HomeMy WebLinkAbout72144_Long Groin_20180530❑DREDGE & FILL q I� M.72144 A C D
GENERAL PERMIT v1 Previous permit#
New ❑Modification ❑Complete Reissue El Partial Reissue Date previous permit issued
As authorized by the State of North Carolina, Department of Environmental Quality
;and •the. Coastal Resources Commission in an area of environmental concern pursuant to 15A NCAC
.,:i" •ti , 1 k]c Rules attached.
Applicant Name ��Z�-+TcS'� � �=t +� Project Location: County: 1�`ac
V
Address 01 D 3 ti �-_ Street Address/ State Road/ Lot #(s) l'� C tt Sl- , 13 \ ..•
City6115k State LZIPZ�S�6
Phone #`J(at,T2:)Gi �'.� -`71 (6 tp E-Mail
Authorized Agent t-� A�-
Affected ❑ CW`EW )$PTA ❑ ES ❑ PTS
AEC(s): ❑ OEA ❑ HHF ❑ IH ❑ UBA ❑ N/A'
❑ PWS:
ORW: 'yes / no PNA yes /' no
Subdivision -
City V✓l�=�M'�-�--o�l ZIP " 7. '�
Phone # ( ) River Basiri-F_e4-q-,- LA ee:
Adj. Wtr. Body-1-2t L cam_ man /unkn)
Closest Maj. Wtr. Body�AML'
■�•■■■■■■■■■■�■■��■��■■moo■■■■■■■■■■■■■■■■■
M.
ME ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■s■■■
MEN
■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■
Agent or Applit Print Name ,
Signature Please read compliance statement on back of permit"
-IC19
� R
Application Fee(s) Check #
Pe i ice s Printed Name
Sign ure
-2J ti�
Issuing Date Expiration Date
Authofzzed Agent ConsentAgreement
I, 9 ,, - ' I- S;g k 6&, % - , herby authorize Tobin Jay Tettertolm of
(Property Owner(s) )
Txs Marine Construction, LLC to act on my behalf in obtaining LAMA perlAits for
the location listed below.
PROPERTY ADDRESS:
PROPERTY OWNER'S MAILING ADDRESS:
AlC, 7,--79-SV
Phone No. ZSZ !F(&- ?/ 6 6
PROPERTY OWNER'S SIGNATURE:
4:;� 'I/, -
AUTHORIZED AGENT SIGNATURE:
TOBIN TETTERTON
DATE: 41 g ( `` 20
W/Authorized Agent Consent Agee.
A �9 0ENT ME AN PP-OPEl�� 2W—MER STATEMENT
I hereby eerl r that I own property adjacent to �Fe r7 ,'d-
properlii located at �� (� ®� pay ®rr�
ar�r�e� �w� K�
(A,ddrw g Lot, BloJro Read et
e�o
on A?&- GO A%tom�IZe , in ®w N.C.
(CRYIT6 and/or count)
The applicant has described to me, as shown below, the development proposed at the above
__... locationy
ti I have- no objection to this proposal.
y I have objections to this proposal.
(individual proposing -devel®prrnent east fill fn desorlpflan below, or aM ch a siae drawh9g)
i understand that a pier, dock, mooring pilings, Moat ramp, breaf4arer, boathouse, lift, or drain
_- must be set back a minimum distance of •Is' frorn my area of riparian access unless waived by
me. (If you wish to waive the setback, you Rust a_ "re' I� the appropriate blank below.)
I do Wish to waive the I& setback requirem'ent.
i �Jo got; wish to waive the I5' setback requirement.
(pr®Fe� Br/�f�r aruatuo�� (Adjacent pQoperq Gvmeir Unfan ruagan)
YYM
Si ahel a Sig-rtatm. a*
��T . � � - Gr'�; 7tle
Pant or Type Marn
e Pant` or)T e. &fame
L 7-79.98
�� 76 4. co, 9-� .
Telephone- lllurnberI, all adds
Dale
'-`Valid for one calendar year after signature
L A r
MarfingAd` e" �
cvl/ tatemp�,�q
"may
Telephone Numbed eraeil address
Date*
(Revised Aug. 20141
dftmfoW tD Me, aS atan befm% dwdWnent Wq=W at #w abm
I have d*craw 10 Wa
a E
dock m*waters bmftm-, 1p, or
la MjSt be Set ba* M.MM
[Star
two- wam cr IM Of'i.VfMm b
ray c-M of r�)SrbftaCCM UnbW-M18Md br
/V C-
iRevAmdAM
ROY COOPER
T 9ovemor
MICHAEL S. REGAN
Secrmry
Coastal Management BRAXTON DAVIS-
ENVIRONMENTAL QUALITY DlrectQr
SUFFER AUTHORIZATION CERTIFICATE FOR SHORELINE STABILIZATION
A riparian buffer authorization is required for shoreline stabilization activities within the Neuse and Tar -Pamlico. River
basins per Division of Water Resources (DWR). regulations 15A NCAC 02B. 0233 and 0259. The Division of Coastal
Management (DCM) through a Memorandum of Understanding with the Division of Water Resources (DWR) has
reviewed your project proposal and has determined that the project as proposed complies with the aforementioned
regulations.
