HomeMy WebLinkAbout72167_Launch pier and boat lift_20180613Mf
MA 0 DREDGE--&, FILL N2 72167� 'A C _-_D"11_`
ni S �5 -
"IENE1,20-NAL:-PERM T'
G
Previous permi
t i;��levv El Modification. Llto" e R ElPartial Reissue Date previous, permit issued
Tplet eissue
'As a At uthoeiielbytheSt eof North'Carpl!na;",Rppartmentof Environmental Quality
and the 6a"s'tal•Resources Commission-, in anardia of -environmental concern pursuant to 15A NCAC
Rules ftached.
Applicant, Name' Project Location: County
Address Street Address/ Stdte Road/ Lot #(s) -
Ci -State ZIP J� a
-;7Phone 3
E-Mail' Subdivision Authorized Agent,
-,.
City4 ZIP
'El PTS River Basin
El ES
_-Ew TA
"Q ii;y� Phone #
-Affected
E10EA E]�UBA El N/A AdWtr. Body HHF' 0 1H, Z_(:n�at'/man-JunI
j.
AEC(s):,
E] MS.,
Closest Maj. Wtr. Body ;14141?
P14A' yes
ORW:, yes 0
k" e 6fProject/ 4 ctivity A, 'r, 7
TYP'en — X , ;,�
1 //1 11 - 1// - // - f, I I
Pier
Fizej
Float
Finge
G o!
Basin
Boat
Boat
Beacl
Oth
thor
SAV-
Pho)
'Wai
(Scale:/ !/0_ )•
Pl�tfprm(s)-.
ng,Plaiform(i)
r pi
le.I
■■■■MEMO■■■■■■
ME
ME
won
M■■■C
■■
M
number
ead/ Riprap length—
ayZ -distance offsho
6ia�clistapce�6ffsho're__,
IMMI
MEN
MEMO
cubic yards
MOM
00.2
RAMMUMEMILIUMMIAMMOMMEMMEM■MOMEMIMMEEM
ramp
MEN
�ousq�_42AW,_-I�!
■■■C■■■■■■.....■.■�.■..■■.........�..■■
M
Bulldozing'
MENMEMOMMOMMEMMIMEM
PlhneLengih..
7AaV__
IRMO
not sure yes
to�ium. nI yes 6-pp-PI;
11211HOMIN
- yes Ko'-
S:. "Wav
MOMME■MEN
MEMIME
M
MEMIMI!
Pr Attachpd- vp;
.0mrcomis■ON
A -building permit may -be required by: See note on back regarding River Basin rules.
Note,Local Planning riscliction)
Noies/ Special Condition
s
'Agent or Applicant , Prr* c r
ii;gn ,—:4—olease
- . atur� , , I -, -/, k?
statement on back of permit'*
I
-Application Fees)
"
Check#
i, Date
Ji
Coastal Management
ENV1Fi0k 1ENTAL QUALITY
BUFFER AUTHORIZATION CERTIFICATE
FOR PIER AND DOCKING FACILITIES ACCESS WAY
ROY COOPER
Governor
MICHAEL S. REGAN
Secretary
BRAXTON DAVIS
Director
A riparian buffer authorization is required for pier and docking facilities access ways through the Tar-Pamlido &
Neuse River Riparian buffer per Division of Water Resources (DWR) regulations 15A NCAC 02B.0233 & .0259. The
Division of Coastal Management (DCM), through a Memorandum of Understanding with the Division of Water
Resources (DWR) has reviewed your project proposal'and has determined that the project as proposed complies
with the aforementioned regulations.
Those activities covered by your Coastal Area Management Act (CAMA) permit have received Buffer Authorization
provided the project is constructed in a manner that continues to meet all of the conditions listed below. Failure to
comply with this Buffer Authorization may subject the property owner and the party (contractor) performing the
construction and/or land clearing to a civil penalty by DWR of up to $25,000 per day per violation.
1. Crossing is Perpendicular: Pier and docking facility access way must cross the 50 ft. riparian buffer
perpendicularly (which is defined as between 75 and 105 degrees) unless otherwise approved by DCM. The
alignment shall minimize the removal of woody vegetation to the greatest extent practicable.
