Loading...
HomeMy WebLinkAbout72172_Pier_20180626�.. ` rgAMA [-,QDREDGE & FILL N23217G • GENERAL PERMIT Previous permit#.44 ; New ❑Modification _'. ❑Complete Reissue ❑Partial Reissue Date previous permit issued As authorized by the' State'of North -Carolina,° Department of Environmental Quality and the Coastal Resources Co mission in an'area of environmental concern. pursuant to I SA NCAC / G� :. • l,/I �1 RR-les a ched... . ' Applicant Named Project Location: County Address? �e�r (il�� Street Address/ State Road/ Lot. (s) , City . 1151 Y� State; -ZIP,).•��' Phone`# ( E=Mail. Subdivision a, 4 Autlioriiecl Agent• City Gc- ZIPd'r!a 'qCw: [EVI/`� LPTA- ❑ ES. ElPTS Phone #' ( ) f�'ver Basin, Affected .0 OkA o HHF ❑ El ❑ UBA N/A Adj. Wtr. Body _ l'n /�f nat man uri o PWS: ORW;` •yes, /' PNA yes Closest Maj. Wtr. Body _ - Type of Project/>Activity r/�? �f O e_- /K�` 4,ok aloo (Scaler ..Pierr ' Fize Float Fing -'Groin Bulk --Basin Boat = Boat 1-.,Beac Oth Shor ,SAV Mo Ph Wai ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■i® ■rr■■■■■■■■■■■■■■■■■■■■■n�■■■■■■■■■■■■■■■ ■1N'W rl■—ii■■■■■■■■■■■WNq■■�W(1 WMUMFRM�MlIME■ ■■■■■■■■■■■■■■■■■■■■■■■■r�■L■�s■■■■■■■■■■ a�g,�Iistance offshore max distance offihore ■�■■■■■■■■■■■■■� ■■■■■■■■■■■■■■■� ■■number ■:■ ■ ■■NVAU iEVIEN■■■■M■■■ OEM ■■■■■ ■■■■■■ cubic yards ■■■■■■■■►�■■■■■■■■■■■■■■■■■■■■■■■e■■■■■ ■■■■■■■c�®■■r�■■■■■■■■■■■■■■■■■■■■■■■■■■■■ e■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■e►.■ n■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ dine not sure n.—■r■■■■I■■■■■■■■■■■■■■■MeW■■■.■■■Uri■■■■■■ -yes toriurn: n/a ''yes no ■■■■Gu ye�- noi�rl� �Ol■ SEEN NEE OMEN erAttvrbe.■■■■■■■■■■■■■■■■■■■■■■■■■s■■■■■■■■■■■ NOON ='A building permit may be required by: (<? e, (' C� , See note on back regarding•River Basin rules. ( Note Local Planning Jurisdiction)/ Notes/ Special Conditions �EG�GGt1G� 1i1�_i/l7/ G�/ f /i��// Agent or Applicant Printed Name Permit Off% Prints ame , Signatur Please rea ompliance statement on back of permit Signature ' . - AppJi ation Fee(.,) Check # Issuing Date Expiration Date - Workspace Webmail :: Print https://email21.godaddy com/view print multi.php?uidArray=... Print I Close Window Subject: Platform Dock From: Christy Fyle <christyfyle@gmail.com> Date: Mon, Jun 25, 2018 2:20 pm To: Shannon Cox <shannon@stripedhatstudio.com> To whom it may concern, We give permission for Shannon Cox to have a platform dock built which would be attached to her bulkhead. Tom and Christy Fyle 283 Matchapungo Shores Copyright © 2003-2018. All rights reserved. 1 of 1 6/26/18, 9:50 AM ADJACENT RIPARIAN PROPERTY OWNER STATEMENT I hereby certify that I own property adjacent to property located at m own and/or County) The applicant has described to me, as shown below, the development proposed at the above location. L----- I have no objection to this proposal. '�C I have objections to this proposal. _ DESCRIPTION AND/OR DRAWING OF PROPOSED DEVELOPMENT '- �LiadlVtd!tIIa� WAIVER SECTION I understand that a pier, dock, mooring pilings, boat ramp, breakwater, boathouse, lift, or groin must be set back a minimum distance of 15' from my area of riparian access unless waived by me. (If you wish to waive the setback, you must initial the appropriate blank below.) I do wish to -waive the 15' setback requirement. I do not wish to waive the 15' setback requirement: Print or Type Narpq _.C2C/(1 .l fi-kk oftt Mailin ss 13�A dcam , d City/State/Zip qRLf Telephone umbe / email address M2 Date Property Qwner Inf"ation) Telephone Number / er'hail address Date* (Revised Aug. 2014) *Valid for one calendar