Those activities covered by your Coastal Area Management Act (CAMA) permit have received Buffer. Authorization
provided the project is constructed in a manner that continues to meet all of the conditions listed below. Failure to
comply with this Buffer Authorization may subject,the property owner and the party (contractor) performing the
construction and/or land clearing to a civil penalty by DWR of up to $25,000 per day per violation.
1. Impacts: Impacts to woody vegetation from clearing and filling in Zone 1(begin s at the most landward of either
normal water line (NWL) or normal. high water line (NHWL) and extends 30 feet landward) shall be minimized to
what must be impacted for the sound'installation of the shoreline stabilization project. Unnecessary clearing and
filling in the buffer is a violation of the riparian buffer rules.
2. Clearing & Grading: Clearing and grading of Zone 2 (begins at the landward edge of Zone 1 and extends 20 feet
landward) is allowed provided that.it is re -vegetated immediately and Zone 1 is not compromised, which includes
maintaining diffused (non-channelized) flow of storm water runoff through the buffer.
3. Construction Corridors:, Construction corridors are allowed for shoreline stabilization projects, but they must be
satisfactorily restored as described in condition 5 below.
4. Potential overwash: For vertical shoreline stabilization projects (bulkheads) only; sites where wave overwash is
expected to be severe, the first ten (10) feet landward (unless specifically authorized otherwise by DCM) from the
structure may be maintained as a stable lawn in order to provide for structural stability.
s. Temporary Stabilization: Immediately post- construction, bare soils must be stabilized as quickly as possible by
providing a temporary ground cover. Newly seeded areas should be protected with mulch and/or erosion matting.
This ground cover is a temporary measure used to address erosion until site restoration can be accomplished.
6. Site Restoration: At minimum, pre -project site conditions must be re-established. A site that was wooded prior to
this shoreline stabilization project must be restored with woody vegetation at a stem density of 260 stems per acre.
Non wooded sites may be re -vegetated with woody vegetation. Restoration must be completed by the first
subsequent planting season (November 1 through March 30) after completion of the bulkhead.
• Pre -project site conditions:
7. Project Drawing: The drawing on the CAMA General Permit is considered the project drawing of your property
indicating the location of the shoreline stabilization structure and any associated clearing, grading, and construction
corridors. This drawing will be used to aid in compliance and monitoring efforts.
By your signature belowyou agree to be held responsiblefor meeting all of the above listed conditions and verify that all
inforti'on is cgmp to and accurate. _
Agent or ApplicAfwPirinted Name er ice s Signat
AgiM or Applicant Signature Issue to
CAMA GENERAL PERMIT #: -2'2! V_ V , g
—r
State of North Carolina I Environmental Quality I Coastal Management
Washington Office 1943 Washington Square Mall Washington. NC 278891252-946-6481
Wilmington Office 1 127 Cardinal Drive Ext. Wilmington, NC 28405-38451 910-796-7215
Morehead City Office 1400 Commerce Avenue Morehead City. NC 28557 1 252-808-2808
Applicant: 1E2 14 107S'T- L ATz ILi
Date: 3 0 M A-Y -Zo t f?
General Permit* —7 Z t 4, Al-
Describe below the HABITAT disturbances for the application. All values should match the name, and units of measurement
found in your Habitat code sheet.
Habitat Name
DISTURB TYPE
Choose One
TOTAL Sq. Ft.
(Applied for.
Disturbance total
includes any
anticipated
restoration or
ternimpacts)
FINAL Sq. Ft
(Anticipated final
disturbance.
Excludes any
restoration
and/or temp
impact amount)
TOTAL Feet
(Applied for.
Disturbance
total includes
any anticipated
restoration or
temp impacts)
FINAL Feet -
(Anticipated final
disturbance.
Excludes any
restoration and/or
temp impact
amount)
OP
Dredge ❑ Fill gR Both [I' Other ❑
Z
�a
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill'[] Both ❑ Other ❑