC278841'252-946-6.481
Wilmington Office 1 1V Cardinal Drive En Wilmington, NC 28465-38451 910-796-72i5
Morehead City Office 1400 Commerce Avenue Morehead City, NC 28557 1 252-808-2808
and verify
Trowell, Steve
From:
cathypat@suddenlink.net
Sent:
Monday, April 16, 2018 10:50 AM
To:
Trowell, Steve
Cc:
boydmarine57@gmail.com
Subject:
[External] Boat lift request
CAUTION: External email. Do not click links or open attachments unless verified. Send all suspicious email as an
attachment to Report Spam.<mailto:report.spam@nc.gov>
As the owners of the property located at 449 Pungo Retreat Road, Belhaven, NC, wel authorize Marty Boyd to act on our
behalf in securing permits and construction/installation of a boat lift and pier extension adjacent to our existing pier.
Owners:
Charles P. Cox
Cathy S. Cox
ADJACENT RIPARIAN PROPERTY OWNER STATEMENT
I hereby certify that I own pr4operty adjacent to �'�tr1 141- Jr c U 's
/� (N me f Pro erty Owner)
Property located at „l�l y9 !�"yy9D �� %�°C>�
(Address, Lot, Block, Road, etc.)
on Ae Yl/dd//_I 12,-Mr- , in &`/zallexl,, /zi° :, N.C.
(Waterbody) (Ci y/Town and/or County)
The applicant has desceibed to me, as shown below, the development proposed at the above
location.
V/' I have no objection to this proposal. .
'I have objections to this proposal.
DESCRIPTION AND/OR DRAWING OF PROPOSED DEVELOPMENT
,e;c,IteMeryell
:0 /0-
svh w
D�
I understand that a pier, dock, mooring pilings, boat ramp, brea ater, boathouse, lift, or groin
must beset back a minimum distance of 15' from my area of riparian access unless waived by
me. (if you wish to waive the setback; you must initial the appropriate blank below.)
I do wish to waive the 15' setback requirement.
I do not wish to -waive the 15' setback requirement.
(Prgpwj/ Owner Information) (Adjacent Property Owner Information)
pa- 17*46*1r
wru► m., . - d-&L A�
•
Signature S22tur *Z
Print o Type Name r ` Print or Type Na ie/�
Mailing Address M ding Address,
a�it.�er�/d�� ,
City/State/Zip, City/State/Zip
Telephone Number/ email address Telephone Number / embil ad • rees§
1015 o114-g4o7 a
Date 312 r�Al 019 Date
J ` (Revised Aug. 2014)
*Valid for one calendar year after signature*
ADJACENT RIPARIAN PROPERTY OWNER STATEMENT
I hereby certify that I-ownproperty adjacent to CltafkS A 's
ol n (Name of Prbperty Owner)
Property located at% A9�pGY_, j
(Address, Lot, Block, Road, etc.)
on �Mp PJ�J�� .�� ✓Pr . in ✓ey. N.C.
aterbody) (Cii /Town and/or County)
The applicant has described to me, as shown below, the development proposed at the above
location
I have no objection to this proposal. -
-I have objections to this proposal.
DESCRIPTION AND1OR DRAWING OF PROPOSED DEVELOPMENT .
a� (3 N k 1 o 4160 Is9
I understand that a pier, dock, mooring pilings, � boat ramp, break0ater, boathouse, lift, or groin
must be set back a minimum distance of 15' from my area of riparian access unless waived by
me. (if you wish to waive the setback, you must initial the appropriate blank below.)
do wish to waive the 15'setback requirement.
do nbt wish to waive the-15' setback requirement=
(Property Owner Information) (Adjacent Prooperty.00wneer I10op ation)
Mare
t'n or 1 e ry
v " i h
MaFY Ad
cic�israt�/z rUP
Telep Number/email address
Date*
(Revised Aug. 2014)
Valid for one calendar year after signature-