year after signature* Coastal Management ENVIRONMENTAL QUALITY BUFFER AUTHORIZATION CERTIFICATE FOR PIER AND DOCKING FACILITIES ACCESS WAY ROY COOPER Governor, MICHAEL S. REGAN Secretary BRAXTON DAVIS Director A riparian buffer authorization is required for pier and docking facilities access ways through the Tar -Pamlico & Neuse River Riparian buffer per Division of Water Resources (DWR) regulations 15A NCAC 02B.0233 & .0259. The Division of Coastal Management (DCM), through a Memorandum of Understanding with the Division of Water Resources (DWR) has reviewed your project proposal and has determined that the project as proposed complies With the aforementioned regulations. Those activities covered by your Coastal Area Management Act (CAMA) permit have received Buffer Authorization provided the project is constructed in a manner that continues to meet all of the conditions listed below. Failure to comply with this Buffer Authorization may subject the property owner and the party (contractor) performing the construction and/or land clearing to a civil penalty by DWR of up to $25,000 per day per violation. i. Crossing is Perpendicular: Pier and docking facility access way must cross the 50 ft. riparian buffer perpendicularly (which is defined as between 75 and 105 degrees) unless otherwise approved by DCM. The alignment shall minimize the removal of woody vegetation to the greatest extent practicable. 2. Pervious Materials: All reasonable measures shall be taken to ensure the access way is made of pervious materials like open -slatted wood or composite, mulch, or grass to meet the intent of the rules to the maximum extent practicable. 3. Access Width: The width of the pier or docking facility access way shall be limited to six (6) feet. 4. Project Drawing: The drawing on the CAMA General Permit is considered the project drawing of your property indicating the relative location of the pier or docking facility and any requested access way. This drawing will be used to aid in compliance and monitoring e#torts. i 1 Is Pre -project site conditions: By your signature below you agree to be held responsible for meeting all of the con ' io listed above and verify that all infor ation provided s complete and accurate. '�ktrj 'y'19Z) 'Cc Agent or pli n Prin a Name Permit Officer's Signature Agent or Koolicant Signature Issue Date CAMA GENERAL PERMIT #: �* / State of North.Carolina I Environmental Quality I Coastal Management Washington Office 1943 Washington Square Mall Washington, NC 278891252-946-6481 ' Wilmington Office 1 127 Cardinal Drive Ext. Wilmington, NC 28405-38451 910-196-7215 Morehead City Office 1400 Commerce Avenue Morehead'CIty, NC 28557 1 252-608-2608 NC Division of Coastal Mgt. habitat Impact Computer Sleet Applican'd""' �j/t Date: ,General Permit#: Describe below the HABITAT disturbances for the application. All values should match the name, and units of measurement found in your Habitat code sheet. Habitat Name DISTURB TYPE Choose One TOTAL Sq. Ft. (Applied for. Disturbance total includes any anticipated restoration or temp impacts) FINAL Sq. Ft. (Anticipated final disturbance. Excludes any restoration and/or temp impact amount) TOTAL Feet (Applied for. Disturbance total includes any anticipated restoration or temp impacts) FINAL Feet (Anticipated final disturbance. Excludes any restoration and/or temp impact amount Dredge ❑ Fill ❑ Both ❑ Other Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both -❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ 252-808-2808 :. 1-888-4RCOAST :: www.nccoastaimanaaement.net revised: 02/03/10