Loading...
HomeMy WebLinkAbout72119_riprap_20180619•i'CAMA / KDREDGE If'C D"?� GENERAL PERMIT �a��� Previous permit # /l1 thew- ❑Modification ❑Complete Reissue ❑Partial Reissue Date previous permit issued - As authorized by the State of North Carolina, Department of Environmental Quality Iwo; and the Coastal Resources -Co mmission ( an area of environmental concern pursuant to 15A NCAC %' // s`Rul s attached. • Applicant Name " ( Project Location: County S--/7U Address / - 2 • ^\ Street Address/ State Road/ Lot #(s) City(:2!Ztdzlyz/ C State//� ZIPS Phone # ) 'X _Mail Authorized Agent e/r ElCW YEW 1 PTA XESPTS ' Affected • ❑ OEA ❑ HHF ElIH ElUBA AEC(s): , ElN/A ❑ PWS: ORW: yes / no PNA yes /0 Activity A 'c 1 1, Type of Project/ r k� 7 e Pier (dock) length �— r— Fixed Platform(s) Floating Platform(s) Finger pier(s) ..� Groin length number Bulkhead/ Riprap length avg distance offshore max distance offshore Basin, channel cubic yards P Boat ramp -r Boathouse/ Boatlift Beach Bulldozing Other fi Shoreline Length SAV: not sure yes no Moratorium: n/a yes Photos: yes 9ho Waiver Attached: es Subdivision /P-cC7li // l City & ��//� r ZIP 7 _ �r Phone # River Basin /G,f Adj. Wtr. Body - /7 /�% /(at, hian./unkn) Closest Maj. Wtr. Body �- r e,! /'!.✓�/i � v` "(Scales cif,/��� ) _+ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■ ■■r� �D��■/y Cam■■�■■■ Ulyl, NNOMME■■ ■■■ r . / T . �. SY ►r.' '� ■■■■■■■■■■r�■■o■■■��■■■■!■■■■■-N■EW■■■ ■■■■■■■■■■ram■■�■■■��■�rr■■■■■■■■■■■■■■ ■■■ ■■■■■■■■■�■■fir■■■t� �■■■■■C��I�J�la�■■i% �■■ .. ........z M ■■■:■:11N■■■ . M®■ .. ■....■■■■■■��I■�i�■■�■. ■■■■■■■■■■■■■ y A building permit may be required by: ( Note Local Planning Jurisdiction) Notes/ Special Conditions N -See note on back regarding River Basin rules: L-1 .S'/e - - AX PermitOffi- rs/Printe N?rr Signature 1please refiftomplia9ce statement on back of permit Ap lication Fee(s) _ Check #, Signature , Issuing Date . R e Expiration. Date ROY COOPER Governor MICHAEL S. REGAN Secretary Coastal Management BRAXTON DAVIS ENVIRONMENTAL QUALITY Director BUFFER AUTHORIZATION CERTIFICATE FOR SHORELINE STABILIZATION A riparian buffer authorization is required for shoreline stabilization activities within the Neuse and Tar -Pamlico River basins per Division of Water Resources (DWR) regulations 15A NCAC 02B. 0233 and 0259. The Division of Coastal Management (DCM) through a Memorandum of Understanding with the Division of Water Resources (DWR) has reviewed your project proposal and has determined that the project as proposed complies with the aforementioned regulations. Those activities covered by your Coastal Area Management Act (CAMA) permit have received Buffer Authorization provided the project is constructed in a manner that continues to meet all of the conditions listed below. Failure to comply with this Buffer Authorization may subject the property owner and the party (contractor) performing the construction and/or land clearing to a civil penalty by DWR of up to $25,000 per day per violation. 1. Impacts: Impacts to woody vegetation from clearing and filling in Zone 1(begins at the most landward of either normal water line (NWL) or normal high water line (NHWL) and extends 30 feet landward) shall be minimized to what must be impacted for the sound installation of the shoreline stabilization project. Unnecessary clearing and filling in the buffer is a violation of the riparian buffer rules. 2. Clearing & Grading: Clearing and grading of'Zone 2 (begins at the landward edge of Zone 1 and extends 20 feet landward) is allowed provided that it is re -vegetated immediately and Zone 1 is not compromised, which includes maintaining diffused (non-channelized) flow of storm water runoff through the buffer. 3. Construction Corridors: Construction corridors are allowed for shoreline stabilization projects, but they must be satisfactorily restored as described in condition 5 below. 4. Potential Overwash: For vertical shoreline stabilization projects (bulkheads) only; sites where wave overwash is expected to be severe, the first ten (10) feet landward (unless specifically authorized otherwis&by DCM) from the structure may be maintained as a stable lawn in order to provide for structural stability. 