2. Pervious Materials: All reasonable measures shall be taken to ensure the access way is made of pervious
materials like open -slatted wood or composite, mulch, or grass to meet the intent of the rules to the
maximum extent practicable.
3. Access Width: The width of the pier or docking facility access way shall be limited to six (6) feet.
4. Project Drawing: The drawing on the CAMA General Permit is considered the project drawing of your
property indicating the relative location of the pier or docking facility and any requested access way. This
drawing will be used to aid in compliance and monitoring efforts.
r
• Pre -project site conditions:
By your signature below you agree to be held responsible for meeting all of the conditions list above and verify
that all in�formatio �provi.dledomplete and accurate.
Agent or Applic nt Printed Name ermit Officer's rogature
Agent or Applicant Signature Issue Date
CAMA GENERAL PERMIT #:�
State of North -Carolina I Environmental Quality [Coastal Management
Washington Office 1943 Washington Square Mall Washington, NC278891252-946-6481
Wilmington Office 1 121 Cardinal Drive Ext. Wilmington, NC 28405-384S 1910-796-7215
Morehead City Office 1400 Commerce Avenue Morehead City, NC 28557 1 252-808-2808
Nk
uoisuapaxag,,qounwj 0
�uacudojanQ,pasodournnrQ
97 `07
7t
Z'b
40 �4w4oq
'Jai
qw �
d d' f Wd ,4,TOV —ip p�*q IP �t m aql,,c!l,,uo 4=- NO W
iolaq ppwm!s VRq,,mii�q wM aqj_jufpq,,29ff Ij
UO& oql
04
d oid
PO 40.w �—,Uo 110 pmr-)Oi ��Uqlio-- Wag"luill immio
4jo-"oXu old vau isxa xm41p-
kffit'- T"'Okoil
' 'bK
Nola
loog-t- waiJuxi sz-qt t, 9-4 � i 5.-- i, - (-a
tuS v Diaz:tr -iff"
6, JariadorjJa
-P
_A5 XCJ'27840
g%g
RaxX 6'- 4' -4
0-- 6 .4
�09" 0 -
q 0
3qqtenerat ConfractorLicense-*72600
persFCom
Aatho, iCConsent; Agreement
To: Sike-ort-Nd& Car6linatiepartineii-.,or-',-Local,"iqo.vemmenf--beparfineriir<;
from -whom ihis,permitis-beingapplied for.,
below speiifW,projects-.`
5i36f flatmch pier andAposiIM.
'Piojecf Im6onkaddress:
I 1WRossRA-
llatli,W
.'B ilyo
-=Owncr,Maifig,,Addrew
and
1-10&--Ross, Rd-
BathlqC-27908?
-(765)7-2,94173'
T?
rop
Dike:,
A 0
.1 "All � - -M - 4 0 Z
lit,•
AW.
-N -'N
F-1
Ono,
qwvw�y SAC 4.
won;
Aw
PR Zvi MFQ oil
1. 1 MAX nQT?
4", -24 0 b Kalov �2)945il
OEM cb__W�
e- C
Q1,
"I T w0a K,a
Q- 'fop"
Know- 1- 01
m 'i.
V. ww"M A- Q NAJ gm
01
sh wow
' ' ' �� - "', �i � �Z. 7 � �' " .- - �.., :'Mae "Al
NC Division of Coastal Mgt. Habitat Impact Computer Sheet
Applicant:1.e 6;14?") \rn
Date: 12 5vd1L �v��
General Permit#:6�
Describe below the HABITAT disturbances for the application. All values should match the name, and units of measurement
found in your Habitat code sheet.
Habitat Name
DISTURB TYPE
Choose One
TOTAL Sq. Ft.
(Applied for.
Disturbance total
includes any
anticipated
restoration or
temp impacts)
FINAL Sq. Ft.
(Anticipated final
disturbance.
Excludes any
restoration
and/or temp
impact amount)
TOTAL Feet
(Applied for.
Disturbance
total includes
any anticipated
restoration or
temp impacts)
FINAL Feet
(Anticipated final
disturbance.
Excludes any
restoration and/or
temp impact
amount
"k
Dredge ❑ Fill ❑ Both ❑ ,Other,A
Dredge ❑ Fill ❑ Both ❑ Other
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
252-808-2808 :: 1-888-4RC®AST :: www.nccoastaimanacaement.net revised:02/03/10