5. Temporary Stabilization: Immediately post- construction, bare soils must be stabilized as quickly as possible by providing a temporary ground cover. Newly seeded areas should be protected with mulch and/or erosion matting. This ground cover is a temporary measure -used to address erosion until site restoration can be accomplished. 6. Site Restoration: At minimum, pre -project site conditions must be re-established. A site that was wooded prior to this shoreline stabilization project must be restored with woody vegetation at a stem density of 260 stem per acre. Non wooded sites may be re -vegetated with woody vegetation. Restoration must be completed Xbtlnef' stysubsequent planting season (November 1 through March) after mpletnrof the bu ead.ed ,,/r/rGl� • Pre -project site conditions: (7/� L/ C /// /1lJ 7. Project Drawing: The drawing on the CAMA General Permit is considered the project drawing of your property indicating the location of the shoreline stabilization structure and any associated clearing, grading, and construction corridors. This drawing will be used to aid in compliance and monitoring efforts. By your signature below u agree to be held responsible for meeting all of the above li e n ' ion and veri all informa�ly��is cori�9r.pnd accurate. 6 Agent or6pplrcant-5ignawre // I9sue Date CAMA GENERAL PERMIT #: ` ` r/J State of North Carolina I Environmental Quality I Coastal Management Washington Office 1943 Washington Square Mall Washington, NC 278891252-946-6481 Wilmington Office 1 127 Cardinal Drive Ext Wilmington, NC 28405-38451 910-796-7215 Morehead City Office 1400 Commerce Avenue Morehead City, NC 28557 1 252-808-2808 Roy S. Selby 109 Bells Street Greenville, NC 27858 252-341-3610 May 31, 2018 Mrs. Gloria D. Eubanks 14587 Greenover Lane Jacksonville, FL 3228 Dear Mrs. Eubanks: Thanks for taking my call this morning. I enjoyed our brief conversation about reminiscing a little about Winsteadville and Ransomville. I knew some of your family but not all. I do remember your father, Mr. Plum Jordan very well. As stated, I lease a lot from Carolyn Paul, which is adjacent to your property. She authorized the dumping of some rather large pieces of concrete (rip -rap) on the river shore, which my neighbor on the other side and I want to move closer to the river shore in order to help stabilize the shore line and to have a more pleasant view when sitting outside looking at the Pungo River. I met this morning with Steve Trowell, who is with CAMA, along with Jerol Selby, Jr. who will do the work for me. Steve asked that I advise you, as a neighbor property owner of my intentions and to request that you let me know by return mail, that you have no objections of my having the shoreline stabilized more and to move some unsightly chunks of concrete and other debris. If you would, sign your name at the bottom of this letter and return one copy to me so that I can complete the application process with the Coastal Area Management Authority. Thank you very much for your cooperation. Sincerely, Roy S. Selby I, Gloria Dean Eubanks, do not have any problem with what Roy Selby has proposed too at 109 Kenion Avenue, Belhaven. �? 4 Gloria D. Eubanks. Nit Division of Coastal Mgt. Applicant. l�O �ld Date: r� fUd1� General Permit #:�/��-� Habitat Impact Computer Sheet Describe below the HABITAT disturbances for the application. All values should match the name, and units of measurement found in your Habitat code sheet. Habitat Name DISTURB TYPE Choose One TOTAL Sq. Ft. (Applied for. Disturbance total includes any anticipated restoration or temp impacts) FINAL Sq. Ft. (Anticipated final disturbance. Excludes any restoration - and/or temp impact amount) TOTAL Feet (Applied for. Disturbance total includes any anticipated restoration or temp impacts) FINAL Feet (Anticipated final disturbance. Excludes any restoration and/or temp impact amount Dredge ❑ RXI Both ❑ Other ❑ _ Dredge ❑ Fill ❑ 'Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ 252-808-2808 :: 1-888-4RCOAST :: wwww.nccoastalmanagement.net revised: 02/03/10 t